TSUNAMI ~The Great East Japan Earthquake~

Similar documents
How ATFM Assists with Disaster Recovery

Collaborative Decision Making at JCAB ATMC

ASSEMBLY 39TH SESSION

STATUS REPORT JAPAN. (ATMC) Japan Civil Aviation Bureau. CIVIL AVIATION BUREAU of JAPAN. 6th Global Air Traffic Flow Management Conference

Asia/Pacific Region A-CDM Planning

JAFA Country report Japan Air-cargo Forwarders Association. Country Report. 38 th FAPAA Executive Council Meeting.

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Volcanic Ash Exercise

Thailand ATFM Operations at Sub- Regional Level

Asia/Pacific Air Traffic Management Perspectives

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Federal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)

SWIM Transition of TFMS and ATFM in the Caribbean. Eurocontrol Collaborative ATFM Workshop - Madrid March 9, 2016

ICAO APAC SCHEDULE OF MEETINGS, WORKSHOPS AND SEMINARS January

Introduction of New CANSO Member Simon Li Director General CAD Hong Cong

TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

Information Paper 2 SUMMARY

Aviation Growth in China:Challenges, Opportunities, and Solutions

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO APAC SCHEDULE OF MEETINGS, WORKSHOPS AND SEMINARS 2018

Asia-Pacific Aviation: Growth and Challenges

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

State ATM Corporation of Russia

Japan earthquake and tsunami Situation Report No March 2011 As of 1830 hrs Manila Time

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Cathay Pacific Airways 2011 Analyst Briefing 23 June 2011

Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports

ASIA PACIFIC Air Traffic Flow Management

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

(Presented by Japan) SUMMARY

Transport and Travel in Japan

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

Introduction of KIX & ITM

HONG KONG AND HKIA. by aviation in Hong Kong and other businesses at HKIA amounted to HK$78 billion in value added 1, or 4.6% of Hong Kong s gross

Sector Complexity and safety. Dr. Arnab Majumdar 26 OCTOBER, 2006

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Overview of Japan s Sustainable Tourism Development

Northeast Asia Container Trade & Busan Port

Airspace Organization and Management

Air Traffic Control System Command Center (ATCSCC) Crisis Management. Federal Aviation Administration 1

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

Data Link Operation and PBCS Implementation in Japan

Great East Japan Earthquake Kimiaki Nagashima

Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake

Cranfield Safety Management and Investigation Course

TO: Air Traffic Control System Command Center (ATCSCC) DATE: May 10, FROM: Paul McEwen, Traffic Management Officer, Anchorage ARTCC

Many Nations through Civil Aviation. China Civil Aviation Development Forum Beijing June 2015

Air Transportation Optimization. Information Sharing for Global Benefits

Automation Interface Update North American, Caribbean and Central America

MARCH 2011, TSUNAMI DISASTER IN JAPAN

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

Regional air navigation planning and implementation performance framework: Review of programmes and projects

Asia Pacific Aviation

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

OVERVIEW OF ADS-B COST BENEFIT STUDY

Impact on Oil Distribution and Lessons from the Great East Japan Earthquake

Ultra s Experience with A-CDM

ATM Collaboration & Data Sharing

State of Global Air Transport and ICAO Forecasts for Effective Planning. Economic Development Air Transport Bureau ICAO

Monitoring data of clean water (tap water)

Agenda Item 5: Airspace Safety Monitoring Activities/Requirements in the Asia/Pacific Region

Commercial Development Update MetroTex Forecast

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan

Jun. May. Jul 0 500,000 1,000,000 1,500,000. Market % to LY. Japan 745, , % Korea 544, , %

(Presented by Secretariat) EXECUTIVE SUMMARY

Myanmar s CNS/ATM Development Master Plan

Asia Pacific Aviation

AirportInfo. ACI-NA 2011 Traffic Report

P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University)

Main Air Traffic Management Center

International Civil Aviation Organization

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

International Civil Aviation Organization. Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002

Notice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance Center, Tokyo

Future ATM - from Asian operator's point of view

Earthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami

Global 8 ATFM Conference 4 6 November 2014 Cancun, Mexico

Minutes of Meeting. 1. Introduction

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

Letter of Agreement (LOA)

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. 25th COSCAP SA STEERING COMMITTEE MEETING

Suvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar 2 May ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand

Asia Pacific Aviation

International Civil Aviation Organization ASSEMBLY 37TH SESSION EXECUTIVE COMMITTEE RECENT EFFORTS IN THE ASIA AND PACIFIC REGION AFTER APAM-AVSEC

WCO General Session JAPAN. Rengo Co., Ltd. May 23, 2011 / Montreal

6 th CAPSCA Asia Pacific Meeting. Business Continuity Management Systems: Implementation Guidelines for Airports

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

From local to regional to global ATFM

Transcription:

CIVIL AVIATION BUREAU of JAPAN TSUNAMI ~The Great East Japan Earthquake~ ICAO ATFM Global symposium,singapore 20-22 November 2017 Japan Civil Aviation Bureau (JCAB)

1. Outline of The Great East Japan Earthquake 2

What s The Great East Japan Earthquake Date & Time : 14:46 (0546UTC) on 11 th Mar. 2011 Epicenter Location : 380612N1425136E Tohoku district Epicenter Depth : 24km ATMC Tokyo Fukushima Nuclear Power Plant Magnitude: 9.0 (biggest earthquake in recorded history in Japan) Tsunami, created by earthquake, mostly affected Tohoku district. Fukushima Nuclear Power Plant, damage by tsunami, released radioactive materials. 3

Map of the Height of Tsunami Fukushima Nuclear Power Plant RJSS The source: Tohoku earthquake tsunami joint survey group 4

Photo (Tsunami) The source: DAYS JAPAN 2012/05 5

Photo (Sendai Airport) 6

2. Impact on Airports and Air Traffic 7

The Impact of the Earthquake on airports RJSS Complete loss of function of airport RJAA RWY closed + Immediate evacuation needed from the tower after the earthquake except aeronautical information officers who are in charge of the oceanic area. RJTT RWY closed + Almost all transportation stopped. The terminal buildings were heavily congested, no aircraft was accepted during this period. 86 aircraft bound for RJAA or RJTT were required to divert to other airports. 8

The Number of Aircraft Diverted from RJAA and RJTT (TOTAL) 9

3. ATFM s Response to the Disaster 10

Fukuoka and Adjacent s Khabarovsk Petropavlovsk Kamchatsky Anchorage Pyongyang Incheon Shanghai Taipei Fukuoka Manila Oakland 11

3.11 Time Sequence (1) Civil Aviation Bureau of Japan Time(z) ATFM Other Events Time(z) ATFM Other Events 0546 0551 0600 0605 0617 0627 0634 0637 0638 0649 0656 The earthquake occurred. Ground Stop(GS) for RJAA/RJTT from dom. AP. For RJAA/RJTT from Incheon/Taipei suspended. For RJAA/RJTT from Shanghai suspended. For RJAA/RJTT from Manila suspended. For RJAA/RJTT from Oakland suspended. For RJAA/RJTT from Anchorage suspended. RJAA/RJTT (All RWY) CLOSED. RJTT B/D RWY opened. RJTT (All RWY) CLOSED. (aftershock) Sharing information with ATCSCC (Hot Line) 29 ACFT for RJAA 16 ACFT for RJTT In Fukuoka Most staff in RJAA office evacuated. Comm. Lines between Russia and Japan out intermittently 0720 0720 Shanghai Highlighted by Green : Cross-Border ATFM Taipei Pyongyang Incheon Manila GS for RJTT cancelled. GDP (CTOT) implemented. Suspension for RJTT from Anchorage/Oakland cancelled. Khabarovsk RJTT RJAA Fukuoka RJTT (ALL RWY) OPENED. Petropavlovsk Kamchatsky Oakland Anchorage 12

3.11 Time Sequence (2) Civil Aviation Bureau of Japan Time(z) ATFM Other Events Time(z) ATFM Other Events 0730 0730 0749 0952 1053 1100 1105 1204 1455 Suspension for RJTT from Manila cancelled. Suspension for RJTT from Shanghai Taipei Incheon cancelled. 30MIN in Trail RALT. GDP for RJTT terminated. For RJTT from Taipei suspended again. For RJTT from Shanghai suspended again. Suspension for RJTT from Taipei and Shanghai cancelled. GS for RJAA cancelled. The number of flight in Fukuoka : 231 AIDC and L/L between Anchorage/Oakland and Japan were out. GS for RJTT by HQ (Due to congestion of Terminal Building) @1155 Suspension for RJTT cancelled. (for only intl. ferry, cargo, goverment) RJAA OPENED. 1500 1523 1837 Shanghai Suspension for RJAA from Anchorage, Oakland, Manila, Taipei, Shanghai and cancelled. Suspension for RJAA from Incheon cancelled Pyongyang Incheon Taipei Manila Khabarovsk RJTT RJAA Fukuoka Petropavlovsk Kamchatsky GS for RJTT by HQ cancelled. Oakland Anchorage 13

The communication tools for CDM in the disaster For Airlines and ATC facilities CDM conference system (IP VPN) For FAA (ATCSCC) Hot Line Tele-Conference For JCAB Headquarters Commercial Line *remain connected In ATMC Large-Screen Projectors providing information on: Flow control and capacity Runway of major airports (wind factor) Live cameras in major airport,etc. And the white boards 14

4. Conclusion 15

How ATFM Assists with Disaster Recovery 11 th Mar. (mainly response to earthquake) 14 of 86 diverted aircraft declared emergency. All landed safely. 1. To Balance Demand and Capacity Domestic ATFM Cross-Border ATFM Dom. ATFM EARTH QUAKE 12 th Mar.~ (mainly response to the radioactive accident and loss of various circuits) 1. To establish detour routes and re-routing. 2. To Balance Demand and Capacity Apply the appropriate capacity for related sectors. Implement ATFM by the appropriate measures. 16

Lessons In such a disaster, unforeseen problems come about one after another. For instance, infrastructure was crippled, including many forms of communication. it is difficult to manage air traffic properly only by domestic ATFM. Cross-Border ATFM will adequately assist other ATFM. Between Japan and Republic of Korea, and between Japan and Taipei, there is a Letter of Agreement on ATFM to implement cross-border ATFM smoothly. It is necessary for us to make an arrangement from a contingency point of view. Since there are a great deal of earthquakes in the APAC region, it is important to develop cross-border ATFM even in non-emergency situations and prepare for any contingency. The epicenter 17

ATC LOA ATFM LOA (Include contingency scheme) Contingency scheme LOA ATFM unit ATC unit Under planning Relationship between adjacent unit and ATMC FSUE MATMC *5 Magadan (FL265+) Petropavlovsk-Kamchatsky (FL265-) Anchorage ARTCC Anchorage Shanghai Shanghai ATFMD *2 2017.3~ NARAHG ATCC *3 (Daegu) 2017.7~ Incheon ATMC FAA ATCSCC * 4 Oakland Oakland ARTCC Taipei Hong Kong ATMD Taipei ACC Manila Manila ACC Fukuoka * 1 ATCC : Air Traffic Control Center * 2 ATFMD : ATFM Department * 3 ATCC : Air Traffic Command Center *4 ATCSCC : Air Traffic Control System Command Center *5 MATMC : Main ATM Center

Northeast Asia Regional ATFM Harmonization Group (NARAHG) The ICAO Asia Pacific Regional Office founded Beijing Branch Office (RSO) in June 2013.RSO advocated the establishment of NARAHG as an effort dedicated to the Northeast Asia region (Japan, China, Republic of Korea), Japan, China and Republic of Korea authorities agree to participate. The Northeast Asia region (Japan, China, Republic of Korea) could discuss for stable ATFM through NARAHG. Shanghai ATCC and Fukuoka ATMC signed LOA in March 2017. Preparation for trial of CRACP(the Cross Region ATFM Collaborative Platform) and so on

Sub-Regional ATFM Coordination in APAC NARAHG Multi-Nodal Sub-Regional ATFM Regional ATFM

Jun.2013 RJSS 21

Any questions? 22