Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

Similar documents
A. CONCLUSIONS OF THE FGEIS

5 Rail demand in Western Sydney

Lake Erie Commerce Center Traffic Analysis

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

London Borough of Barnet Traffic & Development Design Team

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

KING STREET TRANSIT PILOT

5.1 Traffic and Transportation

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

TORONTO TRANSIT COMMISSION REPORT NO.

Chapter 4 Route Window NE3 Manor Park station. Transport for London

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

DEMOGRAPHICS AND EXISTING SERVICE

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

KING STREET TRANSIT PILOT

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Pedestrian Safety Review Spadina Avenue

Spadina Avenue Built Form Study Preliminary Report

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Northern Beaches Transport Action Plan

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

Treasure Island Supplemental Information Report Addendum

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Borders Railway - Scottish Borders Work Plan

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

SAMTRANS TITLE VI STANDARDS AND POLICIES

Assessment of Travel Trends

New free City connector bus service

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Summary of Proposed NH 120 Service

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

AirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA

Request to Improve Transit along the Dufferin Street Corridor

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Sharing the Way with Sustainable Transport Options

MODAIR. Measure and development of intermodality at AIRport

SR 934 Project Development And Environment (PD&E) Study

Multimodal Planning Studies

New 55-Dogpatch Outreach Findings & Route Development

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Moreton Bay Rail Link community consultation report. January 2016

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Maryland Transit Administration. Master Plan Alignment Trail

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Business Growth (as of mid 2002)

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Watts St westbound thru

Public Realm & Landscape

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Appendix 8: Coding of Interchanges for PTSS

This report recommends two new TTC transit services in southwest Toronto.

Construction Staging Adelaide Street West

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

Table of Contents. List of Tables

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

Update on the Thameslink programme

Airport Planning Area

2017 LRT Passenger Count Report

Arlington County Board Meeting Project Briefing. October 20, 2015

PUBLIC TRANSPORT FARES RATIONALISATION FOR CAPE TOWN

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.


Sarawia Street Laxon Terrace Rail Level Crossing Removal

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

John Betts School Crossing Review

3. Proposed Midwest Regional Rail System

Chapter 4 Route window W23 Taplow station. Transport for London

Bus Corridor Service Options

Authors. Courtney Slavin Graduate Research Assistant Civil and Environmental Engineering Portland State University

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

Transcription:

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

1. Introduction The purpose of this report is to detail the planning evaluation for the trunk route alignment alternatives for the proposed Lansdowne Wetton Corridor. This evaluation will primarily focus on the alternatives to the Wynberg destination as the Claremont trunk route options are limited to only Iman Haroon Avenue towards Claremont. The Wynberg bound trunk alignment evaluation will be done at two levels, namely: Strategic Corridor level which will determine the spines of the corridor, i.e Wetton Road vs Ottery Road option Localised Corridor level testing how the corridor accesses the Wynberg Node i.e Rosmead Avenue & Broad Road vs Old Ottery Road vs South Road and the proposed Wynberg Couplet assuming Ottery Road is the preferred spine 2. Policy Contextual Analysis - Comprehensive Integrated Transport Plan (CITP) & Integrated Public Transport network (IPTN) guiding framework The Lansdowne Wetton integrated corridor forms part of the approved 2032 Integrated Public Transport Network (IPTN) plan. The City s 2032 IPTN, which was approved by Council on the 25th of June 2014, is a network of integrated public transport routes that are served by a variety of transport modes. The development of the 2032 IPTN was guided by the IPTN Framework contained within the 2013-2018 CITP. The CITP, together with the IPTN framework, was approved by Council in December 2013 after undergoing a public participation process. Both the CITP and the IPTN identified the two major public transport missing trunk links in the Metropolitan area, namely the Metro South East (MSE) to Wynberg Claremont and the MSE to Bellville links. Accordingly the Lansdowne Wetton Corridor was identified as the next BRT Corridor and the MSE to Bellville link will be served by the proposed Blue Downs Rail link. The existing public transport services along these corridors currently compete with private transport for road space resulting in unnecessary delays for current road based public transport users. Both these projects aim to reduce travel time for public transport users travelling along these corridors. LWC public transport corridor Trunk Route Planning analysis 2

The dominant mode of public transport currently operating in the Lansdowne / Wetton Corridor is the mini bus taxi service followed by the Golden Arrow Bus Service. There is no direct east west rail link between the Metro South East and Wynberg and Claremont. Lansdowne Wetton Corridor comprises two road based trunk routes, namely, T11, which is the route that links Khayelitsha to Wynberg, and T12, which links Mitchell s Plain to Claremont. In addition to these trunk routes, a number of feeder / distributor routes will be planned to serve the trunks and to serve the local areas within the corridor. Feeder routes will cover the following communities: Khayelitsha Mitchells Plain Philippi Cross Roads Nyanga Guguletu Manenberg Hout Bay Hanover Park Wetton Lansdowne Ottery Claremont Wynberg Constantia Imizamo Yethu In addition to these two major public transport links, the IPTN proposes 10 road based trunk corridors to address the public transport demand in the metropolitan area. 3. Trunk Route Alignment Evaluation 3.1 Strategic Corridor Level Wetton Road vs Ottery Road The Lansdowne / Wetton Corridor trunk routes as approved in the IPTN consist of 2 trunk routes linking Khayelitsha with Wynberg (route No T11) and Mitchells Plain with Claremont (T12). These routes share a common alignment for the portion of Govan Mbeki Road (formerly Lansdowne Road) between Stock Road to the east and Strandfontein Road to the west. This shared portion allows for transfers between the 2 routes which enable all possible movements between the 4 origins and destinations of Wynberg, Claremont, Khayelitsha and Mitchells Plain. This BRT corridor connects with both north-south rail corridors, namely Cape Flats and the Southern Suburbs line in the west and therefore with efficient transfers, this service provides improved connectivity with the rest of the metropolitan area. The proposed route as contained in the approved IPTN is shown below in Figure 1. LWC public transport corridor Trunk Route Planning analysis 3

Claremont Wynberg Govan Mbeki Rd N Transfer opportunities Khayelitsha Mitchells Plain Figure 1: LWC Trunk Route Alignment Towards the west the proposed route alignment forks, north and south, at the intersection with Jan Smuts and Strandfontein Road. North towards Claremont as depicted in blue and south towards Wynberg as depicted in red in Figure 1 above. The alternative option for the Wynberg bound route is a more direct east west route along Wetton Road as shown on the dotted line in Figure 2 below. This report evaluates these two Wynberg bound options. Wetton Rd Ottery Rd Figure 2: Alternative trunk option to Ottery Road Key criteria used to evaluate between these two trunk routes options are: Passenger demand System Coverage IPTN alignment System operational efficiency Land-use integration LWC public transport corridor Trunk Route Planning analysis 4

3.1.1 Passenger demand Existing road based public transport modes (busses and taxis) along this corridor use the more direct Wetton Road to access the Wynberg Public Transport interchange (PTI). A recent transport study around the Wynberg PTI highlighted the following movement patterns in and around the PTI: Approximately 15 000 passengers arrive at the Wynberg transport hub of which 10600 passengers alight on the eastern side of the railway line and walk to the western side of the Southern Suburbs rail line to their work and education activities. Percentage of these further transfer to other taxis, buses and rail. Further breakdown of these trips can be seen in the Figure 3 below. Volumes in yellow denote taxi passengers and bus in red. Figure 3: Peak Period Public Transport Trip arrivals at the Wynberg PTI Figure 4 below shows how these passengers depart from Wynberg PTI during the same time period LWC public transport corridor Trunk Route Planning analysis 5

Figure 4: Peak Period Public Transport Trips departing from the PTI By far the majority of the departures leave from the west side of the railway line with a third walking beyond the PTI towards the west. This predominant east-west pedestrian movement is seen on a daily basis in the morning peak period under the existing Broad Road under Southern Suburbs railway line. Figure 5 shows this movement from the East to West under the existing road underpass. Figure 5: Morning Peak Pedestrian Movement towards the West of the Railway line A more detailed analysis of the walking trips from the PTI shows destination along Wynberg Main Road and upper Wynberg as can be determined from the Figure 6 below: LWC public transport corridor Trunk Route Planning analysis 6

Figure 6: Pedestrian counts around the Wynberg PTI In summary the existing public transport operations do not adequately respond to passenger needs and therefore cannot be used to accurately indicate where passengers would like to be. As shown above, the majority of passenger s desire to be on the western side of the railway line where they either walk to their destination or transfer to another mode of transport towards areas further south along Main Road, or towards Hout Bay, or towards Claremont. So how do the alternatives support the passenger demand and desire for movement? Alternative 1: Wetton Road (via Broad Road) The Wetton Road alternative mirrors the existing public transport routes and operations and therefor poorly responds to passenger demand and movement desires for reasons already discussed above. Figure 7 below shows system coverage, showing a 250m, 500m and 750m walk, for this alternative: The Figure clearly shows that with a 750m walking distance the greater Wynberg area is out of reach and either requires an additional transfer to another mode of transport or a lengthy walk. LWC public transport corridor Trunk Route Planning analysis 7

250 500 750 Figure 7: System Coverage of Wetton Road Proposal The coverage of this alternative can only be improved by extending to the west side of the railway line which is physically near impossible to achieve through the existing underpass. Alternative 2: Ottery Road The Ottery Road (incl. South Wynberg Couplet) option allows a more direct service for passengers without the need for a transfer at the PTI to access destination along Wynberg Main Road and the greater Wynberg area. This is clearly shown in the system coverage map of the Ottery Road alternative below: 250 500 750 LWC public transport corridor Trunk Route Planning analysis 8

Figure 8: System Coverage of Ottery Road proposal Figure 8 clearly shows that within a 750 500m walk the majority of destination along Wynberg Main Road and the greater Wynberg area can now be reached directly with the Ottery Road alternative 3.1.2 System Coverage System coverage refers to the area reached by the proposed corridor and it is a function of trunk route location and supporting feeder route design. So how do the alternatives respond to system coverage? Turfall Road Alt. 2 Alt. 1 Wetton Road Ottery Road Alternative 1: Wetton Road (via Broad Road) This alternative has a narrower width and requires longer feeder services to match a similar coverage of the Ottery Road alternative. Alternative 2: Ottery Road This option includes a feeder service along Wetton Road and with this in place the coverage far exceeds the Wetton Road alternative by stretching further south towards Grassy Park and Lotus River. 3.1.3 IPTN alignment In the approved IPTN 2032, there are two north-south trunk routes intersecting with Lansdowne Wetton Corridor trunk routes within this vicinity of the metropolitan area, namely Strandfontein trunk corridor stretching from Strandfontein to Cape Town via Strandfontein Road and Jan Smuts Drive. Shown in green in Figure 9 Retreat to Bellville North East diagonal Corridor. Shown in black in Figure 9 LWC public transport corridor Trunk Route Planning analysis 9

Figure 9: IPTN Trunk Routes Intersecting along Strandfontein Road These trunk routes intersect along Strandfontein and Jan Smuts Drive between Ottery and Turfall Roads and provide direct connection between the following communities to Wynberg and Claremont, namely Strandfontein Pelican Park Lotus River Grassy Park Lansdowne Crawford Athlone Thornton Pinelands LWC public transport corridor Trunk Route Planning analysis 10

To ensure seamless and closed transfers, these transfers must take place within closed station environment. For this to happen, trunk routes need to overlap and share a common station as depicted below. Closed and seamless transfers is achieved Closed and seamless transfers are not possible where trunk routes intersect perpendicularly as shown below: Impossible to achieve closed and seamless transfers LWC public transport corridor Trunk Route Planning analysis 11

Routes that intersect perpendicular cannot share a common station and transfers between these services are open which requires passengers alighting one service and walking to another bus stop to board another service. So how do the alternatives respond to IPTN alignment? Alternative 1: Wetton Road This option intersects with the future north south road trunks perpendicularly and requires an open transfer where passengers would have to cross intersecting roads to catch the next public transport service. To overcome this, the north south trunk route needs to be re-routed off its direct alignment to provide this close transfer along Lansdowne Road. Alternative 2: Ottery Road This alternative provides the route overlap required to provide the closed and seamless transfers as shown in Figure 10 below: Figure 10: Alternative 2 Closed transfers Alternative 2 avoids any open transfers which risks passengers to conflicting private vehicle and public transport vehicles 3.1.4 System Operational efficiency LWC public transport corridor Trunk Route Planning analysis 12

A key indicator for public transport operational efficiency is average operating speed. Average operating speed determines route cycle time which influences fleet size. In summary the higher the operating speed, the shorter the cycle time and less the vehicles you need to provide a certain level of service. The average operating speed is directly proportional to the Right of Way categories of the public transport system and the class of road it operates on. A public transport system that operates on a physically separated right of way (Phase 1A red roads) can achieve much high average operating speed than a bus travelling in mixed traffic. A higher class or order of road is characterised by wider road reserves, longer intersection spacing s, reduced private erf access which results higher operating speeds. The average bus operating speed is an essential indicator that determines ridership and reduces system operational costs. To achieve this performance it is preferred that trunk routes operate along higher Class 2 order roads. However at the start and end of routes, accessibility outweighs mobility and therefor lower order roads are preferred at trip ends or where there is key accessibility segment along the route. So how do the alternatives respond to System Operational Efficiency? Alternative 1: Wetton Road The section of Wetton Road between Wetton Circle and Chukker Road operates as a Class 3 facility with regular intersecting roads and direct erf access. Figure 11: Pictures along Wetton Road - All Pics are in a westbound direction LWC public transport corridor Trunk Route Planning analysis 13

This route has significant congestion with daily private vehicular commuter trips travelling eastbound and then via Chukker Road to access the M5 towards Cape Town. To ensure the trunk operates at an acceptable travel speed, dedicated bus lanes will be required along this route. This will significantly impact: Road access arrangements: Numerous intersecting roads and private erf access along Wetton Road will be restricted to left in and left out access Road reserve requirements: Section of Wetton Road between Plantation and Chukker Road is too narrow to provide dedicated bus lanes and possibly require expropriation. LWC public transport corridor Trunk Route Planning analysis 14

Alternative 2: Ottery Road The City s approved road classification map identifies Ottery Road as a Class 2 facility which inherently supports mobility by having sufficient access road spacing and no direct erf access. The proposed South Road scheme has also been identified as an extension to this Class 2 facility to Wynberg. The only confined segment is between De Wet Road and Strandfontein Road which is an accessibility segment serving Ottery Hyper market, Makro and China Town development. Along this short segment accessibility outweighs mobility and therefore concept design has responded accordingly. Figure 12: Pictures along Ottery road - All pics are in a westbound direction LWC public transport corridor Trunk Route Planning analysis 15

3.1.5 Land-use integration An essential element to ensure sustainable public transport operations is a mutualistic land-use mix and arrangement that will ensure a two way flow ridership along this corridor. To achieve this appropriately located dense mix-use development is required. This evaluation assesses the alternatives readiness to respond this type of development So how do the alternatives respond to Land-use integration? Alternative 1: Wetton Road The Wetton Road alternative option is primarily residential with a portion of commercial and industrial between Plantation Road and Cape Flats Railway line. Beyond the Cape Flats Railway line towards the west, there is Kenwyn residential area on the north of Wetton Road and Youngsfield Military base on the South. Further west towards Wynberg, the rest is Sportsfield and the Kenilworth Racecourse until Rosmead Avenue. With an exception of the Plantation industrial area which only spans a short length, there is very low trip attracting land-use which will encourage more two way flow along the corridor. Alternative 2: Ottery Road The Ottery Road alternative currently consist of the following trip attracting land-use activities, namely Macro, Ottery Hypermarket, China Town and the Plantation Industrial area which will provide some degree of two way flow along the corridor. In addition the Lansdowne Wetton Corridor Land-use strategy has identified Ottery Road for mixed use intensification ranging from residential, retail, light industrial, commercial and institutional. 3.1.6 Strategic Corridor Level Conclusion LWC public transport corridor Trunk Route Planning analysis 16

Alternative 1: Wetton Road Alternative 2: Ottery Road Passenger Demand and Desire Does not respond to passenger Responds directly to passenger demand and requires an additional demand service (either walk or another mode) to access final destination System Coverage Poorer system coverage compared to Better System Coverage Alternative 2 compared to Alternative 1 IPTN Alignment Requires open transfer with Closed seamless transfer is intersecting trunks achieved Efficient Public Transport Operations On average slower operating speeds On average higher operating speeds Land-Use Integration Predominantly residential More retail and trip attracting land-use and better opportunity for future Transit Orientated Development Red shade denotes relatively negative impact & Green Shade denotes relatively positive impact Therefore, Alternative 2: Ottery Road is the preferred alternative 3.2 Localise Corridor Level Assuming Ottery Road is the preferred trunk route there are three options to access Wynberg end from Ottery Road, namely: Option 1 Rosmead and Broad Road (Yellow route below) Option 2 Old Ottery Road (Purple route below) Option 3 South Road Road and Wynberg Couplet (blue route below) Broad Rd LWC public transport corridor Trunk Route Planning analysis 17

Similar criteria and process, as for the strategic evaluation, was followed to assess the three (3) options. Option 3 scored relatively better and is therefore the preferred option. The results are summarised in table: LWC public transport corridor Trunk Route Planning analysis 18

Option 1: Rosmead & Broad Road Option 2: Old Ottery Road Option 3: South Road & Couplet Passenger Demand and Desire for movement Option 1 takes passengers to the existing Public transport interchange (PTI). Option 1 has similar results as Alternatative 1 as detailed in 3.1.1 Option 2 takes passengers to the existing PTI Option 1 has similar results as Alternatative 1 as detailed in 3.1.1 Option 3 takes passengers directly to their destination without the need on any additional transfer or walk Option 1 coverage is marginally less than Option 2 Option 2 is marginally more than Option 1 but Option 3 stretches across the railway and with a System Coverage and Option 3 and is limited to east of the railway line is still limited to east of the railway line feeder can also add the coverage reached by option 1 and 2 In terms of coverage, options score similarly. In terms of coverage, option score similarly In terms of coverage, option score similarly. IPTN Alignment All options align with the IPTN Network All options align with the IPTN Network All options align with the IPTN Network Efficient Public Transport Operations Due to Rosmead and Broad being a lower class of road, frequent road and private erf access contributes to slower operating speeds. Most of the on-board passengers will be bound to the PTI so mobility is still essential. Due to Old Ottery Road being a lower class of road, frequent road and private erf access contributes to slower operating speeds. Most of the on-board passengers will be bound to the PTI so mobility is still essential. The approved Road Network Plan identifies the future South Road as Class 2 facility. Along the Wynberg Couplet, since passengers are alighting closer to their destination, accessibility is now essential and therefor along the couplet mixed traffic bus operations is required. Land-Use Integration Mainly residential, sports and recreation, Civic and commercial Mainly residential, educational and small retail The Wynberg Couplet is planned for appropriate Transit Orientated Development Relative negative impact Relative medium impact Relative positive impact