ACRP Project Evaluating Airfield Capacity

Similar documents
ACRP Project 03-17: Evaluating Airfield Capacity

ACRP EVALUATING AIRFIELD CAPACITY. Contractor s Final Report

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Airfield Capacity Prof. Amedeo Odoni

Analysis of Air Transportation Systems. Airport Capacity

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Validation of Runway Capacity Models

RUNWAY OPERATIONS: Computing Runway Arrival Capacity

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

APPENDIX D MSP Airfield Simulation Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

Automated Integration of Arrival and Departure Schedules

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET

! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1

Surveillance and Broadcast Services

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

IFR SEPARATION USING RADAR

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS)

Time-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017

Wake Turbulence Research Modeling

ARCHERFIELD AIRPORT MASTER PLAN TECHNICAL PAPER TP 03/10 RUNWAY CAPACITY

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Key Purpose & Need Issues

Evidence for the Safety- Capacity Trade-Off in the Air Transportation System

APPENDIX X: RUNWAY LENGTH ANALYSIS

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

Assignment 10: Final Project

Airports and UAS: Managing UAS Operations in the Airport Vicinity

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

Airport Engineering Lectures

LONG BEACH, CALIFORNIA

Merritt Island Airport

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

CAUTION: WAKE TURBULENCE

Table of Contents. Overview Objectives Key Issues Process...1-3

Chapter 5 Facility Requirements

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

Las Vegas McCarran International Airport. Capacity Enhancement Plan

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Defining and Managing capacities Brian Flynn, EUROCONTROL

Developing an Aircraft Weight Database for AEDT

CATCODE ] CATCODE

A Note on Runway Capacity Definition and Safety

TRB and ACRP Research Updates: Practical Application

Hartford-Brainard Airport Potential Runway Closure White Paper

Simulation Analysis of Dual CRDA Arrival Streams to Runways 27 and 33L at Boston Logan International Airport

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Operational Performance and Capacity Assessment for Perth Airport

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Facility Requirements

TABLE OF CONTENTS 1.0 INTRODUCTION...

Evaluation of Strategic and Tactical Runway Balancing*

Determining Airport Acceptance Rate (AAR) Mexico City Airport Case Study

Validation of Runway Capacity Models

Appendix 6.1: Hazard Worksheet

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

Learning Objectives. By the end of this presentation you should understand:

Runway Length Analysis Prescott Municipal Airport

CAPAN Methodology Sector Capacity Assessment

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Study Committee Meeting. September 2015

A DEPARTURE REGULATOR FOR CLOSELY SPACED PARALLEL RUNWAYS

IFR SEPARATION WITHOUT RADAR

ERIE ATCT STANDARD OPERATING PROCEDURES

ANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS

USA Near-Term Progress for Closely Spaced Parallel Runways

Chapter 5 Facility Requirements

National Transportation Safety Board Aviation Incident Final Report

OVERVIEW OF THE FAA ADS-B LINK DECISION

Analysis of ATM Performance during Equipment Outages

Assignment 7: Airport Geometric Design Standards

NextGen Priorities: Multiple Runway Operations & RECAT

DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport

The Noise & Environmental office reviews airline schedules and night-time performance of the airlines operating at the Airport.

a. Aeronautical charts DID THIS IN LESSON 2

Integrated Optimization of Arrival, Departure, and Surface Operations

Forecast and Overview

RNP AR APCH Approvals: An Operator s Perspective

Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology

Chapter III - Demand/Capacity and Facility Requirements

Chapter 1 Introduction and Project Overview

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

Friedman Memorial Airport Authority. Regular Meeting September 4, 2012

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

CEE Quick Overview of Aircraft Classifications. January 2018

Chapter 1. Draw Standard Departure Procedure

Transcription:

DEN572 PRESENTATION ACRP Project 03-17 Evaluating Airfield Capacity Presented by Pam Keidel-Adams, Landrum & Brown Brian Poe, Landrum & Brown February 13, 2012

Objectives of Research Develop Guidebook for airport planners All types of airports Runways, taxiways, apron areas, aircraft parking positions, approach/departure procedures Assess existing modeling techniques beyond AC 150/5060-5 and ACM Identify capabilities and limitations of the existing techniques Develop specifications and functional prototype for new model Present capacity modeling guidelines for Determining the appropriate level of modeling sophistication Making the process more consistent from airport to airport 2

ACRP Project 03-17 Panel and Project Team Panel and ACRP Support Rick Busch, Denver Chair Greg Albjerg, HNTB Monica Alcabin, Boeing David Byers, University of Nebraska Nancy Dorighi, NASA Bruce Love, URS Scott Marsh, PANY&NJ ACRP Support Theresia Schatz, ACRP Joseph Snell, ACRP Liaison members Aimee McCormick, FAA Chris Oswald, ACI-NA Kent Duffy, FAA Don Guffey, FAA Richard Cunard, TRB Timmy RoIf Schindler, GAO 3 LeighFisher Bill Dunlay, PI Suzanne Akkoush, Project Manager Landrum & Brown Matt Lee, Deputy, Deputy PI Pam Keidel-Adams, Deputy PM Brian Poe University of California, Berkeley Mark Hansen Liuyi Feier George Mason University Lance Sherry Presentation & Design, Inc. Patti J. Douglas

ACRP 03-17 Deliverables 1. Guidebook 2. Decision Hierarchy How to Choose a Level of Modeling Sophistication 3. New and Newly Available Tools a. Prototype of New Spreadsheet Tools b. Assessment of MITRE runwaysimulator (plans for public release) 4. Final Report Project deliverables will provide comprehensive tools for evaluating airfield capacity 4

Scoping Issues for the Project Three major scope items that define project 1. Definitions of Capacity 2. Capacity vs. Aircraft Delay 3. Airfield Components 5

1. Definitions of Capacity Maximum Throughput: How many aircraft operations can a particular airfield accommodate in given period when there is a continuous demand for service in that period (i.e., the period is saturated)? Practical Capacity or Service Volume: How many aircraft operations can a particular airfield accommodates at a specified level of service (e.g., at a specified level of aircraft delay)? Time interval (15-minutes, hourly, daily, annual) Guidebook will suggest under what circumstances the various definitions are appropriate. 6

2. Estimating Capacity vs. Aircraft Delay Will focus on methods for estimating capacity not delay Will emphasize maximum-throughput definition of airfield capacity rather than practical/service-volume capacity Will provide guidance and examples for using capacity estimates in analytical models for estimating aircraft delay 7

3. Airfield Components Major emphasis will be on runways and close-in terminal airspace Taxiways, aprons, and gates will be included only in terms of how they affect runway/airspace capacity Runway exit and entrance taxiways, parallel taxiways, runway crossings, bypass taxiways, aprons High-level measures of gate capacity vs. airfield capacity 8

Guidebook Overview 9

Chapter 2 Review of Airfield Capacity Concepts 1. Capacity definitions a. Maximum sustainable throughput b. Delay-based 2. Factors that Affect Capacity 3. Levels of Capacity Modeling Sophistication 21 Factors Airport Geometry Runway Exit Design Runway Entrance Taxiways Staging Pads/Taxiways Runway Crossings Parallel Taxiway Airport User Information Aircraft Fleet Mix Daily Demand Distribution Aircraft Performance Avionics Equipage Braking Action Random Variability Runway Use & ATC Procedures Applicability of Visual Flight Rules Wake Turbulence Weather Multiple Approach Technology Runway Specific Fleet Mix Human Factors Air Traffic Controller Workload Air-Ground Communications Random Variability Airspace Factors Departure Fix Restrictions Neighboring Airports Missed Approach 10

Chapter 2 Levels of Modeling Sophistication 11

Chapter 4 New and Newly Available Capacity Evaluation Tools and Guidance 1. Prototype of New Spreadsheet Models (Levels 1, 2, and 3) 2. Soon-to-be-released Level 4 Model MITRE runwaysimulator 3. Guidance on Estimating Capacity of Specialty Cases a. Effects of partial parallel taxiways and runway crossings b. Effects of staggered runway thresholds/runway ends c. Aircraft type runway-use restrictions d. Airports without an operating Airport Traffic Control Tower (ATCT) 12

Chapter 4 Prototype of New Spreadsheet Tool Addresses 3 levels of modeling sophistication in 1 tool Macro-enabled Excel-based file using tabs Will have 3 model options Single runway Parallel runways Intersecting runways Can calculate hourly capacity and Annual Service Volume (ASV) as defined in FAA AC 150/5060-5, Airport Capacity and Delay 13

Chapter 4 Levels of Modeling 14

Chapter 4 Prototype of Spreadsheet Model Airfield Capacity Estimation using Spreadsheet Models Use the spreadsheet model to quickly estimate airfield capacities for Arrivals only, Departures only and Mixed Operations. ENTER OR ADJUST MODEL INPUTS OBSERVE AND EVALUATE OUTPUTS USE RESET BUTTON TO RETURN INPUTS TO DEFAULT SETTINGS INPUTS Light Green fill, with Bold Green text OUTPUTS Blue fill, with Bold White text Reset Inputs Grey fill, with Bold Red text Calculated/Linked Values & Descriptions have white backgrounds Calculated Values Linked Values Comments are attached to Input descriptions to provide understanding/definitions to input titles 15

Chapter 4 Partial Input Screen INPUTS Meteorological Conditions VMC, % Occurrence 90% IMC, % Occurrence 10% VMC-Departure-Arrival Separation 2.0 nm Arrival - Arrival Std. Dev. 18.0 sec IMC-Departure-Arrival Separation 2.0 nm Departure ROT Std. Dev. 6.0 sec Length of Common Approach 7.0 nm Z-Value, 95% Confidence 1.645 ------------ Operations Assumption on Touch -N- Go's 0% T-Factor (Touch-N-Go's) 1.00 RESET INPUTS Aircraft Classification New Category Small - S Small - T Small + Large-TP Large-Jet Large-757 Heavy Previous FAA Category A B C C C C D Maximum Gross Takeoff Weight (MTOW) Less than 12,500 lbs (Single Engine) Less than 12,500 lbs (Twin Engine) Between 12,500 lbs and 41,000 lbs Between 41,000 lbs and 255,000 lbs Between 41,000 lbs and 255,000 lbs Boeing 757 Series More than 300,000 lbs Fleet Mix Enter the actual or expected % share each aircraft class Share Allocations 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% Arrival Runway Occupancy Time Enter the estimated time from touchdown to runway clearance Time in Seconds 35 40 42 48 52 55 60 Average Approach Speeds Enter the average suggested manufacturers final approach speed under normal conditions Velocity in Knots 80 90 115 130 135 140 150 Runway Exit Availability Excellent (4 or more Exits) 100% Runway Crossing Demand No 0 Full Parallel Taxiway Full Taxiway 1.00 Approach Control Radar Yes Availability Use Advanced Settings to change ATC procedures and adjust 16 Arrival/Departure mix and priority

Chapter 4 Advanced Features Example Use Advanced Settings to change ATC procedures and adjust Arrival/Departure mix and priority Arrival Gap Spacing Buffer 0.0 sec <----OR----> Arrival Gap Spacing Buffer 1.0 nmiles Departure Hold Buffer 0.0 sec Arrival-Arrival Separation Requirements Distance in Nautical Miles (nm) Trailing Aircraft Leading Aircraft VMC IMC Small-S --- Heavy Small-S, Small-T 1.9 3.0 3 Alternate IMC Minimum Small-S --- Small+ Small + 1.9 3.0 3 (if Observed AROT < 50 Seconds) Large --- Heavy Small + 1.9 3.0 3 Use 2.5 nm in place of 3.0 nm? Small-S --- Small+ Large-TP, Jet 2.7 4.0 No Large --- Heavy Large-TP, Jet 1.9 3.0 3 Small-S --- Small+ Large-757 3.7 5.0 Large --- Heavy Large-757 2.7 4.0 Small-S --- Small-T Heavy 4.6 6.0 Small + --- 757 Heavy 3.6 5.0 Heavy Heavy 2.7 4.0 Departure - Departure Separation Requirements Time in Seconds Trailing Aircraft Leading Aircraft VMC IMC Small-S --- Small + Small-S- Small + 35 60 Large -TP --- Large 757 Small-S- Small + 45 60 Heavy Small-S- Small + 50 60 Small-S --- Small+ Large 50 60 Large --- Heavy Large 60 60 Small-S --- Large 757 Heavy 120 120 Heavy Heavy 90 90 17

Arrivals/Hour Chapter 4 Partial Output Screen OUTPUTS VMC IMC Average Arrivals Only Capacity 34 26 33 Arrivals Only Capacity (including TNG's) 34 26 33 Departures Only Capacity 60 60 60 Mixed Ops - Departure Capacity (including TNG's) 34 26 33 Total Mixed Operations Capacity 67 52 66 Arrivals Percentage 50% 50% 50% Capacity estimates for: Arrival priority Departure priority Various percentages of arrivals Pareto Frontier Chart Selection VMC 40 VMC Arrival -Departure Ca Save - 35 Used for Graphing only! 34, 34 30 0, 34 Used in Graph Departures 25 Arrivals Departures Arrivals Departures Arrivals 0 34 0 26 0 33 0 34 34 20 34 26 26 33 33 34 34 60 0 60 0 60 0 60 0 15 VMC IMC Average 10 5 VMC Arrival -Departure Capacity Frontier 60, 0 Similar to capacity charts in the FAA Airport Capacity Benchmark Report 2004 (and upcoming 2011) 0 0 10 20 30 40 50 60 70 Departures/Hour 18

Chapter 4 MITRE runwaysimulator ACRP 03-17 Project will provide an independent assessment of the runwaysimulator for purposes of airfield capacity evaluation Developed at MITRE CAASD Discrete-event simulator based on link-node system Simulates aircraft on runways & terminal airspace Comparison with data from ASPM database Appropriate level of modeling sophistication and applications MITRE plans to release this model to the public in 2012 Jennifer Gentry and Bill Swedish of MITRE will cover this model in more detail 19

Chapter 5 How to Select the Level of Modeling Sophistication Hierarchy/Decision Tree (see next 6 slides) 20

Chapter 5 Decision Hierarchy 1: Data Requirements / Availability 21

Chapter 5 Decision Hierarchy 2: Checklist Items (1 of 3) 22

Chapter 5 Decision Hierarchy 2: Checklist Items (2 of 3) 23

Chapter 5 Decision Hierarchy 2: Checklist Items (3 of 3) 24

Chapter 5 Decision Hierarchy 3: Questionnaire (1 of 2) 25

Chapter 5 Decision Hierarchy 3: Questionnaire (2 of 2) 26

Chapter 6: Subsequent Uses of Capacity Information 1. Demand-Capacity Comparisons 2. Aircraft Delay Estimation 3. Aircraft delay-based definitions of capacity (e.g., annual service volume as defined in FAA FACT studies) 4. Reference ACRP Project 03-20, Defining and Measuring Aircraft Delay and Airport Capacity Thresholds 27

Guidebook Appendices A. User s Guide for Spreadsheet Model B. Available Guidance on MITRE runwaysimulator C. Definitions of Terms D. Essential References and Data Sources E. Case Studies lessons learned 28

Next Steps 1. Submit draft Guidebook, draft Final Report, and results of modeling tasks to ACRP Panel for review in February 2012 2. Submit final Project deliverables to ACRP by end of March 2012 3. Expect publication of final ACRP Report a few months thereafter 29