ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

Similar documents
Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

State Route 8 Corridor. Northern Summit County s Path to Success

2 Construction Program

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Guide to. Road Construction Projects

01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd,

142 Collaborative Actions by County June 28, 2011

November 21, 2012 Barbara Kelleher, (954)

FDOT Treasure Coast Traffic Report through

Ohio Department of Transportation Construction Update

Table 2 HIGH CRASH INTERSECTIONS BY COMMUNITY RANKED BY COMPOSITE SCORE Approach Local Overall Ave. Daily Total Crash Severity Composite

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

Palm Beach County Traffic Report July 13 through July 20, 2012

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Most people notice when ODOT builds something

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

October 31, 2014 Chuck McGinness, (954)

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

FDOT Treasure Coast Traffic Impact Report

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

PennDOT Interstate Work next week March 30-April 3:

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

OHIO TURNPIKE TOLL PLAZA ADVERTISING

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Townships Eligible to Apply for Township Sign Grant 2018

FDOT Treasure Coast Traffic Impact Report

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

OHIO TURNPIKE SERVICE PLAZA ADVERTISING

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

A THRIVING COMMUNITY

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, CSA St. Vincent Charity Hospital

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Springettsbury Township. Road Improvement Projects

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Projected Advertisement Date

Palm Beach County Traffic Report August 24 through August 31, 2012

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

OHIO TURNPIKE ATTRACTIONS LOGO PROGRAM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

Road Construction Ahead January-April 2015 NORTHWEST REGION

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC CRASHES

Delaware County Engineer

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, 2013

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

Route 29 Solutions Projects

Weekly East Tennessee Construction Report for May 31-June 6, 2018

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

OHIO TURNPIKE LODGING LOGO PROGRAM

Northeast Corridor Transportation Update

Long water shutdown scheduled for Tuesday, September 18

State Project Reconstruction I-84

FORM G-37. Name of Regulated Entity: Sudsina & Associates, LLC. Report Period: Second Quarter of 2017

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Constructor: Joseph B. Fay

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Public Information Center August 12, 2010

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

El Dorado County / Tahoe Roadwork Schedule

PID Number. Letting Date. Federal State BRIDGE REPAIR 7/9/2008. Federal State Letting Date. PID Number

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

ALAN BRUBAKER P.E., P.S.

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal

Florida Department of Transportation MIKE DEW SECRETARY

City of Grand Island Tuesday, December 12, 2017 Council Session

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

NATURAL LAKES IN OHIO

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Transcription:

ODOT DISTRICT 4 2017 CONSTRUCTION PROGRAM SERVING ASHTABULA, MAHONING, PORTAGE, STARK, SUMMIT AND TRUMBULL COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

Download the New OHGO App Today Visit our Do the Detour website OVERVIEW 2

Construction Outreach at ODOT District 4 During the 2016 Construction Season the District 4 Public Information Office continued its expanded outreach to inform motorists, residents and businesses of any construction projects causing significant maintenance of traffic issues. One of the key components to this outreach is the use of Closure Notification Brochures on high impact projects around the district. These brochures identify construction projects that have large maintenance of traffic impacts in areas that may affect businesses. The Closure Notification Brochures explain the construction project, the maintenance of traffic, the amount of time motorists and businesses will be impacted and include detailed detour maps for the area. If a project is deemed to have a Closure Notification Brochure created, these documents are handed out to local officials, residents and businesses. A representative from the District 4 Public Information Office will typically be joined by a construction project engineer and will distribute the brochures door to door within or near the construction project. Projects marked with a red asterisk (*) in this book are projects that the Public Information Office will include Closure Notification Brochures during the 2017 construction season. OVERVIEW 3

2017 Construction Program Total Costs: $578.9 million - Construction Costs: $516.9 million Thank you for your interest in Ohio Department of Transportation - District 4 s 2017 Construction Program. This publication is intended to provide a general overview of projects that currently are under construction and those scheduled to be awarded or begin construction in 2017. The 2017 Construction Program is divided into six sections, one representing each county in District 4. Award dates, expected completion dates, project descriptions, project locations, cost and maintenance of traffic are listed. Total costs include preliminary engineering, right-of-way and construction. County maps have also been included for your reference. Please keep this book on hand throughout the upcoming construction season. Information regarding construction projects is continually changing; therefore, if you have any questions or require additional information, please do not hesitate to contact us or visit the District 4 website at www.transportation.ohio.gov/dist4 for updates. District 4 utilizes Facebook and Twitter! Please like us on our Ohio Department of Transportation Akron / Canton District 4 page and follow us on Twitter at ODOT_Akron. District 4 Public Information Office 330-786-2208 Printed: July 2017 Front cover photo: US 62 bridge rehabilitation the city of Youngstown, Mahoning County. OVERVIEW 4

Ashtabula County Construction Costs: Active: $15.3 million Upcoming: $1.8 million Total: $17.1 million ASHTABULA COUNTY 5

Ashtabula County Active Projects US Route 6 Rome, New Lyme, Cherry Valley & Andover Townships PID: 96543 PROJECT: 16-612 CONSTRUCTION COST: $3.4 million TOTAL COST: $3.5 million START DATE: May 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Resurfacing of US 6 from just west of SR 45 to Stanhope Kellogsville Rd. Project includes a bridge re-deck on US 6 just east of Dodge Rd. and other miscellaneous bridge repairs. maintained with flaggers during paving. US 6 will be closed for 75 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. US Route 6 & State Routes 7 & 167 Pierpont & Richmond Townships PID: 88877 PROJECT: 17-120 CONSTRUCTION COST: $2.3 million TOTAL COST: $2.3 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of US 6 within the Village of Andover and between N. Richmond Rd. to the Pennsylvania State line, the resurfacing of the SR 7/SR 167 overlap and the resurfacing of SR 167 from Stanhope- Kellogsville Rd. to SR 7 and from SR 7 to the Pennsylvania State line. The project also includes minor bridge repairs. maintained with flaggers. SR 167 between Stanhope-Kellogsville Rd. and Lewis Rd. will be closed for four days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. US Routes 6 & 322 * Hartsgrove, Orwell & Windsor Townships; Village of Orwell PID: 88884 PROJECT: 17-231 CONSTRUCTION COST: $2.6 million TOTAL COST: $2.6 million START DATE: May 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Resurfacing of US 6 between the Geauga County line to Hyde Rd. and the resurfacing of US 322 between the Geauga County line and Staley Rd. Project also includes a concrete bridge deck overlay and replacement of the approach slabs on the US 322 bridge between Parker Rd. and Fortney Rd. The project also includes the installation of a decorative sidewalk at the US 322 and SR 45 intersection in the village of Orwell. maintained by flaggers. US 322 will be closed for 14 days. The intersection of US 322 and SR 45 will be closed for four days (one day per leg of the intersection). All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 7 & 166 Williamsfield, Pierpont, Monroe & Trumbull Townships PID: 100237 PROJECT: 17-151 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 AWARD DATE: March 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Chip seal on SR 7 between the Trumbull County line to US 322 and between SR 167 to Hammond Corners Rd. and on SR 166 between the Geauga County line to SR 534. This project also includes chip sealing on various routes in Portage and Trumbull Counties. maintained by flaggers. ASHTABULA COUNTY 6

Ashtabula County Active Projects Continued State Routes 45 & 531 Morgan, Austinburg, Saybrook & Geneva Townships PID: 100294 PROJECT: 16-561 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Microsurfacing of SR 45 between Schweitzer Rd. to just south of I-90 and between SR 84 to just south of the CSX Railroad and on SR 531 between the eastern Geneva-on-the-Lake Corporation limit and the western Ashtabula Corporation limit. maintained with flaggers. State Routes 46 & 307 Harpersfield, Jefferson & Plymouth Townships PID: 88879 PROJECT: 17-007 CONSTRUCTION COST: $800,000 TOTAL COST: $800,000 START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 307 from the Lake County line to SR 534. The project also includes miscellaneous bridge repairs on SR 46 just south of Clay St., just north of Griggs Rd. and at SR 11. State Route 84 Harpersfield, Geneva, Saybrook & Ashtabula Townships PID: 100318 PROJECT: 16-524 CONSTRUCTION COST: $1.4 million TOTAL COST: $1.4 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 84 between the Lake County line and the western Geneva Corporation limit and the eastern Geneva Corporation limit and the western Ashtabula Corporation limit. maintained with flaggers. Interstate 90/State Route 11 Plymouth Township PID: 95472 PROJECT: 16-262 CONSTRUCTION COST: $1.1 million TOTAL COST: $1.1 million START DATE: July 2016 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: The installation of tower lighting at the I-90/SR 11 interchange. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction on I-90 throughout construction. maintained with flaggers. ASHTABULA COUNTY 7

Ashtabula County Active Projects Continued State Route 193 Cherry Valley & Wayne Townships PID: 88881 PROJECT: 17-230 CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million START DATE: May 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Resurfacing of SR 193 between US 322 and US 6. The project also includes the replacement of a bridge on SR 193 between Linton Rd. and Windsor Rd. and other minor bridge repairs. maintained with flaggers. SR 193 will be closed for 21 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 534 Harpersfield Township PID: 99622 PROJECT: 17-346 CONSTRUCTION COST: $600,000 TOTAL COST: $600,000 START DATE: July 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Widening of SR 534 to include a southbound left turn lane at Clay St. Project also includes the resurfacing of SR 534 from just north of I- 90 to the southern Geneva Corporation limit. Ashtabula County Upcoming Projects US Route 20 Geneva Township PID: 100951 ESTIMATED CONSTRUCTION COST: $400,000 ESTIMATED TOTAL COST: $400,000 AWARD DATE: December 2017 COMPLETION DATE: October 2018 PROJECT DESCRIPTION: Resurfacing of US 20 from the Lake County line to the western Geneva Corporation limit. maintained with flaggers. State Routes 46 & 307 Colebrook, Lenox & New Lyme Townships PID: 98385 ESTIMATED CONSTRUCTION COST: $1.4 million ESTIMATED TOTAL COST: $1.4 million AWARD DATE: July 2017 COMPLETION DATE: June 2018 PROJECT DESCRIPTION: Chip sealing of SR 46 between the Trumbull County line to Holcomb Rd. and on SR 307 just east and west of SR 11. Project also includes chip sealing SR 46 in Trumbull County. maintained by flaggers. MAINTENANCE OF TRAFFIC: SR 534 at Clay St. will be closed for 30 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. ASHTABULA COUNTY 8

Mahoning County Construction Costs: Active: $110.8 million Upcoming: $21.9 million Total: $132.7 million MAHONING COUNTY 9

Mahoning County Active Projects State Route 11 Canfield & Austintown Townships PID: 83042 PROJECT: 17-364 CONSTRUCTION COST: $3.7 million TOTAL COST: $3.7 million START DATE: July 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Resurfacing of SR 11 from just south of US 224 to I- 80. Project also includes minor bridge repairs. maintained in each direction during non-peak travel times. Various ramp closures at the US 224 and SR 11 interchange for three nights. SR 11 southbound at the I-80 interchange will close for one night. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 14 Smith, Goshen & Green Townships PID: 100298 PROJECT: 16-623 CONSTRUCTION COST: $1.5 million TOTAL COST: $1.5 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Microsurfacing of SR 14 from the Portage County line to the Columbiana County line. Project also includes microsurfacing on various routes in Portage County. State Route 46 Beaver, Green & Canfield Townships PID: 88888 PROJECT: 16-603 CONSTRUCTION COST: $2.4 million TOTAL COST: $2.5 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 46 between the Columbiana County line and the southern Canfield Corporation limit. Project also includes two bridge replacements one on SR 46 between Calla Rd. and W. Reserve Rd. and one on SR 46 just north of Western Reserve Rd. MAINTENANCE OF TRAFFIC: SR 46 will be closed for 21 days for each structure. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. US Route 62 City of Canfield; Canfield Township PID: 96554 PROJECT: 17-028 CONSTRUCTION COST: $1.3 million TOTAL COST: $1.5 million START DATE: April 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Rehabilitation and widening of US 62 from Dartmouth Dr. to Sleepy Hollow Dr. Project includes resurfacing from Sleepy Hollow Dr. to the north Canfield Corporation limit. maintained by flaggers. maintained with flaggers. MAHONING COUNTY 10

Mahoning County Active Projects Continued Interstate 76 & 80 Milton & Jackson Townships PID: 81637 PROJECT: 16-498 CONSTRUCTION COST: $4.9 million TOTAL COST: $4.9 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of I-76 between the Portage County line and Bailey Rd. Project also includes miscellaneous bridge repairs on I-76 and I-80. maintained in each direction of I-76 during non-peak hours. Northeast River Rd. will be closed for one weekend for a concrete bridge overlay. A detour will be posted. Access to all businesses and residences will be maintained at all times throughout construction. Interstate 76 Milton Township PID: 100004 PROJECT: 17-113 CONSTRUCTION COST: $2 million TOTAL COST: $2 million START DATE: May 2017 COMPLETION DATE: Dec. 2017 Interstate 80 * Austintown, Weathersfield & Liberty Townships; City of Girard PID: 77260 PROJECT: 15-126 CONSTRUCTION COST: $91.2 million TOTAL COST: $102.2 million START DATE: June 2015 COMPLETION DATE: Sept. 2018 PROJECT DESCRIPTION: Pavement replacement and widening on I-80 from four to six lanes between SR 46 and SR 193/Belmont Ave. in Trumbull County. The project also includes the widening and replacement of six bridges on I-80. Work completed in 2016 included the widening of the interior lanes of I-80 eastbound between SR 46 and US 422 and the replacement of the eastbound bridges just west of US 422. Work to be completed in 2017 includes the completion of the widening on I-80 eastbound and the start of the widening of I-80 westbound, including the replacement of the westbound bridges just west of US 422. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction of I-80 during peak travel times via crossovers or contra-flow traffic patterns. Various ramp closures will occur throughout construction. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. PROJECT DESCRIPTION: Diamond grinding the I-76 bridge over Lake Milton. Project also includes bridge sealing throughout district. MAINTENANCE OF TRAFFIC: Various one night ramp closures at different locations during bridge sealing. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. MAHONING COUNTY 11

Mahoning County Active Projects Continued Interstate 80 Austintown & Jackson Townships PID: 104169 PROJECT: 17-326 CONSTRUCTION COST: $700,000 TOTAL COST: $800,000 START DATE: June 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Concrete pavement repairs on I-80 between the Ohio Turnpike and SR 46. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction on I-80 during peak traffic hours and a minimum of one lane of traffic will be maintained in each direction on I-80 during non-peak travel times. State Route 534 Berlin & Goshen Townships PID: 100321 PROJECT: 16-514 CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 534 from just south of Calla Rd. to US 224. Project also includes asphalt overlays on SR 88 and SR 303 in Portage County. maintained with flaggers. State Routes 165 & 534 Goshen & Smith Townships PID: 100239 PROJECT: 17-194 CONSTRUCTION COST: $800,000 TOTAL COST: $800,000 START DATE: May 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Chip sealing of SR 165 from the northern Beloit Corporation limit to SR 14 and on SR 534 from the Columbiana County line to just north of W. Middletown Rd. Project also includes catch basin replacements along SR 534. maintained by flaggers. MAHONING COUNTY 12

Mahoning County Upcoming Projects 12 th Street Village of Sebring PID: 101773 ESTIMATED CONSTRUCTION COST: $600,000 ESTIMATED TOTAL COST: $700,000 AWARD DATE: July 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Resurfacing of 12 th St. from the Columbiana County line to just north of W. Pine Lake Rd. Project also includes pavement repairs, replacing curbs and installing new ADA curbs. maintained with flaggers. State Routes 46, 165, 170, 534 & 625 Canfield, Austintown, Boardman, Springfield, Milton, Goshen, Green & Beaver Townships PID: 101043 ESTIMATED CONSTRUCTION COST: $1.4 million ESTIMATED TOTAL COST: $1.4 million AWARD DATE: December 2017 COMPLETION DATE: August 2018 PROJECT DESCRIPTION: Microssurfacing of SR 46 between US 62 to just south of Kirk Rd., SR 165 between SR 14 and SR 46, SR 170 between the Columbiana County line to SR 617, SR 534 between Mahoning Ave. and the Trumbull County line and on SR 625 from just north of US 224 to just south of the southern Youngstown Corporation limit. State Route 11 Austintown Townships PID: 103014 ESTIMATED CONSTRUCTION COST: $1.4 million ESTIMATED TOTAL COST: $1.5 million AWARD DATE: October 2017 COMPLETION DATE: Dec. 2018 PROJECT DESCRIPTION: Redecking the Oakcrest Dr. bridge over SR 11. maintained in each direction on SR 11. Oakcrest Dr. over SR 11 will be closed for 75 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 164 & 165 Beaver Township PID: 102419 ESTIMATED CONSTRUCTION COST: $1.8 million ESTIMATED TOTAL COST: $1.8 million AWARD DATE: November 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Resurfacing of SR 164 between SR 165 and SR 626 and from just north of SR 626 to I-680 and the resurfacing of SR 165 between SR 46 to SR 626. maintained with flaggers. maintained with flaggers on each route. MAHONING COUNTY 13

Mahoning County Upcoming Projects Continued US Route 224 & State Route 446 Canfield & Ellsworth Township; City of Canfield PID: 100952 ESTIMATED CONSTRUCTION COST: $1.8 million ESTIMATED TOTAL COST: $1.8 million AWARD DATE: December 2017 COMPLETION DATE: Oct. 2018 PROJECT DESCRIPTION: Resurfacing of US 224 between SR 45 and SR 446 and on SR 446 between US 224 and SR 46. maintained with flaggers. Interstate 680 City of Youngstown; Boardman Township PID: 87273 ESTIMATED CONSTRUCTION COST: $1.5 million ESTIMATED TOTAL COST: $1.6 million AWARD DATE: October 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Spot paving repairs on I-680 between South Ave. and US 224. Project also includes minor bridge repairs. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction during peak traffic hours and a minimum of one lane of traffic will be maintained in each direction during non-peak travel times. State Route 616 City of Campbell PID: 102420 ESTIMATED CONSTRUCTION COST: $600,000 ESTIMATED TOTAL COST: $600,000 AWARD DATE: October 2017 COMPLETION DATE:July 2018 PROJECT DESCRIPTION: Resurfacing of SR 616 from just south of Cooper Rd. to the Trumbull County line. maintained by flaggers. MAHONING COUNTY 14

Mahoning County Upcoming Projects Continued Interstate 680 & State Route 164 * Beaver Township PID: 80192 ESTIMATED CONSTRUCTION COST: $12.8 million ESTIMATED TOTAL COST: $15.9 million AWARD DATE: December 2017 COMPLETION DATE: Oct. 2019 PROJECT DESCRIPTION: Construct new interchange at I-680 and SR 164. Project also includes addition of a southbound lane on SR 164 between I-680 and SR 626, the addition of a southbound left turn lane on SR 164 at the SR 626 southbound junction, conversion of the SR 626 north junction to a multilane roundabout and the widening and replacement of the SR 164 bridge over I-76/Ohio Turnpike. maintained in each direction on I-680. A minimum of one lane of traffic will be maintained by flaggers on SR 164. SR 164 just east of Middletown Rd. will be closed for one weekend. SR 626 will be closed at SR 164 for 60 days. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. MAHONING COUNTY 15

Portage County Construction Costs Active: $17.1 million Upcoming: $5.4 million Total: $22.5 million PORTAGE COUNTY 16

Portage County Active Projects Frost Rd. * City of Streetsboro PID: 92561 PROJECT: 17-066 CONSTRUCTION COST: $5.5 million TOTAL COST: $7.4 million START DATE: April 2017 COMPLETION DATE: Sept. 2018 PROJECT DESCRIPTION: Turn lane addition on Frost Rd. between Ellsworth Rd. to Phillips Parkway and the widening of Frost Rd. between Sunny Lane and SR 43.Widenng of the Frost Rd. bridge over I-480. Project also includes drainage improvements, new sidewalks and signal upgrades. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 14 & 225 Deerfield Township PID: 97482 PROJECT: 17-265 CONSTRUCTION COST: $400,000 TOTAL COST: $800,000 START DATE: May 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Replace culverts on various routes in Portage County including one on SR 14 just south of US 224 and two on SR 225 between Mottown Rd. and Yale Rd. State Route 43 Brimfield & Suffield Townships PID: 88893 PROJECT: 17-216 CONSTRUCTION COST: $2.1 million TOTAL COST: $2.1 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 43 from the Stark County line to just south of Tallmadge Rd. and resurfacing of SR 43 from I-76 to Brimfield Dr. This project also includes minor bridge repairs. maintained by flaggers. All work on SR 43 near I-76 will be performed during non-peak travel times. State Routes 44, 82 & 225 Deerfield & Mantua Townships PID: 100298 PROJECT: 16-623 CONSTRUCTION COST: $1.5 million TOTAL COST: $1.5 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Microsurfacing of SR 44 between SR 82 and the Geauga County line, SR 82 between the eastern Aurora Corporation limit and SR 44 and on SR 225 between the Stark County line and US 224. Project also includes microsurfacing on various routes in Mahoning County. maintained with flaggers. MAINTENANCE OF TRAFFIC: SR 225 will be closed for 28 days. SR 14 will be closed for 5 days. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. PORTAGE COUNTY 17

Portage County Active Projects Continued State Route 44 City of Ravenna; Ravenna Township PID: 100742 PROJECT: 17-181 CONSTRUCTION COST: $500,000 TOTAL COST: $900,000 START DATE: May 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Construct northbound left turn lane on SR 44 at Enterprise Parkway intersection. Signal upgrades at SR 14/SR 44 intersection. maintained in each direction. State Routes 88 & 303 Village of Garrettsville; Garrettsville, Freedom & Windham Townships PID: 100321 PROJECT: 16-514 CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 88 between the southern Garrettsville Corporation limit and SR 82 and the northern Garrettsville Corporation limit to SR 305. Project also includes an asphalt overlay on SR 303 between SR 88 and the western Windham Corporation limit. State Route 88 Nelson Township PID: 100237 PROJECT: 17-151 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Chip seal on SR 88 between SR 305 and the Geauga County line. This project also includes chip sealing on various routes in Ashtabula and Trumbull Counties. maintained by flaggers. State Route 225 Paris & Palmyra Township PID: 100239 PROJECT: 17-194 CONSTRUCTION COST: $800,000 TOTAL COST: $800,000 START DATE: May 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Chip sealing of SR 225 between I-76 and SR 5. Project also includes chip sealing of various routes in Mahoning County. maintained by flaggers. maintained with flaggers. PORTAGE COUNTY 18

Portage County Active Projects Continued State Route 261 City of Kent PID: 88955 PROJECT: 16-486 CONSTRUCTION COST: $1.8 million TOTAL COST: $1.8 million START DATE: October 2016 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Bridge deck overlays and the painting of two structures on SR 261 just east of Mogadore Rd. over Plum Creek and the Wheeling & Lake Erie Railroad. MAINTENANCE OF TRAFFIC: SR 261 will be closed for seven days in each direction. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. US Route 422 Nelson Township PID: 81639 PROJECT: 17-102 CONSTRUCTION COST: $700,000 TOTAL COST: $700,000 START DATE: May 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Resurfacing of US 422 between the Geauga County line and the Trumbull County line. Project also includes the replacement of four culverts on US 422. maintained by flaggers. US 422 will be closed for 28 days in each direction. These closures will not occur at the same time. All detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 303 Shalersville Township PID: 88895 PROJECT: 17-143 CONSTRUCTION COST: $1.6 million TOTAL COST: $2.1 million START DATE: May 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Resurfacing of SR 303 from the eastern Streetsboro Corporation limit to SR 44. The project also includes two bridge replacements, one on SR 303 just west of Diagonal Rd. and one on SR 303 just east of Infirmary Rd. maintained by flaggers. SR 303 will be closed for 60 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. PORTAGE COUNTY 19

Portage County Upcoming Projects North Main St. (Turnpike Mitigation) Village of Windham PID: 101908 ESTIMATED CONSTRUCTION COST: $300,000 ESTIMATED TOTAL COST: $400,000 AWARD DATE: August 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Drainage improvements to North Main St. under I-80/Ohio Turnpike. MAINTENANCE OF TRAFFIC: North Main St. will be closed for a 30 day period. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 14 & 59 Franklin & Ravenna Townships PID: 102395 ESTIMATED CONSTRUCTION COST: $1.6 million ESTIMATED TOTAL COST: $1.6 million AWARD DATE: October 2017 COMPLETION DATE: August 2018 PROJECT DESCRIPTION: Resurfacing of SR 14 from the southern Streetsboro Corporation limit to SR 44 and on SR 59 from the eastern Kent Corporation limit to just west of Brady Lake Rd. maintained by flaggers. Interstate 76 & State Routes 14 & 183 Deerfield, Atwater, Edinburg & Palmyra Townships PID: 102350 ESTIMATED CONSTRUCTION COST: $1.8 million ESTIMATED TOTAL COST: $1.8 million AWARD DATE: October 2017 COMPLETION DATE: August 2018 PROJECT DESCRIPTION: Microsurfacing of I-76 between Rock Spring Rd. and McClintocksburg Rd., SR 14 between SR 225 and the Mahoning County line and on SR 183 between US 224 and SR 14. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction on I-76 during peak traffic times. A minimum of one lane of traffic will be maintained in each direction on I-76 during non-peak traffic times. A minimum of one lane of traffic will be maintained by flaggers on SR 14 and SR 183. State Route 261 City of Kent PID: 98381 ESTIMATED CONSTRUCTION COST: $1.7 million ESTIMATED TOTAL COST: $1.7 million AWARD DATE: September 2017 COMPLETION DATE: June 2018 PROJECT DESCRIPTION: Resurfacing of SR 261 from the Summit County line to just south of Summit Rd. Project also includes minor bridge repairs. maintained in each direction. PORTAGE COUNTY 20

Stark County Construction Costs: Active: $43.9 million Upcoming: $2.1 million Total: $46 million STARK COUNTY 21

Stark County Active Projects Ohio Bridge Partnership Program Cities of North Canton & Massillon; Paris Township PID: 97410 PROJECT: 15-3050 CONSTRUCTION COST: $1.8 million TOTAL COST: $2.1 million START DATE: April 2016 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: The replacement of the Freed St. bridge over Hugle Run between Baird Ave. and Fax Ave., and 17 th St. over Sippo Creek just south of Hankins Rd. Work completed in 2016 included the competition of the Freed St. bridge. Work to be performed in 2017 includes the replacement of the 17 th St. bridge. MAINTENANCE OF TRAFFIC: 17 th St. will be closed for 28 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Hoover Trail West City of North Canton; Jackson Township PID: 95569 PROJECT: 17-254 CONSTRUCTION COST: $700,000 TOTAL COST: $900,000 START DATE: May 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Construction of a pedestrian/bicycle trail beginning at the Hall of Fame bridge on Dressler Rd. and continuing along West Maple St. to Cleveland Ave. to the North Canton YMCA. MAINTENANCE OF TRAFFIC: Traffic will be maintained throughout construction. State Routes 21 & 236 Perry, Lawrence & Jackson Townships PID: 81640 PROJECT: 16-553 CONSTRUCTION COST: $2.2 million TOTAL COST: $2.3 million START DATE: April 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Resurfacing of SR 21 between the northern Massillon Corporation limit to just east of SR 93 and on SR 236 from the northern Massillon Corporation limit to Portage St. The project also includes minor bridge repairs. maintained by flaggers at all times throughout construction. Deerfield Ave. at SR 21 will be closed for two days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. US Route 30/SR 297 Perry & Canton Townships PID: 84627 PROJECT: 16-573 CONSTRUCTION COST: $3.8 million TOTAL COST: $3.9 million START DATE: April 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Resurfacing of US 30 between SR 627 and SR 297. Project also includes bridge repairs including concrete overlays to structures along US 30. maintained in each direction on US 30. Ramps at the SR 21/US 30 interchange will be closed for 7 days. All detours will be posted Access to all residences and businesses will be maintained at all times throughout construction. STARK COUNTY 22

Stark County Active Projects Continued State Routes 44 & 619 Marlboro & Nimishillen Township; Village of Hartville and City of Louisville PID: 88896 PROJECT: 17-301 CONSTRUCTION COST: $1.7 million TOTAL COST: $1.8 million START DATE: June 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 44 from the northern Louisville Corporation limit to US 62 and between St. Peters Church Rd. to the Portage County line and on SR 619 between SR 43 and the eastern Hartville Corporation limit. Project also includes minor bridge repairs. maintained by flaggers at all times throughout construction. US Route 62 Washington & Nimishillen Townships PID: 100322 PROJECT: 16-627 CONSTRUCTION COST: $1.6 million TOTAL COST: $1.7 million START DATE: April 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Resurfacing of US 62 between SR 44 and SR 173. maintained by flaggers at all times throughout construction. State Route 43 * City of North Canton; Plain Township PID: 93376 PROJECT: 16-042 CONSTRUCTION COST: $14.3 million TOTAL COST: $20.4 million START DATE: May 2016 COMPLETION DATE: Sept. 2018 PROJECT DESCRIPTION: Widening of SR 43 between 55 th St. and Applegrove St. Project also includes new sidewalks, drainage improvements, the addition of a pedestrian and bike tunnel and upgraded signals. Work completed in 2016 included utility relocations along the entire project limit and underground drainage repairs on SR 43 between 55 th St. and Applegrove St. Work to be completed in 2017 includes widening of SR 43 and the construction of the pedestrian tunnel under SR 43. MAINTENANCE OF TRAFFIC: One lane of traffic will be maintained in each direction on SR 43. Various side street closures at SR 43 will occur during the project. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Interstate 77 & US Route 30 City of Canton PID: 88956 PROJECT: 17-068 CONSTRUCTION COST: $3.9 million TOTAL COST: $4 million START DATE: May 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Concrete deck overlays to six bridges at the US 30 & I-77 interchange. Project also includes resurfacing of three ramps, bridge deck sealing and bridge painting to three structures. MAINTENANCE OF TRAFFIC: Various ramp closures at the US 30 & I-77 interchange ranging from one weekend to 30 days. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. STARK COUNTY 23

Stark County Active Projects Continued Interstate 77 & State Route 687 Canton, Jackson & Plain Townships; City of Canton PID: 100287 PROJECT: 17-033 CONSTRUCTION COST: $2.1 million TOTAL COST: $2.1 million START DATE: April 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Microsurfacing of I-77 between Navarre Rd. to just north of 12 th St. and on SR 687 between SR 241 and Whipple Ave. and between Everhard Rd. and I-77. maintained in each direction on SR 687. A minimum of two lanes of traffic will be maintained in each direction of I-77 during peak travel hours. State Route 241 Tuscarawas Township PID: 94122 PROJECT: 17-185 CONSTRUCTION COST: $1.2 million TOTAL COST: $1.2 million START DATE: May 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Resurfacing of SR 241 between the Wayne County line to SR 93. Project also includes minor bridge repairs including a concrete overlay to the bridge on SR 241 at the Wayne County line. maintained by flaggers. SR 241 will be closed for 5 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 619 * Lake Township PID: 93172 PROJECT: 17-043 CONSTRUCTION COST: $10 million TOTAL COST: $13.2 million START DATE: May 2017 COMPLETION DATE: June 2020 PROJECT DESCRIPTION: Widening of SR 619 between Kaufman St. and Milan Ave. and the addition of turn lanes. Project also includes roundabouts at the SR 619 and Kings Church Ave. intersection and Kaufman Ave. and SR 619 intersection. Project also includes drainage repairs and new signals. maintained in each direction on SR 619. King Church Ave. will be closed for one construction season. Kaufman Ave. will be closed for 30 days. Market Ave. north and south of SR 619 will be closed for 14 days each. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 687 Jackson Township PID: 88905 PROJECT: 17-146 CONSTRUCTION COST: $600,000 TOTAL COST: $600,000 START DATE: May 2017 COMPLETION DATE: June 2017 PROJECT DESCRIPTION: Resurfacing of SR 687 from just east of Foxchase Ave. to just south of Everhard Rd. maintained in each direction. STARK COUNTY 24

Stark County Upcoming Projects US Route 30 & State Route 43 Canton Township PID: 100958 ESTIMATED CONSTRUCTION COST: $700,000 ESTIMATED TOTAL COST: $700,000 AWARD DATE: December 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Microsurfacing of US 30 between SR 43 and the eastern Canton Corporation limit and on SR 43 between Sandy Ave. and US 30. State Routes 44 & 171 Osnaburg & Sandy Townships PID: 101042 ESTIMATED CONSTRUCTION COST: $600,000 ESTIMATED TOTAL COST: $600,000 AWARD DATE: December 2017 COMPLETION DATE: August 2018 PROJECT DESCRIPTION: Microsurfacing of SR 44 from SR 43 to US 30 and on SR 171 between the Carroll County line to SR 43. maintained by flaggers at all times throughout construction. maintained by flaggers at all times throughout construction. US Route 30 Sugar Creek & Bethlehem Townships PID: 102416 ESTIMATED CONSTRUCTION COST: $800,000 ESTIMATED TOTAL COST: $800,000 AWARD DATE: November 2017 COMPLETION DATE: August 2018 PROJECT DESCRIPTION: Resurfacing of US 30 between SR 93 and SR 21. maintained by flaggers at all times throughout construction. STARK COUNTY 25

Summit County Construction Costs: Active: $257.3 million Upcoming: $3.5 million Total: $260.8 million SUMMIT COUNTY 26

Summit County Active Projects Cleveland Massillon Rd. City of Norton PID: 85076 PROJECT: 16-197 CONSTRUCTION COST: $2 million TOTAL COST: $2.4 million START DATE: June 2016 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Widening of Cleveland Massillon Rd. from Greenridge Rd. to just north of Pleasant Dr. Work completed in 2016 included the widening of the eastern half of the roadway. Work to be completed in 2017 includes drainage improvements, the widening of the western half of the roadway and resurfacing. maintained in each direction on Cleveland Massillon Rd. Various side street closures will occur. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Route 8 City of Cuyahoga Falls PID: 102453 PROJECT: 17-3004 CONSTRUCTION COST: $700,000 TOTAL COST: $700,000 START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Increase storage capacity for additional vehicles on the SR 8 northbound and southbound exit ramps to Howe Ave. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction on the SR 8. All ramps will remain open. State Route 8 City of Cuyahoga Falls PID: 84658 PROJECT: 16-555 CONSTRUCTION COST: $4.6 million TOTAL COST: $4.6 million START DATE: April 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Resurfacing of SR 8 from Howe Ave. to Graham Rd., SR 303 from east of Chittenden Rd. to Olde 8 and on SR 261 from just west of SR 8 to N. Main St. Project also includes four concrete bridge deck overlays along SR 8. maintained in each direction on SR 8 during non-peak hours. Various ramp closures spanning from two to four days. The pedestrian bridge just south of Graham Rd. over SR 8 will be closed for 14 days during the summer. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Interstates 76/77 Johnston/Spicer Bridges City of Akron PID: 86979 PROJECT: 15-086 CONSTRUCTION COST: $15.6 million TOTAL COST: $20.1 million START DATE: May 2015 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Removal of three bridges on I-76/I-77 over Johnston St. Project also includes the relocation of Johnston St. between Johnston Ct. and Brown St. Work completed in 2016 included the removal of the three bridges on I- 76/I-77 over Spicer/Johnston St and the re-decking of the I-76 bridge over Brown St. Work to be completed in 2017 includes placement of the final layer of asphalt throughout the entire project limits. MAINTENANCE OF TRAFFIC: A minimum of two lane of traffic will be maintained in each direction on I-76 during non-peak travel times. SUMMIT COUNTY 27

Summit County Active Projects Continued State Route 18 Bath & Copley Township; City of Fairlawn PID: 83067 PROJECT: 15-391 CONSTRUCTION COST: $7.7 million TOTAL COST: $9 million START DATE: August 2015 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Widening of SR 18 between S. Hametown Rd. and I- 77. The project also includes the relocation of the SR 18 eastbound entrance ramp to I-77 southbound, the replacement of the SR 18 bridge over Yellow Creek between Creekrun Dr. and Harmony Hills Rd. and the resurfacing of SR 18 between the Medina County line and Western Akron corporation limit. Work completed in 2016 included the widening of SR 18 between Hametown Rd. and I- 77, the replacement of the SR 18 bridge over Yellow Creek between Creekrun Dr. and Harmony Hills Rd., the realignment of the SR 18 eastbound to I-77 southbound ramp and the resurfacing of SR 18 between Hametown Rd. and I-77. Work to be completed in 2017 includes resurfacing SR 18 between Hametown Rd. and the Medina County line, placement of guardrail and permanent striping. maintained in each direction on SR 18 during non-peak travel times. Interstate 76 (Design Build) * Cities of Norton & Barberton PID: 93501 PROJECT: 16-3003 CONSTRUCTION COST: $80.4 million TOTAL COST: $87.6 million START DATE: August 2016 COMPLETION DATE: July 2019 PROJECT DESCRIPTION: Widening of I-76 to three lanes in each direction between SR 21 and Central Ave. Project also includes pavement replacement on I- 76 between the Medina County line and SR 21 and the re-decking of two bridges on I-76 over SR 261 in Medina County. Work completed in 2016 included the widening of the median portion of I-76 from State St. to SR 21. Work to be completed in 2017 includes the replacement of I-76 westbound pavement from State St. to the Medina County line and the replacement of the Cleveland Massillon Rd. bridge over I-76 and the replacement of I-76 westbound bridges over Wolf Creek, Barber Rd. and SR 261. MAINTENANCE OF TRAFFIC: Two lanes of traffic will be maintained in each direction of I-76 during peak travel times. One lane of traffic will be maintained in each direction of I-76 during non-peak travel times. Various ramp closures will occur at the I-76 and SR 21 interchange and at the I-76 and Barber Rd. interchange. Various overhead bridges will close for one day. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. State Route 91 City of Akron PID: 94115 PROJECT: 16-556 CONSTRUCTION COST: $1 million TOTAL COST: $1 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 91 between Wedgewood Dr. and SR 18/E. Market St. and between Gilchrist Rd. to just north of Eastwood Ave. maintained in each direction on SR 91. SUMMIT COUNTY 28

Summit County Active Projects Continued Interstate 76/Main/Broadway * City of Akron PID: 77269 PROJECT: 16-219 CONSTRUCTION COST: $84.2 million TOTAL COST: $97.6 million START DATE: August 2016 COMPLETION DATE: June 2020 PROJECT DESCRIPTION: Reconstruction of the Main/Broadway Interchange along I-76. Project will remove the interchanges at Wolf Ledges Pkwy. and Grant St. and reconstruct access points and realign Main/Broadway at I-76. Work completed in 2016 included: utility relocations, drainage repairs, building demolition and the removal and rehabilitation of the Wolf Ledges Parkway bridge over I-76. Work to be completed in 2017 includes the widening and relocation of new Main St., the completion of the Wolf Ledges Parkway bridge over I-76, the reconstruction of the Grant St. bridge over I-76, the replacement of the Bartges St. bridge and utility relocations. MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic in each direction will be maintained on I-76 during non-peak travel times. Various side street closures will occur. Wolf Ledges Pkwy. is closed through mid-spring. Grant St. will close for 180 days. These closures will not occur at the same time. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. Interstate 77 & State Route 21 Copley & Bath Townships; Cities of Norton & Fairlawn PID: 84659 PROJECT: 17-0034 CONSTRUCTION COST: $7.2 million TOTAL COST: $7.3 million START DATE: May 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Resurfacing of I-77 between SR 21 and Cleveland Massillon Rd. and on SR 21 from the northern Norton Corporation limit to I-77. Project also includes minor bridge repairs. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction on I-77 and SR 21 during peak travel times. A minimum of one lane of traffic will be maintained in each direction on I-77 and SR 21 during non-peak travel times. Various ramp closures at the SR 18/I-77 interchange. Minor Rd. will be closed for three days at each side of SR 21. Johnson Rd. over SR 21 will be closed for one weekend. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Interstate 77 City of Akron PID: 103632 PROJECT: 16-630 CONSTRUCTION COST: $2.2 million TOTAL COST: $2.2 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Concrete pavement repairs on I-77 from just east of I- 76/Kenmore Leg to just north of SR 261/V. Odom Blvd. MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be maintained in each direction during peak traffic times. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic times. Weekend ramp closures at I-77 and I-76/Kenmore Leg interchange. Detours will be posted. Access to all businesses will be maintained at all times throughout construction. SUMMIT COUNTY 29

Summit County Active Projects Continued US Route 224; State Routes 93 & 241 City of Akron; Springfield & Coventry Townships PID: 100299 PROJECT: 17-115 CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million START DATE: May 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Microsurfacing of various routes including: US 224 from just east of I-77 to just east of Kelly Ave. and from just east of Hilbish Ave. to just east of Shanafelt Ave., SR 93 from just south of State Rd. to just north of Linda Dr. and on SR 241 from just south of Beryl Rd. to Oakes Dr. maintained in each direction on all routes. Interstate 271 Richfield Township PID: 76404 PROJECT: 16-554 CONSTRUCTION COST: $1.9 million TOTAL COST: $2 million START DATE: May 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Concrete bridge deck overlays and bridge painting to three structures over I-271: Medina Line Rd., Everett Rd. and Southern Rd. MAINTENANCE OF TRAFFIC: All three structures will be closed between one and five days. Theses closure will NOT occur at the same time. Detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Interstate 271; State Routes 8 & 59 City of Stow; Boston, Northfield Center & Sagamore Hills Townships PID: 100293 PROJECT: 16-589 CONSTRUCTION COST: $1.2 million TOTAL COST: $1.2 million START DATE: May 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Microsurfacing of various routes including: I-271 between Boston Mills Rd. to just south of SR 8, SR 8 between SR 82 and Ledge Rd. and SR 59 between Oak Park Blvd. and the Silver Lake Corporation limit. maintained in each direction during non-peak travel hours. Interstate 271 Village of Richfield; Richfield Township PID: 18710 PROJECT: 13-0147 CONSTRUCTION COST: $46.7 million TOTAL COST: $49.8 million START DATE: October 2013 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Pavement replacement of I-271 from Broadview Rd. to the Ohio Turnpike. Project also includes repairs to nine bridges including two bridges over I-77, SR 303 over I-271, SR 176 over I-271, Brecksville Rd. over I- 271 and various ramps at the I-77/I-271 interchange. Work completed in 2016 included reconstruction of the I-271 southbound lanes between Broadview Rd. to the Ohio Turnpike and two bridges, one on I-271 southbound over I-77 and one bridge over the ramp connecting I-271 northbound to I-77 northbound. Work to be completed in 2017 includes bridge painting and the placement of the final layer of asphalt on I-271. maintained on I-271 during non-peak traffic times. Various short term ramp closures will occur. All detours will be posted. Access to all businesses will be maintained at all times throughout construction. SUMMIT COUNTY 30

Summit County Active Projects Continued Interstate 271 City of Macedonia PID: 104112 PROJECT: 17-379 CONSTRUCTION COST: $600,000 TOTAL COST: $700,000 START DATE: July 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Installation of a noise wall on the west side of I-271, just north of SR 82. MAINTENANCE OF TRAFFIC: Traffic will be maintained at all times.. Summit County Upcoming Projects Olde Eight Rd. Village of Boston Heights PID: 98703 ESTIMATED CONSTRUCTION COST: $900,000 ESTIMATED TOTAL COST: $1 million AWARD DATE: July 2017 COMPLETION DATE: Dec. 2017 PROJECT DESCRIPTION: Resurfacing of Olde Eight Rd. from SR 303 to Boston Mills Rd. maintained in each direction on all routes. Cleveland Massillon Rd./Hopocan Ave./Wooster Rd City of Barberton PID: 104582 ESTIMATED CONSTRUCTION COST: $300,000 ESTIMATED TOTAL COST: $300,000 AWARD DATE: July 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Resurfacing of Cleveland Massillon Rd. from the southern Barberton Corporation limit to 31 st St. Project also includes intersection upgrades including restriping, new signage and new signal at the Wooster Rd. and Hopocan Ave. intersection. maintained in each direction throughout construction. SUMMIT COUNTY 31

Summit County Upcoming Projects Continued Interstate 77 City of Akron; Copley Township PID: 100823 ESTIMATED CONSTRUCTION COST: $1.1 million ESTIMATED TOTAL COST: $1.1 million AWARD DATE: October 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Microsurfacing of I-77 from Schocalog Rd. to just east of SR 21. maintained in each direction on I-77 during non-peak travel times. State Route 162 & Interstate 271 Copley & Richfield Townships Interstate 271 & State Route 21 Village of Richfield; Richfield Township PID: 100387 ESTIMATED CONSTRUCTION COST: $600,000 ESTIMATED TOTAL COST: $600,000 AWARD DATE: October 2017 COMPLETION DATE: October 2018 PROJECT DESCRIPTION: Microsurfacing of I-271 from the Medina County line to just west of SR 176/Wheatley Rd. and on SR 21 between I-77 and I-80/Ohio Turnpike. maintained in each direction of I-271 and on SR 21 during non-peak travel hours. PID: 102396 ESTIMATED CONSTRUCTION COST: $600,000 ESTIMATED TOTAL COST: $600,000 AWARD DATE: October 2017 COMPLETION DATE: Dec. 2018 PROJECT DESCRIPTION: Resurfacing of SR 162/Copley Rd. from the Medina County line to Cleveland Massillon Rd. and on SR 162/Copley Rd. from just west of Cleveland Massillon Rd. to the west Akron Corporation limit.project also includes resurfacing of the I-271 northbound and southbound rest areas. maintained by flaggers on SR 162. Rest areas on I-271 will remain open during construction. SUMMIT COUNTY 32

Trumbull County Construction Costs: Active: $35.8 million Upcoming: $2 million Total: $37.8 million TRUMBULL COUNTY 33

Trumbull County Active Projects Ohio Bridge Partnership Program Vienna & Warren Townships PID: 97418 PROJECT: 15-3051 CONSTRUCTION COST: $1.6 million TOTAL COST: $1.9 million START DATE: May 2016 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: The replacement of the Niles Vienna Rd. bridge over Liberty Lake stream between Smith Stewart Rd. and Scoville North Rd., the Risher Rd. bridge over Duck Creek just west of S. Leavitt Rd. and the Pleasant Valley Rd. bridge over Squaw Creek just south of Smith-Stewart Rd. Work completed in 2016 included the replacement of the Risher Rd. bridge. Work to be completed in 2017 include the replacement of the Niles Vienna Rd. bridge and the Pleasant Valley Rd. bridge. MAINTENANCE OF TRAFFIC: Niles Vienna Rd. and Pleasant Valley Rd. will each be closed for 75 days. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. Corinth Court Rd. Vernon & Johnston Township PID: 97634 PROJECT: 17-255 CONSTRUCTION COST: $600,000 TOTAL COST: $1 million START DATE: July 2017 COMPLETION DATE: October 2017 County Line Turnpike Rd. Southington Township PID: 97632 PROJECT: 17-334 CONSTRUCTION COST: $700,000 TOTAL COST: $1.3 million START DATE: July 2017 COMPLETION DATE: October 2017 PROJECT DESCRIPTION: Replacement of the County Line Turnpike Rd. bridge over Dead Branch just east of SR 534. MAINTENANCE OF TRAFFIC: County Line Turnpike Rd. will be closed for 90 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 7 & 46 Hubbard, Brookfield, Howland & Bazetta Townships PID: 100323 PROJECT: 16-557 CONSTRUCTION COST: $1.5 million TOTAL COST: $1.5 million START DATE: April 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Resurfacing of SR 7 from US 62 to SR 82 and on SR 46 between SR 82 and SR 5. maintained by flaggers at all times throughout construction. PROJECT DESCRIPTION: Replacement of the Corinth Court Rd. bridge over Sugar Creek just north of SR 5. MAINTENANCE OF TRAFFIC: Corinth Court Rd. will be closed for 90 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. TRUMBULL COUNTY 34

Trumbull County Active Projects Continued State Routes 7, 193 & 305 Kinsman, Fowler and Johnston Townships PID: 100237 PROJECT: 17-151 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: March 2017 COMPLETION DATE: August 2017 PROJECT DESCRIPTION: Chip sealing on SR 7 between SR 5 and the Ashtabula County line, SR 193 between Bradley Brownlee Rd. and SR 88 and on SR 305 between the Portage County line to US 422. Project also includes chip sealing of various routes in Ashtabula and Portage Counties. maintained by flaggers. State Route 11 Howland & Liberty Townships PID: 76408 PROJECT: 15-523 CONSTRUCTION COST: $4.8 million TOTAL COST: $5.6 million START DATE: May 2015 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Raising and redecking of four bridges. Tibbetts Wick Rd. over SR 11, Anderson Morris Rd. over SR 11, SR 304 over SR 11 and Liberty St. over SR 11. Work completed in 2016 included the redecking of the Tibbetts Wick, SR 304 and Liberty St. bridges over SR 11. Work to be completed in 2017 includes the re-decking of the Anderson Morris Rd. bridge over SR 11. MAINTENANCE OF TRAFFIC: One lane of traffic will be maintained in each direction on SR 11. Anderson Morris Rd. will be closed for 75 days. A detour will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 11, 45 & 46 Village of Lordstown; Vienna, Howland, Warren & Weathersfield Townships PID: 100297 PROJECT: 16-590 CONSTRUCTION COST: $1.9 million TOTAL COST: $1.9 million START DATE: April 2017 COMPLETION DATE: Oct. 2017 PROJECT DESCRIPTION: Microsurfacing of SR 45 between the Mahoning County line to just south of the southern Warren Corporation limit, SR 46 between the Mahoning County line to the CSX railroad and between US 422 to just south of SR 82 and on SR 11 between SR 82 and King Graves Rd. maintained by flaggers at all times throughout construction. State Routes 11 & 82 Howland & Vienna Townships PID: 92654 PROJECT: 17-0035 CONSTRUCTION COST: $4.9 million TOTAL COST: $5 million START DATE: May 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Resurfacing of SR 82 from just east of Warren-Sharon Rd. to just east of SR 193. Project also includes left turn lane additions at Niles Vienna Rd. and Warner Rd. and minor bridge repairs on SR 11. MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic maintained in each direction on SR 82. Occasional ramp closures for one night at the SR 11/82 interchange. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. TRUMBULL COUNTY 35

Trumbull County Active Projects Continued State Route 11 Liberty Township; City of Girard PID: 97620 PROJECT: 17-302 CONSTRUCTION COST: $3.9 million TOTAL COST: $3.9 million START DATE: June 2017 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Resurfacing of SR 11 between I-80 to just south of Niles Vienna Rd. Project also includes minor bridge repairs. maintained in each direction on SR 11 during peak travel hours. State Route 45 Champion Township PID: 102024 PROJECT: 17-227 CONSTRUCTION COST: $200,000 TOTAL COST: $200,000 START DATE: May 2017 COMPLETION DATE: Nov. 2017 PROJECT DESCRIPTION: Replace traffic signals at SR 45 and Champion Ave. and at SR 45 and SR 305. maintained in each direction on SR 45. US Route 62 Hubbard & Brookfield Townships PID: 77886 PROJECT: 16-131 CONSTRUCTION COST: $9.8 million TOTAL COST: $10.3 million START DATE: June 2016 COMPLETION DATE: Sept. 2017 PROJECT DESCRIPTION: Resurfacing of US 62 from the northern Hubbard Corporation limit to the Pennsylvania state line. The project also includes repairs to five bridges, including the replacement and widening of the I-80 bridges over US 62. Work completed in 2016 included the resurfacing of US 62 from Ruth St. to the Pennsylvania state line and the beginning of the widening on the I-80 bridges over US 62. Work to be completed in 2017 includes the resurfacing of US 62 from Ruth St. to the Hubbard Corporation limit and the completion of the widening of the I-80 bridges over US 62. MAINTENANCE OF TRAFFIC: Traffic will be maintained on I-80 and US 62 at all times throughout construction. Various short term ramp closures to occur throughout construction. All detours will be posted. Access to all residences and businesses will be maintained at all times throughout construction. State Routes 82 & 305 Braceville & Southington Townships PID: 88912 PROJECT: 17-186 CONSTRUCTION COST: $1 million TOTAL COST: $1 million START DATE: May 2017 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Resurfacing of SR 82 between SR 534 and SR 5 and on SR 305 between US 422 and SR 534. Project also includes minor bridge repairs. maintained by flaggers. SR 82 will be closed for five days. A detour will be posted. Access to all residences and businesses will be maintained at all times TRUMBULL COUNTY 36

Trumbull County Active Projects Continued State Route 193 Liberty & Vienna Townships PID: 88916 PROJECT: 17-407 CONSTRUCTION COST: $3.6 million TOTAL COST: $3.7 million START DATE: August 2017 COMPLETION DATE: June 2018 PROJECT DESCRIPTION: Resurfacing of SR 193 from the Mahoning County line to SR 82. maintained in each direction on SR 193. State Route 304 City of Girard; Liberty Township PID: 86956 PROJECT: 16-475 CONSTRUCTION COST: $400,000 TOTAL COST: $400,000 START DATE: November 2016 COMPLETION DATE: July 2017 PROJECT DESCRIPTION: Resurfacing of SR 304 from US 422 to just east of Beechwood Ave. maintained by flaggers on SR 304 throughout construction. Trumbull County Upcoming Projects Salt Springs Rd. /S. Leavitt Rd. Village of Lordstown PID: 101707 ESTIMATED CONSTRUCTION COST: $700,000 ESTIMATED TOTAL COST: $800,000 AWARD DATE: Sept. 2017 COMPLETION DATE: January 2018 PROJECT DESCRIPTION: Resurfacing of Salt Springs Rd. from Ellsworth Bailey Rd. to SR 45 and on S. Leavitt Rd. from Palmyra Rd. to Hewitt Gifford Rd. maintained by flaggers. State Route 46 Mecca and Greene Townships PID: 98385 ESTIMATED CONSTRUCTION COST: $1.3 million ESTIMATED TOTAL COST: $1.4 million AWARD DATE: August 2017 COMPLETION DATE: July 2018 PROJECT DESCRIPTION: Chip sealing SR 46 between SR 87 and SR 88. Project also includes chip sealing on various routes in Ashtabula County. maintained by flaggers. TRUMBULL COUNTY 37

O UR M I S S I O N To provide easy conveyance of people and goods from place to place, we will: Take care of what we have; Make our system work better; Improve safety; Enhance capacity O UR VISION A long-term, reliable, professional and highly productive organization For more information, contact the ODOT District 4 Public Information Office at (330) 786-2208. Like us on Facebook: www.facebook.com/odotd4 Follow us on Twitter: www.twitter.com/odot_akron Statewide Traffic Information: www.ohgo.com For general information, call (330) 786-2230 or visit District 4 s Web site at: www.transportation.ohio.gov/dist4