Canal Street Ferry Terminal Design Presentation and Pedestrian Bridge Public Input Session. Facilitated by Bill Rouselle, Bright Moments, LLC

Similar documents
REGIONAL TRANSIT AUTHORITY BOARD OF COMMISIONERS MAY 27, 2014 FERRY PRESENTATION

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

Community Advisory Committee Meeting #3 April 21, 2015

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

ARLINGTON COUNTY, VIRGINIA

WATERFRONT PROGRAM PROGRESS REPORT

Market Connections Committee Meeting Agenda

Plaza Park, Village Park, and Community Clubhouse

South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

FY Transit Needs Assessment. Ventura County Transportation Commission

WINNETKA LANDMARK PRESERVATION COMMISSION NOTICE OF MEETING January 16, :00 p.m.

Restoration of Historic Streetcar Services in Downtown Los Angeles

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

Memorandum / Letter of Intent

Public Outreach Activities for San Francisco Groundwater Supply Project 2007 through 2014

Capital Programs Update

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Port Everglades Master/Vision Plan Update

Final General Management Plan/Wilderness Study/Environmental Impact Statement:

Board Report April 26, 2016

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire

TORONTO TRANSIT COMMISSION REPORT NO.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

South Bay Metro Green Line Extension

Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting

Arvidson, Adam R. Adam,

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

ANSI Unmanned Aircraft Systems Standardization Collaborative (UASSC) Kick-off Meeting. 28 September 2017 (updated 4 October)

Welcome. Green Line in Your Community

Submission to NSW Koala Strategy Consultation Process. March 2017

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

FERRY TERMINAL ST LUCIA

Mercer Island Town Center Stakeholder Meeting E. June 10, 2015

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Market Connections Committee Meeting Agenda

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Architectural Review Commission

Town of Perryville Town Meeting Minutes July 2, The Town of Perryville Town Meeting was called to order at 7:00 p.m. by Mayor Eberhardt.

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Chapter 1 Introduction and Project Overview

1. INTRODUCTION 2. OTAS AND THE MFN CLAUSE

Jamie Cepler Washington Metropolitan Area Transit Authority, Bus Operations Specialist Washington, DC

Village of Glenview Appearance Commission

AAPA CRUISE SEMINAR CRUISE FACILITY DESIGN, PROCESSING, SAFETY & SECURITY Jim Rowe, AIA Bermello Ajamil & Partners APRIL 25, 2013

Total 1 Total. Current Functions (Enter categories from instructions) Materials (Enter categories from instructions)


Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

CRUISE TERMINAL DEVELOPMENT THE TRUE STORY

CITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES

STATE OF IOWA. Historical and Architectural Survey for 2008 Flood Projects in Vinton, Benton County

Nantucket Memorial Airport Master Plan Update

Cabinet Member, Councillor Kerry had submitted a written report by which had been circulated to Parish Councillors.

2017 Proposed Service Changes. For Public Meetings January 2017

MINUTES OF THE REGULAR MEETING ZONING BOARD OF APPEALS MAY 19, 2008

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

Mechanized River Valley Access Public Engagement Report. April 2015

LUDLAM TRAIL CORRIDOR DISTRICT

Introduction DRAFT March 9, 2017

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Three Sisters Campground Redevelopment

Central Mississippi Riverfront Regional Park Master Plan

CITY OF ONALASKA MEETING NOTICE

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

SECTION 106 ACTIVITIES ANNUAL REPORT

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

JetBlue University includes approximately 106,000 square feet of training facilities, classrooms,

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Master Plan Phase 2 Building on Partnerships

Rogue River Access and Management Plan Draft Alternatives

WINTER SHELTER IN EAST KING COUNTY

September Past issues IUMI Political Forum

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Union Station Queens Quay Transit Link Study

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR

Ozaukee County Transit Development Plan

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING FEBRUARY 22,, 2018

ALLIANCE CITY PLANNING COMMISSION MINUTES OF JANUARY 15, 2014 MEETING 4:30 P.M.

PRM SAC SOCIETA AEROPORTO CATANIA

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

SR 934 Project Development And Environment (PD&E) Study

REGULAR PUBLIC MEETING OCTOBER 4, 2010

Transcription:

7:45

Canal Street Ferry Terminal Design Presentation and Pedestrian Bridge Public Input Session Facilitated by Bill Rouselle, Bright Moments, LLC

Canal Street Ferry Terminal Design Presentation 6:00pm-6:30pm Facilitated by Bill Rouselle, Bright Moments, LLC

Ferry Terminal Design Presentation Purpose: Provide history of Ferry Terminal design, review past input, present final design, provide project update and next steps Facilitator: Bill Rouselle, Bright Moments Presenter: Brian O Reilly, Royal Engineering

Ferry Terminal Design A Brief History In 2014, having a successful track record with Federal grants, the RTA discovered that the Terminal may be eligible for replacement under the TIGER Grant program, as well as other State and Local sources. By 2015 a conceptual rendering of an all new Terminal, that would be controlled by a local agency, was circulated to the community and local leaders. With full support of both, the TIGER Grant application was completed and an award made in late 2015.

Ferry Terminal Design Stakeholder/ Design Meetings 08/10/15 - Port of New Orleans Project Coordination Meeting (#1) @ PONO 09/23/15 - Preliminary Vision Alignment @ CNO 10/07/15 - Traffic Circle Planning @ CNO 10/07/15 - Wharf-Integrity Planning @ CNO 10/28/15 - FTA/RTA Announce Grant Award 10/29/15 - Tricentennial Group Vision/Progress Alignment (#1) @ RTA 11/03/15 - Vision Alignment @ CNO 11/06/15 - Port of New Orleans Coordination Meeting (#2) @ PONO 11/11/15 - Design Charrette @ CNO 11/12/15 - Tricentennial Group Vision/Progress Alignment (#2) @ Woodward D-B/WTC 11/13/15 - Design Charrette Outcomes @ Manning Architects 12/03/15 - Tricentennial Group Vision/Progress Alignment (#3) @ Woodward D-B/WTC 12/17/15 - Tricentennial Group Vision/Progress Alignment (#4) @ CNO 12/17/15 - Project Design Presentation @ Manning 04/30/16 - FTA approves 30% Design 05/19/16 - New Orleans Public Belt Coordination Meeting (#1) @ Royal 05/25/16 - Port of New Orleans Project Coordination Meeting (#3) @ PONO

Ferry Terminal Design Activities/ Meetings November 2016 February 2017 10/18/16 - Project Design Presentation @Audubon Nature Institute 10/24/16 - Project Design Presentation @ Audubon Nature Institute 01/04/17 - Design Team Public Outreach Special Meeting 01/12/17 - Port of New Orleans Coordination Meeting @ PONO 01/10/17 - Justin Augustine, Mark Major meeting with Councilman Jared Brossett 01/10/17 - Justin Augustine, Mark Major meeting with Councilwoman Nadine Ramsey 01/11/17 - Meeting with Algiers Point Association, Ferry Association 01/18/17 - Public Outreach Meeting #1 @ Audubon (General Public with Algiers Point Association, Ferry Association) 02/07/17 - City Planning Commission Hearing #1 on Demolition @ City Hall (General Public with Algiers Point Association, Ferry Association). Commission deferred vote until 2/24/17. 02/20/17 - Public Outreach Meeting #1 @ Westbank Community Center Library (General Public with Algiers Point Association, Ferry Association) 02/24/17 - City Planning Commission Hearing #2 on Demolition @ City Hall (General Public with Algiers Point Association, Ferry Association). Commission voted 4-3 in favor, but needed 5-3 by law to take any action, therefore, deferred to City Council s 3/23/17 meeting. 03/16/17 - Joint Riverfront Projects Coordination Meetings, CNO (on-going) 03/17/17 - FTA approves 60% Design 03/23/17 - City Council Hearing of Demolition Permit

Ferry Terminal Design What We Heard What we heard from the January 18, 2017 and February 20, 2017 public outreach meetings: Services should be increased and ADA Accessibility restored Enclosed shelter and better Security should be provided Pedestrian bridge provided How we addressed/incorporated requests and suggestions: Listened to the community, the neighbors, the organizations, and funding sources. The old Terminal will be replaced with an enclosed, iconic structure A new wharf will connect adjacent wharves for 360-degree ADA accessibility, and integrate the Streetcar and Bus systems. Canopies will be added to the Gangways & a new pedestrian bridge built

Ferry Terminal Regulatory Agencies Regulatory agencies that have provided approval: FTA USCG USACE LADOTD CPRA/SLFPAE/OLD LADEQ LASFM PONO CNO/CPC/DPW/HDLC/VCC SHPO

Ferry Terminal Design

Ferry Terminal Design

Ferry Terminal Design

Ferry Terminal Design Schedule Currently the designers are preparing the Construction Documents. Advertisement to Contractors by the end of the year. NTP for Construction by first quarter of 2018. Substantial Completion by first quarter of 2019. Schedule could be impacted by high water levels on the Mississippi River Continuous ferry service during demolition and construction with temporary ADA accessible landing barge located at the wharf behind the Audubon Aquarium

Thank You!

Pedestrian Bridge Public Input Session 6:30pm-7:45pm Facilitated by Bill Rouselle, Bright Moments, LLC

Before We Get Started A message from Audubon Nature Institute Ronald Forman, President and Chief Executive Officer A second Pedestrian Bridge Public Input Session will be held on Thursday, January 18, 2018, 6:00pm 8:00pm at the Algiers Auditorium in Federal City 2485 Guadalcanal Street, New Orleans, LA 70114

Pedestrian Bridge Public Input Session Purpose: Provide history of pedestrian bridge project, review location analysis and location selection, conduct public input session NOTE: The pedestrian bridge has not been designed, please disregard anything you have previously seen or heard Facilitator: Bill Rouselle, Bright Moments Presenter: Ray Manning, Manning Architects

Pedestrian Bridge CEA Agreement CEA Agreement

Pedestrian Bridge Location Analysis How was the location selected? Location options included: 1. Audubon Aquarium 1A. Audubon Plaza/Badine street 2. Audubon Plaza/Canal Street 3. Ferry Terminal 4. Spanish Plaza/Four Seasons Hotel What was the criteria for selection?

Bridge Location Options Schematic

Pedestrian Bridge Location Analysis Location Rating Matrix Produced the Audubon Aquarium site as best suited

Pedestrian Bridge Public Input Session Why We re Here Take public input on the design of the pedestrian bridge s functionality and aesthetics How we are going to take public input: Complete comment cards 3 minutes for statements Session is being recorded

Conclusion Next steps: January 18, 2018 Pedestrian Bridge Public Input Session 6:00pm 8:00pm Algiers Auditorium in Federal City 2485 Guadalcanal Street, New Orleans, LA 70114

Thank You!