PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Similar documents
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

1. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

UNOPS IN THE CARIBBEAN

What is the British Prosperity Fund

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2164 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1412 Project Name

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

AII CHAIRMANSHIP OF MONTENEGRO PRIORITIES AND CALENDAR OF EVENTS-

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009

Performance Clackamas Clackamas County Strategic Plan

Catchment and Lake Research

GEOGRAPHICAL LOCATION OF colombia

DIRECT PUBLIC INVESTMENT

Draft Executive Summary

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

THE SAN JUAN RIVER BASIN PROJECT

Guánica Bay Watershed Initiative

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

Norte Grande Road Infrastructure (P120198)

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Press Release March 1, Refer to: Anna Salgado

LATIN AMERICA AND CARIBBEAN. Investment Project Financing P Ministerio de Economia y Finanzas - MEF

GROWTH, CONFIDENCE AND OPPORTUNITIES TO INVEST

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Urban Transport in Metropolitan Areas (P095485)

1 Bicentenario Centrality Convention Center of the Metropolitan District of Quito

PERMANENT MISSION OF BELIZE TO THE UNITED NATIONS

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

2016 Regional Transportation Alternatives Program (TAP) Grant Application

HELLENIC REPUBLIC Voluntary National Review on the Implementation of the 2030 Agenda for Sustainable Development. 16 July 2018

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

MANAGING FRESHWATER INFLOWS TO ESTUARIES

Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006

OFFICIAL MEDIA & PRESS KIT Updated November 2014

Transforming a City People Health Environment Governance

A Brief Overview of the Rio Grande Compact 04/26/06

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Presented by: Ms. Kanageswary Ramasamy Department of Statistics, Malaysia February 2017

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

REDD+ IN YUCATAN PENINSULA

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach

Implementation of the Integrated Territorial Investments in Romania ITI DANUBE DELTA

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

PARKLAND COUNTY TOURISM ACTION PLAN

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region

The blue economy: Prosperous. Inclusive. Sustainable.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA124664

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008

Strategic Plan. Regional Opportunity. Strong For Generations

INVITATION FOR EXPRESSION OF INTEREST

Paul Sturm Roberto Viqueira Ríos

GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES

Infrastructure: Networks to Sustain Development

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Biosphere Reserves of India : Complete Study Notes

Satoquo SEINO (Graduate School of Engineering, Kyushu University, Japan)

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

The Corporation of the City of Kawartha Lakes Council Report

I m not poor because I live with my five senses and the four spiritual energies

The Government s Aviation Strategy Transport for the North (TfN) response

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY

PERU WATER PROJECT: CERRO VERDE CASE STUDY

Land, Water and Community: Preparing for a Successful 2015 Review

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

ISA AND ITS BUSINESS UNITS

Scotland s Water Industry: Past, Present and Future

Co-ordinated and Orderly Growth A Suite of Infrastructure and Public Assets for the Future... 1

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA

Urban Transport in Metropolitan Areas (P095485)

MUNICIPALITY OF GUATEMALA

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

UNFCCC Expert Meeting on Loss and Damage

MIÑO O AND LIMIA BASINS

SUSTAINABLE ECOTOURISM DEVELOPMENT IN THE EMBERÁ INDIGENOUS COMMUNITIES, CHAGRES NATIONAL PARK, PANAMA

En Terreno. WCS Colombia Newsletter November No

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Output volume and order backlog at record levels Renewed significant increases in net profit and operating profit Dividend bonus announced

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

2015 PURDUE ROAD SCHOOL March 11, 2015

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

Session III: Closing the gap Placing tourism within the wider urban agenda

Policy PL Date Issued February 10, 2014

Crown Corporation Business Plans. Trade Centre Limited

Transcription:

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection (30%) Project ID P111479 Borrower(s) CORPORACION AUTONOMA REGIONAL DE CUNDINAMARCA (CAR) Implementing Agency Corporación Autónoma Regional de Cundinamarca Carrera 7 No. 36-45, Colombia Tel: 320-900, Ext. 1400-1401 Contacts: i) Jorge Plata García: Asesor Direccion FIAB, jptatag@car.gov.co ii) Aníbal Acosta: Coordinador FIAB, aacostap@car.gov.co Environment Category [] A [ ] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared April 07, 2009 Estimated Date of September 2009 Appraisal Authorization Estimated Date of Board December 2009 Approval 1. Key development issues and rationale for Bank involvement The Río Bogotá is a medium sized river that traverses the western perimeter of the Bogotá city. Despite decades of planning, the Río Bogotá remains highly contaminated and is an environmental and public health liability. The key development challenge is to transform the Río Bogotá from an environmental liability into a healthy river that will provide economic and environmental benefits to the Bogotá metropolitan region. The proposed Plan de Saneamiento has evolved over time, and represents a first step towards the longterm goal of creating a healthy river system. The World Bank involvement will help refine the Plan de Saneamiento and establish the basis for a long-term program to improve the water environment in the basin. The Bank s expertise in integrated urban water management, combined with its deep understanding of urban development issues, will enable it to help guide Bogotá towards a sustainable approach to improving the river and creating an urban environmental asset. The objective is to create an internationally recognized model project for urban river recuperation that incorporates water quality improvements, flood control, wetlands, and multifunctional parks. Plan de Saneamiento del Río Bogotá: The Río Bogotá starts at an elevation of 3,400 meters and flows 370 kms before discharging into the Río Magdalena at an elevation of 280 meters. The Basin covers 6,000 km 2 and is divided into three parts: i) upper basin north of Bogotá; ii) middle basin in the Bogotá metropolitan area; and iii) lower basin below Bogotá. The average flow before entering the city is 10 m 3 /s, and Bogotá discharges an additional 22 m 3 /s of wastewater. After leaving Bogotá, the river plunges 2000 meters in a short distance into the Río Magdalena valley. The Bogotá power company (EMGESA) has constructed a hydropower facility (1124 MWs installed capacity) downstream of Bogotá to take advantage of the river flow and elevation drop. The holding reservoir for the EMGESA power complex is

the 853 ha Muña reservoir, which is also highly contaminated. The spectacular Falls of Tequendama are located downstream of the Muña reservoir. The original wastewater master plan for Bogotá was conceived in the late 1980s, and called for the construction of one 22 m 3 /s wastewater treatment plant (WWTP) downstream of the city. In the early 1990s, however, the municipal government changed course and decided to pursue 3 medium-sized wastewater treatment plants (WWTPs), one for each of the three micro-basins (Salitre, Fucha, and Tunjuelo) in Bogotá city. In 1994, the city entered into a build-operate-transfer (BOT) concession contract with a French consortium for a 4 m 3 /s primary WWTP called Salitire, which is located in the northern part of Bogotá. The plant started operations in 2000, and in December 2003 the District cancelled the contract, purchased the plant from the consortium, and turned over its operation to EAAB. The key government entities charged with implementing the Plan include: i) the municipal government of the Bogotá Capital District; ii) the regional environmental agency Corporación Autónoma Regional de Cundinamarca (CAR); and iii) the Empresa de Agua y Alcantarillado de Bogotá (EAAB). In December 2004, the Departmento Nacional de Planeacion (DNP) issued a strategic planning document for the Río Bogotá, which called for upgrading and expanding Salitre WWTP to an 8 m 3 /s secondary plant and the construction of a large plant (14 m 3 /s) downstream of Bogotá called Canoas to treat wastewater from the Fucha, Tunjuelo and Saocha basins. The large wastewater interceptors to convey wastewater to Canoas identified in the DNP plan are either completed or under construction by EAAB, thereby locking in the two-plant approach. In addition, the DNP called for expanding wastewater treatment in the upper basin, as well as interim measures to improve environmental impacts associated with Muña reservoir The strategy calls for improving the Bogota River in a phased manner, and going from upstream to downstream. The first phase involves improving wastewater treatment in the numerous small municipalities in the upper basin. The second phase focuses on improving the river the Bogotá metropolitan area by expanding the existing Salitre WWTP; intercepting wastewater from the rest of the city and conveying it downstream of Bogotá; and improving flood control protection. The third phase consists of constructing a second WWTP downstream of Bogotá, referred to as Canoas (14 m s /s) to treat the waters that will be conveyed out of Bogota under the second phase. Given the cost of the Canoas plant, treatment levels are planned to be gradually increased over time. This approach is consistent with the evolution of wastewater management in OECD countries, which generally followed a phased approach that balances environmental improvements with affordability and economic growth. In 2007 the three key parties: the CAR, the EAAB, and the Bogotá Municipal Government signed Convenio 171 which defined the responsibility of the various parties. The CAR committed to finance the expansion of Salitre WWTP, and the Río Bogotá flood control works from Puente La Virgen to Alicachín. The urban area of Bogotá has expanded to the western edge of the Río Bogotá, and the existing low flood control standards of 10-25 year return floods need to be upgraded. In addiction, CAR has also committed to river recuperation by enlarging the flood plains, restoring wetlands, and creating multi-functional parks. The EAAB assumed responsibility for financing and constructing the necessary large wastewater interceptors, and operating both the Salitre and Canoas WWTPs. The construction phasing (preliminary, primary, and secondary treatment) and financing for the Canoas WWTP is still under consideration by the Colombian government and courts. Rationale for Bank Involvement: The World Bank can bring international expertise to help refine the Plan de Saneamiento, and integrate the investments into a broader urban development and environmental management perspective. The World Bank has been deeply involved in urban development and water supply and sanitation issues in Bogotá over the past decades. The Bank has supported the water sector in Bogotá through five operations, with the most recent project, Santa Fe I (P006894), closed in 2005 with satisfactory ratings. During the Santa Fe project, EAAB made

substantial progress toward the key policy objective of transforming itself into a commercial water utility with a corporate culture based on professional responsibility and accountability. EAAB is owned and controlled by the Bogotá municipal government. In 2003 EAAB contracted three firms to provide customer service, and operation and maintenance of its small diameter water distribution system. EAAB also started the process of restoring the urban wetlands that drain into the Río Bogotá under the Santa Fe project The Bank has also supported the broader development agenda in Bogotá, most recently with the on-going Bogotá Urban Services Project. The Project focuses on the issues of affordable housing, the improvement of marginalized settlements, improving public transport, comprehensive road maintenance, and interagency coordination. The Bank has financed the second phase of the Transmilenio, and is currently helping Bogotá with planning studies for the proposed Metro system. The proposed project is consistent with the Colombia-World Bank Country Partnership Strategy which highlights environmental sustainability, in particular integrated management of water resources, as one of the five pillars in Colombia s national development strategy. 2. Proposed objective The project development objective (PDO) is to transform the Río Bogotá from an environmental liability into an urban asset for the metropolitan region by improving water quality, reducing flood risk, and creating a series of multi-functional parks along the river. The preliminary PDO indicators (values to be determined during preparation) are: The Río Bogotá meets interim water quality standards Flood control standard of 100 years within the Bogotá urban area Creation and/or improvement of parks and wetlands along the Río Bogotá with aquatic ecosystems. 3. Preliminary description Brief description of the four main components of this Project is presented below. Component 1: Salitre WWTP: This component includes the upgrading and expansion of the existing 4 m 3 /s primary treatment plant to an 8 m 3 /s secondary treatment plant. Component 2: Flood Control and Environmental Works in the Río Bogotá: This component will finance a comprehensive river recuperation program that incorporates best practice in urban river restoration. This component consists of improving flood control from an existing 10-25-year return period to a 100-year period, restoring part of the river flood plain, creating and enhancing wetlands and multifunctional parks, and complementing wastewater infrastructure with in-situ wastewater treatment when possible. Component 3: Water and Environmental Planning: The upgraded Salitre WWTP, along with the interception and conveyance of other wastewater flows out of Bogotá, will improve water quality but much more analysis and work will be needed to recuperate the Bogotá River. This component will therefore finance a number of studies and actions that will provide a framework for future water quality and environmental improvements. Studies will be funded to promote integrated urban water planning. Potential topics include point and non-point pollution control, sewage and stormwater collection, and ecological restoration. The goal is to create cost-effective water quality improvement actions that combine conventional and natural approaches, as well as water reuse for wetland and river restoration, agriculture

in the adjacent La Ramada irrigation district, and hydropower in the Muña hydropower complex. The component will also provide planning support for the Canoas WWTP and recuperation of the Muña reservoir. A study to develop a biosolids management plan for EAAB is also under consideration. Component 4: Project Management: The CAR currently has a strong project team of around 12 professionals preparing the project who will continue to support the implementation. The professionals include a wastewater engineer, hydrologist, environmental scientists, social specialist, resettlement expert, lawyer, procurement and financial management specialists, and two project managers. 4. Safeguard policies that might apply SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered Yes No TBD Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Indigenous Peoples (OP/BP 4.10) Involuntary Resettlement (OP/BP 4.12) Safety of Dams (OP/BP 4.37) Projects on International Waterways (OP/BP 7.50) Projects in Disputed Areas (OP/BP 7.60) Although the environmental benefits of the project will be significant, the project is categorized as a Category A project due to its size and potential impacts. Portions of approximately 400 lots along the river will be purchased by CAR in order to move the Rio Bogota river embankment in the mainly rural western bank, as well to create a riparian buffer zone. Approximately 100 households in the low-income area of Porvenir, most of them without title to the property, will be relocated. A RAP that meets Bank resettlement requirements will be prepared to guide the land acquisition and relocation activities. Since the project activities will take place in and along there river in an area which has been inhabited for thousands of years, there may be chance archeological finds during construction. Therefore, the OP 4.11, Physical Cultural Resources, is triggered. 5. Tentative financing Source: ($m.) Borrower--CAR 196 International Bank for Reconstruction and Development 250 Total 446 6. Contact point Contact: Greg J. Browder Title: Sr. Water Resources Spec. Tel: (202) 473-0339 Fax: (202) 614-0927 Email: gbrowder@worldbank.org