CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE)

Similar documents
ATC Datalink on Boeing Airplanes

PDC VERSUS DCL. Southwest Airlines. Data Comm Update 2/26/2016

ATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

NATS Operational CPDLC Capability Prestwick and Swanwick centres

U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation

What you should know: Future Air Navigation System (FANS)

The LINK2000+ Test Facility Presentation. Eurocontrol LINK Programme

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

The benefits of satcom to airlines. Prepared by Helios for

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary

GOLD Chapter 4 Controller Procedures

Virgin Atlantic Airways

Summary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

23/05/2017. Analysis of FANS services in the EUR/SAM Corridor for the Year 2016

THE LINK DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL. March By Isabelle HERAIL

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

Version 3.0 February 28, 2017

The purpose of North Atlantic Operations Bulletin is to distribute the new issue of the Oceanic Errors Safety Bulletin (OESB).

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)

This NAT OPS Bulletin supersedes NAT OPS Bulletin, Serial Number: Summary of Changes

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

Future Air Navigation System (FANS)

Data Link Checklist. As of: 9/10/2017 1

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

[Docket No. FAA ; Directorate Identifier 2008-NM-103-AD; Amendment ; AD ]

Version 5.0 November 08, 2018

Atennea Air. The most comprehensive ERP software for operating & financial management of your airline

AERONAUTICAL INFORMATION CIRCULAR 33/17

Version 4.0 December 20, 2017

MITRE DATA COMMUNICATION LABORATORY INITIATIVE FOR DEPARTURE CLEARANCE (DCL)

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2008-NM-061-AD; Amendment ; AD ]

Central Reporting Agency (CRA) Issues List

Evidence Based Training For Airline Pilots

Mandates. Airbus Fleet Implementations. AEEC 19 th June 2018

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Aeromexico 787 C Checks A Maintenance Insourcing Case

Draft Rule for the Provision and Use of Data Link Services Economic Appraisal

COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) IPS over VDLm2 Feasibility Demonstration. CP WGI 19/IP January 2016

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

THIRTEENTH AIR NAVIGATION CONFERENCE

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

Update to Doc 8335 Manual of Procedures for Operations Inspection, Certification and Continued Surveillance

THIS MONTH. Aircraft Finance Review Engine-Maintenance Management Aircraft Comparative Analysis Phenom 300 Safety Focus: When No is Necessary

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

U.S. Domestic Data Link Overview

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

NAT OPS Bulletin Checklist Issued/Effective: 11 June 2012

Every detail counts.

Pilot Handbook U.S. Domestic En Route Controller Pilot Datalink Communication (CPDLC)

COMMUNICATIONS PANEL. WG-I 20 Meeting

Data Link Deep Dive. Brandon Burton

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

The NAT OPS Bulletin Checklist, available at (Documents, NAT Docs), contains an up to date list of all current NAT Ops Bulletins.

ICAO NAM/CAR/SAM ATS Data Link Implementation Workshop

SESAR DEPLOYMENT MANAGER WORKSHOP AIRPORT SAFETY. Airbus initiatives on airport safety nets PIERRE NIERADKA AIRBUS 20 FEB 2018

[EFFECTIVE DATE: 23 AUG 2012]

Interim Statement Ref. AAIU

Problem Reporting and System Performance Analysis

Global Operational Data Link Doc 10037

CIVIL AVIATION PUBLICATION CAP 00 GENERAL

Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference. 25 April 2007

AIRCOM Datalink Infrastructure

Aircraft Systems and 4D Trajectory Management

Australia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June SITA

PENS Symposium How to join PENS

ATC Guild, India. November 1 st, SITA AIRCOM Air Traffic Services Data Link Operational Solutions

[Docket No. FAA ; Product Identifier 2018-NM-151-AD; Amendment ; AD ]

Interim statement IN-036/2013

SAT/FIT/11 South American Office Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11

Tailored Arrivals (TA)

APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL

Jeff Holt October 21, Mandates & Timelines

ROLLS-ROYCE PLC

Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities

THE BOEING COMPANY

Cooperative Development of Operational Safety & Continuing Airworthiness Programme

ARINC Project Initiation/Modification (APIM)

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

Performance Based Communication and Surveillance

Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

U.S. Domestic CPDLC Flight and Route Planning Guide

U.S. Domestic CPDLC Flight and Route Planning Guide

ICAO provisions on data link implementation

Next Generation CNS/ATM. Incorporating Lessons Learned into Future Systems

Seeking Connec+vity Op+ons: We are here to learn!

AIR EUROPA LINEAS AEREAS, S.A.U. Plan for addressing the needs of the families of passengers involved in an aircraft accident.

AMDAR Software Development. B777 Software Development. (Submitted by AMDAR Panel Chairman) Summary and purpose of document

[Docket No. FAA ; Product Identifier 2018-NM-075-AD; Amendment ; AD ]

CNS / ATM Capabilities and Initial Operating Experience Of the Modernized C-5 Galaxy Steve Knoblock Lockheed Martin Flight Operations

July 2008 ISSUE, RENEWAL AND RE-ISSUE OF A FLIGHT ENGINEER LICENCE INCLUDING ADDITIONAL CATEGORY AND AIRCRAFT TYPE RATING 1.

CIAIAC CIAIAC. Report A-020/2016 COMISIÓN DE INVESTIGACIÓN DE ACCIDENTES E INCIDENTES DE AVIACIÓN CIVIL

Managing the unmanageable - views on the role airline companies can play. IBSC meeting, Stavanger, Introduction

AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives

[Docket No. FAA ; Product Identifier 2018-NM-129-AD; Amendment ; AD ]

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Transcription:

CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE) 1

Cpt. Apple Tree Cpt. Cherry Tree AEA is a very "Fruitful" Airline!! 2

3

Air Europa Founded in 1986 Headquarters in Mallorca (Spain) 80% Sheduled, 20% Charter Flights Domestic, European, American & Asian routes 4

Air Europa Present Fleet: 28 Boeing 2 Boeing 5 Boeing 1 Airbus B737-800 B737-400 B767-200 A340-200 5

Air Europa Year 2010 expected Fleet: 40 Boeing B737-800 5 Airbus A330-200 1 Airbus A340-200 A330 & A340 will be replaced with A350 6

CPDLC Approach Alex Wandels visit to PMI (July 2003) Evaluation Team:»»»»» Maint Engineering Computer Expert Handling Gnd Ops Flight Ops 7

CPDLC Approach Evaluation Team conclusion: CPDLC project useful for AEA due to: Future implementation ACARS introduction to AEA» Handling» Gnd Ops data link» Maintenance data» Flight Ops Eurocontrol incentives 8

CPDLC Approach Project proposal to and approval by AEA Staff Contract signature with Eurocontrol (Jan 04) 19 B737-800 CPDLC / VDL-2 equipped by end 06 First fully operational flight before April 05 9

CPDLC Development Meetings with Servers suppliers AEA server installation Equipment definition (CMU, printer...) OFG & LIT teams participation 10

CPDLC Development Flight Tests with new equipped aircrafts Crew Training DGAC authorisation Retrofit considerations (6 aircraft) 11

Flight Tests Performed 5 October 04: Boeing 1st delivery (EC-JAP) 4 November 04: Boeing 2nd delivery (EC-JBJ) 18 November 04: Boeing 3rd delivery (EC-JBK) 24 November 04: Boeing 4th delivery (EC-JBL) 26 January 05: MAD-ORY-MAD 28 January 05: PMI-ORY-PMI 18 February 05: MAD-ORY-MAD 12

5 October: Boeing 1st delivery (EC-JAP) First Boeing Production Aircraft with VDL-2 Training Session done before departure No previous experience with ACARS and Datalink 13

5 October: Boeing 1st delivery (EC-JAP) Seattle - Gander Gander - Palma 14

5 October: Boeing 1st delivery (EC-JAP) Data Link had to be changed manually over U.K. from POA to AOA (ACARS to VDL-2) 15

5 October: Boeing 1st delivery (EC-JAP) Many messages were interchanged 16

5 October: Boeing 1st delivery (EC-JAP) CONCLUSIONS: Although link was interrumped for a few minutes......test was very successful 17

4 November: Boeing 2nd delivery (EC-JBJ) No link could be established Solution was easy but unknown for us 18

18 November: Boeing 3rd delivery (EC-JBK) Cond AIR/ No GROUND 1. 2. 3. Air Procedure Element# Downlink REQUEST FL250 message dm6 Ground Upon receipt of downlink REQUEST FL250 message Uplink DESCEND TO FL250, DESCEND AT 2000 MAXIMUM message um23 + um174 Air Upon receipt of DESCEND TO FL250, DESCEND AT 2000 MAXIMUM message Downlink WILCO dm0 Predetermined Scenario was used Test was very satisfactory 19

24 November: Boeing 4rd delivery (EC-JBL) Previous experience was very useful Many messages were interchanged 20

24 November: Boeing 4rd delivery (EC-JBL) Final results were very successfull 21

26 January: MAD-ORY-MAD Cond AIR/ No GROUND Air 1. 2. Procedure Downlink REQUEST DIRECT TO NTM message Ground Upon receipt of downlink REQUEST DIRECT TO NTM message Uplink FLY HEADING 180 message 3. Air Upon receipt of uplink FLY HEADING 180 message Send a STANDBY response Send a WILCO response Element# dm22 um190 dm2 dm0 Previous Scenario was repeated Data Link was lost for a few minutes over France and several times in Spain 22

CPDLC Test 23

28 January: PMI-ORY-PMI A 4 sec difference between Aircraft FMC and Ground was noticed Reason: CMU was not reading Time data from the FMC Solution: CMU software change to allow CMU use FMC time data 24

18 February: MAD-ORY-MAD A DGAC Inspector flew on board Everything went according to plans D-ATIS was used Departure Clearance (DLC) could not be obtained 25

Crew Training 26

Crew Training WRITTEN EXAMINATION 27

DGAC Authorisation 1.Ops Manual Inclusion......V 1.Incidents Report Format....V 1.Crew Training...V 1.Verification Flight.. (18 Feb 05)...V 28

DGAC Authorisation Therefore, Spanish CAA considers that Air Europa has addressed the relevant operational considerations to use, according to the Eurocontrol LINK 2000+ Programme, Controller Pilot Data Link Communications (CPDLC), and takes down the beginning of CPDLC operations as a supplementary means of communication to voice, without replacing voice as a primary means of communication. DGAC CPDLC Operation for B737 Letter was approved on 18 April 2005 Ready to overfly Maastricht!! 29

Future Objectives First CPDLC over Maastricht Crew experience ACARS optimisation FANS A (A340-200) FANS A+ (A330-200) FANS B (A350-800) ADS B?? 30

Summary Good news: 6 Aircraft fully CPDLC equipped 6 Aircraft retrofit beginning Nov 05 New Aircraft expected soon ACARS server operational We are on the right track Bad news: AENA delayed CPDLC implementation til 2011 (first 2007, then 2009, 2011??) 31

32

We, at Air Europa, look the future with enthusiasm Centro Empresarial Globalia P.O. BOX 132 07620 Llucmajor - Baleares - Spain Tel.: +34 629 163 083 Fax.: +34 971 178 093 e-mail: jordi.manzano@air-europa.com 33