Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion 2014-2015 Updated to September 2
TRANSPORT INFRASTRUCTURE
THE AMAZON WATERWAY CALLED Loreto Ucayali Implementation of works and actions to improve navigability and passenger and cargo transit on the Amazonas, Marañón, Huallaga and Ucayali rivers. Dredging on critical areas (Malos Pasos) and on the access totheportofiquitos. GPS information system on the navigation route. Installation of level measuring stations with data transmission capabilities. Monitoring system. Cleaning system. Estimated investment (VAT not included): US$ 69.4 million Type of concession: Co-financed Concession period: 20 years. Estimateddateofaward:IIIQ2014
LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO TO BE CALLED Concession, through two independent bids, of two linesofthenetworkofthemetrooflimaandcallao for the design, financing, construction, equipment, operation and maintenance of 62 Km of this transportation system, which serves a city of more than 10 millions of inhabitants. Estimated Investment: Under evaluation Type of concession: Co-financed Concession period: 35 years Lima and Callao Approximated length Estimateddate of award Line 3 Line 4 32 Km 30 Km 2015 2015
HUANCAYO - HUANCAVELICA RAILWAY TO BE CALLED Project oriented to the transportation of passengers and cargo, including the execution of the following works along 128 Km of the existing railway: Railway upgrade Changestotherouteincriticalsectors Purchase of rolling stock Reinforcement of 15 railway bridges Extension of 38 tunnels for standard gauge rolling stock (1,435 mm) Upgrades to signaling and telecommunication systems Draining works Junín Central Railway Huancayo Huancavelica Railway South Railway Huancavelica The project includes interoperability with Ferrocarril Central (railway service withastandardgaugeof 25 tonper axle) for the connectionofhighandes regions withtheportofcallaoandthe Santa Anita market. Estimated investment: Type of concession: Concession period: Under evaluation Co-financed 30 years Estimated date of award: II Q 2015.
PERIPHERAL RING ROAD UNDER EVALUATION Unsolicited proposal for the construction, financing, operation and maintenance of a new urban highway approx. 33 Km long ( from Av. Elmer Faucett to Av. Circunvalación), intended to improve vehicle traffic between North and East Lima districts and other areas in the city. Estimated Investment: Studies in progress Type of concession: Co-financed Lima and Callao Estimateddate of award:ii Q 2015 ( ifno interested thirdpartiesparticipate) Ring road
FAST MONORAIL MASS TRANSPORTATION SYSTEM -AREQUIPA UNDER EVALUATION An unsolicited proposal for the design, construction, electromagnetic equipment, systems, rolling stock, financing, operation and maintenance of a 14 Km fast mass transportation system (on elevated track) in the Arequipa Metropolitan Area. Estimated Investment: Studies in progress Type of concession: Co-financed Estimateddate of award:iii Q 2015. Arequipa
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4 TO BE CALLED Execution of upgrade and rehabilitation works (117 Km), initial periodic maintenance(310 Km); and subsequent maintenance and operation of the 965 Km highway, in order to reach and maintain established service levels on the entire route. Estimated Investment: To be adjusted, according to studies conducted and arrangements between the Ministry and MEF. Type of concession: Co-financed Concession period: 25 years Estimateddateofaward:IIIQ2015
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5 TO BE CALLED Initial periodic maintenance, operation and maintenance of 422 Km of road, in order to maintain established service levels. Estimated Investment: The ministry is currently updating restoration and maintenance costs. Type of concession: Co-financed Concession period: 25 years Estimateddateofaward:IVQ2015
PANAMERICANA SUR HIGHWAY : ICA-DV. QUILCA SECTION UNDER EVALUATION Unsolicited proposal for the concession of the construction, operation and maintenance of infrastructure works on the South Panamericana Highway, Ica-Dv. Quilca section, with an approximate lengthof518km. Estimated Investment: Under evaluation Concession period: Self-sustained Ica Estimated date of award: 2015 Arequipa
AZÁNGARO JULIACA PUNO 220 kv TRANSMISSION LINE CALLED Puno Concession for the design, financing, construction, operation and maintenance of a transmission line with an approximate length of 110 Km with a capacity of 120 MVA, intended to eliminate congestion in the current system and increase the reliability of Peru s national grid, The National Electric Power grid ( SEIN by its initials in spanish). Estimated investment(vat not included): US$ 68.9 million Concession period: Self-sustained Concession period: 30 years plus the construction period(about 24 months). Estimateddateofaward: IVQ2014
220/60 kv NUEVA LURÍN SUBSTATION and 220 kv AND 60 kv CONNECTION LINES CALLED South Lima Concession for the design, financing, construction, operation and maintenance of the 220/60 kv Nueva Lurín Substation, that will be connected to the Chilca-San Juan line (220 kv) and to existing substations Lurín and La Pradera (60 kv). This will enable an increase of the electric power supply required to meet the growing demandinthesouthoflima. Estimated Investment: US$ 49.6 million Type of concession: Self-sustained Concession period: 30 years plus the construction period(about 24 months). Estimateddateofaward: IVQ2014
CARAPONGO SUBSTATION AND LINKS TO ASSOCIATED LINES TO BE CALLED Lima Concession for the design, financing, construction, operation and maintenance of the first stage of the new Carapongo substation (located in the east of Metropolitan Lima). The new substation will include Protection, Control, Measurement and Communication Systems related to the transmission lines and electric power substations that supply electricity to Lima. Estimated investment: US$ 31.3 million Type of concession: Self-sustained Estimateddateofaward: IIQ2015 MetropolitanLima
220 kv NEW CÓRPAC SUBSTATION AND 220 kvindustriales -CORPAC TRANSMISSION LINES CALLED Lima Industrial Substations Ate Concession for the design, financing, construction, operation and maintenance of the following projects: New Córpac Substation (underground) 220 kv Industrial Transmission Lines - Corpac(underground) Industrial TLs -Córpac The upgrade of electric power supply will allow to meet the increasing demand in the districts of Ate, Cercado de Lima, La Victoria, Miraflores, San Isidro, San Borja (particularly in commercial and financial areas in the latter three districts) and San Luis. Estimated investment (VAT not included): US$ 148 million Type of concession : Self-sustained New Córpac Substatio n San Borja Concession period: 30 years plus the construction period (about 25 months). Estimated dateofaward: IIQ2015
ELECTRICITY SUPPLY FROM NEW HYDROELECTRIC POWER PLANTS TO BE CALLED Nationwide Contract for the purchase of 1,200 Mw of power in years 2020 and 2021, to be generated by new hydroelectric power generation projects that will be incorporated to the National Electric Power Grid (SEIN). Estimated Investment: Under evaluation Type of concession: Self-sustained Estimateddateofaward: IIQ2015
QUILLABAMBA THERMAL POWER PLANT TO BE CALLED Concession for the design, financing, construction, operation and financing of a 200 Mw thermal power plant to be located in Quillabamba (department of Cusco) which shall begin operations in 2017 and be connected to The National Electric Power Grid(SEIN) Estimated investment: US$ 200 million Type of concession: Self sustained Estimateddateofaward:IIQ2015
HYDROCARBONS
LNG SUPPLY SYSTEM FOR THE DOMESTIC MARKET CALLED Concession to provide with natural gas (NG) supply system to be used in emergency situations (failure in NG production in the forest, or in its transportation from the forest to the Peruvian coast). The system comprises back-up storage capacity for 130,000 m3 and facilities of regasification and shipping of 400 MMSCFD of NG, in order to guarantee the supply of fuel to users in Lima andcallaoforuptosevendays. Estimated investment (VAT not included): US$ 250 million Type of concession: Self-sustained Concession period: 20 years plus the construction period(30 months). Estimateddateofaward:IVQ2014
SANITATION AND HEALTH
MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA TO BE ANNOUNCED CALLED Concession for the design, financing, construction, operation and maintenance of the following infrastructure projects in the departments of Lima and Junín: Re-enlargement of the Pomacocha and Huallacocha Bajo dams (about 90 MCM) Trans-Andean tunnel (about 10 Km) Newdrinking water plant (5m 3 /s) South branch pipeline (about 26 Km), including six reservoirs (total storage volume: 24,000 m 3 ) and works for the interconnection with the current drinking water supply system. The concession also includes the operation and maintenance of the following facilities: Current drinking water plant (5m 3 /s) North branch pipeline (27.1 Km), including four compensation reservoirs (total storagevolume: 23,000 m 3 ) Estimated investment (VAT not included): US$ 400 million Modality: Self-sustained Period: 30 years Estimated dateofaward:iq2015
REGULATION WORKS OF THE CHILLÓN RIVER TO TO BE BE CALLED ANNOUNCED Concession for the design, financing, construction, operation and maintenance of the following infrastructure projects, intended to ensure drinking water supply to the districts of North Lima. Jacaybamba dam (about 28 million m3) located in the province of Canta, northeast of Lima. Pipeline (about 30 Km) for an average flow rate of about1.5m3/s,fromtheprojectedwaterintakeonthe Chillon River to the current Chillon drinking water plant. Estimated investment (VAT not included): US$ 70 million Type of concession: Self-sustained Concessionperiod: 20to30years Estimateddateofaward:IIQ2015
THREE NEW HIGH-COMPLEXITY HOSPITALS FOR LIMA AND TWO PROVINCES IN THE NORTH OF PERU TO BE CALLED Concession of the design, construction, equipment, operation and maintenance of complementary services (blue-collar services) in high-complexity hospitals in the Peruvian Social Security System (ESSALUD): a new one in the city of Lima (Instituto de Saluddel Niño y Adolescente) and two in provinces (Piura and Chimbote) Estimated Investment: Studies in progress Estimateddate of award: III Q 2015
SOLID WASTE MANAGEMENT IN HEALTH FACILITIES UNDER THE MINISTRY OF HEALTH IN METROPOLITAN LIMA UNDER EVALUATION Lima and Callao An unsolicited proposal that comprises the construction, operation and maintenance of a modern solid waste treatment plant (hazardous bio-contaminated/hazardous special/common) for the project s integral management. EstimatedInvestment:Pre-investmentStudiesin progress Type of concession: Co-financed Estimated date of award: 2016
TOURISM
CHOQUEQUIRAO CABLEWAY CALLED Concession for the design, financing, construction, equipment, operation and maintenance of a cableway, as an access route, from Kiuñala (Apurímac) to Choquequirao Archaeological Park, including the arriving and exit stations. Estimatedinvestment(VAT notincluded):us$ 52 million Type of concession: Co-financed Concession period: 20-25 years Cusco Estimateddate of award: I Q 2015. Apurímac
CORRECTIONAL SYSTEM
ELECTRONIC SHACKLES UNDER EVALUATION Lima and Callao An unsolicited proposal for the provision of electronic personal surveillance services to alleviate overcrowding in correctional facilities in Peru through the use of electronic shackles for tried and sentenced inmates allowed having access to this benefit. Estimated Investment: Type of concession: Under evaluation Self-sustained Estimateddate of award: II Q 2015
RE-LOCATION OF CORRECTIONAL FACILITIES TO BE CALLED Lima and Cusco Re-location of four correctional facilities that are currently in the urban areas of Metropolitan Lima and the department of Cusco. The project is intended to promote the participation of the private sector in the construction of new replacement correctional facilities in more appropriate areas, under highquality safety standards 1.Chorrillos Women s Facility(ordinary) and annex. 2. Lurigancho 3. Miguel Castro Castro. 4. Cusco and Cusco Women s Facility Estimated investment: Under evaluation Estimateddate of award:ii Q 2015
CORRECTIONAL INFRASTRUCTURE AND URBAN RENEWAL: TINKUY PLAZA PROJECT UNDER EVALUATION Lima An unsolicited proposal for the construction of a shopping center, houses, warehouses and parking lots on the current location of the San Jorge Prison (Historic center of Lima). Additionally, it includes the construction and equipping of a new correctional facility where the San Jorge inmates will be transferred. Estimated investment: Type of concession: Under evaluation Self-sustained Estimateddate of award: III Q 2015
BROADBAND INTERNET ACCESS FOR FOUR PERUVIAN REGIONS 4 3 2 1 Concession, through four independent bids, to implement broadband internet access in four Peruvian regions (Apurímac, Ayacucho, Huancavelica, Lambayeque). The project involves the implementation of a high-capacity fiber optic network and an access network(microwaves). Region Location Required fiber length Estimated investment USD million Ayacucho Central-Southern 1,900 Km 42 highlands Apurímac Southern highlands 1,400 Km 55 Huancavelica Central-Southern 1,330 km 47 highlands Lambayeque Northern coast 570 Km 19 Type of concession: self sustained Estimated award date: IV Quarter 2014
700 MHZ 4G BAND Concession of three 698 806 MHz band blocks to provide nationwide 4G broadband internet access services. The band is initially expected tobechanneled in15mhz+15mhzblocks Estimated investment: under evaluation Type of concession: Self sustained Estimateddate of award: I Q 2015
MINING
HUAYDAY AMBARA PROSPECT CALLED La Libertad Mining concession with a total surface of 2,992 ha, high exploration potential due to its coal mantles ( clean anthracite ), with an estimated reserve of 1.8 million MT. Location of the Project Estimated investment(vat not included): US$ 8million Estimateddateofaward: IVQ2014
INTEGRAL WATER-MINING-AGRICULTURE PROJECT TO ADDRESS THE CHALLENGE OF INFORMAL MINING IN PIURA CALLED Location of the ore enrichment plant Piura Informal mining area of operation The project will be conducted in two stages: 1st Stage: Design, financing, construction, operation and maintenance of an Ore Enrichment Plant in Talara, where the gold-bearing ore extracted by miners operating in the Piura region(formalized or in process of formalization) will be processed. 2nd Stage: Promotion of a project portfolio for development in agriculture and other sectors, aiming at solving the problem of water(household and agricultural use) in the influence area of formalized mining operations. Estimated investment (VAT not included): US$ 12 million Estimateddateofaward: IVQ2014
www.proinversion.gob.pe