RVSM GMU Monitoring in the AFI Region for ARMA. Flight requirement guide Operators

Similar documents
CHAPTER 5 SEPARATION METHODS AND MINIMA

Pilot RVSM Training Guidance Material

USE OF RADAR IN THE APPROACH CONTROL SERVICE

IFR SEPARATION USING RADAR

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers

IFR SEPARATION WITHOUT RADAR

SECTION 6 - SEPARATION STANDARDS

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

CLEARANCE INSTRUCTION READ BACK

Reduced Vertical Separation Minimum (RVSM) Monitoring Procedures for U.S. Operators

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

Safety and Airspace Regulation Group

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

AVIATION OCCURRENCE REPORT A98W0216 LOSS OF SEPARATION

Instrument Multi Engine Practical Test Standards

Republic of Iraq Ministry of Transport Iraq Civil Aviation Authority REGULATIONS (31) RVSM OPERATIONS IN REDUCED VERTICAL SEPARATION MINIMUM AIRSPACE

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough

AIRCRAFT INCIDENT REPORT

EXPERIMENTAL OPERATING LIMITATIONS EXHIBITION GROUP I1

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

International Civil Aviation Organization

AERONAUTICAL INFORMATION CIRCULAR

CHAPTER 4 AIR TRAFFIC SERVICES

Advisory Circular. Flight Deck Automation Policy and Manual Flying in Operations and Training

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

Conditions of Carriage

Santa Monica Flyers. Pre-Solo Knowledge Test. Aircraft Type to be flown solo:

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Requirements for acceptance of operations in Volcanic Ash Zone 2

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

AERONAUTICAL INFORMATION CIRCULAR 33/17

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

SUBPART C Operator certification and supervision

AIR LAW AND ATC PROCEDURES

All-Weather Operations Training Programme

SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.

Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control

Instrument Proficiency Check Flight Record

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GC No. 6 Flight in UK Airspace of Certain Foreign Registered Aircraft not holding ICAO compliant certificates of airworthiness

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

ETHIOPIA ECAA CIVIL AVIATION RULES AND STANDARDS (ECAR) PART 8 OPERATIONS FATIGUE MANAGEMENT REST PERIODS, DUTY, AND FLIGHT TIME

MetroAir Virtual Airlines

Non-Group RVSM Certification Presentation Topics

3) There have some basic terminology of a flight plan and it is the fuel calculations

Sample Regulations for Water Aerodromes

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

Safety Brief. 21st March Operations in Somali Airspace

Sitting 2 3. Meteorology (20 Questions, Time allowed 1 hour) 4. Human Performance & Limitations (20 Questions, Time allowed 40 minutes)

REGULATIONS (10) FOREIGN AIR OPERATORS

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

HOLDING STACK MANAGEMENT

Annex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

IAGSA Survey Contract Annex

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

AIP PORTUGAL ENR NOV-2007

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI


Phases of a departure

Approach Specifications

Contents. Subpart A General 91.1 Purpose... 7

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI.

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

LETTER OF AGREEMENT. Between. and RELATING TO

BFR WRITTEN TEST B - For IFR Pilots

Flight Inspection for High Elevation Airports

AERONAUTICAL INFORMATION CIRCULAR 18/18

Separation Methods and Minima

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

Time: 1111Z Position: 5049N 00016W Location: 1nm SE Brighton City Airport

SECTION 4 - APPROACH CONTROL PROCEDURES

Flight Operations Officer Recurrent Training Syllabus

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

FAA FORM UAS COA Attachment FAA

Non-Group RVSM Certification Process. Anthony C. Wiederkehr FAA DER - Flight Analyst

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

LIST OF ACRONYMS USED IN RVSM

PART 101--MOORED BALLOONS, KITES, UNMANNED ROCKETS AND UNMANNED FREE BALLOONS

Transcription:

RVSM GMU Monitoring in the AFI Region for ARMA Flight requirement guide Operators

Requesting RVSM GMU Height Monitoring RVSM Height Monitoring must be requested through the AFI Regional Monitoring Agency (ARMA) directly. The RVSM Height Monitoring requirement and Information Request Form is available on the ARMA website for completion prior to the monitoring flight being scheduled. ARMA Webpage address is: www.atns.co.za/afi-rvsm 2

GMU Description The GMU is a small unit weighing approximately 10 kilos and is set up on the flight deck or in the cabin and our ARINC Staff Specialist would occupy the 'jump seat' or a passenger seat for the duration of the flight making note of assigned flight level, altimeter readings and various other parameters. There is no interference with the flight crew's normal duties at any time. Two small GPS antennae are attached to the rear cockpit windows or cabin windows prior to departure and the transponder output from the aircraft is recorded by a 'patch' antenna within the GMU. No connection is required between the GMU and the aircraft systems and the unit is fully EASA Form 1 compliant. The GMU does not interfere with any aircraft avionics or operating systems. 3

Flight Requirements The requirement for GMU monitoring flights is 30-45 minutes level cruise at an RVSM flight level, (FL290 - FL410 inclusive). This straight and level cruise portion should be conducted within the aircrafts normal operating envelope and with an absolute minimum of heading changes. Whilst small heading changes are allowed (5 degrees), large deviations from track may increase the potential for invalid raw data. There is no need for a speed decrease or any other abnormal aircraft attitude. Only the altimetry system performance in the RVSM airspace is relevant for this flight and program. The flown profile in this section must be a horizontal flight at the same altitude without any climbs or descents. The horizontal flight path (ground track) must not show any turns, since turns will result in an increased wing load resulting in an increased angle of attack, which might influence the airflow around the static ports. Additionally, the autopilot will be forced to increase the thrust of the engines to compensate the additional drag due to the increased attack angle. This may lead to a control process that also may influence or affect the height keeping performance of the aircraft. For the GMU flight, there is no need to make a special flight for monitoring. A normal scheduled flight that can meet the monitoring requirements above is sufficient. 4

Flight Plan Requirements Field 10a shall indicate W. It would be advisable to indicate on the ICAO flight plan, Field 18, that the flight is a GMU height monitoring flight so that this can be taken into consideration by ATC. Co-ordination with the appropriate Air Traffic Control Unit, where this is permitted, prior to departure by the air crew is advisable to assist in facilitating the GMU height monitoring flight. 5

Routing in South Africa Routing for operators opting to make special test flights will be as follows: From Lanseria/ Johannesburg International or any other local airports in the vicinity, the route should be filed westwards towards Upington on the RNAV route UZ6 and UQ11, turn around on UQ11 and route inbound on UQ 19. Routes South West or South should be filed on an appropriate RNAV route to allow sufficient time for the GMU monitoring flight requirements. Flights may continue South/West or South West in order to achieve the optimum flight time needed. In all other countries the routing will be negotiated prior to the flight. 6

Point of Contact The point of contact for the Program Manager, Logistics Manager and Staff Specialist must be defined in the early stages of the planning process. Information regarding planning, aircraft information and height monitoring flight requirements must be passed down to the flight crew in a timely manner to ensure that everyone is aware of what has to be achieved. 7

MET Requirements for RVSM Height Monitoring Flights are weather dependent in the RVSM band of levels FL290 FL410 inclusive. The GO/NO GO decision can be made up to 72 hours prior to the flight taking place, and confirmed 24 hours before the flight based on the approved British MET Office forecast specifically developed for the AFI region and GMU flights in particular. Frontal patterns, wind speed and turbulence areas in the region are forecast enabling the GMU management organization to ensure that the flight route of does not cross or parallel too closely the area of frontal activity which can corrupt the collected raw data. Other available weather forecast charts produced by the operator have no bearing on the GO/NO GO decision as these charts may not show the required information needed for this decision. Flights undertaken in spite of MET NO GO decisions at the operator s request may or may not be approved. If the flight is approved by the RVSM Height Monitoring program manager, the operator will be fully responsible for any invalid results and will be required to re-fly the mission at their own cost. There will be no departures prior to 0600z unless otherwise approved by the RVSM Height Monitoring Program Manager due to the availability of the MET forecast. The MET GO/NO GO decision will be made by the RVSM Height Monitoring Program Manager only. 8

Crew Information Crew must be fully aware of what is expected of them prior to departure in order that the GMU records sufficient, quality raw data. Any required information not passed on to the crew by the operators point of contact, or not adhered to by the operator and resulting in compromised data will be the full responsibility of the operator, possibly resulting in a re- test at cost to the operator. 9

Invoice payment requirements for RVSM Height Monitoring Invoicing is actioned either prior to the monitoring flight taking place, by ARINC, or just shortly after. Invoicing may depend on the number of aircraft the operator has to monitor and when they are able to be monitored. Payment terms are 30 days. Invoicing may be requested during the planning stage if the operator requires it. 10

Release of Results No height monitoring results will be released from the ARINC operational base, as they will only have raw unprocessed data which will need to be processed at the Gatwick Operational Control Centre (OCC). This raw data is of no use to the operator until it is processed. Operators are requested to refrain from contacting ARINC directly for height monitoring results as ARINC will not release this information. All height monitoring results will be forwarded to the ARMA by ARINC and released officially to the applicable operator by the ARMA. Results will not be released by ARINC until payment is made in full however not within 10 working days from the date of the flight. 11

Cancellation and Failure of results It should be clearly understood that most height monitoring flights are successful however cases do occur where flights need to be reflown due to the quality of the data recorded for what ever reason. The expenses incurred will be the responsibility of the operator with ARINC doing all in its capabilities to avoid such a situation. Certain matters outside of ARINC s control which may adversely affect the integrity of data collected during RVSM Monitoring Flights necessitating their repetition may include, but are not limited to, failure of the GPS satellite signal and subsequent non-recording of GPS data by the GMU equipment, failure of the UK Met Office to provide meteorological data for the date of the flight, for the flight area, or failure of CYBIT to provide DGPS data for the date of flight. The customer shall be fully responsible for all ARINC charges in the event that the failure to collect valid RVSM data is not attributable to ARINC. In the event of a flight cancellation and/or delay for any reason whatsoever, the customer must notify ARINC not later than Twenty-Four (24) hours prior to the scheduled RVSM Monitoring Flight or Staff Specialist positioning flight, as applicable. Otherwise, the customer shall be fully liable for ARINC charges associated with the Monitoring Flight, whether or not it takes place 12

Service Provider Contact Details Enid Otun Rockwell Collins ARINC EMEA Europe/AFI RVSM Program Manager EMEA ISO Management Rep/QA/Import - Export Compliance Manager Aviation Solutions Rockwell Collins ARINC Crawley, West Sussex, United Kingdom Office number +44 (0) 1293 641315 Mobile number +44 (0) 7740 410300 skype enidotun email:eotun@arinc.com 13

ARMA Contact Details Kevin Ewels AFI Regional Monitoring Agency Tel:+27 11 9286506 Fax:+27 11 9286546 Mobile: 0820854045 Email: afirma@atns.co.za www.atns.co.za/afi-rvsm 14