Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Similar documents
Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Urban Transport in Metropolitan Areas (P095485)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Public Disclosure Copy

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

January 2018 Air Traffic Activity Summary

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Road Rehabilitation Project

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

Figure (1/3) RAINFALL DATA

Air China Limited Annual Results. March Under IFRS

Sound Transit Operations January 2014 Service Performance Report. Ridership

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

AFTA Travel Trends. June 2017

Performance monitoring report 2017/18

CARICOM Single ICT Space Digital Transformation is a Journey

Recovery Now! ANZPHIC 2010 Sydney - July 8, Hotel Performance Back On Track

Analysts Briefing. 24 June Cathay Pacific Airways Limited

2007/08 Full Year Results Investor Briefing

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2

TAG Farnborough Airport

Rotorua. newzealand.com. argentina. Market information about our Visitors and our Active Considerers

Analysts and Investors conference call. Q results. 15 May 2013

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017

I T N E T R E N R A N T A I T ON O AL A L A R A R R I R VA V L A S L S A N A D N D D E D PA

Information Paper 2 SUMMARY

Performance monitoring report for 2014/15

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

IATA FUEL EFFICIENCY CAMPAIGN

AFTA Travel Trends. July 2017

CWC LA - Cash Balance (January 2012)

Sound Transit Operations December 2014 Service Performance Report. Ridership

METRO OPERATIONS COMMITTEE

STATISTICAL BULLETIN ON INTERNATIONAL ARRIVALS, DEPARTURES AND MIGRATION 2011 SERIES NO. SDT: Government of Tonga

Noise Oversight Committee

Jakarta, 3 May Analyst Meeting. Q1/ Corporate Performance

Technical Cooperation Bureau

Toronto Pearson February 2019 Briefing. February 19, 2019

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE

Airworthiness Analysis

International Visitation to the Northern Territory. Year ending March 2017

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Cranfield Safety Management and Investigation Course

Annual General Meeting. 20 April 2011

Contract (Description)

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

Cathay Pacific Airways Analyst & Investor Briefing June Cathay Pacific Airways Interim Results 6 August 2008

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank

Exchange Sunshine Coast 2014

PERFORMANCE REPORT JANUARY Keith A. Clinkscale Performance Manager

Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO

INVEST IN BOUNTIFUL. THE best performing stock exchange for longterm investors

Manual vs. Automatic Operation and Operational Restrictions

Sound Transit Operations August 2015 Service Performance Report. Ridership

Global Airline Trends and Impacts International Aviation Issues Seminar

Network Manager Adding value to the Network 29 September 2011

Heathrow (SP) Limited

SSP progress in Latvia. Overview

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure Project (P079906) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 05-Mar-2014 Country: Indonesia Approval FY: 2007 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): BPPSPAM - Ministry of Public Works Key Dates Board Approval Date 06-Jul-2006 Original Closing Date 31-Dec-2011 Planned Mid Term Review Date Last Archived ISR Date 03-Aug-2013 Effectiveness Date 01-Nov-2007 Revised Closing Date Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to improve economic competitiveness by improving the capacity and quality of strategic national roads on the Borrower's islands of Java and Sumatra, improving road safety and increasing the efficiency, quality and transparency of works procurement and implementation in Borrower's Ministry of Public Works. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Improvement to Strategic National Roads 250.00 Implementation Support 19.00 Road Sector Institutional Development 4.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Investments are now nearly completed and the project is expected to achieve its main objectives with only moderate shortcomings. The capacity and transparency of the Ministry of Public Works have been strengthened as reflected in its procurement practices, anti-corruption procedures, construction oversight, and complaints handling performance. Civil works to increase the capacity and quality of the strategic national road network have already been completed on 89 percent of the 245 km of new, upgraded, or improved roads targeted Page 1 of 6

under the project. Road safety audits were conducted for all the project roads and their recommendations addressed, and the road accident recording system developed under the project is now fully operational and being expanded and upgraded. Improvement of about 100 intersections has also helped increase both traffic capacity and road safety. Locations Country First Administrative Division Location Planned Actual Indonesia Not Entered Kecamatan Widang Indonesia Not Entered Tegal Not Entered Not Entered Tegal Indonesia Not Entered Tanjungkarang-Telukbetung Indonesia Not Entered Surabaya Indonesia Not Entered Propinsi Sumatera Selatan Indonesia Not Entered Semarang Indonesia Not Entered Pekalongan Indonesia Not Entered Pasuruan Indonesia Not Entered Palembang Indonesia Not Entered Propinsi Lampung Indonesia Not Entered Kartasura Indonesia Not Entered Propinsi Jawa Timur Indonesia Not Entered Propinsi Jawa Tengah Indonesia Not Entered Propinsi Jawa Barat Indonesia Not Entered Propinsi Jambi Indonesia Not Entered Daerah Khusus Ibukota Jakarta Raya Indonesia Not Entered Cirebon Indonesia Not Entered Propinsi Banten Indonesia Not Entered Kabuyutan Indonesia Not Entered Bawan Indonesia Not Entered Kecamatan Boyolali Indonesia Not Entered Kabupaten Magelang Page 2 of 6

Country First Administrative Division Location Planned Actual Indonesia Not Entered Keprekan Indonesia Not Entered Kecamatan Pejagoan Indonesia Not Entered Kecamatan Karangampel Indonesia Not Entered Kecamatan Ambarawa Indonesia Not Entered Kecamatan Cianjur Indonesia Not Entered Kecamatan Karawang Indonesia Not Entered Kecamatan Demak Indonesia Not Entered Kabupaten Kendal Indonesia Not Entered Kecamatan Cilegon Indonesia Not Entered Kecamatan Losari Indonesia Not Entered Kecamatan Brebes Indonesia Not Entered Kecamatan Pemalang Indonesia Not Entered Desa Pilang Indonesia Not Entered Kecamatan Ngawi Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Roads in good and fair condition as a share of Percentage Value 56.00 55.84 56.03 total classified roads The denominator (the size of the total classified network) is the defined national road length of the project provinces. The roads in good and fair condition increased from Baseline. Size of the total classified network Kilometers Sub Type Supplemental Value 7168.00 7603.00 7603.00 Page 3 of 6

Number of kilometers of new strategic national Kilometers Value 0.00 36.80 54.07 road 68% completed against the restructured schedule. The shortfall is due to termination of one package (17km) due to non-performance of the contractor. Number of kilometers of strategic national road Kilometers Value 0.00 74.64 84.64 with increased capacity 88% completed against the restructured schedule. The remaining length (10 km) will be achieved by the closing date. Average increase of travel speed Percentage Value 0.00 25.00 35.00 New data not available yet. The necessary surveys will be carried out at EOP. Average increase of AADT on project roads Percentage Value 0.00 0.00 20.00 Data not available yet. The necessary surveys will be carried out at EOP. Number of kilometers of strategic national road Kilometers Value 0.00 106.00 106.00 betterment implemented (plus percentage completion of civil works) with good and orfair condition 100% completed against the Original target was 153 (prior restructured schedule. to April 2011 restructuring). Percentage of Construction contracts that Percentage Value 0.00 95.00 100.00 comply with specifications All completed and currently ongoing construction contracts comply with specifications. Expected to achieve 100% when all are completed. Number of Technical Audits carried out Number Value 0.00 15.00 20.00 Page 4 of 6

Anti-Corruption procedures and Construction Supervision carried out as the framework Fully Operational Road Accident Recording System with Trained Staff Road safety audits conducted and recommendations addressed Expected achievement as per restructured schedule. Number Value 0.00 19.00 19.00 Expected achievement as per restructuring. Percentage Value 0.00 100.00 100.00 IRSMS-2 TA completed its original scope and additional scope. IRSMS-1 TA canceled. Number Value 0.00 19.00 19.00 Target achieved. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of meters of bridge construction (plus Meter(m) Value 0.00 32.00 52.00 percentage completion of civil works) The remaining length will be achieved by the revised closing date. Percentage Disbursement of construction Percentage Value 0.00 89.00 100.00 works achieved. Disbursement is behind schedule as per restructured schedule. Number of intersections improved Number Value 0.00 100.00 106.00 Date 30-Jun-2006 Works are underway to complete the remaining 6 improved intersections. Data on Financial Performance (as of 16-Jan-2014) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P079906 IBRD-48340 Effective 06-Jul-2006 13-Sep-2007 01-Nov-2007 31-Dec-2011 Page 5 of 6

Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P079906 IBRD-77860 Effective 04-Aug-2009 04-Aug-2009 04-Aug-2009 31-Dec-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P079906 IBRD-48340 Effective USD 208.00 206.46 1.54 0.00 0.00 0.00 P079906 IBRD-77860 Effective USD 206.46 181.46 25.00 171.44 10.02 94.00 Disbursement Graph Key Decisions Regarding Implementation The project closing date was extended by another six months to June 30, 2014. Restructuring History Level two Approved on 17-Apr-2011, Level two Approved on 30-May-2013, Level 2 RVP Decision on 17-Dec-2013 Related Projects There are no related projects. Page 6 of 6