ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Similar documents
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE


CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Riverside County Transportation Department Summary of Bids

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

ADDENDUM NO. TWO AB

ADA Compliance Projects Summary Sheet

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Table of Contents. Riser Rings. Riser Rings. Riser Rings. Product Description Page

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report July 13 through July 20, 2012

Wichita Falls MPO - MTP Project List 1 of 6

Action Recommendation: Budget Impact:

HOST KA

FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Grade Crossings in High Speed Rail Corridors

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Projected Advertisement Date

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Second Street Improvements Project Project Update Archive

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

Culpeper District. Albemarle County Monthly Report December 2011

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Appendix E. Build Alternative Design Information

FDOT Treasure Coast Traffic Report through

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Culpeper District. Albemarle County Monthly Report. September 2012

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

MORGAN CREEK GREENWAY Final Report APPENDICES

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

B10. Agate Beach State Recreation Site

Community Park Capital Project. February 6, 2017

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017

TYPICAL SECTION OF IMPROVEMENT

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

El Dorado County / Tahoe Roadwork Schedule

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

City of Grand Island

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Weekly construction update

FDOT Treasure Coast Traffic Impact Report

Trail Feasibility Study

Application to Impose and Use Passenger Facility Charges - #16

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

DATA BOOK IV : COST ESTIMATE

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

National Model Railroad Association

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

PARKS & RECREATION BOARD MISSION STATEMENT

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Design Meeting Presentation

Guide to. Road Construction Projects

Capital Improvement Plan

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Quiet Zone Evaluation for Huron, Ohio

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

CAPITAL IMPROVEMENT PLAN

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

Ohio Department of Transportation Construction Update

October 31, 2014 Chuck McGinness, (954)

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

THE BIG PICTURE. Week of March 4, Bring your dog. Bring your kids. Bring a picnic and spend the day with us! Free and open to the public.

Design Considerations For Accessible Parks & Trails

Gulf Coast MPO Obligated Projects

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park

Palm Beach County Traffic Report August 24 through August 31, 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Transcription:

ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where conflict occurs between the unit price and the total amount named for any item, the unit price shall prevail, and the totals shall be corrected to conform thereto. SCHEDULE A - S 312TH ST (PACIFIC HWY S TO 28TH AVE S) TOTAL DESCRIPTION QUANTITY PRICE 1,100 HR $52.00 $57,200.00 100 HR $52.00 $5,200.00 288 HR $75.00 $21,600.00 32 DAY 6 2-01 Roadside Cleanup 1 FA $3,000.00 $3,000.00 7 2-02 Asphalt/Cement Concrete Sawcutting 10,568 LF 8 2-03 350 CY 9 2-12 1,200 SY 10 4-04 200 TN 11 4-04 Maintenance Rock for Shoulder Reconstruction, Incl. Haul 55 TN 12 5-04 Planing Bituminous Pavement 8,472 SY 13 5-04 HMA Class 1/2" PG 64-22 3,096 TN 14 5-04 Widening 700 TN 15 7-05 Adjust Manhole 9 EA 16 7-05 Adjust Catch Basin 10 EA 17 7-05 Install Conversion Riser for Type I Catch Basin 18 7-05 Repair or Rebuild Manhole 19 7-05 Adjust Existing Utility to Grade 20 8-02 Sod Lawn, Incl. 4 In Topsoil 20 SY 21 8-04 Cement Conc. Curb and Gutter 26 LF 22 8-07 Precast Sloped Mountable Curb 5 LF Asphalt Overlay Project PWC ver. 4-15 24

23 8-07 24 8-09 25 8-09 26 8-13 27 8-14 28 8-14 29 8-14 30 8-14 31 8-14 32 8-14 33 8-20 34 8-22 35 8-22 36 8-22 37 8-22 38 8-22 39 8-22 40 8-22 41 8-22 42 8-22 43 8-22 44 8-22 45 9-29 Precast Dual Faced Sloped Mountable Curb Adjust Monument Case & Cover Cement Conc. Sidewalk Cement Conc. Approach Cement Conc. Curb Ramp Type 1 Parallel Cement Conc. Curb Ramp Type 2 Parallel Cement Conc. Curb Ramp Type 1 Perpendicular MMA-Style Truncated Dome Detectable Warning Surface Pedestrian Push Button Detector Loop R3-9A and R3-9B L Sign and Post Painted Traffic Arrow Painted Bike Symbol Plastic Shared Lane Marking Profiled Plastic Wide Line Profiled Plastic Dotted Wide Line 115 LF 6.4 HUND 8 EA 80 SY 32 SY 9 EA 10 SF 4 28 EA 14,220 LF 2,914 LF 1,071 LF 300 LF 1,290 LF 177 LF 26 EA SUBTOTAL SCHEDULE A SCHEDULE B - 23RD AVE S (S 312TH ST TO S 319TH PL) DESCRIPTION Asphalt Overlay Project PWC ver. 4-15 25 QUANTITY PRICE TOTAL 670 HR $52.00 $34,840.00 50 HR $52.00 $2,600.00

6 2-01 7 2-02 8 2-03 9 2-12 10 4-04 11 5-04 12 5-04 13 5-04 14 7-05 15 7-05 16 7-05 17 8-02 18 8-13 19 8-04 20 8-09 21 8-09 22 8-14 23 8-14 24 8-14 25 8-14 26 8-20 27 8-22 28 8-22 29 8-22 30 8-22 31 8-22 32 8-22 144 HR $75.00 $10,800.00 52 DAY Roadside Cleanup 1 FA $4,000.00 $4,000.00 5,000 LF 215 CY 1,000 SY 200 TN Planing Bituminous Pavement 7,198 SY HMA Class 1/2" PG 64-22 1,730 TN Widening 440 TN Adjust Manhole 4 EA Adjust Catch Basin Install Conversion Riser for Type I Catch Basin Sod Lawn, Incl. 4 In Topsoil 3 SY Adjust Monument Case & Cover Cement Conc. Curb and Gutter 13 LF 3.4 HUND Cement Conc. Sidewalk 18 SY Cement Conc. Curb Ramp Type 1 Parallel Cement Conc. Curb Ramp Type 1 Perpendicular MMA-Style Truncated Dome Detectable Warning Surface 202 SF Detector Loop 60 EA Painted Bike Lane Arrow 1 Painted Bike Symbol 1 5,949 LF 2,968 LF Profiled Plastic Wide Line 884 LF 1,180 LF Asphalt Overlay Project PWC ver. 4-15 26

33 8-22 34 8-22 212 LF 2 SUBTOTAL SCHEDULE B SCHEDULE C - WEYERHAEUSER WAY S PAVEMENT REPAIR 6 2-02 7 2-03 8 2-12 9 4-04 10 5-04 11 8-09 12 8-22 13 8-22 14 8-22 15 8-22 16 8-22 TOTAL DESCRIPTION QUANTITY PRICE 360 HR $52.00 $18,720.00 20 HR $52.00 $1,040.00 64 HR $75.00 $4,800.00 12 DAY 5,654 LF 235 CY 1,000 SY 150 TN Widening 405 TN 1 HUND 1,000 LF 1,300 LF 100 LF 60 LF SUBTOTAL SCHEDULE C SCHEDULE D - S 328TH ST PAVEMENT REPAIR Traffic Control Labor DESCRIPTION Asphalt Overlay Project PWC ver. 4-15 27 QUANTITY 120 HR $52.00 $6,240.00 6 HR $52.00 $312.00 6 DAY PRICE TOTAL

5 2-02 6 2-03 7 2-12 8 4-04 9 5-04 10 8-09 11 8-09 12 8-22 1,338 LF 45 CY 50 SY 30 TN Widening 90 TN 0.25 HUND Paint Line 1,050 LF SUBTOTAL SCHEDULE D Asphalt Overlay Project PWC ver. 4-15 28