San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

Similar documents
LA Waterfront Annual Program Update March 29, 2012

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

LA Waterfront Public Sites Opportunity Analysis Community Meeting

HARBOR ±10,000 SF CENTER FREE-STANDING SAN PEDRO RETAIL AVAILABLE 233 N. HARBOR BLVD SAN PEDRO, CA BEACON POTENTIALLY UP TO PACIFIC OCEAN

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

VENTURA PORT DISTRICT

Release of the Draft Environmental Impact Statement/Draft Environmental Impact Report

Downtown to Defiance Trolley Key Messages Jan. 2017

PIER 44. Premiere Waterfront Retail & Restaurant Opportunities & 4625 Admiralty Way Marina Del Rey, CA 90292

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ROUTE 171 & SEAL BEACH CIRCULATOR

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

1.2.1 Introduction and Project Overview

Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

This presentation is available online.

San Diego. Airport. AAD Rates

BATHURST QUAY NEIGHBOURHOOD PLAN

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

444 WASHINGTON BOULEVARD

David Martin, Director, Planning and Community Development. Karen Ginsberg, Director, Community and Cultural Services

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.

Textile and Apparel Importer Trade and Transportation Conference

MAC Meeting. February 2, 2017

Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Home of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

CAE003 N ', W ' Columbia St. US 80 (and Market St.) once continued straight west from here. Continue east on Market St.

DOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

LAS VEGAS STRIP ICONIC STRUCTURES & DIGITAL MARQUEES

INDUSTRIAL / BUSINESS PARK OPPORTUNITY

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas

US 19 Sunset Point Rd to Countryside Blvd.

EAST-WEST STREETS 3.7

Fuller/Fuller Heights Road Improvements

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

places Mooloolaba s heart five

KING STREET PILOT STUDY PUBLIC MEETING

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

RETAIL FOR LEASE. Mixed-Use Development Heart of Point Loma BELLAMAR POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

NORTHLAND-BELTLINE CORRIDOR

Anaheim Resort. Hotel Stay Impact

FOR LEASE MARINA LANDING SHOPPING CENTER PHASE II WALMART ANCHORED PADS AVAILABLE

X Respond to staff direction

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Brightline Overview THE ONLY PRIVATELY OWNED, OPERATED AND MAINTAINED EXPRESS INTER-CITY TRAIN SERVICE IN THE UNITED STATES

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

RETAIL FOR LEASE MIXED-USE DEVELOPMENT IN THE HEART OF POINT LOMA. Bella mar POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

from boat parking lots to icons Marina Development Update Marina Development Update from boat parking lots to icons Presentation by Ed Modzelewski

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

PRICE RECUDED! VACANT IN 60 DAYS! 13,265 SF INDUSTRIAL BUILDING 23,087 SF OF LAND FOR SALE OR LEASE 3817 S SANTA FE AVE VERNON CALIFORNIA 90058

Park Plaza at the Village

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

,000 SF 23,109 SF S SANTA FE AVENUE LOS ANGELES CALIFORNIA ,000 SF & 7,000 SF FOR SALE OF BUILDINGS ON OF LAND 2 BUILDINGS

San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009

Claremont Project Background and Update Community Meeting September 11, 2017

Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas

Toronto Islands Advisory Committee Meeting May 12 th, :00 pm 4:00 pm City Hall, 2 nd Floor, Committee Room 4

Port of San Diego Overview and Updates. September 2017

410 Adelaide ST WEST. Premium retail for lease

Slow Down! Reducing Downtown Bloomington s Progression Speed

A Master Plan is one of the most important documents that can be prepared by an Airport.

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION MARKET HIGHLIGHTS PROJECT HIGHLIGHTS

David Tickle, Principal, Urban Design, Hassell

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

MASTER PLAN July 24, 2014

Corridor Investment Projects (FY FY2012)

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Treasure Island Supplemental Information Report Addendum

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

NOW DIVISIBLE TO 2,500 SF

ARLINGTON COUNTY, VIRGINIA

WATER PETALUMA TRAIL WATER WAYS PROJECT PORTFOLIO. petalumawaterways.org OVERVIEW

In the Eye. From the Commodore. News from Hurricane Gulch Yacht Club

Oyster Point Business Park FOR LEASE. Under New Ownership Oyster Point Boulevard, So. San Francisco CONTACT. kiddermathews.

FOR MORE INFORMATION, PLEASE CONTACT: KEVIN FENENBOCK JACOB MUMPER COLLIERS INTERNATIONAL. Professionally owned and managed by:

28,765 SF INDUSTRIAL BUILDING FOR LEASE LOS ANGELES, CA 90021

26 Miles Across the Sea

BELMOND BRAND LAUNCH

Transcription:

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee November 17, 2015

Ports O Call Area Redevelopment

Ports O Call Area Redevelopment Implementation Schedule Sampson Way & 7th St. Intersection Improvements Town Square at 6 th Street Ports O Call Promenade and Parking

Ports O Call (POC) Area Implementation Schedule POC -- INFRASTRUCTURE ELEMENTS 2015 2016 2017 2018 2019 Sampson Way - 7th Street at Harbor Blvd. Intersection Improvements Promenade along Main Channel & Town Square at 6th and 7th Street Design Bid Construction Design Bid Construction POC -- DEVELOPER ELEMENTS 2015 2016 2017 2018 2019 Lease Approval Design/Due Diligence Construction Documents Construction

Ports O Call Area Redevelopment An Authentic & Unique Experience The LA Waterfront is the only destination in Southern California set against the background of a working trade gateway America s Port. Unique setting and assets Development district is distinctively different from any other Southern California visitor destination New build and adaptive reuse opportunities

Our Unique LA Waterfront

Our Unique LA Waterfront

LA Waterfront 10-year Capital Improvement Program (CIP) Approx. $200 million for new public access projects through the Public Access Investment Plan

Wilmington Waterfront Projects Avalon Boulevard Corridor Phase I North Wilmington Pedestrian Bridge Avalon Boulevard Corridor Phase IA South

San Pedro Waterfront Projects Sampson Way & 7th St. Intersection Improvements Town Square at 6 th Street Ports O Call Promenade & Parking

PROJECT IMPLEMENTATION LA Waterfront (San Pedro and Wilmington) FY 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 Current Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 10 year CIP* (millions) Sampson Way & 7th Street Intersection Improvements x x x x x $13.6 Town Square at 6th Street x x x x x $4.1 Ports O Call Promenade and Parking x x x x x $34.5 Total San Pedro Waterfront $52.2 Wilmington Waterfront Promenade and repurpose or demolition of former Catalina Freight building x x x x x x $52.7 Harry Bridges Blvd. Beautification between Island Ave. and Avalon Blvd. x x x x $17.4 Wilmington Waterfront Pedestrian Bridge x x x x $14.9 Total Wilmington Waterfront $85.0 TOTAL $137.2 POTENTIAL ADDITIONAL PROJECTS LA Waterfront (San Pedro and Wilmington) FY 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 Current Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 10 year CIP* (millions) Sampson Way Roadway from Harbor Blvd to SP Slip x x x x $8.5 Sampson Way South Roadway from SP Slip to 22nd Street x x x x $24.5 Total San Pedro Waterfront $33.0 Avalon Triangle Park x x x $8.9 Total Wilmington Waterfront $8.9 TOTAL $41.9

Other Potential Projects Sampson Way Harbor Blvd to SP Slip Avalon Triangle Park

Waterfront Linkages For Development Master Planning for Pedestrian, Vehicular and Alternative Modes of Public Access to the Water s Edge.

Waterfront Linkages: World Cruise Center

Waterfront Linkages: USS IOWA

Waterfront Linkages: Downtown Harbor

Waterfront Linkages: Public Events at the Downtown Harbor

Waterfront Linkages: CRAFTED at the Port of Los Angeles

Waterfront Linkages: Cabrillo Way Marina

Waterfront Linkages: AltaSea at the Port of Los Angeles

Linkage Implementation: Pedestrian Continued Promenade progress now connecting through Ports O Call

Linkage Implementation: Vehicular Sampson Way Roadway Project

Linkage Implementation: Alternatives Rubber Tire Trolley investment Bike Share concept

LA Waterfront Report to City Council Strategy: Build Value in Waterfront Assets Investment in Public Access Infrastructure Events & Destination Marketing Attract Private Investment

LA Waterfront Report to City Council Waterfront & Commercial Real Estate Division Waterfront Leasing Policy Commercial cycles for reinvestment Strategic term Waterfront Development Strategy LA Waterfront Web, Social Media & Advertising Awareness-building Outreach to Private Developers and Investors

Thank You!