STATUS REPORT JAPAN. (ATMC) Japan Civil Aviation Bureau. CIVIL AVIATION BUREAU of JAPAN. 6th Global Air Traffic Flow Management Conference

Similar documents
Collaborative Decision Making at JCAB ATMC

Sector Complexity and safety. Dr. Arnab Majumdar 26 OCTOBER, 2006

TSUNAMI ~The Great East Japan Earthquake~

How ATFM Assists with Disaster Recovery

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

SIMULATION ANALYSIS OF CONFLICT BETWEEN INTERNATIONAL DEPARTURE FLIGHTS FROM JAPAN AND OVERFLIGHTS

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

Airspace Organization and Management

Asia/Pacific Region A-CDM Planning

Hosted by General Civil Aviation Authority (GCAA)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Contributing to Efficient Air Traffic Operations

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

Traffic Flow Management

Ministry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan

Agenda Item 5: Airspace Safety Monitoring Activities/Requirements in the Asia/Pacific Region

Asia/Pacific Air Traffic Management Perspectives

ATM Collaboration & Data Sharing

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

Air Traffic Flow & Capacity Management Frederic Cuq

Runway Status Lights (RWSL) in Japan. July 2015

International Civil Aviation Organization

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Data Link Operation and PBCS Implementation in Japan

TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1

Aviation Growth in China:Challenges, Opportunities, and Solutions

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ANDREW WATTERSON Vice President Planning and Revenue Management

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Making the World A better place to live SFO

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Urban Air Mobility NASA Perspectives

A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)

Myanmar s CNS/ATM Development Master Plan

Ultra s Experience with A-CDM

Introduction of KIX & ITM

Agenda Item 3: Performance framework for Regional Air Navigation Planning and Implementation

Seen through an IATA lens A-CDM Globally

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

Next Generation Airspace Developments: Key Operational Trends and Enablers

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

EUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre

TO: Air Traffic Control System Command Center (ATCSCC) DATE: May 10, FROM: Paul McEwen, Traffic Management Officer, Anchorage ARTCC

Volcanic Ash Exercise

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

Pacific Project. CPWG/8 - WP/6 Appendix A

Federal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)

30th IBSC Conference - Stavanger, Norway June, Takahiro TOKUI

Civil and military integration in the same workspace

(Presented by Japan) SUMMARY

NASA Aeronautics Jaiwon Shin, Associate Administrator Aeronautics Research Mission Directorate. 1

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Network Manager Adding value to the Network 29 September 2011

PROPOSED UPDATES TO FLIGHT OPERATING PROCEDURES FOR HURRICANE HUNTER AIRCRAFT (TEAL & NOAA) (Presented by the United States) SUMMARY

ASIA PACIFIC Air Traffic Flow Management

PBN Airspace Concept. ATS requirements

Efficiency and Automation

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

ICCA & the International Association Meetings ICCA-JNTO-JTA Bid Workshop 2013

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

ATFM Update - EUROCONTROL Day 1-16h45

Asia-Pacific Aviation: Growth and Challenges

From local to regional to global ATFM

Improvements for Business Aviation in Japan

Global 8 ATFM Conference 4 6 November 2014 Cancun, Mexico

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

KTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE

Integrated SWIM. Federal Aviation Administration Presented to: Interregional APAC/EUR/MID Workshop>

CDM Quick Reference Guide. Concepts I Need to Know for the Exam

When Plans Don t Go as Planned

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

ANA Fact Book All Nippon Airways Co., Ltd. Contents

USE OF RADAR IN THE APPROACH CONTROL SERVICE

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

Extending the Reach of Your Flight Department Team

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK

Better Access to Tokyo Metropolitan Gateways

European Performance Scheme

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

INVESTOR RELATIONS Earnings Release

A-CDM FOR REGIONAL AIRPORTS CONCEPT VALIDATION DOCUMENTO PÚBLICO

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

1. Air Traffic Statistics Suvarnabhumi Airport: Monday, 11 Sunday, 17 June Actual Daily Traffic & Runway Utilization. (Wed) 13 Jun.

Main Air Traffic Management Center

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

Validation Plan & Objectives. Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)

SES Performance Scheme

Transcription:

CIVIL AVIATION BUREAU of JAPAN STATUS REPORT JAPAN 6th Global Air Traffic Flow Management Conference (ATMC) Japan Civil Aviation Bureau

ATMC (RJJJ) Fukuoka ACC (RJDG) KYOTO FUKUOKA TOKYO 2

Evolution from ATFMC to ATMC Air Traffic Flow Management Center (ATFMC) started operations in October 1994. The ATFMC evolved into ATMC in October 2005. ATFMC ATFM function Organization + ASM function ATC (Oceanic) function + CDM Air Traffic Management Center (ATMC) 3

ATMC Functions Civil Aviation Bureau of Japan Monitor of air traffic flow and volume Route coordination with aircraft operators Flow control Oceanic control with data-link Organization of Pacific Organized Track System Coordination of international traffic flow ATFM OcnATM ASM Designing of airspace and airways Management of civil training and testing airspace Coordination with military for flexible use of airspace 4

FUKUOKA FIR Vladivostok FIR Petropavlovsk Kamchatsky FIR Anchorage FIR Yuzhino Sakhalinsk FIR Pyongyang FIR Shanghai FIR Incheon FIR Fukuoka FIR Taipei FIR Oakland FIR Manila FIR

Jurisdiction Sapporo ACC (RJCG) Tokyo ACC (RJTG) Fukuoka ACC (RJDG) Naha ACC (RORG) ATMC ATMC (RJJJ) (RJJJ for ATM) 6

400 A/C at a peak hour (around noon) in Japan 7

ATM Center Heavy snow fall Civil Aviation Bureau of Japan RWY CLSD SNOW HEAVY RAIN FLOW CONTROL typhoon THUNDER STORM 8

Domestic Air Traffic Flow Civil Aviation Bureau of Japan New Chitose Fukuoka Osaka Narita Haneda(TOKYO) Kansai Chubu 9

International Air Traffic Flow ANCHORAGE FIR 50N Anchorage East coast of USA Europe/Russia SAPPORO ACC Korea INCHEON FIR TOKYO ACC West coast of USA 40N China FUKUOKA ACC ATM CENTER Hawaii NAHA ACC FUKUOKA FIR 30N OAKLAND FIR South East Asia MANILA FIR Guam/Australia 140E Ministry of Land, Infrastructure, Transport 20Nand Tourism 160E 10

50 40 * ** ESTIMATED TRAFFIC G RPH (SECTOR) * ** AREA : T27 03: 51 TIME : 0350-0640 NORTH AREA EAST AREA WEST AREA SOUTH AREA VLADI VOSTOK FIR PYONGYANG FI R 30 T27 T21 TARGU FI R T26 T08 20 F01 T22 T09 T24 T10 T18 F03 F02 T17 T11 T31 T32 F08 F05 F06 T16 10 F07 N0 1 T19 N0 7 N0 1 N0 2 0 N0 2 03 04 04 04TAIPEI 04FI R 04 04 05 05 05 0 5 05 05 06 06 06 06 06 HH 50 00 10 20 30 40 50 00 10 20 3 0 40 50 00 10 20 30 40 MM N0 5 SCHDU 0 0 0 0 0 0 N0 o6 1 1 1 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN -F L 28 28 28 27 27 26 24 22 21 19 1 9 17 14 12 10 8 7 7 TO TAL 28 29 29 30 32 36 37 38 39 40 3 9 38 34 32 29 29 30 31 CAPA 37 37 37 37 37 37 37 37 37 37 3 7 37 37 37 37 37 37 37 S21 S03 T01 T12 S01 T03 S04 S02 T02 T04 T05 T29 T20 * ** ESTIMATED TRAFFIC G RPH (SECTOR) * ** AREA : T27 03: 51 TIME : 0350-0640 50 40 30 20 10 0 03 04 04 04 04 04 04 05 05 05 0 5 05 05 06 06 06 06 06 HH 50 00 10 20 30 40 50 00 10 20 3 0 40 50 00 10 20 30 40 MM SCHDU 0 0 0 0 0 0 o 1 1 1 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN -F L 28 28 28 27 27 26 24 22 21 19 1 9 17 14 12 10 8 7 7 TO TAL 28 29 29 30 32 36 37 38 39 40 3 9 38 34 32 29 29 30 31 CAPA 37 37 37 37 37 37 37 37 37 37 3 7 37 37 37 37 37 37 37 TAI PEI FI R NORTH AREA EAST AREA WEST AREA SOUTH AREA N07 TARGU FI R N0 6 F0 5 PYONGY ANG FI R F03 N0 1 N0 2 N02 F06 F07 N0 1 VLADI VOSTOK FI R F01 F02 F0 8 T21 T22 T2 7 T26 T24 T3 1 T3 2 T16 N05 T18 T1 7 S0 3 S0 2 S21 S0 1 T01 T02 T12 T03 T0 9 T1 0 T11 T19 S0 4 T04 T0 5 T29 T20 T0 8 50 40 30 20 10 *** ESTIMATED TRAFFIC GRPH (SECTOR) *** AREA : T27 03: 51 TI ME : 0350-0640 0 03 04 04 04 04 04 04 05 05 05 05 05 05 06 06 06 06 06 HH 50 00 10 20 30 40 50 00 10 20 30 40 50 00 10 20 30 40 MM SCHDU 0 0 0 0 0 0 o 1 1 1 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN-FL 28 28 28 27 27 26 24 22 21 19 19 17 14 12 10 8 7 7 TOTAL 28 29 29 30 32 36 37 38 39 40 39 38 34 32 29 29 30 31 CAPA 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 *** ESTIMATED TRAFFIC GRPH (SECTOR) *** AREA : T27 03:5 1 TIME : 0350-0640 50 40 30 20 10 *** ESTIMATED TRAFFIC GRPH (SECTOR) *** AREA : T27 03 :51 TI ME : 0350-0 640 50 NORTH AREA S04 VL ADI VOST OK FI R EAST AREA T0 5 WEST AREA S03 40 SOUTH AREA S0 2 T29 PYONGYANG FI R S2 1 S01 T0 1 T02 T20 30 T27 T0 3 T04 TARGU FI R T2 1 T1 2 T2 6 F01 T09 T0 8 T22 T2 4 T10 20 F03 T1 8 F02 T17 T1 1 T31 T32 F08 F05 F06 F07 T1 6 10 N07 N01 T1 9 N01 N02 0 N02 03 0 4TAIPEI 0 4 FIR 0 4 0 4 04 04 05 05 05 05 05 05 06 0 6 0 6 0 6 0 6 HH 50 0 0 1 0 2 0 3 0 40 50 00 10 20 30 40 50 00 1 0 2 0 3 0 4 0 MM SCHDU 0 0 0 0 0 N0 6 0 o 1 1 1 N0 5 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN-FL 28 2 8 2 8 2 7 2 7 26 24 22 21 19 19 17 14 12 1 0 8 7 7 TOTAL 28 2 9 2 9 3 0 3 2 36 37 38 39 40 39 38 34 32 2 9 2 9 3 0 3 1 CAPA 37 3 7 3 7 3 7 3 7 37 37 37 37 37 37 37 37 37 3 7 3 7 3 7 3 7 *** ESTIMATED TRAFFIC GRPH (SECTOR) *** AREA : T27 03 :51 TI ME : 0350-0 640 50 40 30 20 10 10 04 5k t 5k t C A T 3 3 9 5 0 0 10 04 15 kt 1012 15 kt Other ACC Coordination International ATFM Incheon ACC Taipei ACC Civil Aviation Bureau of Japan Sharing Information Information Exchange Coordination ATMC L 10 kt 0 150 ~ 37 0 15 kt L 6H 0 03 04 04 04 04 04 04 05 05 05 05 05 05 06 06 06 06 06 HH 50 00 10 20 30 40 50 00 10 20 30 40 50 00 10 20 30 40 MM SCHDU 0 0 0 0 0 0 o 1 1 1 2 2 2 3 3 6 7 7 PL AN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN-FL 28 28 28 27 27 26 24 22 21 19 19 17 14 12 10 8 7 7 TOTAL 28 29 29 30 32 36 37 38 39 40 39 38 34 32 29 29 30 31 CAPA 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 0 03 0 4 0 4 0 4 0 4 04 04 05 05 05 05 05 05 06 0 6 0 6 0 6 0 6 HH 50 0 0 1 0 2 0 3 0 40 50 00 10 20 30 40 50 00 1 0 2 0 3 0 4 0 MM SCHDU 0 0 0 0 0 0 o 1 1 1 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN-FL 28 2 8 2 8 2 7 2 7 26 24 22 21 19 19 17 14 12 1 0 8 7 7 TOTAL 28 2 9 2 9 3 0 3 2 36 37 38 39 40 39 38 34 32 2 9 2 9 3 0 3 1 CAPA 37 3 7 3 7 3 7 3 7 37 37 37 37 37 37 37 37 37 3 7 3 7 3 7 3 7 Restriction Flow Control - ATFM Measures Capacity Constraints - Objects of restrictions - Start/End time AOs Internal ACC - The cause of flow control - Capacity falls at int l airport - Malfunction of ATC systems Capacity Constraints - Flow control restrictions from other facilities - Other adverse effects 11

The number of FLIGHT PLAN (IFR) 1,304,886 FLT/YEAR OVER FIR 通過 FLT 13% 14% 3,575 FLT/DAY INTER NATIONAL 国際 26% 27% DOMESTIC 国内 60% 60% 12

Monitoring TFC Volume ATFM system calculates and displays the traffic demand against the system capacity for the next 6 hours. 6h 13

Flow Control Civil Aviation Bureau of Japan ACC sector traffic volume is expressed as ATC workloads SCHEDULE Sector Capacity Workload/30min FLIGHT PLAN IN-FLIGHT 14

Airport traffic volume Flow Control Civil Aviation Bureau of Japan /MIN NUMBER OF FLIGHTS/30min Departure Expected Airborne Delay (MIN) Arrival Spacing time Arrival capacity 15

ATFM - Flow Control Techniques Ground Delay (EDCT) Minutes in-trail Ground Stop Pre-flight Speed adjustment Miles in-trail In-flight Airborne holding 16

Ground Delay Program Civil Aviation Bureau of Japan Expected Departure Clearance Time (EDCT) is calculated by ATFM system. Calculation of suitable time for aircraft to go into sectors/airports Allocation of necessary ground delay to aircraft EDCT = EOBT + taxiing time + necessary ground delay 17

18

50 40 30 20 10 0 03 04 04 04 04 04 04 05 05 05 05 05 05 06 06 06 06 06 HH 50 00 10 20 30 40 50 00 10 20 30 40 50 00 10 20 30 40 MM TOTAL 28 29 29 30 32 36 37 38 39 40 39 38 34 32 29 29 30 31 CAPA 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 Delivery of EDCT Civil Aviation Bureau of Japan EDCT is transmitted to ATC facilities and Airline Operators 40 minutes before EOBT. *** ESTIMATED TRAFFIC GRPH (SECTOR) *** AREA : T27 03:51 TI ME : 0350-0640 ATMC EDCT Airline SCHDU 0 0 0 0 0 0 o 1 1 1 2 2 2 3 3 6 7 7 PLAN 0 1 1 3 5 10 13 15 17 20 18 19 18 17 16 15 16 17 PLN-E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IN-FL 28 28 28 27 27 26 24 22 21 19 19 17 14 12 10 8 7 7 EDCT ACC EDCT ATC Clearance with EDCT TWR ATC Clearance with EDCT Expect departure at or later than hhmm due to flow control 19

Minutes in trail mm mm mm mm 20

Miles in-trail Speed Adjustment Airborne holding SHELY IXE Holding SWAMP SHELY IXE ENTRY FIX CFDT FIX ARROW FACER SWAMP RJAA 15NM 15NM 15NM RJAA ARROW FACER MIT XAC MAMAS NJC XAC ANGEL NJC MANAT MANAT 21

Air Space Management Self-Defense Force s High Altitude Training/Testing A Areas C B D G Conditional Routes U J H E N K P L Area utilization plans Operational coordination of CDRs Coordination of the Self-Defense Force s High Altitude Training/Testing Areas Management of Civil Training and Testing Airspace Coordination for the U.S. Forces Altitude Reservation (ALTRV) 22

W 182 W 17 W 179 W 1 76 4A W 17 4 W 17 W 17 8 8A W 172 P6 P3 P5 P4 P1 R104 P1 R105 P2 W 1 N1 73A W 17 3 W 18 5 N2 1 N2 2 N2 4 N2 3 R 1 3 4 W 1 81 R108 R91 R9 2 W 183 NO9 Q U R53 3 W 1 84 R1 09 NO6 L G1 G 4 NO 5 R10 1 超音速飛行空域 G2 K1 G3 J K2 R14 4 NO4 K3 C1 H R 114 NO2 NO3 S1 R1 27 NO1 R1 16 R521 R130 R 121 R1 31 E3 E2 E1 A R129 B1 B 3 R5 32 D B2 S2 Oceanic ATC Civil Aviation Bureau of Japan Oceanic ATM Data link technology (ADS/CPDLC/AIDC) is fully utilized. Tokyo ACC (RJTG) Sapporo ACC (RJCG) ATMC (RJJJ) Fukuoka ACC (RJDG) Naha ACC (RORG) ATMC provides oceanic ATC service in Fukuoka FIR. 23

North-A A02 A01 North-B A03 East A04 South-A A05 South-B 24 24

Establishment of PACOTS Pacific Organized Track System 25

Operation Room 4,5 3,BkUp Oceanic Sector BkUp Oceanic ATM Strategic Oceanic ATM Supervisor North East ATFM Strategic Projector South ATFM & ASM West ASM Strategic ATM Supervisor Information Specialist Information Specialist JSDF Liaison 1,2 Flight data Engineering Specialist Weather Specialist 26

Meteorological Information Large Display Civil Aviation Bureau of Japan Alert classification is shown by colored symbol Large Display Chronological forecast 27

CDM CONFERENCE TMC CDM Conference Participants ATMC,AOC(ANA, JAL),ATMetC,RJAA, RJTT,ACC Periodical meeting 2times a day 28

THANK YOU 29