CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

Similar documents
CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Thailand ATFM Operations at Sub- Regional Level

Operations Hand Book. Air Traffic Flow Management. Central Command Center Central - Air Traffic Flow Management New Delhi

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Cooperative traffic management

Air Traffic Flow & Capacity Management Frederic Cuq

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

International Civil Aviation Organization

ATM Network Performance Report

A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)

Hosted by General Civil Aviation Authority (GCAA)

AIRPORTS AUTHORITY OF INDIA AIR NAVIGATION SERVICES

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Future Network Manager Methods

Airspace Organization and Management

Network Manager Adding value to the Network 29 September 2011

Asia/Pacific Region A-CDM Planning

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

Bits to Blocks Aviation System Block Upgrades (ASBU)

The flow centric approach :

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

MET matters in SESAR. Dennis HART

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

AIR TRAFFIC FLOW MANAGEMENT SYSTEM (ATFMS)

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

ATFM/CDM ICAO s Perspective

Runway Scheduling Limits Summer 2015

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

Main Air Traffic Management Center

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seen through an IATA lens A-CDM Globally

ORGANISER HOST LEAD SPONSOR

ATM Network Performance Report

[EFFECTIVE DATE: 23 AUG 2012]

Global 8 ATFM Conference 4 6 November 2014 Cancun, Mexico

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Civil and military integration in the same workspace

ATM Collaboration & Data Sharing

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

ATNS Operations Division. Air Traffic Flow Management

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

CANSO ATFM Data Exchange Network for the Americas (CADENA) (Presented by ALTA, CANSO, COCESNA and IATA)

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

Implementation of SESAR Pilot Common Project. - expected effects

ATM processes automatization for Runway (Airport) Throughput Enhancement

ATTACHMENT 2 ADDITIONAL AIRSPACE ALLOCATION PROCEDURES

Agenda Item 3: Performance framework for Regional Air Navigation Planning and Implementation

STATUS OF IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN INDIA

From local to regional to global ATFM

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Efficiency and Automation

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

Operations Control Centre perspective. Future of airline operations

Setting the Scene. Chris Zweingathal CEO Airlines Association of South Africa

ECOsystem: MET-ATM integration to improve Aviation efficiency

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

AOP-NOP Integration. Airports CDM Information Exchange Dr. Alexandra von Eckartsberg

ACI EUROPE POSITION PAPER

SES Performance Scheme

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Airspace User Forum 2012

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Classification: Public

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

SESAR Solutions. Display Options

Disruptive Technologies in Air Traffic Management

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

PART II AIR TRAFFIC FLOW MANAGEMENT (ATFM) DRAFT

South African ATFM & A-CDM - Progress and Integration Status. Mikateko Chabani

FUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013

Pre-Coordination Runway Scheduling Limits Winter 2014

The Network Manager tasks and the ASM improvement initiative

Network Operations Performance

MULTI-NODAL ATFM COMMON OPERATING PROCEDURES (COP)

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

DFLEX (DEPARTURE FLEXIBILITY) When Airport CDM becomes a reality!

MID Region Air Navigation Strategy

DFS Aviation Services GmbH. A brand of experience. Aviation Services

Air Traffic Control System Command Center (ATCSCC) Crisis Management. Federal Aviation Administration 1

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

Intentionally left blank

Changi Airport A-CDM Handbook

Air Traffic Management during VTBS RWY 01R/19L Maintenance

AIR TRAFFIC FLOW MANAGEMENT

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

Transcription:

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA 1 ATFM Global Symposium-2017

Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation Future Developments 2

Air Traffic Forecast 2016-2021 Aircraft Movements (in 000) 3

INTERNATIONAL TRAFFIC FLOW ( PER WEEK) About 3500 Flights per week NEAR 5% Approximately 70% of the International Traffic operates within FIVE Hour flight time from India SOUTH EAST 20% 4

C ATFM SYSTEM IN INDIA Major Airlines State Agencies ATC AIS Remote Users 12 ACCs 24 APPs 36 TMUs CCC Delhi International ATFM Future Capability CNS / ATM Meteorological Information ASM 11/22/2017 ATFM Airports Global Symposium 2017 5 Military Authorities GA

C-ATFM ORGANISATION Phase 1 C-ATFM operations ATFM operation in India started w.e.f. 27/04/2017. a CCC at Delhi and 6 FMPs at the major ACCs of Delhi, Mumbai, Chennai, Kolkata, Bangalore and Hyderabad These cities airports handle about 60% of Indian traffic CCC (Delhi) FMP FMP FMP FMP FMP FMP (Delhi) (Mumbai) (Chennai) (Kolkata) (Bangalore) (Hyderabad) 6

Ground Delay Program (GDP) The C-ATFM System applies regulations to arrivals to a constrained airport in the form of GDP. The departures departing from Indian airports are given a Calculated Take Off Time ( CTOT). The CTOT is the expected time of departure. The airline accordingly adjusts the EOBT. The CTOT window is ( -5 to +10 ). CATFM Phase I operations mainly concentrate on GDP program. 7

CCC Assessment Process Which airports are congested? When and for how long? To what extent? Can the situation be managed without restrictions? How many aircraft are impacted? What time is the expected impacted? Do we have the time for customers collaboration? What measures are to be used to balance demand with capacity (i.e., GDP, GS) 8

Process of Implementation Phase I 2015-17 Phase II 2017-18 Phase III 2019 onwards Airport ( Ground )Delay Program Airport Arrival Constraints e.g. weather, runway outage Addressing constraints of Six Major Airports Ground Delay Program and Airspace Flow programs supporting Airspace Congestion & DCB at most airports across Country Interconnectivity among ATFM ACDM systems Availability of WEB Services for all stakeholders Ability to exchange information with adjacent ATFM Systems Integration with SWIM and 4D-Trajectory Management 9

ATFM Parameters being monitored ATFM Program Impact ATFM Ground delay statistics (ATFM ground delay defined as CTOT-ETOT) ATFM Compliance Measurement ATFM Scenario ATFM Delay statistics Overall compliance rate Affected Flight statistics ATFM Delay Distribution ATFM departure slot adherence distribution Month wise Average ATFM Delay Adherence rate of Airline operators Adherence rate of Regions Adherence rate of Airports within different Regions 10

ATFM Measures Since May 17 25000 ATFM Measures Data 20000 15000 17251 18932 19438 10000 5000 0 11867 10232 8206 8213 7603 7567 7948 6806 4976 4336 4201 4740 2842 3105 3277 39 1695 60 85 102 66 2151 May-17 Jun-17 Jul-17 Aug-17 Sep-17 No of Programs Total Number of Aircraft Affected International Flights Domestic Arrivals Domestic Departures 11

CHALLENGES Data availability for network-wide demand projection Eg., Flight Plan Data, No Ops Data, delay, change. Flexibility to adapt the plan Capacity can change, the plan must be able to change with it Aircraft operators can modify flight priorities and schedules Non adherence to CTOTs and Flight Schedule; Active Participation of Stakeholders; Reliable Met Forecast ; Evolution of C-ATFM System; Integration of ACDM with ATFM Airspace Reorganization WIP; Coordination with Military _ FUA 12

WAY FORWARD Implementation of ATFM measures in Indian Airports Phase I commenced on 27 th April 2017 for 6 airports Phase II September 2018 Nation wide application Cross Border ATFM 2019? Integration with Global ATFM. 13