V/Line Asset Management

Similar documents
What is Rail Futures?

Victorian Infrastructure Plan

January 2018 Air Traffic Activity Summary

Ombined End of Year Ride with Morning Tea at King River Cafe Oxley

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC

DEER PARK JUNCTION TO ARARAT

InterCity and AirTrain The Rail Futures blueprint for faster and better regional trains in Victoria and re-balancing population growth

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

2018 State election regional PRIORITIES

Delivering a stronger economy

GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

Stronger BUSINESS Stronger VICTORIA State Election Regional Priorities

Briefing to ICN VIC 2011 Major Project Forum. Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

UNLOCKING THE BRIGHTON MAINLINE

Sound Transit Operations June 2016 Service Performance Report. Ridership

Sound Transit Operations March 2018 Service Performance Report. Ridership

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

The Evergreen 3 Project

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Shaping the Future of the Railway

Sound Transit Operations January 2014 Service Performance Report. Ridership

2007/08 Full Year Results Investor Briefing

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode

Exchange Sunshine Coast 2014

Housing Outlook. Mr Sam White, Ray White Group Mr Harley Dale, Housing Industry Association. 29 October 2007

Driving Ridership Strategic Partnerships

Sound Transit Operations August 2015 Service Performance Report. Ridership

The Committee for Gippsland Inc

Update on the Thameslink programme

Australian Railroad Group DVD Script

National Rail Performance Report - Quarter /14

Peter Tregilgas - Resumé

Sound Transit Operations December 2014 Service Performance Report. Ridership

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE)

International Visitation to the Northern Territory. Year ending June 2017

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE)

Metra Board of Directors. Board Meeting November 11, 2011

29 June Eastern Region 15/16 Program Presentation

Auckland Transport Quarterly Indicators Report 2018/19

Latest market insights and marketing plans from VisitBritain/VisitEngland. Anke Monestel, VisitEngland 8 th February 2018

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

SUSTAINABILITY HIGHLIGHTS 2014

visitor insights 2016

Domestic Visitation to the Northern Territory

All Things Considered

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

UQFL397 University of Queensland Bushwalking Club Collection

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

IATA ECONOMICS BRIEFING AIRLINE BUSINESS CONFIDENCE INDEX OCTOBER 2010 SURVEY

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

STRATEGIC PLAN

Roads and Maritime Services Presentation to Local Government NSW Annual Conference October 2014

International Visitation to the Northern Territory. Year ending March 2017

METRO OPERATIONS COMMITTEE

International Visitation to the Northern Territory. Year ending September 2017

4 Transport projects underway in Western Sydney

Australian Securities and Investments Commission (ASIC)

Weekly Performance Update

Roads Australia. Peter Duncan Chief Executive Roads and Maritime Services

Weekly Performance Update

Greater Portland Transit District

The Geography of Climate

March 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

PSP 1078 Plumpton and PSP 1080 Kororoit

PLANNING THE SUNBURY GROWTH CORRIDOR

Youth/Backpacker Visitation to the Northern Territory. Year ending June 2017

Weekly Performance Update

RIDERSHIP TRENDS. October 2017

TOTTENHAM TO ALBURY JUNE We re progressing our planning in Victoria for Inland Rail Australia s largest rail freight project

U.S. DOMESTIC INDUSTRY OVERVIEW FOR MAY 2009

August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

USING SPECIAL INTERESTS TO DRIVE TRAVEL. Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum

CAPACITY WHAT DOES IT MEAN?

Grain Monitoring Program

ASLEF Response to Welsh Affairs Select Committee Inquiry Provision of Cross- Border Services for Wales October 2008

ATM Network Performance Report

SAS Group Presentation Carnegie, May 22, 2012 Sture Stölen, Head of IR

Tim Hunter Chief Executive. CCT Business Partner Update 3 March 2015

RIDERSHIP TRENDS. January 2018

Performance monitoring report for 2014/15

Air China Limited Annual Results. March Under IFRS

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August

Sound Transit Operations February 2018 Service Performance Report. Ridership

International Visitation to the Northern Territory. Year ending December 2017

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Train Operating Data NA_NSP_02.01 R

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

Property Metrics Median Days on Market 120

South East Queensland Stabling Site Selection Report January 2014

Transcription:

Shaping the Future of Railway V/Line Asset Management Jim Hunter GM Network Engineering 21 st September 2016 Monash IRT 1 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Opportunities at V/Line Shaping the Future of Railway Jim Hunter GM Network Engineering 21 st September 2016 Monash IRT 2 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

About V/Line V/Line is Australia's largest regional public transport operator. In 2014-15 more than 15.04 million train and coach passenger trips were taken. Every week, we schedule more than 1700 train services between Melbourne and: o Geelong and Warrnambool o Ballarat, Maryborough and Ararat o Bendigo, Swan Hill and Echuca o Seymour, Shepparton and Albury o Traralgon, Sale and Bairnsdale. V/Line branded coach services connect with the rail network and serve regional Victorian communities where trains do not operate. Some coach services also travel to South Australia, New South Wales and the Australian Capital Territory. In addition to being a passenger service operator, V/Line also provides access to, and maintains 3420 km of rail track used by passenger and freight rail services. V/Line is a major employer with a workforce of 1586, many of whom live in regional Victoria. 3 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

4 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

5 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Asset management infrastructure and fleet base Asset Type Passenger Freight Only Mainline Track 1600 kms 1861 kms Diamond Crossings 15 5 Loop Track 49 kms 18 kms Level Crossings 222 572 Pedestrian Crossing 203 99 Turnouts 962 616 Bridges 758 439 Culverts 3117 2761 Station Buildings 97 3 Station Platforms 171 101 Signals & Structures 820 131 Fleet Type Number Vlocity DMU 59* Sprinter DMU 21 N Class Loco 25 P Class Loco 7 N Cars 56 H Cars 55 Z Cars 22 Power Vans 3 * Note: does not include the 21 & 27 cars - 7 & 9 3-car Vlocity DMUs recently ordered V/Line operates 244 train sets over 1600 km of track calling at 88 stations and 143 V/Line managed station platforms. The rolling stock is maintained at 5 depots across the network. 6 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Vision A connected and prosperous regional Victoria

Mission To deliver customerfocused, safe and efficient regional passenger transport & rail freight access. 8 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Challenges Growing populace Catering for growth Capacity Supporting freight and jobs 9 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Top 3 strategic blockers Vlocity Patronage Classic Performance Infrastructure Capacity Longer Term Network Performance 10 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Network high level requirements Classic fleet performance The Classic fleet performance in relation to acceleration and braking plus MDBF is preventing the full potential of the Vlocity fleet being utilised Vlocity patronage capacity The Vlocity fleet cannot meet the projected growth in patronage required without full body re design from the bogie up. Infrastructure (Southern Cross) capacity The capacity of platforms and roads to meet the required increase in service requirements to meet the customer growth beyond the next 10 years. 11 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Patronage continues to trend upwards Focusing on line results, it can be seen that: Rolled patronage is the sum of rail and coach trips over the last 12 months. The rolled figure is used to help eliminate any seasonality. Over the last 12 months, there has been strong patronage growth (18%), with 17.7 million trips taken. ('000) 1,800 1,750 1,700 1,650 1,600 1,550 1,500 1,450 1,400 1,350 Patronage - 12 month rolled 17.7M Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 12 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Record patronage on the south west line Focusing on line results, it can be seen that: The increase in rail patronage was driven by growth on the South West line (59%). May 2016 saw record patronage on this line with 631,092 trips. Significant growth (13%) on the West line. ('000) 700 600 500 400 300 200 100 0 Rail Patronage by line Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 581k 320k 215k 137k 120k South West West North North East East 13 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Four out of five trips include Southern Cross Southern Cross is by far our busiest station, with four out of five journeys starting or ending at Southern Cross. Tarneit recorded the second highest number of trips with 76,082. On the Ballarat line, there were 63,601 trips at Melton and 50,668 at Ballarat. Between these two, they account for more than two in five trips (44%) taken on the Ballarat line Top 5 stations by trips Aug-16 Southern Cross 546,517 Tarneit 76,082 Melton 63,601 Geelong 61,609 Footscray 54,525 14 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

15 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Fleet capacity strategy graph 25,000,000 Patronage > Capacity Signal upgrade required 2018/19 to account for growth 300 20,000,000 15,000,000 10,000,000 189 229 250 250 250 250 250 250 250 250 200 150 100 5,000,000 50 0 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Fleet Additonal Fleet Required Patronage Forecast 0 16 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Current Projects Caroline Springs Murray Basin Rail Project Safer Country Crossing Program 17 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Caroline Springs station The original project scope included: a single-sided platform with shelter and seating bus bays and a taxi rank 350 car parking spaces drop-off zones closed circuit camera security surveillance (CCTV) pedestrian and bicycle access, with a secure bike cage facilities for Protective Services Officers. The revised project scope under the 2016-17 State Budget now includes a centre island platform, upgraded buildings to allow for a staffed station, improved facilities for passengers including larger undercover waiting areas and toilets. The new Caroline Springs Station is expected to be complete in early 2017. 18 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Caroline Springs station 19 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Caroline Springs 20 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Murray Basin Rail Project 21 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Murray Basin Rail Project Scope upgrade the lines in the Murray Basin from broad gauge to standard gauge restore and upgrade the existing standard gauge line between Ararat and Maryborough upgrade the lines in the Murray Basin from 19 tonne per axle to 21 tonnes per axle upgrade the broad-gauge line from Geelong (Gheringhap) to Ballarat (Warrenheip) to dual gauge upgrade the Ouyen to Murrayville line from broad gauge to standard gauge with axle loading of 19 tonnes per axle. 22 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Murray Basin Rail Project Outcomes Up to an extra 500,000 tonnes of grain transported by rail per annum 20,000 fewer truck trips to the ports of Geelong, Melbourne and Portland per annum 276 construction jobs during the project s implementation 1130 km of standardised rail gauge (including the Murrayville line) direct investment by rail operators in new rolling stock and bulk handlers in new loading facilities flow-on investment at the ports of Melbourne, Portland and Geelong due to increased competition and as a direct result of the need to handle higher tonnages per train improved safety and liveability for communities in the region and near the ports as a result of reduced truck numbers. 23 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

24 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Safer country crossing program Phalps Road, Colac 25 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Future Projects Ballarat line upgrade Regional development plan High-capacity next generation regional trains 26 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Ballarat line upgrade The 2016-17 State Budget includes $518 million to duplicate the Ballarat line to Melton, to increase the frequency of services for the Ballarat region and Melbourne s outer west. The project includes: duplication of 17km of track between Deer Park and Melton duplication of three kilometres of track west of Warrenheip three additional crossing loops at Bacchus Marsh, Ballan and near Bungaree the removal of five level crossings new stabling facilities at Melton and Rowsley additional platforms at Bacchus Marsh and Ballan stations and extended platforms at Rockbank station 27 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Ballarat line upgrade Project benefits: the Ballarat line upgrade paves the way for future electrification of the line to Melton passing loops will provide more ways for trains to pass each other, which will help services recover from unexpected delays more quickly, boosting reliability and punctuality the removal of level crossings improves safety for motorists and the local community the upgrade enables two extra services in the morning and afternoon peak, and a train every 40 minutes in the off-peak. 28 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Regional development plan It sets out a medium to long term plan to deliver a modern commuter-style service for the growth areas of Geelong, Bendigo, Ballarat, Seymour and Traralgon, and service improvements to outer regional areas. It outlines a pathway to deliver: a commuter-style service with a minimum 20 minute train frequency in the peak a 40 minute off-peak frequency of services to Melbourne five services, five days a week to the outer regional train lines of Warrnambool, Bairnsdale, Albury-Wodonga, Echuca, Swan Hill and Shepparton. The plan sets out three strategic, network-wide priorities for regional public transport: building a better public transport network putting passengers first developing local transport solutions 29 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

High capacity next generation regional trains 30 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016

Opportunities LXRA signalling cadet program University work experience 31 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016