SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Similar documents
Major Projects Overview

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. Central Florida

FUNDED FOR CONSTRUCTION

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Delaware County Engineer

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Appendix C Agency Coordination and Correspondence

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS

US 19 Sunset Point Rd to Countryside Blvd.

Update of MDX Open Road Tolling

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

I-35 Reconstruction Project

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

MEETING NOTES Project Development and Environment Study SR 408 East Extension from SR 50 to SR 50/SR 520 Intersection

Williamsburg Town Hall Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

GATEWAY PLAZA NWC OF ROCK SPRINGS RD & LESTER RD APOPKA, FLORIDA NEW RETAIL DEVELOPMENT FOR LEASE

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

The Transportation Corridor Overlay District

Westshore Development Forum April 9, 2014

District 3 ITS Project Update

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Fairfax County Parkway Widening Fairfax County

Transportation Supporting Dulles Airport

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

Measure R Program Update

Mainline Description

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

2017 LIST OF PRIORITY PROJECTS

TRANSPORTATION ELEMENT

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY OPERATIONS COMMITTEE MEETING September 19, :00 P.M.

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Draft Year 2040 Cost Feasible Plan

SECTION 106 ACTIVITIES ANNUAL REPORT

Florida Department of TRANSPORTATION. First Coast Expressway

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

I-70/I-71 Project Public Meeting Presented By

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

ASSESSMENT OF MULTI-USE TRAIL ACCOMMODATION

Highways: State Highways

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

APPENDIX A: Planning Consistency Checklist

Basic Project Information

1.2 Corridor History and Current Characteristics

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FY 2011 TRANSPORTATION AUTHORITY MONITORING AND OVERSIGHT REPORT

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

US 380 FEASIBILITY STUDY

Completion: August 2011 LS #321 Design LS #8

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Predictive Economic Impact Study for the Mount Dora to Seminole Wekiva Trail

The St Joe Compan November 2009

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Monthly SunPass Transponder Sales Inception to June 2012

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

NEW YORK AVENUE TOWN HOME SITE

Highways: Interstate. Highways: State Highways

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE

A New Era of Transportation Solutions

Regional Planning for Tri-Rail Coastal Link

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

STATE ROUTE CHANGE DESCRIPTION USRN DECISION IOWA

A Presentation to: Project Advisory Group Meeting #6

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

DEVELOPMENT LAND FOR SALE

LIST OF PRIORITY PROJECTS (LOPP) 2017/ /35

DEVELOPMENT LAND FOR SALE

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

Chapter 4. Development Alternatives

LAND FOR SALE. LAKE COUNTY PLANNED TOWN CENTER MIXED USE LAKEFRONT 721± acres Lake County, FL INCREDIBLE LOCATION SIZE FRONTAGE

BOARD OF AIRPORT COMMISSIONERS

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

RUSHMORE CONNECTOR TRAIL PROPOSAL

Transform66: Inside the Beltway

Southern Beltway Projects Summary

A VISION FOR I-95. January 12, Delaware Department of Transportation

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

State Route 189 Project and Draft Resolution of Support. November 2014

Special Committee on U. S. Route Numbering

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Transcription:

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5

Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway. Total project cost $1.7 billion which includes $500 million of non toll road improvements including Construction of 7 miles of 4 and 6-laning of SR 46 in Lake and Seminole Counties Reconstruction of the US 441/SR 46 interchange in Mount Dora Relocation of CR 46A to provide improved wildlife connectivity and additional local road system benefits Provides connectivity to SR 417 and I-4 corridors 2

Wekiva Parkway Seminole County Lake County Orange County 9.4 Miles Expressway Arterial < x > Number of Lanes Both Directions 3

Tolled/Non-Tolled Segments US 441/SR 46 Interchange Redesign CR 46A Realignment Service Road Seminole County SR 46 Six-Laning SR 46 Six-Laning Lake County Orange County Frontage Roads 4

Funding Partners Florida Department of Transportation District 5 Florida s Turnpike Enterprise Orlando Orange County Expressway Authority 5

Project Construction Sections D R A F T 6

FDOT/OOCEA Agreement in Principle For each agency s respective section they will: Perform Final Design Construct Finance Operate Maintain Collect Tolls Keep all toll revenue 7

Project Status - Environmental FONSI Finding of No Significant Impactapproval anticipated soon FHWA has given the go ahead to advertise Sections 4A & 4B for Design Build Procurement 8

Project Status 15 %Design 15% preliminary engineering currently being performed by D5 FDOT. HNTB - Sections 1-5 Atkins Sections 6-8 Identifying Right of Way Requirements Value Engineering Risk Assessment Determining logical terminii for final design/segments 9

Project Status Final Design FDOT Final Design procurement for Sections 3A, 3B, 5, 6, 7A Begin this summer Last contract executed early winter 2013 Each design segment will last approximately 2 years. OOCEA Sections 1A, 1B, 2A, 2B, 2C Begin this summer 10

Project Status - Construction Section 4A & 4B - Fall 2012 Section 1 2015 Section 2-2016 Section 3A & 3B - 2016 Section 5 & 6-2016 Section 7B - 2016 Section 7A 2017 Section 8-2018 11

OOCEA Section 1 Orange Co. N. of Kelly Park Rd. N. Of US 441

Kelly Park Interchange

OOCEA Section 1A & 1B Orange Co. Section 1A - From 0.25 Mi. N, of US 441 to 0.129 mi. N. of Ponkan Road Section 1B - From 0.129 Mi. N. of Ponkan Rd to 0.485 mi. N. of Kelly Park Rd Final Design - Design consultants have been selected. Construction Begin January 2015 Complete Summer 2016 Estimated Costs 1A - $65,000,000 1B - $76,000,000

OOCEA Section 2 Orange & Lake Co. Systems Interchange

OOCEA Section 2A, 2B, & 2C Orange & Lake Co. SR 429/SR 46 Systems Interchange Final Design Currently in Procurement Section 2A Systems Interchange In advertisement Section 2B & 2C Systems Interchange connections to SR 429 in Orange Co. and SR 46 in Lake Co. Advertised after 2A selected Construction Begin Spring 2015 Complete Summer 2017 Total Estimated Costs - $124,000,000

Section 3A Lake Co. East of Round Lake Rd. East of Pond Rd.

Section 3A Lake Co. FP 238275-3-52-01 SR 46 From 0.038 mi. East of Pond Road to 0.313 mi. East of Round Lake Road Widen Existing SR 46 to 6-lanes Urban Section Final Design - Fall 2012 Construction Begin Spring 2016 Complete Summer 2019 Estimated Costs $11,000,000

Section 3B Lake Co. E of Pond Road. W of US 441

Section 3B Lake Co. FP 238275-2-52-01 US441/SR 46 Interchange - from 0.2 mi. W of US 441 to 0.038 Mi. East of Pond Rd 6 lane US 441 6 lane SR 46 SB to WB flyover ramp Final Design Summer 2012 Construction Begin Summer 2016 Complete Summer 2019 Estimated Costs $32,000,000

Section 4A & 4B Lake & Orange Co. W. Of Old McDonald Rd. Mt. Plymouth/CR 435

Section 4A & 4B

Section 4A & 4B Lake & Orange Co. FP 431163-5-52-01 & 238275-6-52-01 From CR 435/Mt. Plymouth to 0.358 mi. W. of Old McDonald Rd NO New Construction 4 lane rural section Construction CONTACT Design Build Advertised March 16, 2012 3 Week Advertisement 2 Phase Adjusted Score Design Build Procurement Commitment to turn dirt Fall 2012 Estimated Costs $34,000,000 See Advertisement for direction on how to obtain additional information on the project

Section 5 Lake Co. N. of Arundel Way SR 46

Section 5 Lake Co. FP 238275-8-52-01 Realignment of CR 46A from SR 46 to 0.04 mi. N of Arundel Way Removal of portions of Existing 46A Final Design Fall 2012 Construction Begin July 2016 Complete July 2020 Estimated Costs - $10,000,000

Section 6 Lake Co. E of Wekiva River Rd W. of Old McDonald Rd

Section 6 Lake Co. FP 238275-7-52-01 From 0.358 Mi. W. of Old McDonald Rd to 0.5 mi. East of Wekiva River Rd Includes approximately 8000 of wildlife bridging Extensive Environmental considerations Replacement of existing Wekiva River Bridge Wekiva River National Wild & Scenic River State Wild & Scenic River Florida Aquatic Preserve OFW Outstanding Florida Waterway

Section 6 Lake Co. FP 238275-7-52-01 SR 429 Typical Section - 4-lanes expandable to 6-lanes Non-tolled frontage roads Final Design Fall 2012 Construction Begin July 2016 Complete July 2020 Estimated Cost - $198,000,000

Section 7A Seminole Co. East of Wekiva River Rd. Orange Blvd.

Section 7A Seminole Co. FP 240200-2-52-01 SR 429 from 0.5 mi. East of Wekiva River Rd. to Orange Blvd Non-tolled frontage roads Significant Utility effort Final Design Fall 2012 Construction Begin - Summer 2017 Complete Summer 2020 Estimated Costs - $108,000,000

Section 7B Seminole Co. W. of Center Rd. W. Of I-4

Section 7B Seminole Co. FP 240200-3-52-01 SR 46 from 0.057 mi. West of Center Rd to Interstate 4 Widen existing SR 46 from 4 to 6 lanes Final Design Concept Complete Draft RFP Complete Construction Design Build Begin Summer 2016 Complete Winter 2017 Estimated Costs - $17,000,000

Section 8 Seminole Co. I-4 Interchange

Section 8 Seminole Co. FP 240200-4-52-01 I-4 Interchange Currently performing Design Initial Line & Grade Line & Grade complete Fall 2012 Construction Design Build Begin - July 2018 Complete - December 2021 Estimated Costs - $260,000,000

QUESTIONS? FDOT - Suzanne Phillips Suzanne.Phillips@dot.myflorida.com OOCEA - Glenn Pressimone - PressimoneG@oocea.com