Investor Report 1 July June 2014

Similar documents
Heathrow (SP) Limited

Heathrow (SP) Limited

BAA (SP) Limited Results for six months ended 30 June July 2011

Great Portland Estates Trading Update Strong Operational Performance

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong

Annual Results. Year ended 28 April June 2018

Analysts and Investors conference call. Q results. 15 May 2013

Letting Rail Franchises

National Rail Passenger Survey Autumn 2015 Main Report

Update on the Thameslink programme

Published by ASLEF Design & print by TU ink The train drivers union

Managing through disruption

Crown Resorts Limited

The Property Franchise Group

SAS Group Presentation Carnegie, May 22, 2012 Sture Stölen, Head of IR

Introduction Government 6

National Rail Passenger Survey Main Report Spring 2018

January 2018 Air Traffic Activity Summary

Annual Results. Year ended 30 April June 2014

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences

RAMSAY HEALTH CARE ANNUAL GENERAL MEETING 24 November 2009 CHRISTOPHER REX MANAGING DIRECTOR

Analysts Briefing. 18 March Cathay Pacific Airways Limited

Aer Lingus Group plc. Interim Management Statement

Corporate presentation CIBC Whistler Institutional Investor Conference January 21, 2010

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey Autumn 2013 Main Report

For Immediate Release: 2 December Holidaybreak plc ANNOUNCES PRELIMINARY RESULTS FOR THE YEAR ENDED 30 SEPTEMBER 2002

FirstGroup plc TransPennine Express

Business Review and Analysis

SHAPING A SUSTAINABLE FUTURE

Cathay Pacific Airways

Air Berlin PLC AGM 18 June 2014 London

National Rail Performance Report - Quarter /14

Capital Markets Day. 13 January 2012

Transport Delivery Committee

Aer Lingus Group plc. Interim Management Statement

Christopher Rex Managing Director 15 November 2011

Crown Resorts Limited

Highlights from the Annual Results December 2007

Quarterly Progress Report

THE GO-AHEAD GROUP PLC HALF YEAR RESULTS FOR THE SIX MONTHS ENDED 29 DECEMBER 2018

GATWICK AIRPORT LIMITED RESULTS FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2013

2012 RESULT PRESENTATION

Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018

CROWN ANNOUNCES 2017 FULL YEAR RESULTS

Air Berlin PLC AGM 06 June 2013 London

National Rail Passenger Survey: User Guidance Report

Network Rail 2014 Customer Survey Report

Railway performance and subsidy statistics

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel

Performance monitoring report for 2014/15

BAA s regulated airports Investor Report. Issued on 26 June 2012

RESULTS RELEASE 20 August GENTING HONG KONG GROUP ANNOUNCES FIRST HALF RESULTS FOR 2015 Highlights

Half Year F1 Results. November 4, 2015

INTERIM REPORT JANUARY-JUNE 2012 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 2012

Cathay Pacific Airways

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

Forward looking statements

Center Parcs. Investor Presentation

VERY GOOD RESULTS IN OUR MOST IMPORTANT QUARTER

ABX. Holdings, Inc. BB&T Transportation Conference. February 2008

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum

Results 2Q17. August 9, 2017

Credit Suisse. 19 th Annual AIC 8 th April Cathay Pacific Airways Limited

2007/08 Full Year Results Investor Briefing

IHG. Supplementary Information 31 December 2014

RYANAIR ANNOUNCES RECORD Q1 PROFIT INCREASE

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

Management Presentation. March 2016

Jet Airways (India) Ltd. Presentation on Annual Results FY06. May 2006

Interim Results. Half-year ended 27 October December 2018

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

CROWN ANNOUNCES 2018 HALF YEAR RESULTS

5. Economic performance

Fellow of the Royal Institution of Charted Surveyors (FRICS) since Member of the Royal Institution of Charted Surveyors (MRICS) since 1986

Criteria for an application for and grant of, or variation to, an ATOL: Financial

Cathay Pacific Airways Interim Results for the six months ended 30 June 2012

Full Year 2009 Results

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Tuesday 6 June 2017 Afternoon Time allowed: 2 hours

MACQUARIE AIRPORTS FULL YEAR & FOURTH QUARTER 2008 RESULTS FOR SYDNEY AIRPORT

JET AIRWAYS (I) LTD. Presentation on Financial Results Q July 24, 2009

The Start. Ed White, Vice President Corporate Real Estate, Alaska Airlines ACI-NA Economic and Finance Conference, April 7, 2009

Gatwick Airport Limited. Results for six months ended 30 September 2012

2006 Preliminary Results. 7 March 2007

Annual Results for the year ended 28 February 2015

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

EASYJET INTERIM MANAGEMENT STATEMENT FOR THE QUARTER ENDED 30 JUNE 2013

Annual Results Air New Zealand

National Rail Performance Report - Quarter /16 (January-March 2016)

IAG results presentation. Quarter One th May 2018

Air China Limited Annual Results. March Under IFRS

Final Dividend 7.0 cents per share, full year payout of 10.0

MEDIA RELEASE JUST GROUP ACHIEVES FIRST HALF PROFIT INCREASE OF 25.2%

ASL Marine Holdings Ltd.

M2 Group Ltd 2014 Interim Results

Crown Limited Full Year. Results Presentation. 25 August 2011

Heathrow (SP) Limited and Heathrow Finance plc Investor report. Issued on 18 December 2012

Transcription:

Investor Report 1 July 2013 30 June 2014 Angel Trains Investor Report 1 July 2011 to 30 June 2012 1

1 GENERAL OVERVIEW In the 12 months ending 30 June 2014, Angel Trains (the Group ) delivered an increase in EBITDA of 2.3m on the previous 12 month period. There were two bond placements during the period and 135.3m of debt was repaid. Standard & Poor s reaffirmed the Group s credit rating as BBB/Stable. The intense period of refranchising activity continued, with four short term extensions (as a result of the Department for Transport s ( DfT ) Single Tender Action ( STA ) process) and one new lease entered into. Between now and 2019, most of the Group s assets (85.8%) will be due for re-lease. However, a significant amount (c.41%) of the Group s capital rent is protected by Section 54 undertakings until 2019, with a proportion continuing beyond that until 2025. The percentage of assets on lease at the end of the period increased further to 99.5% of the entire fleet. The second Long Term Rolling Stock Strategy for the rail industry was published in February 2014. The report, produced by a cross-industry group comprising Angel Trains and the other ROSCOs, the Association of Train Operating Companies ( ATOC ) and Network Rail, underlines previous scenarios for the future size and makeup of the national rolling stock fleet. It estimates that based on future passenger demand, an increase in the size of the national fleet of between 53% and 99% will be required over the next 30 years. Between 13,000 and 19,000 new electric vehicles will be required over this period, with an average of between eight and 12 needing to be delivered every week. This contrasts with an average of just four per week in the five years to April 2014. For Angel Trains, this strategy provides confidence in the underlying demand for rolling stock and the long term sustainability of the ROSCO market. 2 SIGNIFICANT BUSINESS DEVELOPMENTS 2.1 New significant business developments for the 12 months ending 30 June 2014 New Trains All 40 of the new Siemens Class 350/4 vehicles for First TransPennine Express ( FTPE ) (part of the contract signed in February 2012 with a capital value of 133m), were delivered on schedule between December 2013 and March 2014 and successfully entered passenger service with FTPE following driver training. The commencement of this lease with FTPE means Angel Trains now has vehicles on lease with all the franchised operators in the UK, as well as with two open access operators - a unique position amongst the ROSCOs. The first of the 40 Class 350/3 vehicles for London Midland being built under the same contract were delivered in April 2014, with the remainder due for delivery by the end of August 2014. Refurbishment Projects The off-lease Class 317/7 unit that was refurbished and re-tractioned under the contract with Bombardier Transportation was launched on 28 November 2013. This unit subsequently entered passenger service with Abellio Greater Anglia, where it will operate for a trial period 2

of at least 6 months in order to gauge passenger feedback and to complete the final requirements of the contract. It is anticipated that the success of the trial will significantly increase the re-leasing prospects for this fleet and there has already been interest from a number of operators who attended the launch event in November 2013. This project demonstrates the Group s proactive approach to asset reliability and future remarketing and a similar approach will be considered for other fleets if deemed appropriate. 2.2 Re-leasing activity and current fleet utilization As at 30 June 2014 Angel Trains owned 4,593 rolling stock vehicles, with a fleet utilisation of 99.5%. The following leases were extended during the period, on existing or improved terms, as the result of short-term franchise awards/extensions; A total of 630 vehicles (Class 150, 153, 165, 166, 180 and HSTs) with First Great Western, extended with the franchise for 23 months until September 2015 A total of 428 vehicles (Class 142, 150, 153, 156, 158 and 333) with Northern Rail, extended with the franchise until February 2016 Eight Class 317 vehicles with First Capital Connect, extended with the franchise until September 2014 28 Class 350 vehicles with London & Birmingham Railway, extended with the franchise until September 2015 574 Class 390 Pendolino vehicles with Virgin West Coast Trains, extended with the franchise until April 2017 The following leases were extended or entered into during the period outside of the refranchising process; 177 Class 507 and 508 vehicles with Merseyrail extended until 31 December 2018 12 Class 317 vehicles with Abellio Greater Anglia on a short term basis until 20 July 2014 prior to commencement of STA New build assets delivered during the 12 months ending 30 June 2014 were as follows; 40 Class 350/4 vehicles on lease to FTPE 28 Class 350/3 vehicles on lease to London Midland During the period, 11 Class 508 vehicles that were beyond the end of their useful economic life and were in poor condition, having been off-lease for some time, were disposed of. 3

The following table summarises the Angel Trains fleet by lease counterparty at 30 June 2014: Fleet by Lease Counterparties FRANCHISE OWNER TOC TOTAL VEHICLES LEASE END DATE VEHICLES LEASED FRANCHISE (F) / OPEN ACCESS (OA) Arriva plc 1 4.81% Arriva Trains Wales/Trenau Arriva Cymru Ltd 153 Oct-18 3.33% F Grand Central Railway Company Limited 49 Dec-16 1.07% OA XC Trains Limited 19 Mar-16 0.41% F Directly Operated Railways 2.59% East Coast Mainline Company Limited 119 Dec-18 2.59% F DB Schenker 1 8.23% Chiltern Railway Co. 97 Dec-21 2.11% F DB Schenker Rail (UK) 281 Oct-15 6.12% N/A First / Keolis 0.87% First / Keolis Transpeninne Express 40 Mar-15 0.87% F First Group plc 18.86% First Capital Connect Limited 56 Sep-14 1.22% F Hull Trains Company Limited 20 Dec-16 0.44% OA First Greater Western Limited 630 Sept-15 13.72% F First ScotRail Limited 160 Nov-14 3.48% F Govia (Go-Ahead plc 65% / Keolis 35%) 12.19% London & Birmingham Railway Limited 154 Sept-15 3.35% F London & South Eastern Limited 286 Oct-14 6.23% F Southern Railway Limited 120 Jul-15 2.61% F MTR / DB Schenker 1 0.35% London Overground Rail Operations 16 Nov-14 0.35% F National Express Group 2.44% C2C Rail Limited 112 Sept-14 2.44% F Serco / Abellio 19.70% Northern Rail Limited 428 Feb-16 9.32% F Merseyside Passenger Transport Services Ltd 177 Dec-18 3.85% F Abellio Greater Anglia Ltd 300 Jul-14 6.53% F Stagecoach Group 16.96% East Midlands Trains Limited 46 Mar-15 1.00% F Stagecoach South Western Trains Ltd 733 Feb-17 15.96% F Virgin Rail Group (Virgin 51% / Stagecoach 49%) 12.50% Virgin West Coast Trains 574 Nov-14 12.50% F Off lease 0.50% Off Lease 23 0.50% Grand Total 4,593 100.00% 2.3 Significant Board/Management changes for the year ending 30 June 2014 It was with great sadness that Angel Trains had to report the death of its Chairman, Sir David Rowlands, in May 2014 following a relatively short battle with cancer. Sir David became non-executive Chairman of Angel Trains Group Limited in January 2010 and only last year his appointment was extended for a further three years until December 2015. 1 Subsidiaries of Deutsche Bahn AG 4

The Group has now begun the search for a successor to Sir David. In the meantime, Christopher Cornforth, non-executive director and chair of the Audit & Risk Committee, has been appointed as acting Chairman with the full support of the Group s shareholders. 3 REGULATORY / GOVERNMENTAL DEVELOPMENTS 3.1 Significant announcements/publications by any regulator or relevant government department for the 12 months ending 30 June 2014 An updated refranchising programme was published by the DfT on 8 April 2014. This timetable includes a series of franchise extensions and/or directly awarded franchises (i.e. without a competitive tendering process) with existing operators until new long term arrangements can be put in place, further prolonging the commencement of the long term franchise in some cases. The table below summarises these extensions and direct awards: Franchise Original Franchise Expiry Date New Expiry Date Duration of shortterm arrangement Essex Thameside May 2013 September 2014 16 months East Coast February 2015 February 2015 N/A Northern April 2014 February 2016 22 months TransPennine Express April 2015 February 2016 10 months Great Western October 2013 Sept 2015 or 2020 33 or 83 months (TBC) Greater Anglia July 2014 October 2016 27 months West Coast November 2014 April 2017 29 months London Midland September 2015 June 2017 21 months East Midlands April 2015 October 2017 30 months South Eastern April 2014 June 2018 50 months South Western February 2017 April 2019 26 months Cross Country April 2016 October 2019 42 months The impact of the above announcements on Angel Trains is broadly beneficial, particularly for the DMU portfolio, which now has later lease expiry dates than previously envisaged. The terms of most of the new long term franchises are yet to be announced and will be determined by the circumstances and size of each franchise. However, it is expected that the majority will have an initial term of seven to ten years, with a pre-contracted continuation term of between three and five years, subject to agreed criteria being met by the operator. 4 CAPITAL EXPENDITURE 4.1 Material matters of capital expenditure including future commitments made during the relevant period During the period the Group made capital expenditure payments of 75.9m, all of which were funded using internal cash resources: Stage payments of 63.3m were made for the 80 new Class 350 vehicles. 5

The remaining 12.6m relates to several enhancement and refurbishment projects including: pre-series trial re-traction and interior refurbishment of 1 vehicle, as well as the Return to Service modifications for 23 Class 317/7 vehicles which are currently off lease; Continuous Service Operation ( CSO ) modifications for Class 507/508 vehicles with Merseyrail. The Group had total capital commitments of 98.6m as at 30 June 2014: 21.9m represents the remaining payments for the new Class 350 Desiro vehicles for London Midland, to be fully delivered by September 2014. The remaining 76.7m relates to various enhancement and refurbishment projects, including: PRM (Persons of Reduced Mobility)/CSO modifications for First Great Western, Northern, London Midland and Chiltern; and Merseyrail CSO spend in accordance with the lease extension to 2018. 5 FINANCING 5.1 New bond issues In August 2013, The Great Rolling Stock Company PLC (the Issuer ) successfully priced a 60m private placement through its EMTN (Euro Medium Term Note) programme. The placement was priced at +180bp on a floating rate basis, with a final maturity in 2023. The proceeds from this private placement were used to retrospectively fund the London Midland/FTPE Desiro transaction signed in February 2012. Further to this in November 2013, the Issuer successfully announced and priced a 60m tap of its existing 2031 amortising bond. This issue was priced at a spread of gilts +145bp which represented the lowest ROSCO bond pricing in the market to date. 60m of senior bank debt, with a maturity in 2016, was repaid with the proceeds to further increase the Group s debt maturity profile. 5.2 Total debt outstanding at 30 June 2014 Total Debt Outstanding Debt Facility Group Entity Balance Outstanding* Issue/Facility Limit Maturity Date Facility A The Great Rolling Stock Company PLC 217,500,000 217,500,000 Apr-16 Facility B The Great Rolling Stock Company PLC 370,000,000 370,000,000 Apr-18 Facility C The Great Rolling Stock Company PLC 19,000,000 138,750,000 Apr-16 EDC Loan Locomotive Operating Leasing Partnership 13,194,073 13,194,073 Oct-15 Junior Debt Willow Holdco 1 Limited 150,000,000 150,000,000 Jun-16 10-yr Bullet Bond The Great Rolling Stock Company PLC 300,000,000 300,000,000 Jul-20 25-yr Amortising Bond The Great Rolling Stock Company PLC 480,200,000 480,200,000 Jul-35 20-yr Amortising Bond The Great Rolling Stock Company PLC 455,400,000 455,400,000 Apr-31 Floating Rate Note The Great Rolling Stock Company PLC 60,000,000 60,000,000 Aug-23 Grand Total 2,065,294,073 2,185,044,073 * Gross of capitalised fees 6

5.3 Debt structure: June 2013 v June 2014 Debt Strucutre 2,500 2,000 2023 Floating Rate Note 2035 6.875% Amortising Bond Total Debt m 1,500 1,000 2031 6.500% Amortising Bond 2020 6.250% Bullet Bond EDC Loan Junior Debt 500 Facility C Facility B 0 June 2013 2,112m June 2014 2,065m Facility A 6 HISTORICAL FINANCIAL PERFORMANCE AND RATIOS 6.1 Update on financial performance for the period including ratios EBITDA for the period, the Group s key measure, was 373.2m. This was above the budget target by 0.4m and was a 0.6% increase on the previous 12 months results. Turnover for the period was 461.3m (2013: 474.4m) and Profit Before Tax was 58.2m (2013: 77.1m). Staff and overhead costs continued to be tightly managed and were 0.1m below budget at 21.6m (2013: 20.1m). The Group s total debt at 30 June 2014 was 2,065m, compared to 2,112m at 30 June 2013. The net debt reduction of 47m comprised 76m of contractual bond and bank repayments and a 19m drawdown of the Revolving Credit Facility. The Revolving Credit Facility balance was 19m at 30 June 2014 thereby providing committed liquidity of 119.8m. Furthermore the movement in net debt mentioned above included 120m of new debt issued through the EMTN programme as detailed in section 5.1, whilst 60m of senior bank debt and 50m of junior bank debt were repaid, both of which had a final maturity in 2016. All senior floating rate debt and foreign exchange exposures were hedged and no speculative derivatives were executed. The Senior Interest Cover ratio for the 12 months ending 30 June 2014 was 2.2, compared to the financial covenant requirement of at least 1.5:1. The Leverage ratio for the 12 months ending 30 June 2014 was 5.1, compared to the financial covenant requirement of no greater than 8.5:1. 7

6.2 Credit ratings Standard & Poor s ( S&P ) issued a summary credit report on Willow Bidco Limited, the Group s holding company for senior debt purposes, on 31 March 2014. The report again affirmed the Group s credit rating as BBB/Stable and made reference to the excellent business risk profile and predictable long-term contractual cash flows. S&P also commented that the Group benefits from strong and stable profitability that comes from long-term leasing agreements. 7 OTHER MATTERS 7.1 Other financial and business matters The Group undertook its annual employee survey in September 2013, returning another fantastic response rate of 95.3% (2012: 97.3%). The results themselves were again favourable, with an overall engagement rating of 86.1% (2012: 81.3%) compared to the national benchmark of 62.7% (2012: 63%), and an overall satisfaction rate of 7.9 out of 10 (2012: 7.7) (UK benchmark 6.2). In April 2014 Angel Trains signed a 10 year lease for new office premises in Victoria, London, a short walk from the current head office. This move, anticipated to take place in October 2014, has been brought about by the decision of the current landlord to redevelop Portland House into residential accommodation in the near future. Angel Trains, 22 August 2014 8

The Great Rolling Stock Company PLC Portland House Bressenden Place London SW1E 5BH United Kingdom +44 (0)20 7592 0500 www.angeltrains.co.uk communications@angeltrains.co.uk