RESULTS PRESENTATION 30 JUNE 2016

Similar documents
RESULTS PRESENTATION

Results presentation. December 2012

Bucharest City Report Q3 2015

NEPI Rockcastle has continued its outstanding operational performance during the nine months ended 30 September 2018.

Bucharest City Report Q1 2015

Phase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA

Press Release Regulated Information. Trading Update

OLYMPIA BRNO Deutsche EuroShop Real Estate Summer Brno I

SERBIAN MARKET OVERVIEW 1st semester 2017

Executive Directors Review

1.2% 3.5% 13.2% Inflation May 2017 y-o-y. Retail Sales, May 2017 y-o-y

Belgrade City Report Q City Reports

Annual Results for the year ended 28 February 2015

South Eastern Europe site visit. Investor information October 2017

DEXUS Property Group (ASX: DXS) ASX release

1.0% 3.6% 15.9% Inflation March 2017 y-o-y. Retail Sales,

4.5% 1.4% 14.3% Inflation March 2018 y-o-y. Retail Sales, March 2018 y-o-y

Romanian railways infrastructure projects

PROPERTY DESCRIPTION

SUMMARISED CONSOLIDATED RESULTS FOR THE YEAR ENDED 30 JUNE 2017 STRATEGIC & OPERATIONAL OVERVIEW. Hyde Park Corner (Gauteng)

Positive rental reversions in Hong Kong portfolio. Rising contribution from Singapore office portfolio. Strong performance from Residential business

QUARTERLY UPDATE 31 MARCH 2017

Investor presentation FY 2011 results

Interim Results Presentation to Investors

Full go towards year end

Goodman Property Trust. 30 & 31 October 2018 NAB First Look USPP Conference, Sydney

2.1% 3.0% 12.9% Inflation December 2017 y-o-y. Retail Sales, November 2017 y-o-y

Belgrade City Report Q City Reports

Operational activities

Presentation on DIRSI MALL, TBILISI. AS GEORGIA AS Group Investment LLC

Presentation Results. 4th March 2016

STRATEGIC & OPERATIONAL OVERVIEW. Condensed consolidated interim results for the six months ended 31 December 2017

Sofia City Report H City Reports

Singapore. 23 October 2007

ARSN Interim Report Responsible Entity Brookfield Capital Management Limited ACN AFSL

FIRST HALF RESULTS SFAF MEETING, 27 SEPTEMBER 2017

2017 Half-Yearly Results

IMPORTANT NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS OF THE KRKA GROUP FOR 2006

8 May Derwent London DEVELOPING. Highlights 626,000 sq ft of. December 2013 low at 0.9% in January. Brunswick Group

Euroz Rottnest Investor Briefing

2016 Half-Yearly Results

The GPT Group today announced its operational update for the March 2017 quarter.

2005 year-end results presentation March 2006

THESSALONIKI PROPERTY MARKET. 2nd Semester 2014

Great Portland Estates Trading Update Strong Operational Performance

Finnair Group Interim Report 1 January 30 September 2008

CAPITAL MARKETS DAY 14 NOVEMBER 2016

ECONOMIC ENVIRONMENT IN

Active Asset Management

Austria Romania Bilateral Economic Relations. Rudolf Lukavsky, Commercial Counsellor July 1, 2014

HOPEWELL HOLDINGS LIMITED ANNOUNCES FY 2018/19 INTERIM RESULTS

Heathrow (SP) Limited

4.5% 2.5% 2.3% Inflation. Purchasing power per capita 2016 Prague

3.5% 2.3% 2.2% Inflation March Purchasing power per capita 2016 Prague

CTPark Belgrade North

Trading update Q Wereldhave

The Baltics anticipating new stock increases in the capitals

Act 2. Analyst Meeting 27 July 2016

30 April The Manager Company Announcements Office ASX Limited Level 4, Exchange Centre 20 Bridge Street SYDNEY NSW 2000.

Investor Briefings First-Half FY2016 Financial Results

HALF YEARLY RESULTS TO 30 JUNE Scentre Group Limited ABN All amounts in Australian dollars unless otherwise specified

Presentation at the annual general meeting 2017

FASHION PARK OUTLET YOUR BUSINESS PARTNER

GAMING INVESTMENT FORUM AT G2E. September 26, 2016

Lend Lease Investment Management Australia

01 Amadeus at a glance

Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018

Press release February 21, 2014

Derwent London plc ( Derwent London / the Group ) INTERIM MANAGEMENT STATEMENT FOR THE THREE MONTHS ENDED 31 MARCH 2012

Autumn 2017 OUR VIEW ON HIGH STREET RETAIL

THE BRITISH LAND COMPANY PLC INTERIM MANAGEMENT STATEMENT A Good Start to the Year Delivering on Strategy

JOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH

Lead pic. Report on the first quarter of 2018

Developments. Retail parks and major developments. (UK, Ireland and France) February 2018

Bulgaria investment climate and business opportunities. February 2011

Finnair Q Result

GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST

Press release Stockholm, 13/12/2017

CAPITAL MARKETS DAY THE NETHERLANDS. 4 October 2017

SAS Q3 2017/ August 2018

Bratislava City Report Q4 2015

Precinct Properties New Zealand Annual General Meeting 7 November 2014

What is EBRD? Cumulative commitments 71.1 billion '98 '04 '08 '11. As of 31 December 2011

Australian Property Growth Fund

SKYCITY ENTERTAINMENT GROUP LIMITED (SKC) INVESTOR PRESENTATION FOR UBS INVESTOR CONFERENCE

2008 INTERIM ANNOUNCEMENT

TUI GROUP INVESTOR PRESENTATION

SIAM FUTURE DEVELOPMENT PUBLIC CO., LTD. Corporate Presentation Q4-15

Prague City Report Q2 2015

SAS Group Presentation Carnegie, May 22, 2012 Sture Stölen, Head of IR

Bringing people from further, for longer, more often

For personal use only

Crown Resorts Limited

Le Floria - Fontenay Q May Strong Letting Activity. Percier - Paris Citroën Paris 17

Analysts and Investors conference call. Q results. 15 May 2013

Management Presentation. March 2016

1HFY2012 RESULTS PRESENTATION

MGM GROWTH PROPERTIES LLC Second Quarter 2016 Earnings Presentation

Execution of WIN2016 programme currently underway, confirmation of underlying operating margin target of 5-6% for 2015/2016

Crown Resorts Limited

Transcription:

RESULTS PRESENTATION 30 JUNE 2016

RESULTS PRESENTATION 30 JUNE 2016 1

Company profile Leading property investment and development group in the CEE. Largest retail owner and operator in Romania. Exceptional property portfolio and development pipeline in Romania, Slovakia, Serbia and the Czech Republic. Active management of portfolio. Internally managed group, team of 300 professionals. Strong corporate culture focused on planning, quality of execution, sustainability, ethics and early risk assessment. Investment grade ratings (Moody s and S&P). Eurobond funding. Listings on JSE, BVB and AIM. Semi-annual distribution of the recurring direct result, with a scrip dividend election option. RESULTS PRESENTATION 30 JUNE 2016 2

Team Balanced Board structure: majority of Independent Non-executives from five countries. Strong internalised management team: high level of knowledge of the CEE market, consistently proving outstanding execution and operational excellence. Effective organisational structure: illustrated by a number of best-in-class indicators, including standards of property management, financial reporting timetables, high collection and occupancy rates. ADELA TAPURIN (Tax) ANCA GANIA (Investments) CRISTINA DARVAREANU (Statutory accounting) DANIEL BOD A (Asset and property management) ESTERA ENACHE (Retail leasing) FLORIN CIOBOTARU (Investments) GIJS KLOMP (Investments) IULIAN RUSU (Office leasing) IULIU BARTHA (Asset and property management) JASON BUHRS (Developments) MARIUS BARBU (Asset and property management) RALUCA BUZULEAC (Financial Reporting) RUXANDRA MACELARU (Legal and Investments) SEBASTIAN MAHU (Asset and property management) SORIN BADEA (Legal and Investments) RESULTS PRESENTATION 30 JUNE 2016 3

Strategy Portfolio of dominant retail assets in high-growth European markets. Developing, extending, and acquiring dominant or potentially dominant retail assets. Retail investment criteria: location, access, visibility, design, technical specifications, and extension potential. Office investment criteria: A-grade office buildings, in large cities, in central locations, with excellent access to public transport, up-to-date technical specifications, large floor areas, high efficiency rates and high parking ratios. No acquisitions envisioned; only opportunistic developments. Focus on sustainable income growth. Local management teams. Leverage on platform and track record for further expansion, despite increased competition and yield compression. Disposal of non-core assets. Maintain investment grade rating and further decrease cost of funding. RESULTS PRESENTATION 30 JUNE 2016 4

NEPI s Portfolio map RETAIL ROMANIA 1 Mega Mall 2 Promenada Mall 21 3 Shopping City Sibiu 4 Shopping City Timisoara 5 Iris Titan Shopping Center 6 City Park 7 Shopping City Deva 8 Braila Mall 9 Vulcan Value Centre 10 Pitesti Retail Park 11 Shopping City Galati 12 Ploiesti Shopping City 13 Shopping City Targu Jiu 14 Severin Shopping Center 15 Aurora Shopping Mall 16 Regional value centres Czech Republic 20 19 Slovakia 18 5 SERBIA 17 Kragujevac Plaza Romania SLOVAKIA 18 Aupark Kosice Mall 19 Aupark Zilina 20 Korzo Shopping Centrum CZECH REPUBLIC 4 2 7 4 16 16 3 16 16 16 OFFICE 21 Forum Ústí nad Labem ROMANIA 1 Floreasca Business Park 2 City Business Centre 3 The Lakeview 4 The Office Phases I & II 17 14 16 1 13 10 12 1 2 5 9 1 3 2 16 15 8 11 6 SLOVAKIA 5 Aupark Kosice Tower INDUSTRIAL ROMANIA 1 Rasnov Industrial Facility 2 Otopeni Warehouse Serbia DEVELOPMENTS Detailed map of developments on page 53. RESULTS PRESENTATION 30 JUNE 2016 5

Highlights Recurring distributable earnings per share vs June 2015 ( ) 6% 5-year compound annual growth in distribution ( ) 14% 5-year compound annual growth in distribution (ZAR) 26%* Adjusted NAV per share growth vs June 2015 7% Major increase in retail asset base GLA vs June 2015 44% Earnings drivers: NOI increase from properties: - recently acquired: Shopping City Sibiu, Forum Usti nad Labem, Iris Titan Shopping Center; - recently developed or extended: Deva Shopping City, Shopping City Timisoara; - established: Promenada Mall, Ploiesti Shopping City, Shopping City Galati. NOI decrease for City Park (due to ongoing extension works) and the office portfolio. *Assumes an exchange rate of 17.21 ZAR/EUR for H1 2016 RESULTS PRESENTATION 30 JUNE 2016 6

Highlights» continued Entry into Czech market and acquisition of further assets in Romania, Slovakia and Serbia. 46,200m 2 GLA of extensions under construction. 36,300m 2 GLA of developments under construction. Over 200,000m 2 GLA under permitting and pre-leasing. Brexit: no direct impact. Successful equity issue in July 2016 ( 156 million). Directorate changes: Tiberiu Smaranda, Antoine Dijkstra and Robert Emslie. Additions to senior management team. New remuneration policy: circular to be released. RESULTS PRESENTATION 30 JUNE 2016 7

Financial performance 20 DISTRIBUTION PER SHARE (euro cents) 20% 400 DISTRIBUTION PER SHARE (ZAR cents) 40% 6 ADJUSTED NAV PER SHARE ( ) 15 15% 300 30% 4 10 10% 200 20% 5 5% 100 10% 2 0 2009 2010 2011 2012 2013 2014 2015 Jun 2016 0% 0 2009 2010 2011 2012 2013 2014 2015 Jun 2016* 0% 0 2009 2010 2011 2012 2013 2014 2015 Jun 2016 June (6 months) December (6 months) Compound annual growth rate (%) June (6 months) Compound annual growth rate (%) December (6 months) *assumes an exchange rate of 17.21 ZAR/EUR for 2016 SHARES TRADED (m) NUMBER OF SHAREHOLDERS LEVERAGE PROFILE* 100 15,000 100% 80 12,000 80% 60 9,000 60% 40 6,000 40% 20 3,000 20% 0 2009 2010 2011 2012 2013 2014 2015 June (6 months) December (6 months) Jun 2016 0 2009 2010 2011 2012 2013 2014 2015 Jun 2016 0 2009 2010 2011 2012 2013 2014 2015 * (loans cash)/(investment property + listed securities) Jun 2016 RESULTS PRESENTATION 30 JUNE 2016 8

Finance strategy Current gearing: 24.3%* (targeted: 35%, maximum allowed: 40%). 179 million - issue of new ordinary shares during 2016. Investment grade credit ratings: Baa3 (stable outlook) - Moody s BBB- (stable outlook) - Standard & Poor s Rating review expected in Q4 2016. Debt financing strategy biased towards group level, unsecured bonds. Secured loans contracted only if decreasing the overall cost of debt. Variable interest rate (EURIBOR) risk: 100% hedged. 500 400 300 200 100 0 DEBT MATURITY PROFILE ( m) 2016 2017 2018 2019 2020 2021+ * (loans cash)/(investment property + listed securities) RESULTS PRESENTATION 30 JUNE 2016 9

Operational highlights (H1 2016 vs H1 2015) RETAIL Occupancy 98.2% (H1 2015: 98.3%) Like-for-like increase in NOI 4.2% Like-for-like increase in turnover 11.1% Like-for-like increase in footfall 7.7% Decrease in weighted average remaining lease duration from 6.1 to 5.5 years 100% 90% 80% 70% 60% 50% 40% 30% 20% OCCUPANCY RATE (%) 94.8% 98.2% 94.7% 95.2% 97.7% 98.2% 97.3% 98.1% New retail brands in portfolio in 2016: 10% 0% 2009 2010 2011 2012 2013 2014 2015 Jun 2016 COLLECTION RATE (%) 100% 99.5% 98.1% 97.4% 99.8% 99.9% 99.8% 99.7% 99.7% 90% 80% 70% 60% OFFICE Occupancy 97.5%* (H1 2015: 98.5%) Like-for-like decrease in rental income 0.6% Decrease in weighted average remaining lease duration from 3.7 to 3.5 years 50% 40% 30% 20% 10% 0% 2009 2010 2011 2012 2013 2014 2015 Jun 2016 * excluding assets held for sale RESULTS PRESENTATION 30 JUNE 2016 10

Operational highlights (H1 2016 vs H1 2015)» continued RETAIL Drivers for NOI increase Replacements at higher rents; Rental step-ups; Operational cost efficiency; Vacancy decrease (compared to December 2015). Footfall Increase: Deva Shopping City (+87%), Aurora Buzau (+29%), Ploiesti Shopping City (+17%), Braila Mall (+16%), Promenada Mall (+15%), Severin Shopping Center (+15%); Decrease: City Park Constanta (-4%) is due to the extension works affecting the parking. Marketing The Group internalised the development and management of the on-line communication for better overview and cost efficiency (savings of 90 thousand/year). OFFICE Occupancy for The Office Phase II increased to 88.4% in June 2016. New tenants include Allianz, Hewlett- Packard. Delay in finalising Victoriei Office. RESULTS PRESENTATION 30 JUNE 2016 11

S+2+18 S+3+15 S+1+19 S+3+14 S+1+17 S+4+2+13 Portfolio structure SECTORAL PROFILE 80+ Jun 2015 80+ Dec 2015 82+ Jun 2016 Retail 80% Retail 80% Retail 82% Office 18% Office 19% Office 17% Industrial 2% Industrial 1% Industrial 1% GEOGRAPHICAL PROFILE 82+ Jun 2015 83+ Dec 2015 81+ Jun 2016 Romania 82% Romania 83% Romania 81% Slovakia 15% Slovakia 14% Slovakia 13% Serbia 3% Serbia 3% Czech Republic 4% Serbia 2% CREDIT RATING ROMANIA SLOVAKIA SERBIA CZECH REPUBLIC Moody s Baa3 positive A2 stable B1 positive A1 stable S&P BBB- stable A+ stable BB- stable AA- stable Fitch BBB- stable A+ stable B+ positive A+ stable Source: Economist Intelligence Unit, IMF, Thomson Reuters (2016) RESULTS PRESENTATION 30 JUNE 2016 12

Top 10 retail tenants by rent Auchan 8.1% Carrefour 6.1% H&M Inditex Group* Altex New Yorker C&A Kingfisher Peek&Cloppenburg Deichmann 1.6% 1.6% 1.5% 1.4% 1.4% 1.4% 1.2% 1.2% * Bershka, Massimo Dutti, Oysho, Pull and Bear, Stradivarius and Zara. RESULTS PRESENTATION 30 JUNE 2016 13

Top 10 office tenants by rent PricewaterhouseCoopers Wipro 1.3% 1.3% Huawei 0.9% Holcim 0.7% Bosch Hella Accenture 0.5% 0.5% 0.5% Autoliv Betfair Yardi 0.3% 0.3% 0.4% RESULTS PRESENTATION 30 JUNE 2016 14

Contracted gross rent 160 140 120 100 80 60 40 20 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Retail Office Industrial Weigthed average remaining duration is 5.1 years RESULTS PRESENTATION 30 JUNE 2016 15

Macroeconomic prospects 5 Real GDP growth (%) 4 3 2 1 0 2016 2017 2018 2019 2020 Romania Slovakia Serbia Czech Republic EU28 4 Price inflation (%) (EU harmonised) 3 2 1 0 (1) (2) 2016 2017 2018 2019 2020 Romania Slovakia Serbia Czech Republic EU28 RESULTS PRESENTATION 30 JUNE 2016 16

Macroeconomic prospects» continued 100 General gov. debt (% of GDP) 80 60 40 20 0 2016 2017 2018 2019 2020 Romania Slovakia Serbia Czech Republic EU28 20 Unemployment (%) 15 10 5 0 2016 2017 2018 2019 2020 Romania Slovakia Serbia Czech Republic EU28 RESULTS PRESENTATION 30 JUNE 2016 17

CEE private consumption forecasted growth 120% 120% 100% Serbia 25bn 100% 10-year forecasted growth 80% 60% 40% Bulgaria 28bn Romania 104bn Hungary 56bn Poland 258bn Croatia 26bn Slovakia Czech 45bn Republic 81bn Baltic countries 52bn Slovenia 20bn 80% 60% 40% EU 15 20% 20% 0 0 2 000 3 000 4 000 5 000 6 000 7 000 8 000 9 000 10 000 19 000 private consumption/year/capita Source: Eurostat, Thomson Reuters, Oxford Economics (2016) RESULTS PRESENTATION 30 JUNE 2016 18

Developments and acquisitions completed in 2016 Development Shopping City Timisoara - fashion and entertainment section (31 March 2016) Land for development Ramnicu Valcea (11 March 2016) Novi Sad (20 May 2016) Acquisitions Forum Ústí nad Labem (29 February 2016) Shopping City Sibiu (31 March 2016) Mega Mall minority interest (31 May 2016) Korzo Shopping Centrum (19 July 2016) RESULTS PRESENTATION 30 JUNE 2016 19

Developments and acquisitions completed in 2016» continued 4 Czech Republic 5 Slovakia Romania RETAIL ROMANIA 1 Shopping City Timisoara 2 Shopping City Sibiu 3 Mega Mall 30% 1 2 CZECH REPUBLIC 4 Forum Ústí nad Labem 3 SLOVAKIA 5 Korzo Shopping Centrum RESULTS PRESENTATION 30 JUNE 2016 20

Shopping City Timisoara TIMIS, ROMANIA TIMIS COUNTY 696 000 INHABITANTS TIMISOARA CITY 334 000 RESULTS PRESENTATION 30 JUNE 2016 21

Shopping City Timisoara CATCHMENT AREA 45-570 000 30-341 000 15-158 000 NEPI s Shopping City TImisoara (57,700m 2 ) Iulius Mall (66,500m 2 ) RESULTS PRESENTATION 30 JUNE 2016 22

Shopping City Timisoara TIMIS, ROMANIA First phase (16,300m 2 GLA hypermarket and gallery) opened in November 2015. Second phase (41,400m 2 GLA fashion and entertainment) opened in March 2016. Ownership 100% Type Regional mall Lettable area 57 700m 2 Cinema City is unique in the CEE, as it features both 4DX and IMAX auditoriums. Property value Passing rent 98.1 million 7.6 million Peek&Cloppenburg will open in February 2017. Occupancy 99.4% LPP group opened its first shops in Timisoara for Cropp, House and Sinsay; Reserved is planned for second part of August 2016. Extension possible up to 80,000m 2 GLA. RESULTS PRESENTATION 30 JUNE 2016 23

Shopping City Timisoara TIMIS, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 24

Shopping City Timisoara TIMIS, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 25

Shopping City Timisoara TIMIS, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 26

Shopping City Timisoara TIMIS, ROMANIA FIRST FLOOR GROUND FLOOR RESULTS PRESENTATION 30 JUNE 2016 27

Forum Ústí nad Labem ÚSTÍ NAD LABEM, CZECH REPUBLIC ÚSTECKÝ COUNTY 824 000 INHABITANTS ÚSTÍ NAD LABEM CITY 93 000 RESULTS PRESENTATION 30 JUNE 2016 28

Forum Ústí nad Labem CATCHMENT AREA 45-478 000 30-326 000 15-108 000 NEPI s Forum Ústí nad Labem (27,800m 2 ) OC Pivovar Děčin (17,500m 2 ) Olympia Teplice (29,000m 2 ) Galerie Teplice (22,000m 2 ) Fontana Teplice (18,000m 2 ) RESULTS PRESENTATION 30 JUNE 2016 29

Forum Ústí nad Labem ÚSTÍ NAD LABEM, CZECH REPUBLIC Ústí nad Labem is situated at an important railway junction; the highway connecting the city to Prague and Dresden is scheduled for completion in 2016. Forum is the only mall in the city, located in the centre, and is the dominant retail scheme in the region. Leasing is on-going for the remaining vacancy and several relocations are being negotiated to improve the tenant mix. Ownership 100% Type Regional mall Lettable area 27 800m 2 Property value 82.6 million Passing rent 5.5 million Occupancy 95.8% Higher footfall translated into a double digit tenants turnover increase in H1 2016 vs H1 2015. RESULTS PRESENTATION 30 JUNE 2016 30

Forum Ústí nad Labem ÚSTÍ NAD LABEM, CZECH REPUBLIC RESULTS PRESENTATION 30 JUNE 2016 31

Forum Ústí nad Labem ÚSTÍ NAD LABEM, CZECH REPUBLIC RESULTS PRESENTATION 30 JUNE 2016 32

Forum Ústí nad Labem ÚSTÍ NAD LABEM, CZECH REPUBLIC THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR basement level parking not shown RESULTS PRESENTATION 30 JUNE 2016 33

Shopping City Sibiu SIBIU, ROMANIA SIBIU COUNTY 400 100 INHABITANTS SIBIU CITY 170 000 RESULTS PRESENTATION 30 JUNE 2016 34

Shopping City Sibiu CATCHMENT AREA 45-286 000 30-231 000 15-172 000 RESULTS PRESENTATION 30 JUNE 2016 35

Shopping City Sibiu SIBIU, ROMANIA Sibiu is an important cultural centre, with modern infrastructure (including three rail stations and an international airport with direct connections to other European countries). Ownership 100% Type Retail park Lettable area 79 100m 2 Shopping City Sibiu is the first and only modern retail centre in Sibiu. Property value Passing rent 100.6 million 8.4 million NEPI is currently focused on upgrading the centre to its operational standards. Occupancy 96.8% Refurbishment and extension are planned for 2017, and will include a cinema and increasing the foodcourt area. RESULTS PRESENTATION 30 JUNE 2016 36

Shopping City Sibiu SIBIU, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 37

Shopping City Sibiu SIBIU, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 38

Mega Mall BUCHAREST, ROMANIA BUCHAREST 1 883 000 INHABITANTS RESULTS PRESENTATION 30 JUNE 2016 39

Mega Mall CATCHMENT AREA 30-910 000 15-600 000 5-110 000 NEPI s Mega Mall (75,500m 2 ) Baneasa Shopping City (85,000m 2 ) Afi Palace Cotroceni (76,000m 2 ) Sun Plaza (80,000m 2 ) NEPI s Iris Titan Shopping Center (45,000m 2 ) Bucuresti Mall (37,400m 2 ) NEPI s Promenada Mall (40,400m 2 ) Park Lake (opening Sep 2016) RESULTS PRESENTATION 30 JUNE 2016 40

Mega Mall BUCHAREST, ROMANIA 100% ownership, as of 31 May 2016; the transaction will be recognised in the financial statements of the 3rd quarter of 2016 (as Competition Council s approval was received in July 2016). Mix of over 200 tenants, including flagship stores: Hilfiger Denim, Mango, Marks&Spencer, Peek&Cloppenburg, Reserved. Country s first Marks & Spencer Food concept store opened, and the first 4F store in Romania will open shortly. Ownership 100% Type Mall Lettable area 75 500m 2 Property value 251.7 million Passing rent 18 million Occupancy 98.2% 14-screen Cinema City and the first 4DX auditorium in Romania. Half Olympic-size swimming pool. 10,000m 2 of fast-food and sit-down restaurants. Double digit turnover growth recorded in June 2016 vs. June 2015. Leasing is focused on strenghtening the food and fashion mix. RESULTS PRESENTATION 30 JUNE 2016 41

Mega Mall BUCHAREST, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 42

Mega Mall BUCHAREST, ROMANIA RESULTS PRESENTATION 30 JUNE 2016 43

Mega Mall BUCHAREST, ROMANIA THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR BASEMENT LEVEL -1 (UNDERGROUND PARKING) NOT SHOWN RESULTS PRESENTATION 30 JUNE 2016 44

Korzo Shopping Centrum PRIEVIDZA, SLOVAKIA TRENCIN REGION 591 000 INHABITANTS PRIEVIDZA CITY 48 000 RESULTS PRESENTATION 30 JUNE 2016 45

Korzo Shopping Centrum CATCHMENT AREA 45-308 000 30-144 000 15-78 000 RESULTS PRESENTATION 30 JUNE 2016 46

Korzo Shopping Centrum PRIEVIDZA, SLOVAKIA Acquired in July 2016 (therefore not consolidated in the H1 financial results). Dominant retail scheme in Prievidza, one of the largest municipalities in the Trencin region. Part of a larger retail park, including a Tesco hypermarket and DIY. Ownership 100% Type Mall Lettable area 16 500m 2 Property value 29.5 million Passing rent 2.5 million Occupancy 100% RESULTS PRESENTATION 30 JUNE 2016 47

Korzo Shopping Centrum PRIEVIDZA, SLOVAKIA RESULTS PRESENTATION 30 JUNE 2016 48

Korzo Shopping Centrum PRIEVIDZA, SLOVAKIA RESULTS PRESENTATION 30 JUNE 2016 49

Korzo Shopping Centrum PRIEVIDZA, SLOVAKIA FIRST FLOOR GROUND FLOOR Level -1 (underground parking) not shown RESULTS PRESENTATION 30 JUNE 2016 50

Acquisitions, developments and extensions pipeline ACQUISITIONS PIPELINE ( MILLION) JUN 2016 DEC 2015 )400( )200( 0 200 400 600 800 Finalised* Committed Further opportunities under due dilligence Further opportunities DEVELOPMENTS AND EXTENSIONS PIPELINE ( MILLION) JUN 2016 DEC 2015 )400( )200( 0 200 400 600 800 Finalised Money spent Committed Controlled Further opportunities *does not include the acquisition of Korzo Shopping Centrum Committed: projects currently under construction Controlled: projects where the land is controlled, but not yet under construction Capitalised interest not included RESULTS PRESENTATION 30 JUNE 2016 51

Schedule of developments and extensions Type Category Target opening date Ownership GLA of existing property GLA of development Weighted yield on cost Weighted cost to date (June 16) Weighted total cost % m 2 m 2 % m m Developments under construction 146 200 82 500 8.9 83.3 138.2 Shopping City Piatra Neamt Mall Development 2016 Q4 100 27 900 9.4 12.5 33.4 City Park extension Phase II Mall Extension 2016 Q3 100 28 600 22 800 8.7 36.5 48.1 Braila Mall extension Mall Extension 2016 Q4 100 54 400 2 400 7.2 1.7 6.4 Severin Shopping Center extension Phase II Mall Extension 2016 Q4 100 20 900 1 500 10.4 1.2 1.6 Sfantu Gheorghe Strip Mall extension Value Centre Extension 2016 Q4 100 1 600 1 000 11.6 0.7 The Office Phase III Office Extension 2017 Q3 50 40 700 18 500 12.6 2.3 11.2 Victoriei Office Office Development 2016 Q4 100 8 400 7.7 29.1 36.8 Developments under permitting and pre-leasing 148 500 202 000 106.6 380.5 Promenada Mall extension Mall/Office Extension 2018 100 40 400 60 000 33.4 139.2 Novi Sad Mall Mall Development 2018 Q4 100 56 000 30.8 111.5 Ramnicu Valcea Mall Mall Development 2017 Q4 100 27 900 9.1 36.6 Shopping City Galati extension Mall Extension 2017 Q4 100 27 200 21 000 7.3 27.3 Shopping City Satu Mare Mall Development 2017 100 17 400 5.0 27.2 Shopping City Sibiu extension Mall Extension 2017 Q4 100 79 100 16 900 15.9 Vaslui Strip Mall extension Value centres Extension 2017 Q2 100 1 800 2 800 1.8 Land held for extensions 100 21.0 21.0 Further opportunities 233.7 TOTAL DEVELOPMENTS 294 700 284 500 189.9 752.4 Capitalised interest not included. Amounts included in this schedule are estimates and may vary according to permitting, pre-leasing and actual physical configuration of the finished developments. RESULTS PRESENTATION 30 JUNE 2016 52

Developments 5 SATU MARE Romania 6 CLUJ-NAPOCA 1 PIATRA NEAMT 7 VASLUI UNDER CONSTRUCTION 1. Shopping City Piatra Neamt 2. City Park extension - Phase II 3. Braila Mall extension 2 NOVI SAD 4 RAMNICU VALCEA DROBETA TURNU SEVERIN 3 6 SIBIU 5 SFANTU GHEORGHE 7 1 BUCHAREST GALATI 4 3 BRAILA 2 CONSTANTA 4. Severin Shopping Center extension - Phase II 5. Sfantu Gheorghe Strip Mall extension 6. The Office - Phase III 7. Victoriei Office UNDER PERMITTING AND PRE-LEASING 1. Promenada Mall extension 2. Novi Sad Mall 3. Ramnicu Valcea Mall 4. Shopping City Galati extension 5. Shopping City Satu Mare 6. Shopping City Sibiu extension Serbia 7. Vaslui Strip Mall extension RESULTS PRESENTATION 30 JUNE 2016 53

Shopping City Piatra Neamt DEVELOPMENT UNDER CONSTRUCTION CATCHMENT AREA 15-90 000 30-180 000 45-245 000 NEAMT COUNTY 460 000 INHABITANTS PIATRA NEAMT CITY - 116 000 NEPI s Shopping City Piatra Neamt (27,900m 2 ) Winmarkt Petrodava (10,460m 2 ) GTC Gallery (13,200m 2 ) RESULTS PRESENTATION 30 JUNE 2016 54

Shopping City Piatra Neamt The plot is located in a densely populated area of the city, at the intersection of two main arteries that cross the town, well serviced by local transportation. The Group is developing a regional mall. Carrefour was secured for the 10,000m 2 GLA hypermarket; Cinema City will operate a six-screen cinema. Other secured tenants include: C&A, CCC, Intersport, New Yorker, Orsay, Pepco. DEVELOPMENT UNDER CONSTRUCTION PIATRA NEAMT, ROMANIA Ownership 100% Estimated lettable area 27 900m 2 Estimated rental value 3.2 million Target opening Q4 2016 The centre will have a generous parking (1,000 bays). RENDER Mihu RENDER NOU RENDER PHOTO: JUNE 2016 RESULTS PRESENTATION 30 JUNE 2016 55

City Park extension - Phase II DEVELOPMENT UNDER CONSTRUCTION CATCHMENT AREA 45-541 000 30-435 000 15-305 000 CONSTANTA COUNTY 684 000 INHABITANTS CONSTANTA CITY - 319 000 NEPI s City Park (*51,400m 2 ) Maritimo Shopping Center (51,300m 2 ) Tom Mall (32,000m 2 ) Tomis Mall (18,800m 2 ) * GLA estimated after extension RESULTS PRESENTATION 30 JUNE 2016 56

City Park extension - Phase II The mall has a central location in Constanta, the fifth largest city in Romania, close to the country s most popular seaside resort. The first phase of the extension opened in July 2015, with a ten-screen Cinema City, featuring Romania s second 4DX auditorium. The main anchors of the extension are C&A, Deichmann, H&M, Inditex, New Yorker, Sephora and the only World Class gym in the city. Two new parking levels are added, with approximately 250 parking bays. DEVELOPMENT UNDER CONSTRUCTION CONSTANTA, ROMANIA Ownership 100% Lettable area - Property in use 28 600m 2 Estimated lettable area - Extension under construction 22 800m 2 Passing rent - Property in use 6.5 million Estimated rental value - Extension under construction 4.4 million Targeted opening of extension Q3 2016 RESULTS PRESENTATION 30 JUNE 2016 57

Braila Mall extension DEVELOPMENT UNDER CONSTRUCTION CATCHMENT AREA 45-575 000 30-258 000 15-173 000 BRAILA COUNTY 308 200 INHABITANTS BRAILA CITY - 213 000 NEPI s Braila Mall (54,400m 2 ) NEPI s Shopping City Galati (27,200m 2 ) RESULTS PRESENTATION 30 JUNE 2016 58

Braila Mall extension The food court area was refurbished in spring 2016. The additional extension is based on strong tenant demand and will transform the centre into a regional fashion destination. Tenants already signed include Stradivarius, Berska, Pull&Bear and LC Waikiki (targeted opening - end of September). DEVELOPMENT UNDER CONSTRUCTION BRAILA, ROMANIA Ownership 100% Lettable area - Property in use 54 400m 2 Estimated lettable area - Extension 2 400m 2 Passing rent - Property in use 5.6 million Estimated rental value - Extension under construction 0.5 million Targeted opening of extension Q4 2016 Negotiations are in progress with other renowned fashion tenants. RENDER RENDER RESULTS PRESENTATION 30 JUNE 2016 59

Severin Shopping Center extension DEVELOPMENTS UNDER CONSTRUCTION CATCHMENT AREA 45-175 000 15-102 000 30-138 000 MEHEDINTI COUNTY 256 100 INHABITANTS DROBETA TURNU SEVERIN CITY - 111 000 NEPI s Severin Shopping Center (20,900m 2 ) Cora Gallery (11,200m 2 ) RESULTS PRESENTATION 30 JUNE 2016 60

Severin Shopping Center extension DEVELOPMENT UNDER CONSTRUCTION MEHEDINTI, ROMANIA The new brands signed, C&A and dm have upgraded the shopping centre s visibility and market positioning, generating a major increase in footfall. Tenants turnovers have increased by double digit numbers, and the fashion anchors have registered significant turnover improvements. Ownership 100% Lettable area - Property in use 20 900m 2 Estimated lettable area - Extension 1 500m 2 Passing rent - Property in use 2.2 million Estimated rental value - Extension under construction 0.2 million Targeted opening of extension Q4 2016 RESULTS PRESENTATION 30 JUNE 2016 61

Sfantu Gheorghe Strip Mall extension DEVELOPMENT UNDER CONSTRUCTION COVASNA, ROMANIA The Group has decided to extend this strip mall based on good results of the existing scheme and strong demand for additional commercial space. Ownership 100% Lettable area - Property in use 1 600m 2 Estimated lettable area - Extension 1 000m 2 Passing rent - Property in use 0.2 million Estimated rental value - Extension under construction 0.1 million Targeted opening of extension Q4 2016 RENDER RESULTS PRESENTATION 30 JUNE 2016 62

The Office - Phase III DEVELOPMENT UNDER CONSTRUCTION CLUJ, ROMANIA The Office is an A-grade office development. Works on Phase III started in January 2016. Various current tenants expressed interest in renting additional office space in Phase III. Building will be handed over to tenants in June 2017. Ownership 50% Lettable area - Property in use (Phases I and II) 40 700m 2 Estimated lettable area - Phase III 18 500m 2 Passing rent - Property in use (Phases I and II) 6.4 million Estimated rental value - Phase III 2.8 million Targeted opening of Phase III Q3 2017 RENDER RENDER RESULTS PRESENTATION 30 JUNE 2016 63

Victoriei Office DEVELOPMENT UNDER CONSTRUCTION BUCHAREST, ROMANIA The development is located in Victoriei Square, adjacent to the Romanian Government building. It includes a modern office and the refurbishment of a historical building. The building is largely completed, fit-out being currently under permitting. Ownership 100% Lettable area 8 400m 2 Estimated rental value 2.9 million Targeted opening Q4 2016 RENDER RESULTS PRESENTATION 30 JUNE 2016 64

Promenada Mall extension DEVELOPMENT UNDER PERMITTING AND PRE-LEASING CATCHMENT AREA 30-940 400 15-176 500 5-30 400* BUCHAREST 1 883 000 INHABITANTS NEPI s Promenada Mall (40,400m 2 ) Baneasa Shopping City (85,000m 2 ) Afi Palace Cotroceni (76,000m 2 ) NEPI s Mega Mall (75,500m 2 ) *does not include the approx 60,000 office workers in the CBD region. RESULTS PRESENTATION 30 JUNE 2016 65

Promenada Mall extension The centre is located in the new central business district, near NEPI s Floreasca Business Park and The Lakeview. The extension will includes additional mixed-use fashion, leisure, entertainment and A-grade office space. Permitting is currently in progress. DEVELOPMENT UNDER PERMITTING AND PRE-LEASING BUCHAREST ROMANIA Ownership 100% Lettable area - Property in use 40 400m 2 Estimated lettable area - Extension 60 000m 2 (office+retail) Targeted opening of extension 2018 Negotiations are in progress with international fashion and entertainment brands. RENDER RENDER RESULTS PRESENTATION 30 JUNE 2016 66

Novi Sad Mall DEVELOPMENT UNDER PERMITTING AND PRE-LEASING CATCHMENT AREA 45-607 000 30-354 000 15-211 000 VOJVODINA REGION 1 902 000 INHABITANTS NOVI SAD CITY - 250 000 RESULTS PRESENTATION 30 JUNE 2016 67

Novi Sad Mall Novi Sad is the second largest city in Serbia, 70 km from the capital, Belgrade, and is connected by an international highway to Budapest, Vienna, Belgrade, Zagreb and Skopje. The land plot has a prime central location and zoning in place. DEVELOPMENT UNDER PERMITTING AND PRE-LEASING NOVI SAD, SERBIA Ownership 100% Estimated lettable area 56 000m 2 Targeted opening Q4 2018 The planned development includes a shopping mall of up to 56,000m 2 GLA (in one or more phases). Construction of the first phase is planned to commence in April 2017, subject to permitting. RESULTS PRESENTATION 30 JUNE 2016 68

Novi Sad Mall DEVELOPMENT UNDER PERMITTING AND PRE-LEASING NOVI SAD, SERBIA RENDER RESULTS PRESENTATION 30 JUNE 2016 69

Ramnicu Valcea Mall DEVELOPMENT UNDER PERMITTING AND PRE-LEASING CATCHMENT AREA 45-314 500 30-156 200 15-115 000 VALCEA COUNTY 363 300 INHABITANTS RAMNICU VALCEA CITY - 119 000 NEPI s Ramnicu Valcea Mall (27,900m 2 ) River Plaza Mall (12,400m 2 ) Winmarkt (11,400m 2 ) Kaufland (6,000m 2 ) RESULTS PRESENTATION 30 JUNE 2016 70

Ramnicu Valcea Mall The Group has acquired a 12 ha land plot, close to a residential neighbourhood. There is no modern dominant retail offering in the city (the only retail schemes in the city are River Plaza Mall, Winmarkt and a Kaufland hypermarket with limited discount fashion retailers). DEVELOPMENT UNDER PERMITTING AND PRE-LEASING VALCEA, ROMANIA Ownership 100% Estimated lettable area 27 900m 2 Targeted opening Q4 2017 The development includes a shopping centre with cinema and entertainment components. RENDER RESULTS PRESENTATION 30 JUNE 2016 71

Ramnicu Valcea Mall DEVELOPMENT UNDER PERMITTING AND PRE-LEASING VALCEA, ROMANIA FIRST FLOOR GROUND FLOOR RESULTS PRESENTATION 30 JUNE 2016 72

Shopping City Galati extension DEVELOPMENT UNDER PERMITTING AND PRE-LEASING CATCHMENT AREA 45-559 000 30-368 000 15-310 000 GALATI COUNTY 524 500 INHABITANTS GALATI CITY - 306 000 NEPI s Shopping City Galati (27,200m 2 ) NEPI s Braila Mall (54,400m 2 ) RESULTS PRESENTATION 30 JUNE 2016 73

Shopping City Galati extension The extension will include a cinema, food court and additional fashion offering, that will transform the centre into a regionally dominant one. The extension will create a common access and parking with adjacent Kaufland Hypermarket. Footfall and turnover recorded double digit increase over the past two years. DEVELOPMENT UNDER PERMITTING AND PRE-LEASING GALATI, ROMANIA Ownership 100% Lettable area - Property in use 27 200m 2 Estimated lettable area - Extension 21 000m 2 Targeted opening of extension Q4 2017 1800 parking bays are planned as part of the extension. Refurbishment Existing shopping centre New GLA FIRST FLOOR GROUND FLOOR RESULTS PRESENTATION 30 JUNE 2016 74

Shopping City Satu Mare DEVELOPMENT UNDER PERMITTING AND PRE-LEASING CATCHMENT AREA 45-288 000 30-182 000 15-130 000 SATU MARE COUNTY 340 000 INHABITANTS SATU MARE CITY - 123 000 NEPI s Shopping City Satu Mare (17,400m 2 ) Ankora Mall (6,000m 2 ) RESULTS PRESENTATION 30 JUNE 2016 75

Shopping City Satu Mare DEVELOPMENT UNDER PERMITTING AND PRE-LEASING SATU MARE, ROMANIA The development will be the regionaly dominant retail scheme, located in the centre of the city. The tenant mix will include food and fashion anchors, with various entertainment options. Ownership 100% Estimated lettable area 17 400m 2 Targeted opening 2017 RENDER RESULTS PRESENTATION 30 JUNE 2016 76

Shopping City Sibiu DEVELOPMENT UNDER PERMITTING AND PRE-LEASING SIBIU, ROMANIA The Group plans to refurbish and extend the existing shopping centre, including a cinema and a larger food court area. Ownership 100% Lettable area - Property in use 79 100m 2 Estimated lettable area - Extension 16 900m 2 Targeted opening of extension Q4 2017 Extended and redeveloped area RESULTS PRESENTATION 30 JUNE 2016 77

Vaslui Strip Mall extension DEVELOPMENT UNDER PERMITTING AND PRE-LEASING VASLUI, ROMANIA Based on the strong tenant demand in the area, the group has decided to extend the existing scheme with an additional 2 800m 2 GLA fashion offering. There are signed lease agreements with Pepco and TXM, and negotiations are on-going with other tenants. Ownership 100% Lettable area - Property in use 1 800m 2 Estimated lettable area - Extension 2 800m 2 Targeted opening of extension Q2 2017 RENDER RESULTS PRESENTATION 30 JUNE 2016 78

RESULTS PRESENTATION 30 JUNE 2016 79