FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE NO780017 BRIDGE-REPAIR/REHABILITATION.240 64 PE 4346191 I-95(SR9) FROM: FLAGLER C/L TO: SR207 RESURFACING 13.380 50 PE 25 PE 37,090 CST 81 CST 4240264 I-95(SR9) FROM: INT'L GOLF PKWY TO: DUVAL CL ADD MANAGED LANES 8.638 2,680 PE 6,032 ROW 1,820 ROW 9,200 ROW 3,686 ROW 5,600 RRU 301,414 DSB 4346151 I-95(SR9) FROM: SR207 TO: INTL GOLF PARKWAY RESURFACING 11.095 2,519 PE 35,281 CST Highways: State Highways 4304492 SR206 @ MANTANZAS RIVER ICWW CRESCENT BEACH BRIDGE NO780090 BRIDGE-REPAIR/REHABILITATION.564 3,697 CST 106 CST 4135341 D2-ST JOHNS COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM.000 492 OPS 515 OPS 538 OPS 535 OPS 560 OPS 4282712 SR 5A(A1A)KINGS ST FROM BRIDGE OF LIONS TO CHARLOTTE ST. PD&E/EMO STUDY.571 350 PDE 4373741 SRA1A @ MARY STREET ADDING LEFT TURN LANE FROM: A1A TO: MARY STREET ADD LEFT TURN LANE(S).020 831 CST 4338421 SRA1A BRIDGE OF LIONS @ MATANZAS RIVER BRIDGE NO780074 BRIDGE - PAINTING.293 51 CST 4299311 SRA1A FROM: PALMETO AVE TO: SAND CASTLE LANE DRAINAGE IMPROVEMENTS 2.698 26 CST 7,994 CST 4320481 SRA1A HOSPITAL CREEK BR NO78071 BRIDGE-REPAIR/REHABILITATION.050 1,718 CST 4410571 SR13 FROM: MILL CREEK TO: DUVAL CL RESURFACING 2.737 846 PE 6,172 CST 4376301 SR16 FROM:CR16A T VERONA WY & FROM:ST AUG PREM OUT TO:COLLINS AVE LIGHTING 11.430 7,149 CST 4324241 SR206 FROM: W CR305(WASHINGTON AVENUE) TO: JEFFERSON AVENUE DRAINAGE IMPROVEMENTS.171 101 PE 4393481 SR207 FROM: SR206 TO: BEGIN CURB & GUTTER RESURFACING 7.515 25 PE 10,883 CST 81 CST 2102302 SR313 FROM SR207 TO SR16 NEW ROAD CONSTRUCTION 4.070 4,217 ROW 2102304 SR313 FROM: SR207 TO: S HOLMES BLVD NEW ROAD CONSTRUCTION.000 1,211 PE 11,465 CST 4338432 SR5(US1) @ OYSTER CREEK BRIDGE NO780103 REPLACE OR WIDEN BR CULVERT.001 2,190 CST 4376171 SR5(US1) FROM: FLAGLER CL TO: SR206 RESURFACING 7.380 8 PE 9,046 CST 26 CST 4287991 SR5(US1) FROM: GUN CLUB ROAD TO: RENOIR BOULEVARD DRAINAGE IMPROVEMENTS 9.028 5,854 CST 4324061 SR5(US1) FROM: LEWIS POINT RD TO: SR207 TRAFFIC SIGNAL UPDATE 2.055 1,000 PE 2,739 CST 11 CST 4360231 SR5(US1) FROM: N OF FAIRBANKS ST TO: BIG OAK RD SIDEWALK 3.287 296 ROW 120 ROW 65 RRU 4,736 CST 4393551 SR5(US1) FROM: PONCE DE LEON BLVD N TO: CROSS RIDGE DR RESURFACING 14.257 100 PE 40 PE 23,105 CST 54 CST 4361681 SR5(US1) FROM: SR207 TO: CITY GATES RESURFACING 3.267 17,210 CST 4407611 SR5(US1) FROM: SR312 TO: SR16 CORRIDOR/SUBAREA PLANNING 3.692 500 PLN 4361611 SR5A(A1A) FROM: KING ST TO: SR16 RESURFACING 1.844 10 PE 4308971 SR5A(KING ST) FROM: PRAWN ST TO: AVENIDA MENENDEZ (A1A) DRAINAGE IMPROVEMENTS.767 173 ROW 175 ROW 123 ROW 400 RRU 10,241 CST
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY 4395011 US1 @ SAN CARLOS INTERSECTION LANDSCAPING.542 200 CST 4412821 W CASTILLO DR/RIPLEY'S & S CASTILLO DRIVE/SAN MARCO AVENUE TRAFFIC SIGNAL UPDATE.080 608 CST Highways: Local Roads 4376281 CR13 FROM: CR208 TO: SR16 EAST PAVE SHOULDERS 5.398 1,349 CST 4413711 CR210 @ CR2209 INTERSECTION WIDEN/RESURFACE EXIST LANES.285 1,010 PDE Highways: Off State Hwy Sys/Off Fed Sys 4412201 BISHOP EST RD SAN JOSE TO RACE TRACK; ORANGE AVE RACE TRACK TO BISHOP SIGNING/PAVEMENT MARKINGS 4.234 42 PE 178 CST 4340131 RIVER TO SEA LOOP TRAIL HEAD MUSSALLEM TRACT BIKE PATH/TRAIL 1.000 200 PE 4394701 WILDWOOD DR @ US1 INTERSECTION IMPROVEMENT.100 1,287 CST 2 CST Fixed Capital Outlay: Facilities 4180128 ST AUGUSTINE MAINTENENACE YARD REMODEL KITCHENETTE FIXED CAPITAL OUTLAY.000 20 CST 4180126 ST AUGUSTINE MAINTENANCE YARD FIXED CAPITAL OUTLAY.000 40 CST 4180129 ST AUGUSTINE MAINTENANCE YARD RENOVATE RESTROOMS WAREHOUSE FIXED CAPITAL OUTLAY.000 8 CST Maintenance: Interstate 2151481 ST. JOHNS ROUTINE MAINTENANCE 34.855 250 MNT 250 MNT 250 MNT 250 MNT 250 MNT Maintenance: State Highways 4102148 ST AUGUSTINE MAINT ROUNTINE MAINTENANCE CONTRACTS PRIMARY ROUTINE MAINTENANCE.000 432 MNT 45 MNT 4420741 EDGING & SWEEPING ST JOHNS CO. ROUTINE MAINTENANCE.000 116 MNT 116 MNT 116 MNT 4144201 LIGHTING AGREEMENTS ST. JOHNS COUNTY MISCELLANEOUS CONSTRUCTION.000 181 MNT 187 MNT 192 MNT 198 MNT 204 MNT 4404781 ST JOHNS CO OUTFALL DITCH CLEANING ROUTINE MAINTENANCE.000 102 MNT 102 MNT 4403211 ST JOHNS MAINT CONTRACT CONCRETE REPAIR ROUTINE MAINTENANCE.000 139 MNT 139 MNT 2146191 ST. JOHNS ROUTINE MAINTENANCE.000 4,000 MNT 4,000 MNT 3,500 MNT 4,000 MNT 4,000 MNT Freight, Logistic And Passenger Operation: Intermodal 4419241 NFRA DESIGN & CONSTRUCT EAST TERMINAL ACCESS ROAD PFL11882 AVIATION CAPACITY PROJECT.000 1,856 CAP 1,000 CAP Freight, Logistic And Passenger Operation: Aviation 4367751 NE FL APT DGN & REHAB TW "B" PVT DRAINAGE & LIGHTS PF0010592 AVIATION PRESERVATION PROJECT.000 3,800 CAP 2,000 CAP 4349031 NE FL REG APT DESIGN & CONST HANGARS PFL0010202 AVIATION REVENUE/OPERATIONAL.000 1,700 CAP 4367681 NE FL REG APT DESIGN & CONST W ACCESS RD PFL0010593 AVIATION CAPACITY PROJECT.000 730 CAP 1,000 CAP 4380451 NE FL REG APT DESIGN & OVERLAY TAXIWAY "D" PFL0007618 AVIATION PRESERVATION PROJECT.000 2,100 CAP 4350261 NE FL REG APT DESIGN & REHAB TAXIWAY "F" & "G" PFL0010201 AVIATION PRESERVATION PROJECT.000 200 CAP 2,000 CAP
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY 4399681 NE FLA REG APT ACQUISITION OF INDEX B ARFF VEH REQ PART 139 PFL10688 AVIATION SAFETY PROJECT.000 1,000 CAP 4419241 NFRA DESIGN & CONSTRUCT EAST TERMINAL ACCESS ROAD PFL11882 AVIATION CAPACITY PROJECT.000 400 CAP 1,144 CAP 4399671 NORTHEAST FLA REG APT DESIGN & CONST ARFF BUILDING PART 139 PFL0007619 AVIATION SAFETY PROJECT.000 1,817 CAP Freight, Logistic And Passenger Operation: Transit 4272651 ST JOHNS CNTY FED SECT 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE.000 657 OPS 690 OPS 725 OPS 761 OPS 799 OPS 4292031 ST JOHNS CNTY FED 5307 CAPITAL GRANT CAPITAL FOR FIXED ROUTE.000 725 CAP 808 CAP 808 CAP 808 CAP 808 CAP 4184411 ST. JOHNS COUNTY BLOCK GRANT OPERATING FUNDS OPERATING FOR FIXED ROUTE.000 882 OPS 918 OPS 964 OPS 1,012 OPS 1,062 OPS 4067899 ST.JOHNS CNTY BCC STP FUNDS PURCHASE BUSES/EQUIPMENT PURCHASE VEHICLES/EQUIPMENT.000 750 CAP 750 CAP 750 CAP 750 CAP 750 CAP 4067898 ST.JOHNS CNTY FED 5307 OPERATING GRANT OPERATING FOR FIXED ROUTE.000 1,578 CAP 1,578 CAP 1,578 CAP 1,578 CAP 1,578 CAP
Selection Criteria Report Element Requested Value Report Description: Styled PDF Detail Report: By Local Name Component Groups: Highways=Yes; FLP=Yes; Turnpike=Yes; Maintenance=Yes; Planning=Yes; FCO=Yes; Research and Testing=Yes; Fl Rail Enterprise=Yes; Transportation Disadvantaged=Yes; Miscellaneous=Yes; Version: G1 Fiscal Year: 2019 Number of Years: 5 District: Budgeting District 02 County: N/A Snapshot: 10/01/2017 20:15:01 Allocation Type: H Report Format: PDF Transportation System: Not specified (Select All) Contract Class: B Work Mix: Not specified (Select All) Phase Group: Not specified (Select All) Phase Type: Not specified (Select All) Program Number: Not specified (Select All) Fund Group: Not specified (Select All) Item Status - from: Not specified Item Status - to: Not specified Item Group: Not specified (Select All)
Phase Group Descriptions Phase Phase Phase Description Group Type Exceptions ADM Administration A Any Excl pgm 52;Ph A8 w/pgm 39 CAP Capital 9 Any CST Construction 5,6 Any Excl Ph 5A,5D,56,57; Cnclss 9 DSB Design Build 5,6 Any With Conclass 9 only ENV Environmental C Any INC Contract Incentives 5 A LAR Local Advance Reimburse A 8 With Program 39 only MNT Brdg/Rdwy/Contract Maint 7 Any Excl Phase 76 and 77 OPS Operations 8 Any PDE P D & E 2 Any PE Preliminary Engineering 3 Any Excl Phase 36 and 37 PLN Planning 1 Any RES Research B Any RPY Repayments 5 D Also incl Ph A8 w/pgm 61,78,SB ROW Right of Way 4 Any Excl Phase 46 and 47 RRU Railroad & Utilities Any 6,7 Excl Phase Group 1 and 2 MSC Miscellaneous Other Other
Component Descriptions Trans Phase Phase Budget Component Description System Group Type Dist Highways 01,03-07,16 Any Any Any Turnpike 02 Any Any Any Fixed Capital Outlay 12 Any Any Any Research & Testing Any B Any Any Transportation Planning 13 1 Any Any Maintenance Any 7 Any Any F, L and PO 08-11,15 Any Any Any Transportation Disadvantaged 14 Any Any Any Florida Rail Enterprise Any any Any 31 Miscellaneous Any Other Other Other Any
System Group Descriptions Trans System Group System Program Exceptions Interstate 01 Any Excl pgm 90 State Highways 03,04,05 Any Excl pgm 90 Local Roads 06,07 Any Excl pgm 90 Intermodal 08-11,15 Any Excl pgm 90 High Speed Rail Development Any 90 Other Any Other Other Excl pgm 90