THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT

Similar documents
Appendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No

waterview connection Completing the Western Ring Route the Waterview Connection

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

Message to all Members, Supporters and Associated Parties.

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Concord Road Interchange. Standard hours of work

5.7 Local road upgrades

Policy Transport. Policy highlights. Our plan

Auckland Transport - Transport Indicators Report June 2013

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Expected from the initial 5-year funding package for State Highways (2006/07 to 2010/11) SH1, Cape Reinga SH1, Waitiki Land to Cape Reinga Stage 2*

National Land Transport Programme Auckland

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Whether travelling on two wheels or two feet, we help communities stay active and sustainable.

Draft City Centre Transport Proposals

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Michael John Foster. Cont. Experience: Bachelor of Arts (Massey) Diploma of Town Planning (Auckland)

Northern Beaches Transport Action Plan

Appendix 1 Table 1A: Auckland Transport Proposed Funded Capital Programme for AT Board approval (20th June 2018)

Te Atatu Interchange Upgrade and Causeway Upgrade Project Community Liaison Group (CLG) Meeting 6

Abbey Chesterton bridge Questions & Answers

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

Urban Cycleways Programme Announcement Questions and Answers

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

$745 $10 $41 OVERVIEW

New bus services for Warkworth and the Kowhai Coast

Explore the Bay the Green Way

Centurion Way Chichester

Auckland Transport Quarterly Indicators Report 2018/19

M621. Junctions 1 to 7 Improvement scheme. Share your views

Manawatu Gorge update 2 December

REPORT ON SUBMISSION TO LET S GET WELLINGTON MOVING

Appendix 6 Fulbourn Greenway Review

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

SH1 Cycle Lanes Parking Study

Route 29 Solutions Projects

Statistics Report. May Page 1

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

M4 Junctions 3 to 12 Smart motorway

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

David acts an Independent Hearing Commissioner and has considered plan changes, resource consents and notices of requirements.

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

WESTLAKE GIRLS HIGH SCHOOL AFTERNOON SCHOOL BUSES 2018

Part four. In this part you will find: The next steps to deliver the master plan

FEASIBILITY CRITERIA

Statistics Report. April Page 1

GO MEDIA UPPER NORTH IS. CLASSIC SITECARDS (DEC-JAN)

Inside Government Conference Case Study: Norwich Northern Distributor Road

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

NLTF 2020/21 ($000) Funding Priority NLTF 2018/19 ($000) NLTF 2019/20 ($000)

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

Have your say... on the Ian McKinnon Drive Cycleway Project

Infrastructure Policy Priorities for New Zealand

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Appendix 8 Sawston Greenway Review

ROTORUA INTEGRATED NETWORK STRATEGY

M2 Junction 5. improvements scheme. Preferred route announcement

Kaiwaka and Kaipara District. Council. Working in Partnership

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

Public consultation exhibition

CLEM7 Project South Community Liaison Group Meeting #29

Have your say on Let s Get Wellington Moving PUBLIC FEEDBACK IS OPEN UNTIL FRIDAY 15 DECEMBER 2017

Rangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY

Designing & Building for People on Bikes within evolving constraints Auckland Central City

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Smart Safety Tidal Flow Barrier

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

APPENDIX F List of Commitments

Long water shutdown scheduled for Tuesday, September 18

The Point Roundabout Improvement Scheme

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Strategic Plan Mt Eden Village Inc T: W: mounteden.co.nz E:

North Waikato Integrated Growth Management

Regional summary - Wellington

Traffic Calming Measures

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Statistics Report. June Page 1

November 21, 2012 Barbara Kelleher, (954)

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Monthly Traffic Update

Pattullo Bridge Replacement Project

Department of Environment, Climate Change & Water NSW. Stakeholder feedback

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

4. Safety Concerns Potential Short and Medium-Term Improvements

Road Investment Strategy A1 East of England Strategic Road Study

Industry briefing NOVEMBER 2017

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Routes. Northern Express via Busway. Other timetables available in this area that may interest you

Islay Offshore Wind Farm

Transcription:

THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT The Northern Corridor Improvements Project is the last link in the Western Ring Route, connecting the north with the west long SH1 and SH18. Major benefits of completing the Northern Corridor Improvements Project include: A second high quality, high capacity route for north-south travel through Auckland that avoids the central city A resilient and alternative route for freight between Northland and the rest of the country Easing pressure on the surrounding local road network in Albany, North Harbour and further north and north-west Improving public transport options by extending the successful Northern Busway More than 7kms of new safe shared cycling and walking facilities. To Whangarei Albany Northern Corridor Connection for Western Ring Route State Highway 1 Western Ring Route Northern corridor Western Ring Route corridor SH1 corridor Westgate/ Massey North Waterview Tunnel St Lukes Auckland CBD Newmarket Manukau Harbour Manukau Auckland International Airport To Hamilton & Tauranga

WHAT S PLANNED WHANGAREI OTEHA VALLEY RD The Northern Busway will be extended from The plan shown here has been Constellation Bus Station, further north approved by the Board of Inquiry ALBANY to Albany Bus Station. and is now going through a detailed design process with MCCLYMONTS RD the NCI Alliance team. As part of the detailed design process, SPENCER RD BRIDGE enhancements or changes may be made to the design as we progress into 2018. 7km of shared walking and cycling path alongside SH1 and SH18. GREVILLE RD Extra motorway lanes on SH1 in both directions between Upper Harbour Highway (Constellation) and Greville Rd. KEY ALBANY EXPRESSWAY State highway New state highway Direct motorway-tomotorway connection between the Northern Walking and cycling shared path Paul Matthews Rd s connection to SH18 will be upgraded, with Motorway (SH1) and Upper Harbour Highway (SH18) for Busway extension direct access to and from Constellation traffic heading north and west. Bus station Dr, Caribbean Dr and Main road Secondary road the new SH18 ramps. PAUL MATTHEWS RD CONSTELLATION DR INDICATIVE TIMELINE 2017 Statutory approvals 2018 Construction start 2021/22 Construction complete ALBANY HIGHWAY UNSWORTH DR CARIBBEAN DR SUNSET RD CONSTELLATION Local traffic will continue to use Constellation Dr and Caribbean New SH18 motorway Dr with upgrades lanes connect to planned at both the existing SH18 intersections. motorway lanes at Albany Highway. CITY CENTRE SHARED PATH BUSWAY SH1 SOUTHBOUND SH1 NORTHBOUND HOBSONVILLE, WESTERN RING ROUTE, AUCKLAND AIRPORT Typical cross-section of SH1 north of Rosedale Rd showing the proposed motorway lanes, Busway Extension and shared walking and cycling path.

NEW YEAR, NEW WORKS What will we see happen in the first six months of 2018? Door knocking, meetings and advance notifications of works to all affected neighbours Early works to prepare the motorway, such as pavement strengthening to reduce the risk of skids and potholes. Median barrier replacement and narrowing of lane widths, as well as temporary 80km/h speed limit to create a safe work zone for construction crews Establishment of construction sites, vegetation clearance, fencing and signs Rebuilding and widening of motorway bridge structures Extra VMS signs to warn you of what s ahead. OUR COMMITMENT TO YOU» We will focus on your safety» We will prioritise keeping bus journeys reliable» We will minimise lane changes to avoid driver confusion and frustration» We will minimise local road impacts where ever possible, and keep current walking and cycling paths open WHAT HAPPENS NEXT JAN/FEB 2018 2018-2021 NOV 2017 2021-2022 Board of Inquiry approval of consents and designations Agreement with Auckland Council for work plans and start of works Construction works on Northern Busway, walking and cycling paths and SH1-SH18 in stages Completion and opening events

FUN FACTS 1,000,000m 3 OF EARTHWORKS That s the same as 14,771 40ft shipping containers! LENGTH 5KM UPGRADE & NEW BUSWAY 33.6km OF KERB AND CHANNEL That s the distance from Auckland Harbour bridge to Orewa. BUILDING BLOCKS 350 SUPER-T BEAMS 2KM UPGRADE EARTHWORKS 17.2km OF DRAINAGE That s the distance from the SH18/ Paul Matthews Drive intersection to Hibiscus Coast bus station Silverdale. 24.9km OF SUBSOIL DRAINS Upper Harbour Highway to Hatfields Beach 7,000 TONNES OF BITUMEN That s the weight of 1,296 African Elephants! 10,000 PRECAST UNITS 575 MANHOLES CONSTRUCTION 18 BRIDGE STRUCTURES 7km OF RETAINING WALL 60 such as cranes, excavators and dump trucks. DIFFERENT TYPES MACHINES USED AT PEAK 200,000m 2 OF PAVEMENT That s the same as 19 rugby fields! 25,000m 2 RETAINING 250,000m 2 OPEN GRADED OVER 300,000 native plants to be planted. WE LL HAVE 350 STAFF That s the same as 23 rugby teams (playing 15). WALLS POUROUS APHALT (OGPA)

NEW YEAR, NEW WORKS COMMUNITY SPORTS FACILITIES AND OPEN SPACES The NZ Transport Agency is committed to delivering infrastructure that contributes to a great environmental and social legacy for the community. This means the NCI project is working with Mana Whenua, Auckland Council Parks, Auckland Transport and other stakeholders to reinstate or improve open spaces, parks and ponds along the project zone, including: Creating over 7km of walking and cycling paths and connections, to provide safe separated transport options to encourage greater participation and active lifestyles Ensuring water catchments and stormwater systems recreate natural landscape features, including new wetland ponds, new planting and better habitats for animals and birds Establishing new areas of mass planting and trees to add to the area s biodiversity and creating a green corridor for the community to enjoy Developing reinstatement plans for Meadowood, Rook and Arrenway Reserves Relocating the Harbour Hockey facility from its current location, and supporting their development of a new national hockey centre on the new site. Part of the project s management planning processes include developing an Urban Design Landscape Plan, which is currently with Auckland Council for consultation. This document will be shared with the community in the New Year. Location: Greville Road looking southbound to Constellation Drive (2021-22) SPORTS CLUB RELOCATIONS The Transport Agency has been working with Harbour Hockey, Harbour Hockey Charitable Trust, Hockey NZ, Watercare and Auckland Council for the past two years to investigate options for relocating the hockey facility. A proposal is currently before the Upper Harbour Local Board to approve which would move the hockey facility to another part of Rosedale Park; build a new facility for North Harbour BMX in Hooton Reserve; and build a new pony centre in Wainoni Park, Greenhithe, onto which Rosedale Pony Club would relocate alongside other pony clubs. Resource consent, leasing and approval processes are underway and we will have a decision of the outcome very soon. In the meantime, the Transport Agency will continue to support Harbour Hockey accommodating games and tournaments on its current site.» Artist impressions of the proposed new Harbour Hockey facility, Rosedale Park; new pony club centre at Wainoni Park; and new North Harbour BMX facility, Hooton Reserve.

NEW YEAR, NEW WORKS How will you involve us and keep us informed? We re committed to working alongside the community to try to minimise disruption and provide real-time travel info to keep everyone SUPPORTING PROPERTY OWNERS All property owners with land affected by our project are already in discussions with our project team about what happens next with their property. The next step is for our Community Engagement Team to contact all other neighbouring property owners, businesses and tenants about what s coming up and what temporary traffic management or construction mitigation measures will be put in place nearby. If you have any concerns in the meantime, please don t hesitate to contact the team on the contacts listed here. safe and moving while we re in construction. As part of this we will: Provide neighbouring homes and businesses with advance notice of any works nearby, either in face-to-face meetings or by letter, flyer, phone or email Advertise and run monthly info days and events, including the opportunity to provide input into key issues Provide quarterly briefings about what s coming up with stakeholders and emergency services Mail out quarterly project updates to the wider area Regularly publish videos, photography and updates about what s happening KNOW BEFORE YOU GO Check www.nzta.govt.nz/traffic for live traffic updates, web cameras or to sign up to get On the Move email alerts when incidents happen on your saved routes Use NZTA s online Journey Planner www.journeys.nzta.govt.nz to choose whether it s best to drive, bus, walk or cycle each day Download AT s AT Mobile app to see times and options for public transport trips instead of driving Keep up to date in between times with NZTA s Facebook.com/nztaakl page Subscribe to our weekly works ahead email on our project website: www.nzta.govt.nz/aucklandnorthern-corridor on site to our website and social media. TO ASK QUESTIONS OR PROVIDE US WITH FEEDBACK, CONTACT: EMMA CUSHNIE Community Engagement Manager (Albany, East Coast Bays, Rosedale) OR TRISH VIALL Community Engagement Manager (North Harbour, Unsworth Heights) Phone: 0800 NCI PROJECT Email: northerncorridor@nzta.govt.nz or Web: www.nzta.govt.nz/auckland-northern-corridor

WHANGAREI PROPOSED NCI SHARED USE PATH CONNECTIONS AND PATHS SUBJECT TO FURTHER FEASIBILITY AND DESIGN 19 20 1 OTEHA VALLEY RD EAST COAST RD OTEHA VALLEY RD ALBANY BUS 2 23 3 24 24 SPENCER RD The Northern Corridor Improvements Project includes over 7km of shared use walking and cycling paths which run all the way from Oteha Valley Road down to Constellation Drive and then across and along SH18, joining up to the new cycle path on Albany Highway. It is envisaged that the shared path will be similar to the popular Northwestern Cycleway on the Northwestern Motorway (SH16). ALBANY EXPRESSWAY ALBANY EXPRESSWAY SPENCER RD BRIDGE TAWA DR 4 5 GREVILLE RD 17 6 EAST COAST RD There will be easy access to the path all along its length, connecting the new facilities to the existing local network. There will be ample space for walkers and cyclists with the shared path 5-metres wide in most places (a 3-metre wide shared path with a 1-metre shoulder on either side). The path will be well lit at night, with ramp accesses making it safe and easy for users of all ages to enjoy. 7 8 18 9 APOLLO DR CONSTELLATION DR While the shared use path will be built over the next four years alongside the wider NCI project, Tirohanga Whanui (the Spencer Road to Albany walking and cycling bridge) is already under construction in Albany over SH1. This bridge will provide an early offroad connection between the East Coast Bays and Albany s commercial and retail area as well as Massey University. 22 25 14 WILLIAM PICKERING DR 13 PAUL MATTHEWS RD 11 12 UNSWORTH DR 15 CARIBBEAN DR 21 10 16 SUNSET RD CONSTELLATION UPPER HARBOUR DR CITY CENTRE HOBSONVILLE, WESTERN RING ROUTE, AUCKLAND AIRPORT KEY Proposed Northern Corridor Shared Use Path (2021) Connection points confirmed through statutory approvals: Additional connections and paths still being scoped: Proposed walking and cycling path connection points (2021) Local walking and cycling route Proposed routes for cycling and walking Future proposed Northern Cycleway Current motorway Local roads Busway 1. Oteha Valley Road 2. Masons Road 3. McClymonts Road 4. Spencer Road and bridge connecting to Corinthian Drive 5. Greville Road 6. Rosedale Road 7. Arrenway Drive connection 1 8. Arrenway Drive connection 2 9. Constellation Drive 10. Caribbean Drive 11. Paul Matthews Road 12. Alexandra Creek and connection to existing underpass to Rook Reserve 13. William Pickering Drive 14. Albany Highway 15. Walkway to Jumento Place 16. Walkway to Cabello Place 17. Future link to Rosedale landfill reserve 18. Future link to Centorian Reserve 19. Oteha Valley Road connecting path 20. Crossing over Oteha Valley Road and eastern side path 21. Eastern side path on Caribbean Drive 22. Path along Albany Highway to Bush Road 23. Elliot Rose path, McClymonts Road paths and extra SUP connection at McClymonts Road (opposite side) 24. Pedestrian and cycle refuges at Elliot Rose and McClymonts Road intersections 25. Safety measures at SH18/Albany Highway intersection