ACTION TRANSMITTAL

Similar documents
Community Development Committee

Baker/Carver Regional Trail master plan public review draft

THREE RIVERS PARK DISTRICT

THREE RIVERS PARK DISTRICT

2009 Regional Solicitation Selected Projects*

THREE RIVERS PARK DISTRICT

Corridor Management Committee Meeting. April 2, 2014

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

FEASIBILITY CRITERIA

Madison Metro Transit System

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

MEETING MINUTES District 1 Trail Planning Meeting 1

Fuller/Fuller Heights Road Improvements

Claremont Project Background and Update Community Meeting September 11, 2017

AGENCY NAME TRANSPORTATION

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

ACTION TRANSMITTAL

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Southwest LRT Alignment Video Narration

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

SECTION 106 ACTIVITIES ANNUAL REPORT

CITY COUNCIL AGENDA MEMORANDUM

1.2 Corridor History and Current Characteristics

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

County of Sonoma Agenda Item Summary Report

Arvidson, Adam R. Adam,

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Director, Community Planning, Toronto and East York District

Measure R Program Update

SR 934 Project Development And Environment (PD&E) Study

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Route 29 Solutions Projects

Basic Project Information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Construction Staging Adelaide Street West

Transportation TRANSPORTATION PROJECTS

Spadina Avenue Built Form Study Preliminary Report

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

SCOPING INFORMATION PACKET

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

SECTION 106 ACTIVITIES ANNUAL REPORT

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

Design Charrette Public Meeting

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Waukee Trailhead Public Art and Amenities Project

Hennepin County 2040 Bicycle Transportation Plan. Appendix D. Full list of planned bikeway system corridors

Project Summary 2009

I. COMMUNICATIONS II. RESOLUTIONS, MOTIONS AND NOTICES

TORONTO TRANSIT COMMISSION REPORT NO.

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher

Extending TRACKS. Design and engineering effort nears completion. Animation shows how light rail will operate in Hopkins

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Establishing a National Urban Park in the Rouge Valley

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Figure 1: Little Dry Creek Trail Crossing

Northaven Trail Phase 2 Initial Project Overview

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Bonita to Bridgeport January 24, 2019

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Clackamas County Development Agency

The Baker/Carver Regional Trail is intended to

City of Grand Island Tuesday, December 12, 2017 Council Session

Segment 2: La Crescent to Miller s Corner

Cascade River State Park Management Plan Amendment

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

SRTA Year End Fixed Route Ridership Analysis: FY 2018

Transportation Supporting Dulles Airport

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance

TORONTO TRANSIT COMMISSION REPORT NO.

Community Development

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

DEMOGRAPHICS AND EXISTING SERVICE

Pattullo Bridge Replacement Project

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Administration and Projects Committee Meeting STAFF REPORT July 3, 2014 Page 2 of 2 Agreement Consultant Project General Scope CT 107 URS Corporation

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Fairfax County Parkway Widening Fairfax County

Transcription:

Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2014-64 DATE: October 3, 2014 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED BY: Joe Barbeau, Senior Planner (651-602-1705) SUBJECT: Scope Change Request Three Rivers Park District: Nine Mile Creek Trail East REQUESTED ACTION: RECOMMENDED MOTION: Three Rivers Park District requests a scope change to modify the scope of SP# 091-090-028; 091-090-028AC to modify alignment and termini. The total project cost remains unchanged. Recommend approval of the scope change request for the Three Rivers Park District bicycle/pedestrian project. BACKGROUND AND PURPOSE OF ACTION: Three Rivers Park District received $6,160,000 in Congestion Mitigation and Air Quality (CMAQ) funding for construction of a bicycle/pedestrian trail from Tracy Avenue to the Edina Promenade in Edina. Key changes proposed are: Moving the eastern terminus from Tracy Avenue west two blocks to Doron Avenue. This is due to a City of Edina Reconstruction of Tracy Avenue and Valley Lane into a roundabout. The City intends to construct the trail to fill this gap. Alignment change for CP Rail Crossing (See Segment D1B of attached maps). Alignment change for Highway 100 crossing (see Segment D1-C) Removal of Parklawn Avenue section, which is located in the middle of the original alignment. Reconstruction is to be completed by the City of Edina. Removal of the Gallagher Drive section, which is located adjacent to the Parklawn Avenue section, also mid-alignment. The trail along this section has already been completed by the City of Edina Extension of the alignment from the east end of Edina Promenade south along Xerxes Avenue South the 75 th Street West, where it will connect to existing trail. The project is programmed in FY 2015 for advanced construction to be reimbursed in fiscal year 2016. A TIP amendment will accompany this request. RELATIONSHIP TO REGIONAL POLICY: Projects that receive funding through the regional solicitation process are subject to the regional scope change policy. The purpose of this policy is to ensure that the project is designed and constructed according to the plans and intent described in the original application. Additionally, federal rules require that any federally-funded project scope change must go through a formal review and TIP amendment process if the project description or total project cost changes substantially. The scope change policy and process allow project sponsors to make adjustments to their projects as needed while still providing substantially the same benefits described in their original project applications. 390 North Robert St., St. Paul, Minnesota 55101-1805 (651) 602-1000 Fax (651) 602-1739

STAFF ANALYSIS: Staff reviewed the submitted scope change request. The original trail project application was awarded 760 points, which resulted in third place out of 10 projects that applied in the Bike/Walk category in 2011. It was the lowest-ranked of the projects selected for funding. The highest non-selected project scored 736 points. Based on a review of the proposed changes, the proposed scope changes would not have been likely to considerably change the project score, provided the City of Edina portions are completed as promised by the City and the Park District. Other considerations include: The original project, to be built entirely by Three Rivers, extended from Tracy Ave to the west end of Edina Promenade (just east of France Avenue South). The proposed scope change extends the overall project length to include the Edina Promenade and Xerxes Avenue from the Promenade to 75 th Street West, betterfilling the gap between Nine Mile Creek Trail West (the eastern terminus of which is to be at Tracy Avenue) and the Xerxes/75 th Street intersection, at which point an existing trail begins, heading east. However, the proposed change creates two gaps of significance, to be constructed separately from the project by another entity, the city of Edina, shown in the two sub-bullets below. o Valley Lane from Tracy Avenue to Doron Lane. While this removes only the western two blocks from the original proposal, this two block section provides the connection to the proposed Western segment of Nine Mile Creek Trail. Non-completion of this segment would cause a gap in that trail. o Parklawn Avenue from about 7625 Parklawn Avenue to Gallagher Drive. This leaves a gap in the trail through an area developed with multi-family housing and some office space. Attached is letter from City of Edina Director of Engineering stating staff s intention to include these projects for Council approval in its 2015-16 Capital Improvements Program (CIP). Also attached is a letter provided by the Three Rivers Park District committing that it will complete the project and not leave any gaps should the City decide not to proceed with either or both of these projects. Note that the City s letter does not specify completing the western portion from Tracy Avenue to Doron Lane. It also discusses Parklawn Avenue from France Avenue to 76 th Street, though the portion of Parklawn Avenue in questions runs south of 76 th Street. Note also that the application letter and maps errantly state that the City s projects are included in the 2016 CIP, which has yet to be finalized. In addition, it should be noted that staff review for this request uncovered an error in the original scoring. Because the overall project cost of $10,200,000 was errantly entered into a spreadsheet as $1,200,000, the cost-effectiveness score was over-scored. Staff estimates that the total score of 180 would have been 71, reducing the total score to 651. With the now proposed changes, the cost effectiveness score would be altered from 71 to 69 (for a total of 649, provided the City s portions are completed as promised). While the City s commitment is difficult to gauge, staff recommends approval based on the improved eastern connectivity of the proposed project, the difficulty that City projects place on completing the project as originally proposed, and the Park District s stated commitment to prevent gaps. Page 2

COMMITTEE COMMENTS AND ACTION: At its September 18, 2014, meeting, the Funding and Programming Committee unanimously recommended approval of this scope change request. At its October 1, 2014, meeting, the Technical Advisory Committee Unanimously recommended approval of this scope change request. ROUTING TO ACTION REQUESTED DATE COMPLETED TAC Funding & Programming Review & Recommend September 18, 2014 Committee Technical Advisory Committee Review & Recommend October 1, 2014 Transportation Advisory Board Review & Approve Page 3

Three Rivers Park District Board of Commissioners Penny Steele District 1 August 13, 2014 Mr. Karl Keel, PE TAC Funding and Programming Committee 1700 West 98th Street Bloomington, Minnesota Jennifer DeJournett District 2 Daniel Freeman, Vice Chair District 3 John Gunyou, Chair District 4 John Gibbs District 5 Larry Blackstad Appointed At Large SUBJECT: NINE MILE CREEK REGIONAL TRAIL: EAST SEGMENT, EDINA, MINNESOTA SCOPE CHANGE REQUEST Dear Mr. Keel: INTRODUCTION Three Rivers Park District (TRPD) was successful in the 2011 federal funding solicitation of the Bikeways/Walkways category for the development of the Nine Mile Creek Regional Trail: East Segment via the 2013-2016 TIP Amendment for the 2015-2016 Regional Solicitation Projects. The TIP amendment added 74 projects with approximately $159 million in federal funding of which $41.6 million are from the CMAQ program. The TIP amendment has $6.16 million in federal funding via a combination of the CMAQ program, and the AC program (total project cost of $11.4 million) scheduled for a pedestrian/bicycle trail between Tracy Ave. and France Ave. in the City of Edina known as The Nine Mile Creek Regional Trail: East Segment project in fiscal year 2015. (See Attachment - Segment Maps). Although there are a number of alignment changes since the original submittal, the project description remains similar and the benefits are consistent with its original intent. Therefore, TRPD is requesting a scope amendment in order to move forward with a revised project alignment. Please consider this formal request from TRPD for the change in scope/alignment for the development of the Nine Mile Creek Regional Trail: East Segment project for fiscal year 2015. ORIGINAL PROJECT DESCRIPTION Steve Antolak Appointed At Large Cris Gears Superintendent In the 2011 STP funding submittal, the scope of the Nine Mile Creek Regional Trail: East Segment was described as: Three Rivers Park District will construct 3.75 miles of off-road walkway/bikeway facilities in order to fill a critical gap in the 11 mile Nine Mile Creek Regional Trail in the City of Edina between Tracy Avenue and Edina Promenade (France Avenue). The project includes a new pedestrian bridge over TH 100 and new underpass of the CP Railroad north of 70 th Street. The Nine Mile Creek Regional Trail: East Segment will connect neighborhoods and residential areas to transit, retail, commercial, employment, schools, and parks, ultimately fulfilling a critical component of the multimodal transportation system. The Nine Administrative Center, 0 Xenium Lane North, Plymouth, MN 55441-1299 Information 763.559.9000 TTY 763.559.6719 Fax 763.559.3287 www.threeriversparks.org

Mile Creek Regional Trail: East Segment project will connect to a 3.0 mile trail segment currently under construction to create a contiguous 6.75 mile unified regional route in an area underserved by regional trails. Future trail construction will extend 3.0 miles west and connect to a 1.25 mile trail segment planned for fall 2014 construction. When complete the regional trail will connect the communities of Hopkins, Minnetonka, Edina, Richfield, and Bloomington and to the planned Intercity Regional Trail in Richfield, four existing regional trails in Hopkins, and LRT and bus transit systems (Hiawatha LRT, SWLRT, and numerous bus routes). The trail will serve multiple users including bicyclists, walkers and skaters, and support both commuters and recreational users. REQUESTED CHANGE OF SCOPE Subsequent to submitting the STP funding application, TRPD began preliminary engineering in January 2014 to further the development of the project. Preliminary engineering efforts to date have confirmed necessary modifications to the alignment shown in the original STP funding application. Five significant alignment revisions have been identified, which are described below and are further shown on the attached Project Segment Maps. 1) Segment D1-A: Reconstruction of the intersection of Tracy Avenue and Valley Lane is included in the City of Edina Capital Improvement Program for 2016. Tracy Avenue is a State Aid route. The City project proposes to reconstruct the intersection using a roundabout configuration. The project will also be reconstructing portions of Tracy Avenue, Valley View Road, and Valley Lane. TRPD will provide local funding of the project to the City for inclusion of the trail as part of the roadway project. Therefore, it is proposed to revise the western limit of the project to begin two blocks east at the intersection of Valley Lane and Doron Lane, as shown on the map for Segment D1-A. This will provide adequate distance such that this project will not conflict with the ultimate intersection and roadway revisions. 2) Segment D1-B: The original trail alignment was proposed to pass underneath the CP Railroad into Abercrombie Park as shown on the map for Segment D1-B. The original alignment proposed under the CP Railroad is not feasible due to flood levels in Nine Mile Creek and other vertical constraints with the existing rail tracks and ballast. The revised proposed alignment continues south to 70 th Street, passing under 70 th Street in a box culvert underpass, circling back up to 70 th Street, then continuing to the east along the south side of 70 th Street. 3) Segment D1-C: The original trail alignment was proposed to cross perpendicular to TH100 near the south entrance to Metro Boulevard as shown on the map for Segment D1-C. This crossing was determined not feasible due to limited City right of way, conflicts with private property accesses, and restrictions imposed by nearby overhead power lines along Metro Boulevard. The revised alignment provides adequate space for the required bridge piers in order to achieve the necessary clearance over TH100. 4) Segment D2-B: The original trail alignment has not changed through this segment as shown on the map for Segment D2-B. However, the responsible party for the construction of the segments has changed. The City of Edina constructed the Edina Promenade in 2007 and also recently reconstructed Gallagher Drive in 2012. TRPD entered into a cooperative agreement with the City in 2012 that permits TRPD to use the Edina Promenade for the Nine Mile Creek Regional Trail and required TRPD to contribute funding for construction of the regional trail along the east side of Gallagher Drive from Parklawn Avenue to France Avenue. Gallagher Drive was narrowed and the available space was used to install the new regional trail segment behind the curb in the boulevard area. This process and proposed improvements will serve as a template for the reconstruction of Parklawn Avenue. The reconstruction project on Parklawn Avenue is included in the City of Edina Capital Improvement Program for 2016. TRPD will provide funding to the City for inclusion of the trail along the west and north sides of Parklawn Avenue to fill the gap from Fred Richards Golf Course to Gallagher Drive.

5) Segment D4, 5, 6: The original STP application alignment terminated just east of France Avenue at the Edina Promenade. TRPD is requesting to extend the project limit approximately 2,000 feet east to Xerxes Avenue and then approximately 1, feet south along Xerxes Avenue to the existing regional trail at 75 th Street. The first portion (2,000 feet) of this segment extension will make use of the existing trails within the Promenade until its terminus at the north end of Xerxes Avenue. From there, a new trail segment (1, feet) would be constructed along the west side of Xerxes Avenue and terminate at 75 th Street where it will connect with the existing regional trail. This proposed extension will fill the gap between France Ave. and 75 th Street. MODIFIED PROJECT DESCRIPTION The Nine Mile Creek Regional Trail: East Segment will have a total of 4.43 miles of off-road walkway/bikeway facilities through the City of Edina from the intersection of Valley Lane and Doron Lane to the intersection of Xerxes Ave. and 75 th Street. The Nine Mile Creek Regional Trail: East Segment was identified to fill a critical gap in the 11 mile Nine Mile Creek Regional Trail in the City of Edina. The City of Edina has already completed two segments of the regional trail, the Edina Promenade and Gallagher Drive, in cooperation with TRPD. The City will also construct the segment of regional trail parallel to Parklawn Avenue from 76 th Street to Gallagher Drive as part of their 2016 Capital Improvement Program. TRPD will provide local funds to cover the cost of the off-street trail portion of this City project. When this project is complete, the City will have constructed a total of 1.20 miles of the planned trail. The remaining 3.23 mile project includes the construction of paved trails, boardwalks, pedestrian bridges over Nine Mile Creek, a new pedestrian bridge over TH 100 and a new underpass beneath the 70 th Street corridor. The Nine Mile Creek Regional Trail: East Segment, generally following Nine Mile Creek, will connect neighborhoods and residential areas to transit, retail, commercial, employment, schools, and parks, ultimately fulfilling a critical component of the multimodal transportation system. The Nine Mile Creek Regional Trail: East Segment project will connect to a 3.0 mile trail segment already constructed to create a contiguous 6.75 mile unified regional route in an area underserved by regional trails. Future trail construction will extend 3.0 miles west and connect to a 1.25 mile trail segment previously constructed. When complete the regional trail will connect the communities of Hopkins, Minnetonka, Edina, Richfield, and Bloomington and to the planned Intercity Regional Trail in Richfield, four existing regional trails in Hopkins, and LRT and bus transit systems (Hiawatha LRT, SWLRT, and numerous bus routes). The trail will serve multiple users including bicyclists, walkers and skaters, and support both commuters and recreational users. MODIFIED PROJECT COST ESTIMATE Based on preliminary engineering and cost estimating efforts to date, it has been determined that there is no net cost change to the overall project due to the above described alignment changes. The modified scope and revised design for the Nine Mile Creek Regional Trail: East Segment continues to meet the needs identified in the original application. While some of the project elements have been modified, the benefits remain consistent with its original intent. Therefore, responses to the prioritizing criteria do not need to be revised. We look forward to hearing from you and discussing the revised project in more detail. If you have any questions please contact me at 763-694-2060.

Sincerely, Eric Nelson Senior Manager of Engineering/Project Manager Attachments cc: Lisa Daniels, MnDOT Colleen Brown, MnDOT Heidi Schallberg, Metropolitan Council Jonathan Vlaming, Three Rivers Park District Toby Muse, SEH

5800 6400 5801 5805 5809 5700 5704 5708 5712 5716 CREEK VALLEY RD 5709 5705 5712 5708 5704 LOIS LN GRACE TER 5721 5717 5713 5709 5705 5701 TRACY AVE VALLEY VIEW RD 66TH ST W 5616 6404 6408 6 6304 6308 6405 5620 5608 5604 56 5608 5604 5600 5612 5616 5605 5601 TRACY AVE HILLSIDE CT HILLSIDE CIR 6412 6409 5600 5516 5520 5512 5508 5513 5509 5620 5505 5609 5517 5525 5521 56 5501 5613 6621 6701 6705 6608 6612 6616 6620 6700 6704 6601 6605 6609 6613 6617 6621 6701 66TH ST W 6600 6604 6608 6612 6616 6620 6700 6705 6704 HILLSIDE LN HILLSIDE CT 5521 56 5616 5612 5608 5620 5604 5600 5701 5700 6601 6600 6605 6604 5717 5713 5709 5705 5701 6609 6613 5720 5716 5712 5708 5704 5700 6617 GALWAY DR VALLEY LN 6601 6605 6609 6613 6617 6621 6701 6705 5517 5513 5509 5504 6325 6408 6409 6412 6413 LIMERICK LN VALLEY LN 6404 LIMERICK DR W 6420 6416 5508 5408 5504 5412 5500 5416 5505 5501 6500 6504 6600 6604 6608 6500 6501 6504 6505 CREEK DR 6508 6512 6516 CAHILL RD 6404 6415 5400 5404 6417 6421 6508 6509 LIMERICK DR 6513 6512 6519 6521 6501 6505 6509 6500 6504 6508 6513 6517 6521 6525 6529 6520 65 6528 6532 6533 6600 5508 5504 5500 6601 6604 6605 6600 6601 5505 6604 6608 6605 5504 6612 6616 6620 6700 6704 CAHILL LN 6617 6700 6621 6704 6701 6705 6708 6608 6609 6612 6613 6616 6617 6620 6701 66 6628 6705 6405 6509 6507 6409 6511 6501 6503 6505 6513 6516 6520 65 RIDGEVIEW CIR 6515 6517 6519 6512 6521 6601 6605 6609 6615 6619 6623 6627 6631 6635 6632 6709 RIDGEVIEW DR 6528 6532 6536 6600 6525 6529 6533 6537 6604 6608 6612 6616 6620 66 6628 6632 58 6700 6704 55

0 4 8 712 6716 6720 6705 6709 6713 6717 6721 6708 6710 6712 6716 6720 6709 6715 6717 6721 6725 6632 6635 5228 6704 55 51 5237 6708 5233 6712 6716 5232 6720 6800 5229 5225 5228 5221 52 5217 5220 6804 5229 5216 MEADOW 527 6800 6801 6800 6804 6804 6805 6808 6809 6808 6812 68 6813 7 6816 5523 6829 6825 6901 6833 6905 5406 5408 6909 5410 6913 5402 5400 5404 5412 5426 5414 54 5422 5420 5418 5416 5508 5504 5500 5432 5420 5519 5515 5511 5509 5505 5501 VILLAGE DR BROOK DR 5416 5400 7001 5415 6801 6805 6809 6813 6817 CP RAIL 6904 6908 6912 5221 6808 5225 6805 RIDGEVIEW DR 6812 6809 5221 5225 5221 5217 6909 5216 5212 DUGGAN PLZ 520 5213 5209 5205 5201 5208 5204 5200 5212 5310 5314 5 5312 5304 5232 5308 5228 52 5220 5216 52 6816 6813 5217 6820 6817 5213 5209 68 6821 52 5205 5220 5216 6828 5212 5 5208 6900 5204 TIFTON DR ABERCOMBIE DR 5217 5213 5188 5209 5205 5201 5193 5189 5185 5501 CAHILL RD 7017 AMUNDSON AVE 7075 7044 7048 7052 7056 7060 7064 70407032 7036 7070 7079 7100 7068 7072 70767084 7080 7088 7092 7096 7100 5309 7101 7125

METRO BLVD 5185 5181 5177 5173 5168 5128 5164 5132 5136 5160 5140 5144 5156 5152 5148 5169 5165 5161 5157 5153 5149 4 5220 5216 5212 5108 5208 5112 5129 5133 5145 5137 5141 50 5020 5028 5032 5100 5104 ABERCOMBIE DR 70TH ST W RABUN DR 70TH ST W 5015 70TH ST W 7101 7100 7101 70TH ST W TO SB HWY100 NB HWY100 TO 70TH ST W 4 7117 7190 NORMANDALE RD 7125 7201 7200 7171 72ND ST W 7201 7271 7220 7211 7261 7250 5230 5200 OHMS LN 7221 7231 7251 71 70 7230 7210 7220 7200 73RD ST W HIGHWAY 100 5200 7370 5108 METRO BLVD 74TH ST W

MON WEST HIBISCUS AVE 7212 7228 72 HIGHWAY 100 4909 4905 4901 4813 4809 4805 4801 4757 4753 4749 7217 7221 4754 7225 7233 7229 78 7252 7232 7236 70 74 7228 7225 4745 4712 4741 4737 4720 4716 PHLOX LN 4708 73 4608 4604 4733 4700 4702 47 4704 7328 7332 4609 4605 4729 4716 4725 4712 4708 4704 4608 4604 4721 4717 4713 4709 4705 4701 74 7412 4932 4928 49 4920 4916 7432 7428 74 7416 4936 4917 4940 4944 4949 4948 POPPY LN 4952 4913 4909 7504 4912 4908 4904 4905 4900 4901 7436 7440 7444 7448 7449 7453 7457 7445 7441 7437 7433 7429 7425 7421 7511 7461 7640 7509 7505 7501 7469 7467 7465 4930 77TH ST 4820 4700 466 POPPY LN 4815 77TH ST W 4901

GILFORD DR PHLOX LN WOODDALE AVE OAKLA CORNE GLOUCHESTER CORNELIA DR OAKLAWN AVE GALLAGHER DR FRANCE AVE S PARKLAWN AVE PARKLAWN CT 76TH AVE PARKLAWN AVE GALLAGHER DR 7220 72 73 7334 7219 7225 7321 72 4405 4409 4413 4417 7321 7325 7329 7333 7337 4400 4404 4408 4412 4416 4420 4405 4409 4413 4417 4421 4420 4416 4412 4408 4404 4400 4405 4409 4413 4417 7332 7307 7321 7323 7319 7315 7328 7326 7338 7333 7380 7225 7229 7233 4754 7232 7236 70 74 78 7252 4720 4716 4712 4708 4704 4702 4700 47 1 4757 4753 4749 4745 4741 4737 4733 4729 4421 4425 4429 4433 44 4428 4432 4436 4440 4444 4448 4425 4429 4433 4437 4441 4445 4449 4453 4520 4516 4512 4508 4504 4500 4432 4428 44 4421 4425 4501 4505 4509 4513 4517 4521 4525 4529 4601 4605 4609 4600 4604 4608 73 7328 7332 4704 4705 4701 7416 7412 7433 7429 7425 7421 7417 7413 7409 7405 4608 4604 4600 4520 4516 4512 4508 4504 4500 4521 4517 4515 4509 4505 7412 7416 4504 4508 4512 4516 4520 4525 4521 4517 4515 4509 4505 4501 7405 7409 7411 7417 7421 7501 7505 7640 4716 4712 4708 4725 4721 4717 4713 4709 2 4908 4904 4900 7440 7436 7432 7428 74 7457 7453 7449 7445 7441 7437 7444 7448 7465 7461 4820 4700 7467 4660 4600 4570 4000 7390 7500 4450 4444 4200 4141 4000 7550 3955 7450 4200 4250 4280 7403 4 4201 4251 4415 4425 4435 4456 4456 4452 4440 4480 4550 4540 4510 4530 7600 7600 7625 4451 7685 7725 7600 4175 7338 69 KELLOGG AVE HIBISCUS AVE SEDUM LN FONDELL DR FRED RICHARDS GOLF COURSE GILFORD DR PHLOX LN WOODDALE AVE OAKLA CORNE GLOUCHESTER CORNELIA DR OAKLAWN AVE GALLAGHER DR FRANCE AVE S PARKLAWN AVE PARKLAWN CT 76TH AVE PARKLAWN AVE GALLAGHER DR 7220 72 73 7334 7219 7225 7321 72 4405 4409 4413 4417 7321 7325 7329 7333 7337 4400 4404 4408 4412 4416 4420 4405 4409 4413 4417 4421 4420 4416 4412 4408 4404 4400 4405 4409 4413 4417 7332 7307 7321 7323 7319 7315 7328 7326 7338 7333 7380 7225 7229 7233 4754 7232 7236 70 74 78 7252 4720 4716 4712 4708 4704 4702 4700 47 1 4757 4753 4749 4745 4741 4737 4733 4729 4421 4425 4429 4433 44 4428 4432 4436 4440 4444 4448 4425 4429 4433 4437 4441 4445 4449 4453 4520 4516 4512 4508 4504 4500 4432 4428 44 4421 4425 4501 4505 4509 4513 4517 4521 4525 4529 4601 4605 4609 4600 4604 4608 73 7328 7332 4704 4705 4701 7416 7412 7433 7429 7425 7421 7417 7413 7409 7405 4608 4604 4600 4520 4516 4512 4508 4504 4500 4521 4517 4515 4509 4505 7412 7416 4504 4508 4512 4516 4520 4525 4521 4517 4515 4509 4505 4501 7405 7409 7411 7417 7421 7501 7505 7640 4716 4712 4708 4725 4721 4717 4713 4709 2 4908 4904 4900 7440 7436 7432 7428 74 7457 7453 7449 7445 7441 7437 7444 7448 7465 7461 4820 4700 7467 4660 4600 4570 4000 7390 7500 4450 4444 4200 4141 4000 7550 3955 7450 4200 4250 4280 7403 4 4201 4251 4415 4425 4435 4456 4456 4452 4440 4480 4550 4540 4510 4530 7600 7600 7625 4451 7685 7725 7600 4175 7338 69 KELLOGG AVE HIBISCUS AVE SEDUM LN FONDELL DR FRED RICHARDS GOLF COURSE

FRANCE AVE S EDINBOROUGH WAY PARKLAWN AVE COVENTRY CT YORK AVE S YORK TER 75TH ST W WASHBURN AVE S XERXES AVE S GALLAGHER DR 250 380 400 7390 500 0 8 3014 3020 7321 7315 1 3013 3019 7235 3821 915 913 909 905 903 901 812 804 800 416 414 412 408 404 402 400 1117 1115 1111 1105 1103 1101 1016 1012 1008 1004 1002 1000 616 614 610 606 602 600 719 717 713 711 707 703 701 525 521 517 513 509 505 501 808 7201 7355 7230 7430 7412 7434 7438 7433 7429 7425 7413 7409 7405 3400 7373 100 106 201 213209 205 217 317 313 309 305 301 7414 7426 7432 7438 7444 7445 7439 7433 7427 7421 7415 7409 7405 7500 7501 911 907 806 802 410 406 1113 1109 1107 1014 1010 1006 612 608 604 715 709 705 523 519 515 511 507 503 810 102 104 211 207203 215 315 311 307 303 74TH ST W 74TH ST W COVENTRY LN COVENTRY PL FRANCE AVE S EDINBOROUGH WAY PARKLAWN AVE COVENTRY CT YORK AVE S YORK TER 75TH ST W WASHBURN AVE S XERXES AVE S GALLAGHER DR 250 380 400 7390 500 0 8 3014 3020 7321 7315 1 3013 3019 7235 3821 915 913 909 905 903 901 812 804 800 416 414 412 408 404 402 400 1117 1115 1111 1105 1103 1101 1016 1012 1008 1004 1002 1000 616 614 610 606 602 600 719 717 713 711 707 703 701 525 521 517 513 509 505 501 808 7201 7355 7230 7430 7412 7434 7438 7433 7429 7425 7413 7409 7405 3400 7373 100 106 201 213209 205 217 317 313 309 305 301 7414 7426 7432 7438 7444 7445 7439 7433 7427 7421 7415 7409 7405 7500 7501 911 907 806 802 410 406 1113 1109 1107 1014 1010 1006 612 608 604 715 709 705 523 519 515 511 507 503 810 102 104 211 207203 215 315 311 307 303 74TH ST W 74TH ST W COVENTRY LN COVENTRY PL

Nine Mile Creek Regional Trail - East Segment Scope Change Request - Cost Breakdown Project Additions: Item Segment Length (LF) Unit Cost per LF Extension Notes Trail along Xerxes Avenue from Edina Promenade to 75th Street Revised route from proposed CP Rail crossing to 70th Street underpass, then along south side of 70th Street 1 $ 85.00 $ 110,500.00 Lump Sum $ 1,865,000.00 Unit costs based on off-street trail constructed behind existing curb line within city right-of-way. Total additional project cost: $ 1,975,500.00 Project Deletions: Item Segment Length (LF) Unit Cost per LF Extension Trail along south side of Valley View Road from Tracy Avenue to Valley Lane Replacement of pedestrian bridge on south side of Valley View Road west of Valley Lane Original route from proposed CP Railing crossing, through Abercrombie Park to 70th Street Trail along Parklawn Avenue from 76th Street to Gallagher Drive Trail along Gallagher Drive from Parklawn Avenue to France Avenue 950 $ 85.00 $ 80,750.00 Lump Sum Lump Sum $ $,000.00 860,000.00 2900 $ 130.00 $ 377,000.00 1500 $ 130.00 $ 195,000.00 Unit costs based on off-street trail constructed behind existing curb line within city right-of-way. Unit costs based on relocating curb line to construct off-street trail within city right-ofway. Unit costs based on relocating curb line to construct off-street trail within city right-ofway. Total deleted project cost: $ 1,812,750.00

Nine Mile Creek Regional Trail City of Edina Capital Improvement Plan September 9, 2014 Dear Mr. Nelson: The City of Edina is currently in the review process with staff and the City Council in regards to the 2015 2016 Capital Improvement Plan (CIP). The City Council will get their first look at the list of projects and budget implications at the September 16 City Council Meeting. A form of the CIP will be approved by council before the end of the year. The Engineering Department has submitted two projects of note in relation to the Nine Mile Creek Regional Trail (NMCRT) under development by Three Rivers Park District (TRPD). Both are on municipal state aid roadways that include the reconstruction of Parklawn Avenue from France Avenue to 76 th Street and the reconstruction of the intersection of Tracy Avenue and Valley View Road. The initial discussions for the intersection of Tracy Avenue and Valley View Road include construction of a roundabout. A roundabout would provide a safe pedestrian facility for the NMCRT. If a roundabout is not approved for this intersection, the City of Edina will work with TRPD to determine what crossing treatments satisfy warrants and could be installed to create a safe intersection. Since both projects have a designated funding source in the use of municipal state aid funds, both projects are likely to be included in the CIP. The City is committed to the NMCRT and the infrastructure needed to complete the entire trail through the City of Edina. We look forward to working with TRPD to complete not only the projects listed above but also assist in the completion of the entire NMCRT. Sincerely, Chad A. Millner Director of Engineering