Presentation to Working Group II-B, UTTIPEC

Similar documents
Road Development in India - State Initiatives

Contents. 1. DMRC Advertising A Brief Insight. 2. Benefits of advertising at DMRC. 3. Media Options & Solutions

LINGAYA S UNIVERSITY TRANSPORT DEPARTMENT

EPCA Report No. 33 (March 2007) Report on intercity public transport needs In the matter of W.P. (C) No of 1985; M.C. Mehta v/s UOI & others

Shri N.S. Kang, IAS Addl. Secy & DG (CGHS) Dr. D.C.Joshi, Director (CGHS)

PRESENTING THE NEXT LEVEL IN BUSINESS DESTINATION AMENITIES

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

Alternatives Study of Alignment

PROPOSED BRT SYSTEM NETWORK

Score. Category. Access Aesthetics Community Resources

Basic Project Information

REIMBURSEMENT FACILITY

DELHI METRO TRAIN WRAPS & (Authorised Marketing Associate for Advertising through Delhi Metro Trains on Line I, II, III & IV)

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DPR's Submitted for Delhi

London Borough of Barnet Traffic & Development Design Team

Regional Rapid Transit System in NCR Driver of Balanced and Sustainable Regional Development Vinay Kumar Singh, MD, NCR Transport Corporation

A. CONCLUSIONS OF THE FGEIS

Construction Staging Adelaide Street West

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Name of retail store Address and Weekly Holiday Contact No. 1 Andrews Ganj Road No.4, Qr. No.9 & 11, Andrews Ganj, New Delhi (Wednesday )

Pedestrian Safety Review Spadina Avenue

SCOPING INFORMATION PACKET

Network Size and Growth

South of Fraser Transportation Priorities March 2017 Engagement

Status Report as on March 2017 Department of Women and Child Development, Govt of NCT of Delhi, ICDS

Information for Investors

hba Adjoining Tech Zone, Sector 27, Yamuna Expressway (Opp. Gautam Budh Universrty & Night Safari)

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Assignment 9: APM and Queueing Analysis

PROJECT : IT/ RETAIL PARK

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

POYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad

5.1 Traffic and Transportation

Technical Paper 1 Traffic report

DETAILS OF BUS ROUTES DELHI PUBLIC SCHOOL MATHURA ROAD

Decisions where applications for information rejected. 4. No. of times various provisions were invoked. 4b.

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

Corrigendum No. 1. for

F.No.ll(163)/2017/PWD-II/Vs/ )\Aq\Dated:

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

LUXURY RESIDES HERE WITH AFFORDABILITY SHRI RADHA SKY PARK SHRI RADHA SKY GARDENS-PHASE II. Call:

LUXURY RESIDES HERE WITH AFFORDABILITY SHRI RADHA SKY PARK SHRI RADHA SKY GARDENS-PHASE II

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Building Level Planning Committee March 30, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Williamsburg Town Hall Meeting

Feasibility Study for the Improvement of the National Route 2 and Route 7 Final Report CHAPTER 8 EXISTING TRAFFIC CONDITIONS

Pocket H-1593 C.R. Park New Delhi Tel No , Fax: Director

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Phasing & Cost Estimates

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

Dear All, Here is a further update on the Commission s effort to get meaningful section 4 compliance of the RTI Act.

US 380 FEASIBILITY STUDY

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Transportation TRANSPORTATION PROJECTS

MEMBERS OF THE GOVERNING COUNCIL

Chapter 2: Entire US287 Corridor

TRAFFIC ADVISORY LEAFLET

expect faridabad's finest

Community Advisory Panel Meeting #

Public Open House. Chief Peguis Trail Project


1.2 Corridor History and Current Characteristics

IGI AIRPORT (T-1)-NCR AREA

IGI AIRPORT (T-1)-NCR AREA

Arlington County Board Meeting Project Briefing. October 20, 2015

I-35 Reconstruction Project

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

LOCATION ANALYSIS PURVA ATTRIA. March 2013

RW Bruhn Bridge and Approaches Project

Bonita to Bridgeport January 24, 2019

Traffic Analysis Final Report

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Shop no. 10, Building no. 5, Takshila CHS Ltd., Opp. Pearl Residency, Off Mahakali Caves Road, Andheri (E), Mumbai ; Mumbai

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Centurion Way Chichester

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

ELOQUENCE: THE WELLNESS ELOCUTION GROUP I AWARD FOR MERITORIOUS PERFORMANCE

Hospital Link Project Project Update Winter 2018

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

The. immutable laws of success

Puri Pratham Project Highlights

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

Rappahannock-Rapidan Regional Commission 2010 Travel Time Survey

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

BUS ROUTES : DELHI PUBLIC SCHOOL VASANT KUNJ

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Northern Beaches Transport Action Plan

IAT Annual Conference 'Driving Forward

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011

US 19 Sunset Point Rd to Countryside Blvd.

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Transcription:

Integrated transit corridor development and street network/connectivity plan for the corridor/influence zone along with details of all intersections and mid-sections based on traffic and feasibility studies for the corridor/network: Outer Ring Road from Modi Mill Flyover to IIT Gate Presentation to Working Group II-B, UTTIPEC 1

Key Map showing the Project Corridor Ring Road OuterRing Road 3 1-E (A)

Project Corridor marked on Master Plan of Delhi- 2021 Modi Mill(ROB-22) to IIT Gate 4 1-E (A)

Project Corridor marked on Zonal Development plan 1-E (A)

STUDY AREA CHARCTERISTICS ON GOOGLE MAP Modi Mill Outer 1-E (B)

LOCAL STREET NETWORK PLAN IIT Panchsheel Malviya Nagar Chirag Delhi Savitri Cinema Nehru Place Modi Mill (ROB-22) 1-E (C)

SURVEY BASE MAP EXISTING ROAD BUILDING FOOTPRINT ROAD LEVELS EXISTING BUS STOP Modi Mill flyover A Nehru Place Sri Aurobindo Marg IIT Panchsheel D Malviya a Nagar C Chirag Delhi Savitri Cinema 2-E 8(A)

Section -A TO OKHLA Building Footprints TO IIT ROW-45m ROW-45m 2-E 9(A)

Section -B Building Footprints Nehru Place ROW-45m 2-E 10(A)

Section -C Building Footprints Savitri Cinema Chirag Delhi ROW-45m 2-E 11(A)

Section -D Building Footprints Malviyanagar IIT Panchsheel ROW-45m 2-E 12(A)

PHOTO DOCUMENTATION 2-E (B)

3-arm signalized intersection of Outer Ring Road and Captain Gaur Marg 3 arm signalized intersection with unidirectional flyover (Kalkaji Flyover) Reduced width of carriageway due to Bhairon temple on LHS of Outer Ring Road General view of 4 arm signalized intersection with 2-way flyover at Nehru Place 2-E (B)

Ongoing metro construction work at Chiragh Delhi General View of Outer Ring Road near Panchsheel Metro construction under progress near the toe of Panchsheel flyover View showing IIT Gate 2-E (B)

16 2-E (B)

17 2-E (B)

18 2-E (B)

19 2-E (B)

2-E 20 (B)

2-E (C)

Key Plan showing Traffic Survey Locations Modi Mill flyover IIT Malviya Nagar Chirag Delhi Nehru Place Kalkaji LEGEND TVC Survey locations OD Survey Locations Pedestrian Survey Location Savitri Cinema 22 2-E (C)

Traffic and Travel Characteristics

Traffic Volume characteristics at intersections during Base Year ( 2016 ) S.No 1 Peak Hour Traffic Volume (in PCU) Morning Evening Outer Ring Road Aurobindo Marg (IIT Gate ) 19886 17936 2 3 4 5 6 7 Outer Ring Road Maharishi Dayanand Marg (Panchsheel ) 18090 16669 Outer Ring Road Josip Broz Tito Marg (Chirag Delhi ) 23211 24043 Outer Ring Road GK 2 Main Road (Savitri Cinema ) 15146 15748 Outer Ring Road Lala Lajpat Rai Road (Nehru Place ) 20169 16814 Outer Ring Road Ma Anandmayee Marg (Kalkaji Mandir ) 12814 16321 Outer Ring Road Captain Gaur Marg (Modi Mill ) 11466 12756 2-E (C)

Key Plan Showing Speed and Delay Nodes 2-E (C) Speed and Delay Nodes Speed-Delay Survey Network

Speed and Delay characteristics along project corridor NODES DISTANCE JOURNEY TIME IN SECONDS STOPPED DELAY WITH REASON TIME EXCLUDING DELAY AVERAGE JOURNEY SPEED RUNNING SPEED FROM TO (m) (SECONDS) SECONDS (Km/h) (Km/h) 42 43 1130 280 25 Congestion 255 14.5 16.0 43 44 1050 124 35 Congestion 89 30.5 42.5 44 45 1071 110 26 Congestion 84 35.1 45.9 45 46 754 80 30 Metro Construction 50 33.9 54.3 46 47 2293 190 21 Congestion 169 40.4 41.2 47 48 1100 140 22 Congestion 118 28.3 33.6 7398 924 159 765 28.2 34.2

Traffic Zones delineated for the purpose of this study 27 2-E (C)

Desire line diagram for two wheelers in the study area 2-E (C)

Desire line diagram for four wheelers in the study area 2-E (C) 65

Desire line diagram for LCVs in the study area 2-E (C) 66

Desire line diagram for Trucks in the study area 2-E (C)

Peak hour Traffic Volumes on different sections for Base year (2016) Volume (pcu) v/c 13365 1.78 MODI MILL INTERSECTION KALKAJI INTERSECTION NEHRU PLACE INTERSECTION PANCHSHEEL INTERSECTION CHIRAG DELHI INTERSECTION SAVITRI CINEMA INTERSECTION Volume (pcu) v/c Volume(pcu) v/c 8409 1.12 13670 1.82 Volume (pcu) v/c 11224 1.49 Volume (pcu) v/c 12599 1.67 Volume (pcu) v/c 15148 2.01 2-E (C) 63

Peak hour Traffic Volumes on different sections for Design year (2036) Volume (pcu) v/c 14400 1.92 MODI MILL INTERSECTION KALKAJI INTERSECTION NEHRU PLACE INTERSECTION PANCHSHEEL INTERSECTION CHIRAG DELHI INTERSECTION SAVITRI CINEMA INTERSECTION Volume (pcu) v/c Volume(pcu) v/c 9196 1.22 14950 1.99 Volume (pcu) v/c 12093 1.63 Volume (pcu) v/c 13575 1.81 Volume (pcu) v/c 16567 2.20 2-E (C) 69

IIT Panchsheel Chirag Delhi Nehru Place Malviya Nagar Savitri Cinema 3-E 34

PROPOSED IMPROVEMENT OPTIONS 35

COMPOSIT LAYOUT PLAN TO OKHLA Kalkaji Mandir Savitri Cinema Nehru Place IIT TO RK PURAM Panchsheel Malviya Nagar Chirag Delhi 36

Option-1 Existing Flyover B Proposed Underpass A A Captain Gaur Marg B Layout Plan for Ch 0.000 to Ch 1.000

Option-2 D D Layout Plan for Ch 0.000 to Ch 1.000

Option-3 Captain Gaur Marg Existing Flyover F F Proposed Flyover Layout Plan for Ch 0.000 to Ch 1.000

Option-4 Captain Gaur Marg Proposed Flyover Existing Flyover G G Layout Plan for Ch 0.000 to Ch 1.000

51

Ring Road from Bhairon Marg to DND Flyway 1.Length of Corridor: 5 Km 2. No. of s: 4 3. No. of Grade Separators: 3 Bhairon Marg PURANA QUILA Uni-Directional Flyover at NH-24 Bypass Uni-Directional Flyover at Sarai Kale Khan Barapullah Elevated Corridor over Ring Road Barapullah Elevated Corridor DND

Traffic and Travel Characteristics

Key Plan showing Traffic Survey Locations LEGEND TVC Survey locations OD Survey Locations Pedestrian Survey Location

Peak Hour Traffic Volume at s during Base Year ( 2016 ) S.No Peak Hour Traffic Volume (in PCU) Morning Evening 1 NH-24 Bypass and Ring Road 16730 22410 2 Ring Road Bhairon Marg 16155 17810 3 Sarai Kale Khan 13374 16376

Traffic Zones delineated for the study DELHI(UT)BOUNDARY 25 ZONE BOUNDARY ZONE NUMBER ZONE CENTROID

Travel Desire Line diagram for 2-Wheelers in the study area Rohini Haryana, Punjab, J&K etc. Shahdra MeeraBagh Pitampura Laxmi Nagar Gaziabad Dwarka Noida Greater-Noida Nehru Place Gurgaon Khanpur Faridabad 100-500 Veh Trips 501-1000 VehTrips 1001-1500 Veh Trips Above 2000 VehTrips

Travel Desire Line diagram for 4-Wheelers in the study area Rohini Haryana, Punjab, J&K etc. MeeraBagh Pitampura Shahdra Gaziabad Dwarka Noida Greater-Noida Gurgaon Khanpur Faridabad 100-500 Veh Trips 501-1000 VehTrips 1001-1500 Veh Trips Above 2000 VehTrips

Base Year (2016) Peak hour Traffic volume and V/C Ratio for different segments (Without Project) Bhairon Marg 1 2 3

Base Year (2016) Peak hour Traffic volume and V/C Ratio for different segments (With Project) Bhairon Marg 1 2 3

Design Year (2036) Peak hour Traffic volume and V/C Ratio for different segments (Without Project) Bhairon Marg 1 2 3

Design Year (2036) Peak hour Traffic volume and V/C Ratio for different segments (With Project) Bhairon Marg 1 2 3

CH 1000 Ring Road Sarai Kale Khan ROW-90 m Existing Flyover Proposed Flyover Layout Plan for Ch 0.000 to Ch 1.000

To ITO Sarai Kale Khan Proposed Flyover at Sarai Kale Khan

Cross Section for Proposed flyover at Sarai Kale Khan

Right turning ramp at Sarai Kale Khan intersection

EXISTING FLYOVER ROW-90 m ROW-90 m Ring Road - NH-24 Bypass ( Integration with Proposal of NHAI)

B B To ITO Ring Road To ASHRAM ROW-90 m PROPSED UNDERPASS Layout Plan for Ch 3.000 to Ch 4.000

Cross Section for Proposed Underpass

Proposed Tunnel To Purana Quila Proposal of Underground Tunnel at ITPO Area

Info@craphts.com www.craphts.com 0129-2278813 / 4276700