Company Profile Resumé Selected Projects Complete Project Lis ng Architecture Construction Management General Contracting 303.403.1228 www.tectonicdesignbuild.com Design/Build
Experience: Flight Departments / Hangars Architect for a renovation of an existing hangar for a corporate flight department facility comprised of a 26,500 SF hangar and 16,400 SF office space/support area. The facility includes executive offices, conference rooms, waiting lounge, pilot/mechanic offices, pilot/mechanic support areas, and mechanic shop spaces. Business Jet Center Hangar 9 Corporate Oakland, CA 2013 Design / Builder for a corporate flight department facility comprised of a 30,000 SF hangar and 9,900 SF office space/support area. The facility includes executive offices, conference room, waiting lounge, customer offices, pilot support areas, shop space and an interior vehicle parking area. Rare Air Corporate Centennial, CO 2012 Architecture master plan and architectural services for a new corporate storage hangar expansion to an existing FBO facility which includes one 30,000 SF hangar and one 18,000 SF hangar with support spaces. Utilities for the hangar support spaces are set up to accommodate future tenant build-out. Sun Air Jets Corporate Camarillo, CA 2010 Design / Builder for a corporate flight department facility comprised of a 20,000 SF hangar, a 10,000 SF office and shop area and a 3,000 SF storage area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot support areas, shop space and catering area. International Paper Company Corporate Flight Department Hangar Memphis, TN Design / Builder for a corporate flight department facility comprised of a 30,400 SF hangar with a 13,800 SF office and shop support area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot support areas, shop space and an interior parking garage. Design / Builder for a corporate flight department facility comprised of a 30,400 SF hangar with a two-story, 19,000 SF office and shop support area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot support areas, shop space and interior parking garage. Design / Builder for a 45,600 SF storage hangar with 2,400 SF of leasable tenant space and 3,600 SF of support shops. The hangar was designed with flexible systems, allowing the space to be divided into three separate, leasable hangars. Design / Builder for a corporate storage hangar with a 12,470 SF aircraft storage hangar and 6,800 SF of office and shop support areas. Design / Builder for a 19,200 SF storage hangar including a 160-0 free span hangar with in-floor radiant heat. The structure is designed to accommodate a future office addition. Design / Builder for a 19,500 SF storage hangar with over 13,000 SF of support shops, corporate offices, pilot offices and customer spaces. Additionally, up to four times per year, the hangar is set up to function as a banquet hall with capacity to serve and entertain up to 600 people. Stephens Group Corporate Hangar Little Rock, AR Stephens Inc. Corporate Hangar Little Rock, AR Supermarine Little Rock, AR TBD Skye Gryphon Rifle, CO Wyoming Dept. of Transportation Cheyenne, WY 2007 Bohemian Real Estate II, LLC Loveland, CO 2007 Architecture Construction Management General Contracting 303.403.1228 www.tectonicdesignbuild.com Design/Build
Experience: Flight Departments / Hangars Appearance Management Group, Inc. Location TBD 2006 proposal Business Jet Center B Dallas, TX 2003 Prepared in coordination with Appearance Management, Inc., the proposal entails a series of new hangar facilities comprised of separate leasable 5,600 SF hangars with shop/office support spaces, with an overall square footage of 36,750 SF. The facility also includes a club house for all tenants. Architect for a 40,000 SF storage hangar over 30,000 SF of hangar space with support office and shop space. The design provides doors at each end of the hangar which allows for maximum aircraft movement flexibility. Atlantic Aviation Teterboro, NJ 2002 Construction Management services for a 31,000 SF storage hangar with over 7,000 SF of corporate office space. Business Jet Center Corporate Hangar L Dallas, TX 2001 Architect for an 18,000 SF hangar and a two story, 6,000 SF office / shop lean-to. Signature Flight Support A Dallas, TX 2001 Construction Management service for a 17,000 SF Hangar with 5,000 SF of office space. Richards Aviation Corporate Hangar Memphis, TN 2000 Architecture, Construction Management, and Development of a 12,000 SF storage hangar facility including 3,400 SF of office and maintenance space. Signature Flight Support 4 Dallas, TX Architecture and Construction Management for a 17,000 SF corporate aircraft storage hangar and 5,00 SF of offices. AMR Combs Indianapolis, IN 1998 Architecture and Construction Management for a 21,000 SF corporate aircraft storage hangar and 5,500 SF of offices. Design/Build www.tectonicdesignbuild.com 303.403.1228 General Contracting Construction Management Architecture
Experience: s Renovation and addition to an existing FBO facility including customer lobby expansion, corporate offices, conference rooms, pilot s lounge, line support spaces and mechanics shop/parts storage spaces. Atlantic Aviation Services Casper, WY 2013 Design / Build for a fixed base operation comprised of a 20,000 SF storage hangar and a 15,000 SF office area. Spaces within the office area include a customer lobby, corporate offices, conference rooms, customer office space, shop space, storage space and break room. Supermarine Little Rock, AR Architecture master plan for a new FBO facility which includes an Executive Terminal to support the existing campus. Prepared in coordination with TAC Air, the proposal entails the renovation and expansion of an existing executive terminal and the addition of a new 20,000 SF hangar located on an adjacent site. This FBO is comprised of a 25,600 SF hangar, a 9,000 SF office area and a 3,000 SF GSE/Vehicle maintenance shop. The FBO incorporates executive office spaces, a conference room, waiting lounge, pilot support areas and catering area. The proposed Fixed Base Operator includes three main components: 1) a two story, 25,000 SF executive terminal building; 2) a two story, 150 stall parking structure; and 3) a 60,000 SF service / storage hangar with shop support space. The ramp area includes over four acres of concrete paving with a full service fuel farm. Dassault Falcon Jet Wilmington, DE 2007 proposal Tac Air Fixed Base Operator San Francisco, CA 2006 proposal Sun Valley Aviation Hailey, ID 2005 ACM Aviation San Jose, CA 2002 proposal Architecture and Construction Management for the renovation of an 11,000 SF executive terminal providing both cosmetic and room modifications to create a more efficient plan. Signature Flight Support Executive Terminal Memphis, TN 2000 Construction Manager for American Airlines for the entire AMR Combs Campus including a maintenance hangar, executive terminal, vehicle maintenance facility and overall site development. AMR Combs FBO Facility 1998 Project Management / Owner's Representative for American Airlines for the entire AMR Combs Campus including a maintenance hangar, aircraft storage hangar, executive terminal, vehicle maintenance facility and overall site development. AMR Combs FBO Facility San Francisco, CA 1998 Architecture Construction Management General Contracting 303.403.1228 www.tectonicdesignbuild.com Design/Build
Experience: Completion & Maintenance Centers Maintenance Hangar Lincoln, NE scheduled completion: 2014 Pilatus Business Aircraft Maintenance & Modifications Hangar Broomfield, CO proposal 2013 Summit Aviation, Inc. Middletown, DE 2010 Provo, UT proposal Western Aircraft Company Boise, ID proposal Design/Builder for a 175,000 SF Maintenance Hangar. The facility includes two 40,000 SF maintenance hangar bays with aircraft drive-thru capability. Directly adjacent to the hangar spaces on the first floor are maintenance shops, parts, and storage areas totaling over 47,000 SF. Additionally, second floor space totaling over 47,000 SF includes maintenance storage spaces, future shops and corporate offices. Architecture master plan for a new Corporate Completions Campus. The facility includes a 120,000 SF Completions center with hangar space, Shops and Offices, a Training Center, and a two-bay facility. Master planning and renovation of an existing maintenance and modifications facility totaling over 300,000 SF. Current work includes a 9,950 SF Cold Storage Facility and Conceptual Design for a proposed 44,600 SF Maintenance Hangar with Paint Bay and Support Shops and Offices. Master planning for a new maintenance and modifications facility, comprising a final build-out totaling over 300,000 SF. The project includes corporate offices, shops, paint hangars, maintenance hangars, and associated ramp construction. Master planning for a multi-building facility to accommodate the client s future growth necessities comprising of new paint facilities, hangar facilities and support spaces. Battle Creek, MI Dassault Falcon Jet Wilmington, DE 2003-2007 Design / Builder for a renovation and new addition to an existing facility encompassing a final build-out totaling over 350,000 SF. The project also included the construction of a new paint hangar / storage facility and master planning for the entire maintenance and modifications campus. Design / Builder for a renovation and new addition to an existing facility encompassing a final build-out totaling over 350,000 SF. The project also included the construction of a new paint hangar and master planning for the entire maintenance and modifications campus. Elliott Aviation Paint & Completions Hangar Moline, IL 2003 Design / Builder for a 48,000 SF completions facility including a strip hangar, detail hangar, and a complete state of the art downdraft paint hangar. A design center and shop spaces are also provided. Maintenance & Modifications Hangar Lincoln, NE 2000 Design / Builder for a 130,000 SF completions and maintenance facility including a 60,000 SF hangar and over 70,000 SF of support spaces. Bombardier / Lear Jet DIA Completions & Maintenance Hangar 1996 Located at Denver International Airport; work includes a 30,000 SF aircraft storage facility with support spaces. Design/Build www.tectonicdesignbuild.com 303.403.1228 General Contracting Construction Management Architecture
Experience: Aviation s This 41,900 SF paint hangar includes a downdraft bay for aircraft paint jobs and a cross draft bay for sanding, striping and priming. The attached office spaces provide areas for shop managers, shops and storage. West Star Aviation Paint Facility Grand Junction, CO 2014 scheduled Design/Builder for a 53,000 SF paint hangar that includes a downdraft bay for aircraft paint jobs and a cross draft bay for sanding, striping and priming. The structure of the building is set up to accommodate a future cross draft paint bay for more flexibility in the painting process. The attached office spaces provide areas for shop managers, shops and storage. Paint Facility Lincoln, NE 2013 Renovations at this existing maintenance and modifications facility include new paint booth installations and upgrades to the existing shop infrastructure Paint Facility Lincoln, NE Master planning for a new maintenance and modifications facility, comprising a final build-out totaling over 300,000 SF. The project includes corporate offices, shops, paint hangars, maintenance hangars, and associated ramp construction. Provo, UT proposal Master planning and renovation of an existing maintenance and modifications facility; the project includes major additions to the campus including a new Down Draft and Cross Draft. The campus will also see the addition of a 40,000 SF Maintenance and Completions Hangar. Renovation work includes office, shop, and general renovations of the facility. Western Aircraft Company Boise, ID proposal Master planning for an existing maintenance and modifications facility. The project includes the addition of a new Down Draft and Cross Draft and a 40,000 SF Maintenance and Completions Hangar. Atlantic Aero Greensboro, NC proposal This facility is comprised of a 20,800 SF Paint Bay and 8,500 SF of support space; including a locker room, small parts paint booth, storage space with separate hazardous storage area and a loading dock. Total build-out equals 29,300 SF. Battle Creek, MI 2007 Design / Build for a 38,000 SF paint facility including a state of the art, dual-flow balanced, downdraft paint hangar, a sand/strip hangar bay, and a cross flow priming/striping hangar bay. Two story support spaces are centrally located within the building. Dassault Falcon Jet Wilmington, DE 2004 This Paint and Completions facility is comprised of an 8,840 SF drive through downdraft Paint Bay, a 9,950 SF Sand/Strip Bay, a 17,120 SF Completions Bay and 23,400 SF of shop/office/storage space. Total build-out equals 59,310 SF. Elliott Aviation Moline, IL 2003 Architecture Construction Management General Contracting 303.403.1228 www.tectonicdesignbuild.com Design/Build
Experience: Commercial Facilities Global Finishing Solutions Office Expansion Osseo, WI 2012 Architect for a 32,000 SF office addition and renovation of an existing 13,000 SF office building. Spaces include open office areas, conference rooms, corporate offices, customer reception lounge, and an employee break room. The office space provides support for adjacent shop fabrication/production campus facilities. The Ginn Mill Bar Code analysis and conceptual design for proposed expansion to an existing bar in downtown Denver. Rentech Green Energy Research Campus City of Blackhawk Vehicle Maintenance Facility Blackhawk, CO Code analysis, regulatory permit and building department permit acquisition for an existing green energy industrial research campus. This facility is designed to accommodate the vehicle maintenance needs for the City of Blackhawk, CO. The 14,350 SF building houses a vehicle wash bay, 10 vehicle maintenance bays including a vehicle lift bay, and shop spaces. The floor plan incorporates a mezzanine level with additional office and mechanical spaces. 745 Sherman St. Commercial Office Building Architect for a Commercial Office Building. Rocky Mountain Academy Charter School Evergreen, CO 2002 Architect for a converted office building to an eight classroom Charter School. Sucia Corporation Frontier Office Building Golden, CO 2001 Architect and General Contractor for a three story office building in downtown Golden, CO. Faestel Properties Parker Valley Center - Lot 3 Parker, CO Architect for a 21,000 SF office / retail center for a free-standing facility housing corporate and medical offices in conjunction with retail outlets. Design/Build www.tectonicdesignbuild.com 303.403.1228 General Contracting Construction Management Architecture
Experience: Commercial Facilities Architect for a 25,000 SF office / retail center for a free-standing facility comprised of corporate and medical offices in conjunction with retail outlets. Faestel Properties Parker Valley Center - Lot 4 Parker, CO Architect for a 4,500 SF transmission shop with multiple bays. Faestel Properties Transmission Center Parker, CO Architect and Construction Management for a 43,000 SF, 30-unit congregate care facility. K.R.C.A. Elderly Care Facility Kimball, NE Design and construction management services with consultant/developer/ contractor for a $60 million amusement park within the $625 million Mall of America, for Knotts Berry Farm. Mall of America Camp Snoopy Amusement Park Minneapolis, MN 1995 Design / Build of entire development including conditional use approvals, design, code and regulatory coordination, architecture and construction. Denver International Airport - Design and construction management for the tenant finish construction of an addition doubling the size of the luxury traveller s club room. Project management for the finance for the finance, design / build and operation of the entire airport glycol application, collection and recycling system. Construction Manager for an upgrade to an existing facility including drive-thru lanes and canopy. Texaco Auto Service Center Littleton, CO 1993 American Airlines Admiral s Club 1993 Denver International Airport Aircraft De-icing System 1992 First State Bank Bank Facility Thornton, CO 1991 Architecture Construction Management General Contracting 303.403.1228 www.tectonicdesignbuild.com Design/Build