Similar documents
Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Proposal for the updating of the FASID ATM Evolution Tables

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

Agenda Item 3: Performance framework for Regional Air Navigation Planning and Implementation

Second Seminar on RVSM Implementation in the CARS/SAM Regions

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Air Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR

Standards and procedures for performance-based navigation operations approval

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY

ICAO regional technical cooperation tools for the implementation of air navigation and safety improvements

Follow-up to the implementation of air navigation priorities FOLLOW-UP TO THE IMPLEMENTATION OF AMHS INTERCONNECTION AND NATIONAL IP NETWORKS

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Agenda Item 2: Review of the Implementation of the Regional Air Navigation Plan. (Presented by the Secretariat) Summary

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

CANSO ATFM Data Exchange Network for the Americas (CADENA) (Presented by ALTA, CANSO, COCESNA and IATA)

TWELFTH AIR NAVIGATION CONFERENCE

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Packaging Tomorrow s Aviation System

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

INTERNATIONAL CIVIL AVIATION ORGANIZATION South American Regional Office. Regional Project RLA/06/901 FINAL REPORT

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

Civil and military integration in the same workspace

L 342/20 Official Journal of the European Union

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Regional air navigation planning and implementation performance framework: Review of programmes and projects

EUR/SAM corridor airspace concept

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

FLIGHT OPERATIONS PANEL (FLTOPSP)

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Airport Master Planning Process & Update

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

Agenda Item 2: ATS route structure optimisation - Phase 3 Version 2

2012 Performance Framework AFI

Status and outlook of the Regional Safety Oversight Cooperation System (SRVSOP) (Presented by the Secretariat) SUMMARY

a) PBN en route b) PBN in terminal area c) PBN procedures d) Longitudinal separation reduction

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

PBN and airspace concept

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

ASSEMBLY 35TH SESSION

PART III SUMMARY OF THE CAR-SAM HARMONISATION GROUP

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

TWELFTH AIR NAVIGATION CONFERENCE

Continuous Improvement of the Global Air Traffic Management System

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Dave Allanby GM Operations SOUTH AFRICAN EXPRESS

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

TWELFTH AIR NAVIGATION CONFERENCE

Colombian PBN implementation: El Dorado case study

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWELFTH AIR NAVIGATION CONFERENCE

Ref.: LT 2/6B.49-SA121 Lima, 26 March 2014 LT 11/49

What is Flexible Use of Airspace (FUA)?

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

REPORTS FROM REGIONS

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

NEFAB Project Feasibility Study Report Operational Concept

Optimization of Airspace and Procedures in the Metroplex

ATFM/CDM ICAO s Perspective

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

4-1. MID RVSM TF/6 Report on Agenda Item 4

Flight Operations Inspector Manual

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Presented by: Trinidad and Tobago

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

Global Operational Data Link Doc 10037

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

FLIGHT PLAN FILING PROCEDURES IN THE SAM REGION

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

INTERNATIONAL CIVIL AVIATION ORGANIZATION

International Civil Aviation Organization. UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

European Joint Industry CDA Action Plan

Civil/Military Coordination Workshop Havana, Cuba April 2015

Russian Federation ATM modernization program

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

AN & FS/3-WP/05 International Civil South Third. (Presented SUMMARY. References. Group May Fourth. of air navigation

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

Transcription:

International Civil Aviation Organization SAM/IG/11-WP/03 South American Regional Office 24/04/13 Eleventh Workshop/Meeting of the SAM Implementation Group (SAM/IG/11) - Regional Project RLA/06/901 (Lima, Peru, 13 to 17 May 2013) Agenda Item 2: Optimization of SAM airspace OPTIMIZATION OF SAM AIRSPACE (Presented by the Secretariat) SUMMARY This working paper proposes an update of the Action Plan for the Optimization of SAM Routes, Phase 3, Version 2, and invites to its review and complete update, taking into account the needs of the Region. The implementation of route UM662 is proposed, and the new States participating in Project RLA/06/901 are invited to propose more routes for optimization under the ATSRO Programme. SAM/IG/10 ATS/RO/4 ICAO Strategic Objectives: REFERENCES A - Safety C - Environmental protection and sustainable development of air transport 1 Background 1.1 The SAM/IG/10 meeting continued analysing the feasibility of the routes approved by the ATS/RO/4 meeting, providing information on RNAV/RNP gateways for the respective terminal areas. 1.2 Furthermore, airline operators flying along these routes carried out the corresponding studies of the proposed routes, taking into account flying time over the mountain range, single-engine flying time, weather and volcanic conditions, etc. which might affect them, and submitted these additional analyses. 1.3 The meeting took note of the Brazilian request to conduct the implementation in phases, based on route packages for certain flows with complex traffic volumes, taking into account that a significant traffic increase was expected in some critical areas as a result of world sport events. 1.4 The meeting recognised that it might not be possible to implement the whole route package by the expected date and that, in Brazil, it would not be possible to implement some routes until the second half of 2014.

SAM/IG/11-WP/03-2 - 2 Discussion 2.1 Taking into account that much progress is being made in the Region in route optimization, the meeting felt the need to continue in parallel with airspace optimization and extend it to terminal areas. 2.2 In this regard, ATS/RO meetings will continue to manage the Route Optimization Programme, and this and subsequent meetings will address the optimization of terminal areas with PBN procedures and continuous descent and climb operations (CDO and CCO). 2.3 It was also felt advisable for this meeting to discuss some routes that were pending, providing their coordinates and proceed with their immediate implementation. States like Ecuador and Colombia, which do not participate in Project RLA/06/901, may propose and/or approve the optimization of routes that are of interest to users between pairs of cities, and include them in the ATSRO Programme. 2.4 Amongst the routes long pending implementation is the direct route between Guayaquil and Madrid (UM662), which could not be implemented due to restricted areas along its path, and has been deferred several years. 2.5 Regarding Route UM662, Venezuela proposed a modification to the following path: Guayaquil BIVAN/ILVIR/AMAYA/EGOSU/DAREK Madrid and, if stakeholders agree, the required coordinates shall be provided for its implementation and the corresponding proposal of amendment shall be submitted. Appendix A contains the data on this route for updating. 2.6 Other two direct routes that have been requested by users are the Guayaquil-Lima and Quito-Lima routes, which require coordination and studies for early implementation or inclusion in the route package selected under the ATSRO Programme. See the forms to be completed in Appendix B. 2.7 In this regard, and in order to advance the required tasks before the ATS/RO/5 meeting, which will discuss the ATSRO Programme, it would be advisable for Ecuador, which did not attend the SAM/IG/10 meeting, to analyse and study Appendix A to Item 2 of the SAM/IG/10 meeting report, in order to submit to ATS/RO/5 its analysis of the routes under consideration which affect its FIR. This should be included in the Action Plan to facilitate its follow-up. 2.8 In view of the above, it is necessary to review and update the Action Plan for the Route Optimization Programme shown in Appendix C to this working paper. 3. Suggested action: 3.1 The meeting is invited to: a) create an ad-hoc group made up by experts from the States and users to define the final coordinates of route UM662, as described in Appendix A; b) create an ad-hoc group made up by experts from the States and users to define the coordinates and path of the Guayaquil- Lima and Quito-Lima routes, completing the corresponding route sheet shown in Appendix B; c) update the Action Plan for Route Optimization (Appendix C). - - - - -

SAM/IG/11-WP/03 NE/03 APPENDIX A / APÉNDICE A 42 GUAYAQUIL/MADRID (RUTA UM 662) Ruta actual /Current route (FliteStar) UA550 Notas/Notes Distancia actual Current distance 1369NM Hasta limite/up to boundary FIR Maiquetía/Piarco/ *Número de vuelos mensuales 62 *Number of monthly flights *Tipo de aeronave más utilizada *Type of most used aircraft B763 Trayectoria propuesta Trajectory proposed CARTE/ o BIVAN to DAREK Ecuador confirmará Venezuela expresa que luego de las coordinaciones con las autoridades militares de Venezuela, no habrá inconveniente en el tramo propuesto/venezuela states that after coordinating with its military authorities, there would be no problem with the proposed segment. Ecuador expresa su acuerdo con la propuesta/ecuador agrees with the proposal. Colombia en reuniones anteriores expresó que no tendría inconveniente, sin embargo queda pendiente la confirmación /In previous meetings, Colombia stated that it had no problem. However, it is pending confirmation. Distancia de trayectoria propuesta 1345 Distance of proposed trajectory Millas reducidas 24 Reduced miles Reducción de Combustible/ CO 2 aproximado Fuel Savings / approximate CO 2 Estados involucrados Ecuador, Colombia, States involved Venezuela Observaciones Actualmente no hay ruta directa/currently there is no direct route. Remarks *De acuerdo a información disponible/as per available information.

SAM/IG/11-WP/03 - NE/03 APPENDIX B APÉNDICE B XX GUAYAQUIL/LIMA Ruta actual /Current route XXXX Notas/Notes (FliteStar) Distancia actual Current distance *Número de vuelos mensuales *Number of monthly flights *Tipo de aeronave más utilizada *Type of most used aircraft Trayectoria propuesta Trajectory proposed Distancia de trayectoria propuesta Distance of proposed trajectory Millas reducidas Reduced miles Reducción de Combustible/ CO 2 aproximado Fuel Savings / approximate CO 2 Estados involucrados States involved Ecuador, Perú Observaciones Actualmente no hay ruta directa/currently there is no direct route. Remarks *De acuerdo a información disponible/as per available information.

SAM/IG/11-WP/03 - NE/03 - B2 - XX QUITO/LIMA Ruta actual /Current route XXXX Notas/Notes (FliteStar) Distancia actual Current distance *Número de vuelos mensuales *Number of monthly flights *Tipo de aeronave más utilizada *Type of most used aircraft Trayectoria propuesta Trajectory proposed Distancia de trayectoria propuesta Distance of proposed trajectory Millas reducidas Reduced miles Reducción de Combustible/ CO 2 aproximado Fuel Savings / approximate CO 2 Estados involucrados States involved Ecuador, Perú Observaciones Actualmente no hay ruta directa/currently there is no direct route. Remarks *De acuerdo a información disponible/as per available information.

SAM/IG/11 - WP/03 Appendix C to the Report on Agenda Item 2 2C-1 APPENDIX C (revised 24/04/13) ACTION PLAN FOR THE OPTIMIZATION OF THE ATS ROUTE NETWORK OF THE SOUTH AMERICAN REGION (GPIs 1, 5, 7, 8, 10, 11) Activity Start End Responsible party Observations 1. First Phase RNAV-5 implementation - COMPLETED 2. Second Phase Implementation of Version 1 of the SAM ATS Route Network - COMPLETED 3. Third Phase Implementation of Version 2 of the SAM ATS Route Network 3.1. Flexible use of airspace Activity Start End Responsible party Observations 3.1.1. Establish a civil-military coordination committee to assess the application of the Flexible Use of Airspace concept cited in 3.1.1. 3.1.2. Develop route implementation and/or realignment proposals based on the application of FUA 3.2. Airspace concept SAM/IG/7 SAM/IG/11 States Civil-military committees must be implemented in those States that have not done it yet. Civil/Military Coordination Meeting/ Workshop held on 16-19 August 2011. SAM/IG/7 SAM/IG/11 States 3.2.1. Collect traffic data to understand traffic flows in the upper airspace. SAM/IG/9 30 Sep 2012 SAM/PBN/IG (Project RLA/06/901) States The Secretariat sent a State letter: Response date: September 2012 Chile, Colombia, Paraguay and Uruguay sent traffic data on time.

2C-2 Appendix C to the Report on Agenda Item 2 SAM/IG/11 - WP/03 Another traffic data collection was conducted in August 2012. Bolivia, Chile, Colombia, Paraguay, Peru, Venezuela and Uruguay sent data. 3.2.2. Define the gateways of the main TMAs of the SAM Region 3.2.3. Update the Letters of Agreement and Contingency with adjacent States. 3.2.4. Conduct a detailed study of the SAM ATS route network, with a view to preparing version 2 of the route network, including: Identification of the tools required for conducting the study mentioned in 3.2.5 (aeronautical charts, specific software) Definition of SAM airspace structure scenarios, including ATS routes, control sectors, TMA interface, for assessment using airspace modelling and fast-time ATC simulation tools. Identification of ATS routes that should be eliminated, based on their utilization; Proposal, if necessary, of the extent of the exclusionary airspace volume where RNAV-5 is to be applied. If necessary, identification of the conventional ATS routes that should be eliminated or replaced with RNAV routes, based on the possible extent of the exclusionary RNAV-5 airspace. Identification of RNAV routes that should SAM/IG/7 SAM/IG/11 States States that have not yet restructured the terminal area shall submit the information at the SAM/IG/11 meeting. SAM/IG/12 States SAM/IG/7 SAM/IG/9 SAM/IG/11 SAM/PBN/IG (Project RLA/06/901) Two experts were hired for a period of 3 weeks on the second half of February 2012. The first part has been completed. The first draft was developed for review by States and operators, and support was requested from the Project to continue working on the Optimization Study, with the engagement of a second period of 3 weeks and 2 experts before March 2013, based on new traffic data collected in August 2012, the feasibility studies conducted by States, and any modified TMAs in the Region. This task has not been fulfilled due to

SAM/IG/11 - WP/03 Appendix C to the Report on Agenda Item 2 2C-3 be re-aligned, based on possible modifications to the gateways of the main SAM TMAs. Description of possible scenarios for version 2 of the SAM route network and control sectors based on the analysis of the aforementioned items. Description of the interface between the SAM route network and the CAR route network. Presentation of an initial proposal of amendment to the CAR/SAM ANP. Based on traffic data, analysis of the possibility of implementing RNAV-5 parallel routes with adequate separation. Development of planning criteria to be used by States and airspace users in this implementation process (see paragraph 2.13 of the ATSRO/03 report). Development of a plan for the optimization of restricted, prohibited, danger, and reserved use areas of the SAM Region. Application of CDO techniques 3.2.5. Conduct a seminar/workshop/work meeting on airspace planning failure of States to send their data in August. SAM/IG and ATS/RO meetings have reviewed and modified the first draft, and the deadline for its definition has been set to the SAM/IG/11 meeting. The restructuring of routes, Phase 3, version 2, will be carried out by ATS/RO meetings. ATSRO/3 April 2013 Project RLA/06/901 Request the support of Project RLA/06/901 and DECEA (Brazil). The Secretariat should send a letter to DECEA requesting two instructors. The purpose is to train airspace planners of the States of the Region on the 2 nd half of April 2012 in Lima. This task was fulfilled with the conduction of a Course/Workshop on

2C-4 Appendix C to the Report on Agenda Item 2 SAM/IG/11 - WP/03 3.2.6. Conduct Airspace Modelling and fast-time simulation studies to assess the scenarios developed under 3.2.5 July 2013 SAM/IG/12 Project RLA/06/901 States PBN design of CAR/SAM airspace and terminal areas on 11-22 March 2013, where IATA provided the instructors, Canso the translation, and Project RLA/06/901 contributed with LAN Chile and LAN Peru designers to support the experts during the workshops. Argentina, Brazil, Colombia, Paraguay, and Peru participated from the SAM Region, together with two experts from Project RLA/06/901. A total of 8 experts from the SAM Region were trained. A practical exercise related to the Lima TMA was conducted. The Secretariat inquires about using the tool available in Brazil. If this is possible, procure, through Project RLA/06/901, the participation of 2 experts from the States of the Region. It has not been possible to use the tool due to availability issues.

SAM/IG/11 - WP/03 Appendix C to the Report on Agenda Item 2 2C-5 3.2.7. Prepare the required safety assessment, applying a qualitative methodology using the SMS 3.2.8. Conduct the Fifth Workshop/Meeting for the Optimization of the SAM ATS Route Network (SAM ATSRO/5), for the purpose of reviewing and validating the studies mentioned in 3.2.6 and 3.2.7. 3.2.9. Conduct the Third Workshop/Seminar/Meeting for conducting the risk analysis of version 2 of the SAM ATS route network. Validation of the study described in item 3.2.7. 31/07/12 SAM/IG/10 SAM/IG/11 Project RLA/06/901 States SAM/IG/10 July 2013 Project RLA/06/901 States September 2012 3.3. Implementation of Version 2 of the SAM ATS Route Network SAM/IG/11 Project RLA/06/901 States An expert needs to be hired for 2 weeks to carry out this task. (This task has been completed.) The following task is still pending: States shall conduct a safety analysis of changes in their terminal areas (TMAs). This meeting will also take care of Phase 3, Version 2, of the ATSRO Programme. COMPLETED 3.3.1. Process the proposal of amendment to the CAR/SAM Air Navigation Plan 3.3.2. Publish version 2 of the SAM ATS Route Network 3.3.3. Entry into effect of version 2 of the SAM ATS Route Network or a segment of the route package as per the SAM/IG/10 report, Item 2.5 August 2013 SAM Regional Office The date must be adjusted. 22 August 2013 States The date must be adjusted. 17 October 2013 The date must be adjusted.