Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Similar documents
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

4. Safety Concerns Potential Short and Medium-Term Improvements

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

September 30, 2016 PUBLIC HEARING RESULTS

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Palm Beach County Traffic Report July 13 through July 20, 2012

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Site Location and Setting

Main Street Station Upgrades

Transportation TRANSPORTATION PROJECTS

EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

Additional Economic Development Strategy submissions- Klickitat County

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

B10. Agate Beach State Recreation Site

RAILROAD QUIET ZONE PROJECT

Area Surrounding Maplewood Manor

SR 934 Project Development And Environment (PD&E) Study

Corktown Parks. Public Meeting. City of Toronto

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Second Street Improvements Project Project Update Archive

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Route 29 Solutions Projects

Meeting Notes Public Open House

The Baker/Carver Regional Trail is intended to

Lake Tahoe Airport Master Plan

Lower Salford Township Planning Commission Meeting September 26, 2012

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

November 21, 2012 Barbara Kelleher, (954)

Arvidson, Adam R. Adam,

Lake Erie Commerce Center Traffic Analysis

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

Gulf Coast MPO Obligated Projects

Hospital Link Project Project Update Winter 2018

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

Construction Update. Local Officials Briefing March 2016

Capital Prioritization

Community Development Committee

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SECTION 4(f) DE MINIMIS FINDING

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

AGENCY NAME TRANSPORTATION

Welcome to the Cross County Trail Public Input Session!

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

The Light Rail System Safety & Grade Crossing Equipment

CHASKA PLANNNING COMMISSION MINUTES September 13, 2017

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Becker County Trail Routing Feasibility Study

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Spadina Avenue Built Form Study Preliminary Report

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

ATTACHMENT B. Reference No.

Madison Metro Transit System

Claremont Project Background and Update Community Meeting September 11, 2017

Riverside County Transportation Department Summary of Bids

AGENCY SCOPING MEETING

Non-Motorized Transportation

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Blue River Trail Master Plan JSA to Town Hall June 2004

FDOT Treasure Coast Traffic Impact Report

A. CONCLUSIONS OF THE FGEIS

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

Northaven Trail Phase 2 Initial Project Overview

Appendix 4.1 L. No-Build Project Descriptions

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

FDOT Treasure Coast Traffic Report through

Union Station Queens Quay Transit Link Study

TRANSPORTATION ELEMENT

Grade Crossing Regulations

Transcription:

Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans Review Projects PW 1605, 1701, & 1702 June 20, 2017

Project Background All three projects included in the Connecting Casselberry: The Casselberry Multimodal Transportation Master Plan (MTMP) adopted in 2016 Increased focus on pedestrian and bicycle improvements and complete streets Queens Mirror Circle included in current FDOT Work Program Quail Pond Circle & Southcot Dr included in current Metroplan Orlando Prioritized Project List

Queens Mirror Circle Pedestrian Safety Improvements

Queens Mirror Project Location: Queens Mirror Circle (north side of Queens Mirror Lake)

Project Area Queens Mirror Project Limits

Enhance pedestrian safety and connectivity/safe route to school Install Button activated RRFB s (rectangular rapid flashing beacon) for pedestrian crossing @ S Lost Lake Lane Install permanent speed feedback devices for traffic calming Improve accessibility and visibility of crossing at Rotary Park Queens Mirror: Project Objectives

Queens Mirror Draft Plan

Queens Mirror Draft Plan Remove old crossing signage

Queens Mirror Draft Plan Add button activated RRFB (flashing beacon operates only when pressed)

Queens Mirror Draft Plan Install permanent speed feedback devices

Queens Mirror Draft Plan

Reorient and restripe crossing with ADA compliant curb ramps Queens Mirror Draft Plan

Install new crossing signage Queens Mirror Draft Plan

Queens Mirror Preliminary Add wayfinding Additional Staff Recommendations Can be completed as separate in-house City staff project Confirm whether existing advance warning signage should remain (except New ) Confirm School crossing designation(s) Coordinate with Seminole County Public Schools and Sheriff

City Commission presentation/discussion July 24, 2017 Complete design by approx. September 30, 2017 Construction funded (by FDOT) for Fiscal Year 2020 (mid 2019-2020) Queens Mirror Anticipated Schedule

Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements

Quail Pond Project Location: Quail Pond Circle (from Triplet Lake Dr to Sunset Dr)

Quail Pond Project Context

Quail Pond Project Context

Quail Pond Project Context

Project Area Quail Pond Project Limits

Quail Pond Project Objectives Enhance bike/ped safety and connectivity Add sidewalks to Quail Pond Circle Create ped connection(s) from Quail Pond Circle to Lake Concord Park (north phase) Create shared use path connection from Quail Pond Cir to Sunset Dr Install ped crossing at Sunset Dr

Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan

Construct 6 ft sidewalk starting at new parking lot driveway Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan Construct 8 ft sidewalk starting at Art House driveway Construct connection to Art House Add raised curb and pave Quail Pond Circle Construct roadside swales

Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan

Quail Pond Draft Plan Construct cul-desac Construct 10 ft shared use path to Sunset Dr Add crossing at Sunset Dr

Quail Pond Preliminary Additional Staff Recommendations Add accessible ped connection (if feasible) from Triplet Lake/ Quail Pond to Public Works sidewalk Relocate oak tree a few feet to suit

Quail Pond Preliminary Additional Staff Recommendations Reorient sidewalk to shorten crossing @ driveway Make it a brick crossing

Quail Pond Preliminary Additional Staff Recommendations Add wider (8 ft) and more direct sidewalk connection to Art House/Lake Concord Park Mimic brick pattern in Lake Concord Park for connection to Art House

Quail Pond Preliminary Additional Staff Recommendations Shift sidewalk onto City properties and within right of way as needed to minimize conflicts

Quail Pond Preliminary Additional Staff Recommendations LED acorn lights Art House to cul-de-sac LED path lights for shared use path

Quail Pond Preliminary Additional Staff Recommendations Add sharrows Landscape swales with cordgrass

Quail Pond Preliminary Additional Staff Recommendations Remove invasive trees and plants and failing magnolias Plant new trees

Quail Pond Preliminary Additional Staff Recommendations No Parking from eastern edge of City property to culde-sac Remove unnecessary driveway aprons Add fence along Sunset lot line for screening from adjacent residence

Quail Pond Anticipated Schedule City Commission presentation/ discussion July 24, 2017 Complete design by approx. September 30, 2017 Construction funded (by sales tax) for Fiscal Year 2020 (late 2019-2020)

Southcot Drive Bicycle/Pedestrian Improvements

Southcot Project Location: Southcot Drive from Sunset Dr to S Triplet Lake Dr

Southcot Project Context

Southcot Project Context

Southcot Project Context

Southcot Project Context

Project Area Southcot Project Limits

Southcot Project Objectives Enhance bike/ped safety and connectivity Widen sidewalk Add midblock crossing Conduct 4-way stop analysis at Sunset Dr Integrate traffic calming

Southcot Draft Plan

Southcot Draft Plan

Southcot Draft Plan

Southcot Draft Plan Conduct 4-way stop warrant analysis for Southcot & Sunset Waiting for N Oxford to conclude and school to resume

Southcot Draft Plan

Install curb ramps & stripe crossing Southcot Draft Plan

Southcot Draft Plan Install curb ramps & stripe crossing Widen sidewalks to 8 feet Relocate electric poles

Southcot Draft Plan Add raised curb and gutter with 2-3 ft sod strip

Southcot Draft Plan

Southcot Draft Plan

Southcot Draft Plan

Southcot Draft Plan End south side sidewalk at existing location Add midblock crossing

Southcot Draft Plan

Southcot Draft Plan

Southcot Draft Plan

Widen sidewalk to 8 feet Southcot Draft Plan

Southcot Draft Plan Install raised curb on north side with 2 ft sod strip only

Southcot Preliminary Additional Staff Recommendations Evaluate installing crossing across Sunset Dr @ Southcot Consider safety concerns if 4- way stop determined to be unwarranted Make Southcot curb ramp more direct rather than angled

Southcot Preliminary Additional Staff Recommendations Only widen north side sidewalk Keep south side as-is/avoid pole relocates and landscape disruption

Southcot Preliminary Additional Staff Recommendations Install raised midblock crosswalk instead of at-grade

Southcot Preliminary Additional Staff Recommendations Integrate golf cart path better and address tie-in grading concerns adjacent to golf course

City Commission presentation/ discussion July 24, 2017 Complete design by approx. September 30, 2017 Construction funded (by sales tax) for Fiscal Year 2020 (late 2019-2020) Southcot Anticipated Schedule

Please provide comments by June 30 th 2017 to: Kelly Brock kbrock@casselberry.org (407) 262-7725 ext 1235 Project updates (and this presentation): www.casselberry.org/go