Infrastructure in Greece

Similar documents
The economic impact of ATC strikes in Europe Key findings from our updated report for A4E

PRESS RELEASE. ARRIVALS OF NON-RESIDENTS IN GREECE: January - June 2016 HELLENIC REPUBLIC HELLENIC STATISTICAL AUTHORITY. Piraeus, 13 October 2016

Cumulative Investments by Sector. Cumulative Investment by Country. Industry, Commerce & Agribusiness 18% Transport 30% Natural Resources 2%

March 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28

An overview of Tallinn tourism trends

COMMUNICATION FROM THE COMMISSION TO THE COUNCIL

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018

October 2013 compared with September 2013 Industrial production down by 1.1% in euro area Down by 0.7% in EU28

Outlook Update

Outlook Prospects of inbound tourism to Greece in March Evangelia Lamprou. Dr. Aris Ikkos, ISHC.

Special Coordination Service for Implementation (SCOS) - ROLE

LifeWatch, costing and funding. The LifeWatch e-infrastructure financial issues

Egnatia Odos: An axis for development and co-operation

assists in the development of airport capacity to meet growing demand supports the development of improved ground access to airports

TRIPS OF BULGARIAN RESIDENTS IN ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2011

KLAIPEDA GATEWAY TO THE EUROPEAN MARKET

The economic importance of UK outbound tourism to the EU27 economies

CCBE LAWYERS STATISTICS 2016

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

irport atchment rea atabase

Adequate information for tourism will help us to:

Kosovo s economic and investment potential

The Nordic Countries in an International Comparison. Helga Kristjánsdóttir 20. apríl 2012

Tourist flow in Italy Year 2016

Press Release Athens, 2 June 2014

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

Elpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works

Tourist flow in Italy Year 2017

ECONOMIC ENVIRONMENT IN

SES Performance Scheme

Government Keynote Address. Delian Dobrev, Minister of Economy, Energy and Tourism

Sole parents: participation and equality

I would like to thank the organizers for the opportunity to address such an esteemed audience.

European Performance Scheme

EU-Russia summit Strong recovery of trade in goods between EU27 and Russia in 2011 An EU27 deficit of 91 bn euro with Russia in 2011

Shifting mindsets: Evolution & trends in infrastructure we need to create

Belt and Road Initiative (BRI) in Belarus - assessment from an economic perspective

Legal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL

Novelty and opportunities in the Greek PPP market

1 st US - Kosovo Trade Forum New York, New York

Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of some F&V products

MAIS3+ assessment: Current practices around Europe

IMD World Talent Report Factor 1 : Investment and Development

ANNUAL TOURISM REPORTING - DATA SHEETS COUNTRY: The statistical data provided in the tables below shall cover the year 2014 and, if available, 2015.

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Benchmarking Travel & Tourism in United Arab Emirates

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

The results of indicators, the reports, and generally the Observatory material are available on the internet at:

TAIEX. Institution Building support for Agriculture and Rural Development by Twinning and TAIEX. Institution Building Unit DG Enlargement

JAR-145: APPROVED MAINTENANCE ORGANISATIONS. Please find attached a copy of Amendment 6 to JAR-145, effective 1 November 2004.

Table I. General questions

Russia Energy as Diplomacy in the 21 st Century HOW DID THE SOUTH STREAM FAIL?

Cover Pool ( mn.) 4, , , , , ,494.6 of which derivatives ( mn.)

monitoring of egnatia motorways spatial impacts

Bulgaria investment climate and business opportunities. February 2011

PRESS RELEASE. Graph 1: Road traffic accidents and casualties, January January Jul-14. Jul-15. Apr-15. Jan-15. Oct-15.

DEPA. Participations. Trading Activities. DESFA S.A. EDA S.A. IGI Poseidon S.A. Thessaloniki EPA. Eni

Road Safety Campaigns in Greece

Network Management, building on our experience of flow management and network planning.

Please find attached a copy of JAR-66 Amendment 2 dated February 2007.

External Quality of Service Monitoring

% change vs. Dec ALL VISITS (000) 2,410 12% 7,550 5% 31,148 1% Spend ( million) 1,490 15% 4,370-1% 18,710 4%

European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016

CROATIA Business climate and opportunities for cooperation with Finland. Helsinki, 14th December 2015

JAR-147: APPROVED MAINTENANCE TRAINING/EXAMINATIONS. Please find attached a copy of JAR-147 Amendment 3 dated February 2007.

Contents. Global outlook. UK economic prospects. The outlook for consumer spending and the impact of automation. Regional growth trends and prospects

A Strategy Proposal for Road Infrastructure Development in Recession Times

Who goes where? How long do they stay? How much do they spend?

Corporate Presentation

Benchmarking Travel & Tourism in Russia

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

JAR-21: CERTIFICATION PROCEDURES FOR AIRCRAFT AND RELATED PRODUCTS AND PARTS. Please find attached a copy of JAR-21 Amendment 7 dated February 2007.

Fly America and Open Skies. For Travel on Federal Sponsored Awards

Statistical Bulletin Νο. 39 March 2018

EUROPEANS EXPERIENCE WITH USING SHIPS AND PERCEPTIONS OF MARITIME SAFETY

in focus Statistics How Eur opeans go on Contents Main features INDUSTRY, TRADE AND SERVICES POPULATION AND SOCIAL CONDITIONS

CAP CONTEXT INDICATORS

Observatory of Egnatia Odos motorway, Greece

Please find attached a copy of JAR-25 Amendment 20 dated December 2007.

ATTITUDES OF EUROPEANS TOWARDS TOURISM

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS

First draft program of CONT mission to Greece (24-25 September 2015)

CABOTAGE GUIDELINES. Hauliers from Croatia are covered by a ban on cabotage until the end of June 2017.

ANNEX V. List of Abbreviations

The contribution of Tourism to the Greek economy in 2017

Rules for reimbursement of expenses for delegates attending meetings

SLOVAKIA. Table 1. FDI flows in the host economy, by geographical origin. (Millions of US dollars)

Industrial Statistics of Lifts and Escalators. Ebru Gemici-Loukas, VDMA ASANSÖR, Istanbul 27. March 2015

2. Driving forces and pressures

FACTS & FIGURES ISE 2016

Coastal and maritime tourism in the frame of the European Blue Growth strategies

CEFS SUGAR STATISTICS 2010

sailing on the LNG era POSEIDON MED ll

SHIP MANAGEMENT SURVEY. January June 2018

Next Release: 13 April Next Release: 13 April December

Transcription:

in Greece Funding the future

Content overview 1 Executive summary 3 Greek infrastructure projects pipeline 2 investment 4 Funding of Greek infrastructure projects The investment gap in Greek infrastructure is around 5 Conclusion 1.5pp of GDP 2

Executive Summary 18.7bn total remaining budget backlog and budget of upcoming projects Urban Rail 26,17% Waste Management Rail 3,07% 9,64% 14,50% Transit Transport Source: Press, calculations *excluding telecoms and social infrastructure **for every Euro spent on infrastructure, GDP is further increased by 0.8 (IMF Working paper The welfare multiplier of Public Investment, 2016) 8,98% 37,64% Energy Tourism Funding the future According to OECD, global infrastructure needs* are expected to reach around $ 87trln by 2030 Greece is ranked 24th among the E.U. countries in terms of infrastructure quality, along with systematic low infrastructure quality countries, mostly in Eastern and Southern Europe In Greece, infrastructure investments were affected by the deep economic recession. The infrastructure investment gap is between 0.8 pp of GDP (against the European average) or 1.5 pp of GDP (against historical performance) translating into on average 1.1% of GDP or 2bn spending per year investments have an economic multiplier of 1.8x** which can boost demand in construction and other sectors The infrastructure backlog has grown significantly during the crisis. The value of 75 projects, which are in progress or upcoming is around 18.7bn, of these 21% refer to energy projects, while 36% are rail and motorway projects The investment pipeline has slightly decreased comparing to the stability of the past three years. The pipeline of projects in progress has been reduced in 2017 as a number of projects have been completed Between 2014-2017, 25 of the infrastructure projects have been completed mainly motorways Announced tourist infrastructure and waste management projects (the latter are financed through PPPs), estimated at 10% of total pipeline budget, are important to improving the quality of life Traditional funding sources, such as loan facilities and the Public Investment Program are limited, shifting the financing focus to the private sector. Historically, private funding in Greece was limited to about 15% of total budget, while public sector financing (State and EU) accounted for around 40% PPPs and Project Bonds could provide a significantly higher private sector participation in infrastructure funding, having as prerequisites the improvement of the business environment and lower levels of political uncertainty 3

Sustainable Development Goals 17 SDGs focusing mainly on 6 investment areas addressing poverty and universal development In 2015, 193 UN Member States adopted the Sustainable Development Goals (SDGs) to be achieved by 2030 in order to build sustainable economic growth Investment areas 1. Health 2.Education 3.Social Protection 4.Food Security and Sustainable Agriculture 5. 6.Ecosystem Services In the long-term, infrastructure investment can jolt economic growth by increasing the potential supply capacity of an economy 1. Energy access and lowcarbon energy infrastructure 2. Water and Sanitation 3. Transport infrastructure 4. Telecommunications infrastructure 4

investment Definition of infrastructure is the system of public works in a country, state or region, including roads, utility lines and public buildings OECD is the basic framework for delivering energy, transport, water & sanitation and information & communication technology (ICT) services to people affecting directly or indirectly their lives World Bank In the study, we have included projects with regards to transport (airport, ports, roads & rail), energy (electricity, oil & gas) as well as water & sewage, whilst ICT and Social (e.g. Hospitals, Schools, Public Buildings, Sport Structures and Green Areas) have been excluded Information & Communications Technology, according to the World Bank, refers to physical telecommunications systems and networks (cellar, broadcast, cable, satellite, postal) and the services that utilize them (internet, voice, mail, radio, and television) 5

According to OECD, global infrastructure will absorb around $ 87trln of investment by 2030 In the period 2017-2030, 6.3% of global GDP needs to be invested in water infrastructure, road & rail transportation, airports and ports, energy Traditional funding sources are no longer enough to cover the rapid increase in infrastructure projects, which are expected to reach $ 6.6trln annually by 2030 Road 31.9 Rail Airports & Ports 6.3% 6.4 2.7 Transport 3.0% 86.7 2.3% 1.0% 41.0 32.1 13.6 Water Transport Energy* Total needs ($trln) % of Global GDP Source: OECD *Energy includes Power and electricity T&D, Energy demand/efficiency and oil and gas supply The OECD estimates include additional capital costs of 29% in the energy sector, related to the decarbonisation of the power sector and to the grid extension for the electrification of end-use sectors (e.g. transport); and investment in energy efficiency in the transport, industry and buildings sectors 6

Quality of (Index) 32 Quality of infrastructure Greece is ranked 24th among the EU countries in terms of quality of infrastructure, revealing also a quality gap for the current level of GDP per capita Quality of infrastructure (Index) Avg.5.0 Romania 3.3 Bulgaria 3.9 Poland 4.2 Slovakia 4.2 Greece 4.3 Italy 4.3 Latvia 4.3 Ireland 4.4 Hungary 4.5 Slovenia 4.6 Czech Republic 4.6 Croatia 4.7 Cyprus 4.7 Malta 4.8 Lithuania 4.9 United Kingdom 5.0 Belgium 5.4 Estonia 5.4 Spain Luxemburg Sweden Portugal Germany Denmark Austria France Finland Netherlands 5.5 5.6 5.6 5.7 5.7 5.8 5.9 6.1 6.1 6.2 6.5 6.0 5.5 Czech Republic 5.0 Croatia Hungary 4.5 Poland 4.0 3.5 3.0 France Finland Austria Denmark Portugal Germany Sweden Spain Estonia Belgium Lithuania Romania Malta Quality gap Cyprus Latvia Bulgaria Slovakia Netherlands United Kingdom Slovenia Italy Greece Ireland തR²=0.96 Luxemburg 0 20,000 40,000 60,000 80,000 100,000 120,000 Source: The Global Competitiveness Report 2016-2017, World Economic Forum, IMF Gross domestic product per capita, current prices $ 7 Source: The Global Competitiveness Report 2016-2017, World Economic Forum, IMF

Quality of Index There are two statistically distinct levels of infrastructure quality, whose difference can t be explained by the level of GDP Τhe differences in infrastructure quality between Western and Northern European countries, compared to the Central and Eastern European countries, cannot be explained by the level of relative investment investments, measured through the Gross Fixed Capital Formation (GFCF), appear to have a different impact on infrastructure quality in each group In Greece, the average infrastructure investments during 2000-2017 corresponded to only 19% of GDP, third lowest among all E.U. countries, undermining country s upcoming infrastructure quality 6.5 6.0 5.5 5.0 4.5 4.0 3.5 3.0 Greece Quality gap Netherlands Denmark Germany United Kingdom Italy Slovenia Poland Spain Lithuania Croatia Hungary Slovakia Bulgaria France Belgium Latvia Finland Estonia Austria Sweden Romania 10 15% 20% 25% Czech Republic Ireland Source: World Economic Forum - The Global Competitiveness Report 2017-2018, BMI 30% Gross Fixed Capital Formation in / GDP 8

There is an investment gap of 1.5pp of GDP (or 2bn p.a.) in Greek infrastructure 8 7 6 5 4 3 2 1 0 investment*** 3.7% 8.1 2006 2.5% 5.8 2007 Greek Average 2.6% 1.3% 3.2 2008 1.3% 3.1 2009 Source: BMI International 67 bn gap European Average 1.9% 1.1% 2.6 2010 industry value ( bn) 1.0% 2.1 2011 1.1% 2.0 2012 1.1% 1.9 2013 1.0% 1.0% 1.9 2014 1.8 2015 1.1% 1.9 2016 1.1% 2.0 2017f industry value (% of GDP) BMI Investment incudes: Transport (Roads, Bridges, Railways, Airports, Ports and Waterways) and Energy & Utilities (Power Plants, Transmission Grids, Oil & Gas, Pipelines and Water infrastructure) in Greece has been severely affected by the deep recession. Total value of infrastructure projects has decreased between 2006 and 2017 by c. 75%, while its share in Greek GDP has fallen by 2.6pps in the same period The current rate of infrastructure investment is around 1.1% of GDP, compared to the historical pre crisis average of 2.6% and the European average of 1.9% of GDP The erosion Insert of infrastructure investment text from 2006 to 2017 resulted in a 67bn cumulative shortage According to ELSTAT, the number of employees* directly related to infrastructure amounted to around 580k in 2017 (about 15% of total workforce) posting a significant decline of 37% compared to 2009. Employees indirectly linked to infrastructure projects amount to 880k The backlog up to 2023 of both in progress and planned infrastructure projects is estimated at around 18.7bn or c. 3.1bn on an annual basis investments in Greece have an economic multiplier of around 1.8x**, which boosts demand in other sectors *** Investment data is derived from GDP by output figures from ELSTAT. Specifically, it measures the output of the industry over the reported 12-month period in nominal values. As it is derived from GDP data, it is a measure of value added within the industry, hence it does not measure the nominal value of all inputs used in the infrastructure industry *Direct sector employment: manufacturing, construction, water supply & waste management, electricity & gas supply Indirect sector employment: transportation & storage, real estate activities, wholesale, retail & repair of motor vehicles **for every Euro spent on infrastructure, GDP is further increased by 0.8 (IMF Working paper The welfare multiplier of Public Investment, 2016) 9

Summary There is a large need for further infrastructure investment globally over the next 13 years, estimated at $ 6.6trln per annum or 6.3% of global GDP The average annual level of infrastructure investment in Greece between 2009 and 2017 stands at 2.15bn, 62% lower than the historical average of 2006-2008 In Greece, the infrastructure investment gap ranges between ο.8pp of GDP (against the European average) and 1.5pp of GDP (against historical performance), which translates into 1.1% of GDP or about 2bn per year The quality of infrastructure in Greece is substantially inferior than the level of wealth would predict There is a statistically significant gap in the quality of infrastructure between western and mainly eastern European countries. Greece is in the latter group The need for infrastructure investments in Greece in terms of both capacity expansion and quality improvement is evident 10

32 Greek infrastructure projects pipeline There are 75 infrastructure projects in the pipeline for completion by 2023 totaling 18.7bn Between 2014 and December 2017, 25 infrastructure projects were completed with a total spending of 7.7bn Most of energy and motorway projects are in progress, 4 rail projects are about to be delivered, while tourist product projects are still in initial development stage Rail, energy and motorways require higher investment per project, compared to tourist infrastructure and waste management projects 11

32 The evolution of the infrastructure pipeline Slightly lower infrastructure pipeline mainly due to completion of major motorway projects in 2017 Evolution of infrastructure pipeline (2014-2017) 20bn 42.1% (46 projects) 57.9% (24 projects) 21bn 40.4% (48 projects) 59.6% (30 projects) 21bn 37.1% (34 projects) 62.9% (35 projects) 19bn 41.1% (37 projects) 58.9% (38 projects) Planned projects Projects in progress From 2014 to 2016 the work in progress investment remained fairly stable although in 2017 project pipeline dropped due to completion of a number of projects 2014 2015 2016 2017 Source: calculations 12

32 Completed projects Between 2014 and 2017, 25 infrastructure projects were completed totaling 7.7bn Budget of completed projects (2014-2017) Number of completed projects 13 90.6% 0.5% 1.7% 1.5% 5.8% 2 4 6 Energy Projects Rail Projects Water & Sewage Tourist product upgrading Motorway Projects Source: Press, calculations 2014 2015 2016 2017 Source: Press, calculations Olympia Odos Motorway* was the largest project completed since 2014 having a total budget of approximately 1.5bn (2017 completion date) *Olympia Odos Motorway: Athens - Patras) 13

32 Investment pipeline in Greece There are 75 infrastructure projects in progress and in the pipeline for completion by 2023 with a remaining spending requirements of 18.7bn Pipeline budget* breakdown Estimated Completion year (cumulative) Number of projects 75 59% of the remaining budget represents projects have already commenced Planned 37 projects 41% 59% Source: Press, calculations Planned 37 In progress In progress 38 39 33 38 projects 7 8 4 24 20 2 13 38 29 31 31 20 22 13 2018 2019 2020 2021 2022 2023 N/A Source: Press, calculations 17% of the projects, with a remaining budget of around 1bn, are estimated to be delivered in 2018 The completion dates of 36 projects, with a remaining budget 9.2bn, are unknown * projects backlog and total budget of upcoming projects 14

Urban Rail 32 in Greece From a total of 75 infrastructure projects that will be delivered until 2023, 27 refer to Roads and Ports, 17 to Rail and 10 to Waste Management Total remaining budget* Waste Management Rail 26,17% 9,64% 3,07% 14,50% Transit Transport * backlog and total budget of upcoming projects Source: Press, calculations 8,98% 37,64% Energy Tourism Subsector & project budget 4.9 bn 17 Urban Rail Rail 1.8 bn Rail Transportation Energy Water & Waste Management 1.3 bn 4 Airports Source: Press, calculations There are 16 Energy projects (38% of total pipeline budget) mainly in oil & gas and electricity 36% of the remaining budget covers rail projects (17 projects), while 14% (10 projects) motorways 27 3.1 bn Transit Transport, Ports Total Budget ( bn) 3.0 bn 6 Energy 1.8 bn 7 Oil and Natural Gas Number of projects 2.2 bn 3 Hydroelectric / Wind 10 0.6 bn Waste Management 0.0 bn 1 Water Supply 15

Bulgaria Bulgaria Albania TAP Electricity Interconnectors of Cyclades IGB Revithoussa Islands 3rd LNG Tank Storage Alexandroupoli Independent Natural Gas System Electricity Interconnectors Ptolemaida V Power Plant (lignite fired) Amfilohia Hydropumped storage Gas Compressor Station (Kipoi) Rhodes Power Plants Kavala LNG Kavala storage facility (Underground Storage facility) Siteia and Rethymno Hybrid Stations Alexandroupoli Independent Natural Gas System: New offshore LNG with 28 km length of subsea and onshore pipeline (4 km onshore and 24 km offshore), with storage capacity of 170k m³ and pumping capacity of 6,1bcm per year Kavala LNG: Floating storage (170k m³ LNG capacity) and processing terminal (annual sent-out capacity of 3-5bcm) at Kavala Bay Energy projects Geographical distribution Trans-Adriatic Pipeline of 878 km in total will supply Europe with natural gas from Azerbaijan through Greece, Albania and Italy, with a capacity of 20 bn m³ per annum Ptolemaida V Power Plant: New single lignite power plant of 660 MW and 140 MW for district heating (PPC) Attica Crete and Attica- Peloponnese Crete Interconnectors: 310 km underwater electric cable connecting Crete with mainland with a capacity of 1,000 MW and 400MW respecttively IGB: Natural gas pipeline of 182km length will connect the Greek and Bulgarian existing networks, with daily transport capacity of approximately 3-5bcm per year 16

32 Energy projects Energy amounts to around 7bn of spending Estimated Completion year (cumulative) Number of projects 3 3 Planned In progress 4 4 7 2 5 9 2 7 11 11 3 3 16 8 8 8 8 68.8% of the number of energy projects are interconnections (TAP, IGB, LNGs), while the remaining 31.2% refer to electricity generation (Wind parks, Power plants) Half of the remaining budget is earmarked for energy interconnections and the other half for electricity generation The cost per MW installed reaches 1,3mn Half of the total energy projects have not yet started 2018 2019 2020 2021 2022 2023 N/A Source: Press, calculations 17

32 Energy projects Electricity generation projects account for half of the remaining budget TAP/IGB Electricity Interconnectors Energy projects Remaining budget 2017 ( bn) Electricity generation LNGs Other 7,049 858 1,717 3,511 7 27 237 Remaining Budget ( mn) Source: Press, calculations Electricity generation sources % of remaining budget 2017 40.8% Fuel/Lignite Wind 14.3% Hydro Hybrid 7.9% 37.0% Source: Press, calculations The two electricity interconnectors connecting Crete to the mainland as well as the one between Greece and Bulgaria take up about 19% of the remaining budget About 63% of the total remaining budget of scheduled electricity generation projects refers to projects that use renewable energy sources The majority of the upcoming electricity generation projects are focused around wind power plants 18

Attica Rail projects Geographical distribution Construction of Metro in Thessaloniki and extension to Kalamaria (14.3km) serving 315k passengers per day The new Metro Line 4 in Athens with 33km length (31 new stations) is expected to serve around 500k passengers daily, especially at densely populated areas (Kipseli, Pagrati, Zografou) Extension of Athens metro to Piraeus (6 new stations) connecting the Athens International Airport with the Port of Piraeus will increase current capacity to 123k passengers Thessaloniki Metro ERGOSE Palaiofarsalos ERGOSE Tithorea-Domoko Athens Tram Extension to Piraeus ERGOSE Promachonas ERGOSE Rhododafni ERGOSE Polikastro Upgrade of the network in Treis Gefyres ERGOSE Peiraeus Connection of the Port of Kavala ERGOSE Menemeni ERGOSE Volos Attiko Metro Line 4 Attiko Metro, Extension of Line 3 to Piraeus Tram extension from N. Faliro to Piraeus (5.3km) will have a daily capacity of 100k passengers The construction of the first phase of Thriassio Pedio rail hub has been delivered and the second phase is in progress estimated to be delivered by 2018. The rail hub constitutes one of the largest commercial railway projects in Europe and the largest in the Balkans Construction of double rail tracks and upgrading of signaling and electrification of the main OSE network to improve customer service and time of travel rendering rail an efficient alternative for long distance travel 19

32 Rail projects Rail projects amount to 6.7bn, with 73% coming from urban rail projects Estimated Completion year (cumulative) Number of projects 4 Planned In progress 4 4 4 4 2018 2019 2020 2021 Source: Press, calculations 4 10 10 10 2 2 2 8 8 8 17 5 12 2022 2023 N/A 35% of the rail projects account to urban rail interconnections (Attiko Metro, Tram, Metro Thessaloniki), while the remaining 65% to rail projects More than half of the rail projects have already started with further Attiko Metro and Thessaloniki Metro extensions and some Ergose upgrades in planning The average investment in railway projects is estimated at 6mn/km, while the respective investment in urban railways stands at 104.4mn/km The percentage of electrified lines in Greece reaches only 23% compared to the European average of 52% (International Union of Railways, 2016). However, Greece is making progress in implementing electrified lines by converting and adding about 264km of electrified lines in the national network 4 rail projects with remaining budget of 390mn are planned to be delivered wthin 2018 20

32 Rail projects Although urban rail interconnections account for far less of the projects in the pipeline, they absorb larger part of the total remaining budget Rail projects and Urban Rail projects Remaining budget breakdown ( bn) Rail Projects 1.8 Urban Rail Projects 6.7 4.9 Urban Rail projects Remaining budget breakdown ( bn) 27.4% 0.9% 71.7% 27% of the remaining budget accounts to rail projects, while the remaining 73% to urban rail Attiko Metro s new lines and extensions are the largest urban rail projects, with a total budget of 3.4bn taking up about 65% of the remaining budget of the urban rail projects Source: Press, calculations Attiko Metro Metro Thessaloniki Athens Tram Source: Press, calculations 21

Egnatia Odos Motorway projects Geographical distribution Egnatia Odos vertical Axes will connect the main part of Egnatia Odos with Bulgaria and Serres with Drama and Kavala Ionia Odos side Axis, with a length of 48.5km will connect Aktio to Amvrakia The relative cost of construction of major motorways per km is estimated at 6.4mn/km, while the respective European average stands at 11.6mn/km ( Journal, 2010) Katerini Ring Road Vertical axes of Egnatia Odos Crete Northern Highway Vertical axis of Ionia Odos Aktio-Amvrakia Thessaloniki Doirani Road Axis Underwater tunnel Widening Channel of Leukada Motorway Ε65 Patras-Pyrgos Motorway Average delays in road investment projects Number of months from planned completion 16 11 7 3 The Central Greece Motorway (part of E65 Motorway) is under construction with a total length of 175km and will connect Lamia, Karditsa and Trikala with Egnatia Odos. The Patras-Pyrgos Motorway is a physical extension of Olympia Odos with a total length of 75 km and will establish a better connection between the two cities Greece Spain Germany source: ECA, Are EU Cohesion Policy funds well spent on roads? (2013), analysis Poland 22

32 Motorway projects Major motorways investment pipeline is about 2.7bn Estimated Completion year (cumulative) Number of projects All of the motorway projects have already Planned started except from Salamina In progress 9 underwater tunnel and the Patras-Pyrgos Motorway 2 2 4 Source: Press, calculations 4 4 4 4 4 6 5 5 2018 2019 2020 2021 2022 2023 N/A 6 7 The newest major motorway project that was announced in 2017 was the Patras-Pyrgos Motorway, with a total length of 75km. Its construction is expected to start within 2018 and the projected delivery date is 2022 The total motorway kilometers of planned and in progress projects in Greece amount to 463km, of which only 22% has already been constructed The average cost of motorway construction in Greece is 7.5mn per km 23

Regional Roads Motorways 32 Motorway projects During 2017, 6 motorway projects where completed in Greece with the largest one being Olympia Odos No. Source: Press, calculations Project Name Total Budget ( mn) Length (in km) mn/km* Years to complete 1 Aegean Motorway 1,300 230 5.6 10 2 Ionia Odos 1,180 196 6.0 7 3 Olympia Odos 1,487 205 7.2 9 Subtotal 3,967 631 6.36 4 Fokianos-Kyparissi 15.4 20 0.7 4 5 Thessaloniki- Kassandreia 78.5 17 4.6 7 6 Platygiali-Agios Dimitrios 15.0 6 2.4 7 Subtotal 109 43 3.77 Grand Total 4,076 674 5.07 7.3 * Weighted average The total budget of the completed motorway projects amounted to 4.1bn. A total 631km in motorway length has been constructed The average cost of the projects was around 5mn/km and it took 7.3 years on average to complete 24

Tourist infrastructure Geographical distribution Regional Airports (Joint venture Slentel-Fraport) Marinas Upgrade Ports upgrade Metropolitan Water Airport (Port of Thessaloniki) Greece is a significant global tourist destination, attracting 28mn arrivals in 2016, ranking 15th in global rankings and 9th in Europe Despite being a global tourist attraction, the tourist infrastructure quality in Greece is of low quality The upgrade of Greece as a global tourist destination includes: o o o The upgrade of the 14 regional airports acquired by the Slentel-Fraport joint venture and the second wave of airport privatizations as well as the construction of new regional airports to support the increase of tourist arrivals which is expected in the following years Upgrading vital ports to serve as transit terminals and facilitate interconnection with neighbor countries Upgrading and building key marina hubs (Alimos, Kalamaria, Chios, Crete, Glyfada, Zakynthos & Katakolo, Patra, Pylos and Rhodes & Kos) to meet the increasing demand in marine tourism 25

32 Tourist infrastructure projects For the upgrading of the tourist product around 1.7bn have been scheduled Estimated Completion year (cumulative) Number of projects 3 Planned In progress 3 3 3 4 Source: Press, calculations 4 5 6 5 5 5 6 2018 2019 2020 2021 2022 2023 7 21 N/A 62% of the tourist infrastructure projects are not even fully planned except from the new dock at the Port of Thessaloniki and Kasteli airport which are scheduled to be completed by 2022 and 2023 respectively There is no information on the construction of the key marinas (Katakolo & Zakynthos, Alimos hub, Glyfada hub, Patra hub, Chios hub, Crete hub, Pylos hub and Aretsou Kalamarias hub) except for the marina of Symi The average budget of tourist infrastructure projects amounts to 94.3mn per project 26

Waste Management (Ipirus) Waste Management (Kerkyra) Waste Management Aetoloakarnania Waste Management (Serres) Waste Management (Alexandroupoli) Waste Management Geographical distribution Waste Management (Voiotia) Waste Management (Achaia) Waste Management (Ilia) Waste Management (Peloponnisos) Water Pipeline Aegina Switzerland Center of Sewage Treatment (Koropi-Paiania) Municipal waste treatment 31% 22% 48% 0% Sweden 33% 16% 50% 1% Belgium 34% 20% 45% 1% 29% 19% 51% 1% 25% 45% 48% 18% 32% 1% Austria 26% 33% 38% 3% Finland Estonia 29% 13% 55% 3% 28% 3% 53% 11% 29% 20% 17% France 23% 18% 36% 23% EU-28 30% 17% 28% 25% 30% 22% 28% 18% 31% Denmark Netherlands 28% 1% Germany Luxembourg 34% Italy 20% Lithuania 26% 25% Poland 28% 16% 20% 36% Czech Republic 27% 7% 17% 50% Hungary 27% 8% 15% 51% Spain 18% 12% 14% 57% Latvia 17% 11% 0% 72% Slovakia 16% 8% 10% 66% Cyprus 15% 4% 81% Croatia 20% 2% 78% Greece 14% 3% 82% Malta 8% 92% Source: Eurostat 2016, Data for 2014 On December 2014, the European Court of Justice issued a 10mn fine to Greece for uncontrolled waste disposal sites and landfill use, in contrast to the EC Waste Directive. In addition, the court requires immediate implementation of the relevant policies and an additional 14mn fine for each six-month period of delay Since 2013, 15 Waste Management projects have been announced, budgeted for 1.7bn, out of which only 2 have been completed and the remaining being either postponed or delayed. During 2015, the postponement of all PPP waste management projects was announced, Recycled Composted Incinerated Landfilled 27

32 Waste management projects Waste management projects need about 0.6bn up to 2023 Estimated Completion year (cumulative) Number of projects 1 1 2018 Planned In progress Source: Press, calculations 5 5 5 5 5 5 5 5 2019 2020 5 2021 5 2022 5 2023 11 6 N/A Within 2017, progress was made in waste management projects as 3 PPPs were signed for waste management projects in Serres, Voiotia and Epirus and 2 more PPPs are expected to be signed in 2018 (Ilia and Peloponissos) However, 4 Waste Management projects remain frozen, despite the EU Court decision in September 2016 fining Greece with a 10m fine and another 30k per day for not complying with the EU regulation on uncontrolled waste disposal sites and landfill use The average budget of waste management projects amounts to 62mn per project Only 1 waste management project is expected to be delivered in 2018 (Center of sewage treatment in Koropi) and the rest of the projects that have already started are projected to be delivered in 2019 28

Summary The value of 75 infrastructure projects in progress or planned, expected to be completed by 2023, is standing at 18.7bn 25 projects were completed in 2017. Amongst them, Olympia Odos* was the largest project with a total budget of 1.5bn Projects in progress account for 59% of estimated investment For 48% of the projects, completion dates are not known The transport and energy sectors account for almost 87% of the pipeline of all projects and the smooth evolution of those investments will have a very positive impact in economy Investments in tourism product upgrade (9%), as well as waste management and water supply investments (4%) are important for growth and the upgrade of life quality *Olympia Odos: (Athens - Patras) 29

Funding of Greek infrastructure projects

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 32 Public funding in Greece The Public Investment Program (PIP) has gone back to 2002 levels with no indication of imminent growth The funding rate of infrastructure through the Budget declined from 30%-45% since 2008 to 15% in 2017 The Greek government announced in the new budget that the national part of PIP will be increased by 250mn The available public resources for investment in 2017 are comparable, in nominal value, to those of 2002 Under the new NSRF (ESPA), the funds for infrastructure projects are limited, while priority has been given to the motorways and large frozen projects Public Investment Program Greece 9.5 9.6 9.6 5.3%% 5.2%% 8.8 8.4 4.9%% 8.5 8.2 7.8 7.0 27% 26% 7.4 4.3%% 7.5 4.7%% 31% 49% 4.0%% 4.0%% 26% 6.9 6.8 3.8%% 33% 6.6 6.6 6.3 6.8 6.4 3.8% 28% 33% 47% 3.6%% 3.7% 34% 20% 12% 11% 11% 15% 15% 3.8%% 3.8%% 13% 3.7%% 5.3 45% 3.7%% 3.7%% 3.6%% 3.3%% 22% 2.8%% 73% 74% 69% 74% 72% 67% 67% 80% 88% 89% 89% 87% 85% 85% 53% 51% 66% 55% 78% National part of PIP ( bn) Co-financed part of PIP ( bn) Source: Ministry of Finance Expenditure of PIP (% GDP) 31

32 Funding Greek infrastructure projects Sources of Funding Public (~40%): Historically the State s contribution to major projects accounts to 15% - 20% while the remaining is financed from EU funds. Moreover about 25% of concessionary funding for the major motorways comes from toll revenues Private funding (~10%-15%): Private funding in terms of direct equity historically amounted to below 15% of the total project budget EIB and Banks (~40%-45%): EIB s contribution is limited to 50% of the total project cost. EIB works with other banks, either co-financing projects or by issuing guaranties. Greek Banks have announced the financing of infrastructure projects by 3bn (including Kasteli Airport, Regional Airports, Underwater tunnel in Salamina) Public Private Partnerships (PPPs): PPPs and Project Bonds could provide a significantly higher private sector participation in infrastructure funding adding a low risk element in institutional investors portfolios 32

NSRF 2014-2020 8.7bn of available infrastructure funding Budget per Area/Fund 2,3% 1,8% 15,3% 40,3% 26.6bn 18,2% 22,0% ERDF EAFRD ESF CF YEI EMFF Budget for each action ( mln) Climate Change Adaptation & Risk Prevention Competitiveness of SMEs Educational & Vocational Training Efficient Public Administration Environment Protection & Resource Efficiency Information & Communication Technologies Low-Carbon Economy Network s in Transport and Energy Research & Innovation Social Inclusion Sustainable & Quality Employment Technical Assistance 276 268 78 245 167 396 301 401 544 602 551 724 650 844 997 1.108 1.329 1.386 1.606 2.776 2.211 2.499 2.131 4.590 The total available funds from the new NSRF amount to 26.6bn, of which 7.1bn are EU and 1.6bn are national contribution Major infrastructure projects funded by the cohesion policy include: Source: European Commission 511mn for urban public transport systems in Athens and the region of Attica 1.5bn for the extension of the metro in Thessaloniki, in Central Macedonia 123mn for the upgrade of road networks in the northern Greece and Crete EU contribution National Contribution 33

32 Challenges in meeting infrastructure needs Key Factors contributing to the Financing Gap for 1. Slow process of political consensus in infrastructure planning 2. Projects poorly planned and not well managed 3. Legal delays in preparing for execution which leads to delivery delays 4. Frequent disputes between the state and the concessionaires or contractors 5. User-charges below project costs 6. State contribution below required levels 7. Risk distribution between the state and the contractor/concessionaire may change in the course of the project 34

32 Private funding is necessary for smooth evolution of the project development, but it will remain limited until the business environment improves and political uncertainty decreases Additional infrastructure needs The State with the support of the EC cannot fund the infrastructure projects Banks are under liquidity and credit pressure The private sector, the major pylon of funding demand is expanding to keep up with the growing economic activity and development needs Additional costs of making infrastructure resilient to climate change and less harmful to the environment and improve in general its quality Constrained public budget renders the State unable to fund future infrastructure projects PPPs require in most cases direct public funding Greek banks with compressed balance sheets do not have the capacity to fund large infrastructure investments program Long term funding limits bank liquidity and hence appetite for project finance Project bond (PB) issuance can cover part of the funding gap Concessions (PPP) will remain the largest private sector funding tool 35

Conclusions Global infrastructure investment is expected to reach $6.6trln per annum in the period to 2030 or 6.3% of global GDP In Greece, infrastructure investment as a percentage of GDP shrank from 3.7% in 2006 to 1.1% in 2017, a cumulative 67bn shortage, created by the deep recession and consequent budgetary constraints investments are vital for the Greek economy, having a high economic multiplier (ca. 1.8x) which can boost consumption and investment in other sectors Between 2014-2017, 25 of the infrastructure projects were completed, with Olympia Odos being the largest one ( 1.5bn) The number of planned and in progress infrastructure projects are not decreasing during the crisis. In 2017 their total cost until 2023 is estimated at 18.7bn 7bn of the remaining budget refers to Energy projects, while 6.7bn to Railways and 2.7bn to Motorways. Tourist infrastructure and Waste management projects account for a small part of the remaining budget taking up only about 1.7bn and 0.6bn respectively The available State funding for infrastructure projects in 2017 is, in nominal terms, back to pre-2002 levels The growing need for infrastructure spending, combined with the limited capacity of state funding and the balance sheet constraints of the Greek banks call for new sources of funding The main factors contributing to the financing gap for infrastructure are poor planning, slow process of political consensus and delays Direct private funding will remain limited until the business environment improves and the political uncertainty decreases but PPPs will remain the main private funding platform * until March 2017 36

Appendix 1 projects* in Greece 12 Energy projects 14 Rail projects 8 12 Motorway projects Tourist infrastructure projects 11 Waste management projects * Some projects have been grouped together and thus projects depicted at the tables do not add up to 75 projects

Energy accounts for around 7bn of investments No Interconnection Projects Capacity (MW) Remaining Budget ( mn) Start Date Completion Date* 1 TAP (Trans - Adriatic Pipeline) N/A 630 2016 2020 Electricity Interconnectors (Euroasia 2018 2014 2022 2022 2 Interconnector, Crete - Peloponnese - Attika, Cyclades, 4.070 1.717 2014 N/A 2021 2020 Maritsa East (BG) - Nea Santa (GR)) 3 LNGs (Alexandroupolis LNG, Kavala LNG) N/A 615 N/A N/A 4 Kavala storage facility (Undeground Storage facility) N/A 200 N/A N/A 5 IGB (GR-BG Natural Gas pipeline) N/A 228 2016 2018 6 Revythoussa Islands 3rd LNG Tank Storage N/A 112 2014 2018 7 Gas Compressor Station (Kipoi) N/A 37 2017 2019 Total Budget 3.538 No Power Generation Capacity (MW) Remaining Budget ( mn) Start Date Completion Date 1 Ptolemaida 5 Power Plant (lignite fired) 660 1.260 2015 2021 2 Wind Parks 1.323 1.434 N/A N/A 3 Amfilochia Hydro-pumped storage 680 502 N/A N/A 4 Rhodes Power Plants 114 38 2015 2018 5 Hybrid Stations in Siteia and Rethymno 139 277 N/A N/A Total Budget 3.511 *Commissioning date Source: Press, calculations 38

Rail projects amount to 6.7bn, with 73% coming from urban rail projects No Upcoming Projects Details Remaining Budget ( mn) Start Date Completion Date 1 Attiko Metro 2 Thessaloniki Metro Extension of Line 3 to Piraeus, New Line 4, Line 4 Extension to Perissos and Lykovrisi Main line & Extensions to Kordelio and Kalamaria Source: Press, calculations 3.515 2012 N/A 1.343 2006 2021 3 Athens Tram Extension to Piraeus 43 2013 2018 Grand Total 4.901 No Upcoming Projects Details 1 Ergose Rhododafni Kiato-Rhododafni, Rhododafni- Psathopyrgos, Psathopyrgos-Patras and electrification of railways Remaining Budget ( mn) Start Date Completion Date 722 2006 2018 2020 N/A 2 Ergose Tithorea Tithorea- Domoko 291 2013 2018 3 Ergose Thriassio Pedio Thriassio Pedio Rail hub 46 2013 2018 4 Ergose Palaiofarsalos Electrification Palaiofarsalos - Kalambaka (electrification of railways) 48 2016 N/A 5 Ergose Volos Electrification Volos Larissa (electrification of railways) 60 2018 2021 6 Ergose Polikastro Polikastro - Idomeni 60 2007 2021 7 Ergose Menemeni Agia Paraskevi- Menemeni Thessaloniki 10 2016 2018 8 Ergose: Upgrade of the network in Treis Ergose Piraeus - Athens - Treis Gefyres Gefyres and electrification of the Peiraeus- Electrification Athens-Treis Gefyres 155 2015 2024 9 Ergose Port of Kavala Connection of the Port of Kavala to the existing Thessaloniki-Alexandroupoli line 250 2005 N/A 10 Ergose Central Macedonia Upgrade of the network in Central Macedonia 35 2018 2021 11 Ergose Promachonas Upgrade of existing line Thessaloniki- Promachonas 120 N/A N/A Grand Total 1.797 39

Major motorways investment pipeline is about 2.7bn Νο Upcoming Projects Details Total Klm Total Budget ( mn) Remaining Budget ( mn) Start Date Estimation Completion Date Average investment/ km 1 Crete Northern highway 2 E65 Motorway (Lamia- Egnatia) 3 Egnatia Odos Gournes -Chersonissos and Panormos-Exantis Lamia - Xyniada and Trikala Egnatia Vertical axes of Ardanio-Ormenio & Mandra-Psathades (2018), Serres- Drama-Kavala (N/A), Xanthi-Echinos (2020) 19 119 92 2009 2019 6,3 96 1.435 908 2008 2022 14,9 173 908 803 2011 N/A 5,3 4 Ionia Odos Aktion-Amvrakia Vertical Axis 49 165 95 2010 N/A 3,4 5 Regional roads 6 Underwater tunnel Salaminas Ring road of Katerini, Thessaloniki- Doirani Underwater connection between Salamina and Perama 41 139 98 2013 2011 2018 2019 3,4 5 350 350 2019 N/A 71,4 7 Widening channel in Lefkada Lefkada 6 22 16 2013 2018 3,7 8 Patras-Pyrgos Motorway Patras-Pyrgos 75 356 356 2018 2022 4,7 Total 463 3.495 2.716 7,5 Source: Press, calculations 40

For the upgrading of the tourist product around 1.7bn have been scheduled No Projects Remaining Budget ( mn) Start Date Completion Date 1 Kasteli Airport in Heraklion 850 2018 2023 2 Regional Aiports 330 2017 2021 3 OLTH (upgrade of sixth harbor) 220 2018 2022 4 Igoumenitsa Port upgrade 59 2008 2020 5 Macedonia Airport upgrade 71 2005 2018 6 Ioannina Airport upgrade and new terminal 17 2010 2018 7 Port of Patras upgrade 75 2012 N/A 8 Key marinas 43 2003 N/A 2018 N/A 9 Luxury marinas (Mykonos, Argostoli) 9 N/A N/A 10 Upgrading/ Maintenance in 49 Regional Ports 4 N/A N/A 11 Layrio Mega Yacht 4 N/A N/A 12 Metropolitan Water Airport (Port of Thessaloniki) Total Budget 1.682 0,4 N/A N/A Source: Press, calculations 41

Waste management projects need about 0.6bn up to 2023 No Projects Remaining Budget ( mn) Start Date Completion Date 1 Waste management (Alexandroupoli) 20 N/A N/A 2 Waste Management (Peloponissos) 158 N/A N/A 3 Waste management (Achaia) 128 N/A N/A 4 Waste management (Epirus) 53 N/A 2019 5 Center of Sewage Treatment (Koropi - Paiania) 19 2013 2018 6 Waste management (Aitoloakarnania) 18 2018 N/A 7 Waste management (Kerkyra) 70 N/A N/A 8 Waste management (Ilia) 39 N/A N/A 9 Water Pipeline Aegina 19 2016 2019 10 Waste management (Serres) 36 2017 2019 11 Waste management (Voiotia) 16 N/A 2019 Grand Total 575 Source: Press, calculations 42

www.pwc.gr At, our purpose is to build trust in society and solve important problems. We re a network of firms in 157 countries with more than 223,000 people who are committed to delivering quality in assurance, advisory and tax services. Find out more and tell us what matters to you by visiting us at www.pwc.gr. This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, does not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on the information contained in this publication or for any decision based on it. 2018. PricewaterhouseCoopers Business Solutions SA. All rights reserved. refers to the Greece member firm, and may sometimes refer to the network. Each member firm is a separate legal entity. Please see www.pwc.com/structure for further details.