Merritt Island Airport

Similar documents
Table of Contents. Overview Objectives Key Issues Process...1-3

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Airport Master Plan Update

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

General Aviation Master Plan Update

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Austin-Bergstrom International Airport Master Plan Update

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

CHAPTER 5 - FACILITY REQUIREMENTS

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Forecast and Overview

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Lake Tahoe Airport Master Plan

Study Committee Meeting. September 2015

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

CHAPTER 1: INTRODUCTION

1. Background and Proposed Action

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

MASTER PLAN UPDATE GRANT NUMBER

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

TABLE OF CONTENTS CHAPTERS. INTRODUCTION... i CHAPTER ONE: FORECAST OF AVIATION DEMAND

CHAPTER 1 EXECUTIVE SUMMARY

Chapter 4 Airport Facility Requirements

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

3.1 CRITICAL AIRCRAFT

Addendum - Airport Development Alternatives (Chapter 6)

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

Master Plan Update Technical Advisory Committee Meeting

Chapter 5 Airport Development Alternatives

Public Information Meeting. September 2015

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Collier County Airport Authority. Joint Automated Capital Improvement Program

CHAPTER 3 ALTERNATIVES CONSIDERED

Introduction DRAFT March 9, 2017

Welcome to the Boise Airport Master Plan Update Open House

Hartford-Brainard Airport Potential Runway Closure White Paper

Punta Gorda Airport Master Plan Update

Source: Chippewa Valley Regional Airport ASOS, Period of Record

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

and Forecast Review and Approval Process

Appendix C AIRPORT LAYOUT PLANS

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

Airport Master Plan 1

Chapter 2 FINDINGS & CONCLUSIONS

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

CITY OF HAMMOND HAMMOND NORTHSHORE REGIONAL AIRPORT MASTER PLAN UPDATE Work Authorizatiou for Professional Services

Westover Metropolitan Airport Master Plan Update

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Dallas Executive Airport Town Hall Meeting April 3, 2014

Airport Master Plan Update June 15, 2017

DRAFT MASTER PLAN UPDATE

EXECUTIVE SUMMARY INTRODUCTION EXISTING CONDITIONS CECIL FIELD MASTER PLAN UPDATE

INTRODUCTION. General

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Technical Advisory Committee Meeting February 29, 2016

C > Capacity Analysis and Facility Requirements

Chapter 3 FACILITY REQUIREMENTS

CATCODE ] CATCODE

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Airport Master Plan Update June 15, 2017

Chapter 8.0 Implementation Plan

Agenda: SASP SAC Meeting 3

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Chapter 4.0 Facility Requirements

Alternatives Development and Evaluation Report

ARP Forecast Review Critical Aircraft Data Sources

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS

Transcription:

TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory Guidelines... 1-3 Master Plan Process... 1-4 KEY PARTICIPANTS AND PUBLIC INVOLVEMENT... 1-5 Technical Advisory Committee... 1-5 Titusville-Cocoa Airport Authority Staff... 1-5 Public Involvement Process... 1-7 SUMMARY... 1-7 CHAPTER 2 INVENTORY OF EXISTING CONDITIONS... 2-1 AIRPORT BACKGROUND... 2-1 Overview... 2-1 History... 2-1 Location... 2-1 Airport Management... 2-3 Airport Activity... 2-3 AERONAUTICAL ROLE... 2-3 National System... 2-3 State System... 2-5 Regional Aviation System... 2-5 AIRFIELD... 2-7 Runway... 2-7 Taxiways... 2-7 Signage... 2-8 NAVIGATIONAL AND VISUAL AIDS... 2-8 Non-Directional Beacon... 2-8 Satellite Based Navigation... 2-8 Weather Reporting... 2-11 Visual Approach Aids... 2-11 AIR TRAFFIC MANAGEMENT... 2-12 Communications... 2-12 Airspace... 2-12 LANDSIDE FACILITIES... 2-13 Apron Space... 2-13 Hangars... 2-15 Surface Access... 2-16 Auto Parking... 2-16 Security... 2-16 SUPPORT SERVICES AND FACILITIES... 2-21 Emergency Response... 2-21 Airport Maintenance... 2-21 Fixed Base Operator... 2-21

Fuel... 2-22 Electrical Vault... 2-22 LAND USE AND ZONING... 2-23 ENVIRONMENTAL REGULATORY REQUIREMENTS... 2-25 Water Quality... 2-25 Historical, Architectural, Archaeological and Cultural Resources... 2-26 Biotic Communities... 2-26 Endangered and Threatened Species... 2-27 Wetlands... 2-27 Floodplains... 2-28 Coastal Zone Management Program... 2-28 Farmland... 2-29 CONCLUSION... 2-29 CHAPTER 3 FORECASTS OF AVIATION FORECASTS... 3-1 INTRODUCTION... 3-1 Needs and Benefits... 3-1 Forecasting Limitations... 3-1 HISTORICAL ACTIVITY... 3-2 Operations... 3-2 Based Aircraft... 3-2 EXISTING FORECASTS OF ACTIVITY... 3-4 Florida Aviation System Plan... 3-4 Terminal Area Forecast... 3-4 FAA Aerospace Forecast... 3-4 SOCIOECONOMIC INDICATORS... 3-6 Population... 3-6 Per Capita Income... 3-7 Unemployment... 3-8 Regression Analysis and Socio-Economic Correlation... 3-8 AVIATION ACTIVITY FORECASTS... 3-9 Forecast Methodology... 3-9 Aircraft Operations Forecasts... 3-11 Selected Forecast... 3-12 Local/Itinerant Operations Forecast... 3-14 Aircraft Fleet Mix Forecast... 3-14 Based Aircraft Forecast... 3-18 Instrument Approach Activity... 3-22 PROJECTED BASED AIRCRAFT FLEET MIX... 3-19 Instrument Approach Activity... 3-20 Peak Activity... 3-22 Aircraft Parking... 3-23 GA Passengers and Automobile Parking... 3-24 SUMMARY... 3-25 CHAPTER 4 DEMAND CAPACITY/FACILITY REQUIREMENTS... 4-1 AIRFIELD DEMAND CAPACITY ANALYSIS... 4-1 Airspace Capacity... 4-1 Airfield Capacity Methodology... 4-2 Operational Characteristics... 4-7 Meteorological Conditions... 4-8 Airfield Capacity Analysis... 4-12 Annual Service Volume... 4-14

Annual Aircraft Delay... 4-16 Summary... 4-17 FACILITY REQUIREMENTS... 4-18 Airport Role and Service Level... 4-18 Airport Reference Code and Critical Aircraft... 4-19 RUNWAY SYSTEM REQUIREMENTS... 4-21 Runway Length Analysis... 4-22 Runway Width... 4-25 Runway Pavement Strength... 4-25 RUNWAY SAFETY DIMENSIONAL REQUIREMENTS... 4-25 Runway Safety Area... 4-27 Runway Object Free Area... 4-27 Runway Protection Zone... 4-28 TAXIWAY SYSTEM REQUIREMENTS... 4-28 Taxiway A... 4-28 Taxiway B... 4-29 Taxiway Connectors... 4-29 APPROACH AND NAVIGATIONAL AIDS... 4-29 Instrument Approach Facilities... 4-30 Visual Landing Aids... 4-30 Weather Reporting... 4-30 AIRFIELD LIGHTING, SIGNAGE, AND PAVEMENT MARKINGS... 4-31 Runway Lighting... 4-31 Taxiway Lighting... 4-31 Pavement Markings... 4-31 Taxiway Lighting... 4-31 AIRCRAFT APRONS AND TIE-DOWNS... 4-31 AIRCRAFT HANGARS... 4-32 AIRCRAFT FUEL STORAGE... 4-34 FIXED BASE OPERATOR TERMINAL FACILITIES... 4-36 AUTOMOBILE PARKING... 4-37 GROUND ACCESS... 4-37 AIRPORT SECURITY AND FENCING... 4-38 AIRCRAFT RESCUE AND FIREFIGHTING... 4-38 STORMWATER DRAINAGE... 4-39 LAND ACQUISITION... 4-39 SUMMARY... 4-39 CHAPTER 5 ALTERNATIVES ANALYSIS... 5-1 OVERVIEW... 5-1 AIRPORT S LONG-TERM ROLE AND SERVICE LEVEL... 5-1 DEVELOPMENT CONSIDERATIONS... 5-2 Previously Proposed Development... 5-3 Preferred Development... 5-4 DEVELOPMENT CONCEPTS... 5-6 Runway Safety Area Evaluation... 5-6 Instrument Approach Evaluation... 5-10 Pavement Maintenance... 5-11 ALTERNATIVES ANALYSIS... 5-13 ALTERNATIVE 1 DEMAND BASED DEVELOPMENT... 5-14 Airside Development... 5-16 Landside Development... 5-19 Order of Magnitude Cost Estimates... 5-23 ALTERNATIVE 2 LIMITED DEVELOPMENT... 5-25

Airside Development... 5-25 Landside Development... 5-28 Order of Magnitude Cost Estimates... 5-30 ALTERNATIVE 3 UNCONSTRAINED DEVELOPMENT... 5-32 Landside Development... 5-32 Order of Magnitude Cost Estimates... 5-34 REFINED/SELECTED ALTERNATIVE... 5-36 Flexibility/Planning Requirements... 5-36 Phasing/Construction... 5-36 Operational Performance and Safety Considerations... 5-37 Off Airport Land Use and Airport Zoning... 5-37 Noise and Noise Notice Zones... 5-37 Environmental Impacts... 5-39 Stormwater and Drainage Requirements... 5-39 Community Recommendations/Acceptance... 5-40 Evaluation Summary... 5-40 Preferred Development Concept... 5-41 POTENTIAL ENVIRONMENTAL IMPACTS PREFERRED ALTERNATIVE... 5-52 Projects that are Anticipated to be Categorically Excluded... 5-52 Projects that are Anticipated to Require an Environmental Assessment Level of Documentation... 5-55 Regulatory/Permitting... 5-56 Order of Magnitude Cost Estimates... 5-58 SUMMARY... 5-61 CHAPTER 6 AIRPORT LAYOUT PLAN... 6-1 INTRODUCTION... 6-1 COVER SHEET (SHEET 1)... 6-2 AIRPORT LAYOUT PLAN (SHEET 2)... 6-2 TERMINAL AREA PLAN (SHEET 3)... 6-2 AIRPORT AIRSPACE DRAWINGS (SHEET 4)... 6-3 INNER APPROACH SURFACE DRAWINGS (SHEETS 5 AND 6)... 6-4 DEPARTURE SURFACE PLANS (SHEET 7)... 6-4 AIRPORT LAND USE DRAWING (SHEET 8)... 6-5 AIRPORT PROPERTY MAP (SHEET 9)... 6-5 CHAPTER 7 IMPLEMENTATION PLAN... 7-1 GENERAL... 7-1 HISTORIC AND CURRENT FUNDING... 7-2 Project Cost Estimates... 7-6 Project Phasing... 7-7 Project Funding... 7-7 Capital Improvement Program... 7-13 Other Airports... 7-22 CASH FLOW FORECAST... 7-23 Airport Authority Financial Structure... 7-24 Forecast Methodology... 7-27 Airport Rates and Charges... 7-27 Operating Revenues and Expenses... 7-27 Cash Flow Assessment... 7-29 SUMMARY AND RECOMMENDATIONS... 7-30

APPENDICES APPENDIX A GLOSSARY OF TERMS... A-1 APPENDIX B NATURAL FEATURES INVENTORY... B-1 APPENDIX C KEY PARTICIPANTS AND PUBLIC INVOLVEMENT... C-1 APPENDIX D BASED AIRCRAFT AND HANGAR WAITING LIST... D-1 APPENDIX E RUNWAY SAFETY AREA EVALUATION... E-1 APPENDIX F AIRPORT LAYOUT PLAN CHECKLIST... F-1 APPENDIX G FAA NATIONAL PRIORITY RATING... G-1 APPENDIX H FDOT AVIATION PROJECT HANDBOOK... H-1

LIST OF TABLES TABLE 2-1 NPIAS CLASSIFICATION... 2-5 TABLE 2-2 NEARBY AIRPORT PROFILES... 2-7 TABLE 2-3 SUMMARY OF EXISTING FACILITIES... 2-19 TABLE 3-1 HISTORICAL AIRPORT OPERATIONS... 3-3 TABLE 3-2 HISTORIC BASED AIRCRAFT... 3-3 TABLE 3-3 FASP FORECAST, 2007-2026... 3-4 TABLE 3-4 FAA TERMINAL AREA FORECAST... 3-5 TABLE 3-5 FAA AEROSPACE FORECAST ACTIVE FLEET... 3-5 TABLE 3-6 FAA AEROSPACE FORECAST HOURS FLOWN... 3-6 TABLE 3-7 HISTORICAL POPULATION... 3-7 TABLE 3-8 HISTORICAL PCPI... 3-7 TABLE 3-9 HISTORICAL UNEMPLOYMENT... 3-8 TABLE 3-10 COMPARISON OF TOTAL OPERATIONS FORECASTS... 3-13 TABLE 3-11 LOCAL VS ITINERANT OPERATIONS... 3-14 TABLE 3-12 FAA PROJECTED NATIONAL ACTIVE AIRCRAFT FLEET... 3-15 TABLE 3-13 FORECAST OPERATIONS BY AIRCRAFT TYPE... 3-17 TABLE 3-14 BASED AIRCRAFT FORECAST... 3-18 TABLE 3-15 FORECAST BASED AIRCRAFT BY TYPE... 3-21 TABLE 3-16 COI INSTRUMENT FLIGHT RULES OPERATIONS... 3-22 TABLE 3-17 HISTORIC PEAK MONTH AND DAY % OF OPERATIONS... 3-22 TABLE 3-18 PEAK HOUR OPERATIONS BREAKDOWN... 3-23 TABLE 3-19 UNCONSTRAINED AIRCRAFT PARKING DEMAND... 3-24 TABLE 3-20 PEAK PASSENGER DEMAND... 3-24 TABLE 3-21 FORECAST OF AUTOMOBILE PARKING... 3-25 TABLE 3-22 COMPARISON BETWEEN TAF FORECASTS AND AIRPORT FORECAST... 3-25 TABLE 3-23 FORECAST SUMMARY... 3-26 TABLE 4-1 TAXIWAY EXITS... 4-6 TABLE 4-2 HOURLY CAPACITY OF RUNWAY COMPONENT CALCULATION MATRIX... 4-13 TABLE 4-3 CALCULATION OF WEIGHTED HOURLY CAPACITY... 4-13 TABLE 4-4 CALCULATION OF DEMAND RATIOS... 4-14 TABLE 4-5 ANNUAL SERVICE VOLUME... 4-15 TABLE 4-6 ANNUAL AIRCRAFT DELAY... 4-16 TABLE 4-7 SUMMARY OF AIRFIELD CAPACITY ANALYSIS... 4-17 TABLE 4-8 AIRCRAFT APPROACH CATEGORIES... 4-20 TABLE 4-9 AIRPLANE DESIGN GROUP... 4-20 TABLE 4-10 RECOMMENDED RUNWAY LENGTHS... 4-23 TABLE 4-11 RUNWAY SAFETY AREA DIMENSIONS... 4-25 TABLE 4-12 APRON AND TIE-DOWN PARKING REQUIREMENT... 4-32 TABLE 4-13 UNCONSTRAINED AIRCRAFT STORAGE DEMAND... 4-33 TABLE 4-14 UNCONSTRAINED AIRCRAFT STORAGE AREA DEMAND... 4-34 TABLE 4-15 ANNUAL AIRCRAFT OPERATIONS BY FUEL USAGE... 4-35 TABLE 4-16 FUEL STORAGE REQUIREMENT... 4-35 TABLE 4-17 FBO TERMINAL FACILITY REQUIREMENTS... 4-36 TABLE 4-18 AUTOMOBILE PARKING REQUIREMENT... 4-37 TABLE 4-19 SUMMARY OF FACILITY REQUIREMENTS... 4-40 TABLE 5-1 RSA ALTERNATIVES DECLARED DISTANCES CALCULATIONS... 5-8 TABLE 5-2 ORDER OF MAGNITUDE COSTS PREFERRED RSA ALTERNATIVE... 5-10 TABLE 5-3 NON-PRECISION INSTRUMENT APPROACH REQUIREMENTS... 5-11

TABLE 5-4 PAVEMENT CONDITIONS... 5-13 TABLE 5-5 SUMMARY OF FACILITY REQUIREMENTS... 5-14 TABLE 5-6 ORDER OF MAGNITUDE COSTS ALTERNATIVE 1... 5-23 TABLE 5-7 ALTERNATIVE 1 STRENGTHS AND WEAKNESSES... 5-25 TABLE 5-8 ORDER OF MAGNITUDE COSTS ALTERNATIVE 2... 5-31 TABLE 5-9 ALTERNATIVE 2 STRENGTHS AND WEAKNESSES... 5-31 TABLE 5-10 ORDER OF MAGNITUDE COSTS ALTERNATIVE 3... 5-35 TABLE 5-11 ALTERNATIVE 3 STRENGTHS AND WEAKNESSES... 5-35 TABLE 5-12 PRELIMINARY STORMWATER DRAINAGE QUANTITIES... 5-51 TABLE 5-13 ORDER OF MAGNITUDE COSTS PREFERRED DEVELOPMENT CONCEPT... 5-59 TABLE 7-1 COI FDOT WORK PROGRAM... 7-3 TABLE 7-2 COI JACIP... 7-4 TABLE 7-3 CONSTRUCTION ENGINEERING SOFT COST PERCENTAGES... 7-6 TABLE 7-4 FDOT S SHARE OF PROJECT FUNDING... 7-10 TABLE 7-5 COI SHORT-TERM CAPITAL IMPROVEMENT PROGRAM... 7-15 TABLE 7-6 COI INTERMEDIATE-TERM CAPITAL IMPROVEMENT PROGRAM... 7-17 TABLE 7-7 COI LONG-TERM CAPITAL IMPROVEMENT PROGRAM... 7-19 TABLE 7-8 20-YEAR CAPITAL IMPROVEMENT PROGRAM SUMMARY... 7-22 TABLE 7-9 OTHER AIRPORT DEVELOPMENT FDOT WORK PROGRAM... 7-23 TABLE 7-10 ESTIMATED COI SHARE OF TICO AUTHORITY BUDGET... 7-25 TABLE 7-11 TICO AUTHORITY OPERATING REVENUES AND EXPENSES... 7-26 TABLE 7-12 FAIR MARKET VALUES AND ASSUMPTIONS FUTURE OPERATING REVENUES... 7-28 TABLE 7-13 FUTURE OPERATING EXPENSES... 7-29 TABLE 7-14 COI CASH FLOW ANALYSIS... 7-32

LIST OF FIGURES FIGURE 1-1 STEPS IN THE MASTER PLANNING PROCESS... 1-6 FIGURE 2-1 AIRPORT LOCATION MAP... 2-2 FIGURE 2-2 TITUSVILLE-COCOA BEACH AIRPORT SYSTEM... 2-4 FIGURE 2-3 NPIAS FLORIDA AIRPORTS... 2-6 FIGURE 2-4 NDB APPROACH RUNWAY 11... 2-9 FIGURE 2-5 GPS APPROACH RUNWAY 11... 2-10 FIGURE 2-6 FAA AIRSPACE CLASSIFICATIONS... 2-12 FIGURE 2-7 SURROUNDING AIRSPACE... 2-14 FIGURE 2-8 SURFACE TRANSPORTATION... 2-18 FIGURE 2-9 EXISTING AIRFIELD... 2-20 FIGURE 2-10 OFF AIRPORT LAND USE... 2-24 FIGURE 4-1 U.S. AIRSPACE CLASSES... 4-2 FIGURE 4-2 EXISTING AIRFIELD... 4-4 FIGURE 4-3 AIRCRAFT CLASSIFICATIONS... 4-7 FIGURE 4-4 VFR WINDROSE... 4-9 FIGURE 4-5 IFR WINDROSE... 4-10 FIGURE 4-6 ALL WEATHER WINDROSE... 4-11 FIGURE 4-7 LONG TERM ANNUAL SERVICE VOLUME... 4-15 FIGURE 4-8 PIPER SENECA V... 4-22 FIGURE 4-9 RUNWAY LENGTH CURVES FOR SMALL AIRCRAFT... 4-24 FIGURE 4-10 RUNWAY SAFETY AREA... 4-26 FIGURE 5-1 STANDARD RSA PROFILE... 5-6 FIGURE 5-2 PAVEMENT RATING MATRIX... 5-12 FIGURE 5-3 ALTERNATIVE 1... 5-15 FIGURE 5-4 SHERIFF S APRON IMPROVEMENTS... 5-18 FIGURE 5-5 SEAPLANE LANDING AREA... 5-24 FIGURE 5-6 ALTERNATIVE 2... 5-26 FIGURE 5-7 ALTERNATIVE 3... 5-33 FIGURE 5-8 2007 AND 2027 DNL NOISE CONTOURS... 5-38 FIGURE 5-9 PROPOSED SEAWALL... 5-42 FIGURE 5-10 REFINED ALTERNATIVE... 5-43 FIGURE 5-11 RECOMMENDED STORMWATER IMPROVEMENTS... 5-50 FIGURE ALP-1 COVER SHEET... 6-7 FIGURE ALP-2 AIRPORT LAYOUT PLAN... 6-8 FIGURE ALP-3 GENERAL AVIATION TERMINAL PLAN... 6-9 FIGURE ALP-4 AIRPORT AIRSPACE DRAWING... 6-10 FIGURE ALP-5 INNER APPROACH OF THE APPROACH SURFACE DRAWING RUNWAY 11... 6-11 FIGURE ALP-6 INNER APPROACH OF THE APPROACH SURFACE DRAWING RUNWAY 29... 6-12 FIGURE ALP-7 RUNWAY DEPARTURE SURFACES DRAWING... 6-13 FIGURE ALP-8 AIRPORT LAND USE DRAWING... 6-14 FIGURE ALP-9 AIRPORT PROPERTY MAP... 6-15 FIGURE 7-1 CONSTRUCTION PHASING PLAN (SHORT-TERM)... 7-16 FIGURE 7-2 CONSTRUCTION PHASING PLAN (MID-TERM)... 7-18 FIGURE 7-3 CONSTRUCTION PHASING PLAN (LONG-TERM)... 7-21