East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Similar documents
WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

SOUTH BELLEVUE PARK AND RIDE

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

5.1 Traffic and Transportation

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

East Link Extension. Redmond stations Open House November 17, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

EAST LINK EXTENSION 2017 SEPA Addendum

AGENDA ITEM I-6 Public Works

East Link Extension. Park-and-ride options during East Link construction

I-405 Express Toll Lanes Coming in 2015

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Work in 2015 and Annual Mobility- Management Plan

ENA General Membership Meeting

November 21, 2012 Barbara Kelleher, (954)

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Northeast Corridor Transportation Update

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

2018 Service Implementation Plan Executive Summary

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

G Street Undercrossing. City Council Meeting Date: November 3, 2008

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

Fairfax County Parkway Widening Fairfax County

A. CONCLUSIONS OF THE FGEIS

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Fairfax County Transportation Advisory Commission (TAC)

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

McLean Citizens Association Transportation Committee Project Briefing

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Washington State Transportation Commission

Arlington County Board Meeting Project Briefing. October 20, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Long water shutdown scheduled for Tuesday, September 18

A VISION FOR I-95. January 12, Delaware Department of Transportation

Lake Erie Commerce Center Traffic Analysis

Cell: (408) Release MA June 25, 2012

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Concord Road Interchange. Standard hours of work

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

I-95/395 HOV/Bus/HOT Lanes Project Overview

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

Transportation Supporting Dulles Airport

DOWNTOWN BRT ALTERNATIVE - 19th AVE

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

BRIEFING Subject: 2017 Visitation Initiatives

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

Pre-Construction Public Meeting July 2017

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

An Orientation to Today s Webinar

The Point Roundabout Improvement Scheme

Treasure Island Supplemental Information Report Addendum

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

25 th Avenue Grade Separation. September 13, 2017

Sound Transit Operations August 2015 Service Performance Report. Ridership

I-35 Reconstruction Project

Title VI Analysis for Route Based Fares

Public Information Center August 12, 2010

Region of Waterloo Transportation and Environmental Services Transit Services

Updating the vision for regional transit

(This page intentionally left blank.)

TORONTO TRANSIT COMMISSION REPORT NO.

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

CENTRAL AND EAST CORRIDORS

Exposition Light Rail Transit Project

SECTION 106 ACTIVITIES ANNUAL REPORT

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

SAN LUIS OBISPO TRANSIT + SAN LUIS OBISPO RTA JOINT SHORT RANGE TRANSIT PLANS: SERVICE STRATEGIES. Presented by: Gordon Shaw, PE, AICP; Principal

Construction Staging Area Blue Jays Way (357 King Street West)

Major Projects Overview

BENEFITS OF YOUR FUTURE RIDE

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Juneau Comprehensive Operations Analysis and Transit Development Plan DRAFT RECOMMENDATIONS January 2014

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

395 Express Lanes Project Update

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question.

Sound Transit Service Standards and Performance Measures Edition

Title VI Service Equity Analysis

PennDOT Interstate Work next week March 30-April 3:


Public Open House. Chief Peguis Trail Project

1.2 Corridor History and Current Characteristics

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

DEMOGRAPHICS AND EXISTING SERVICE

TORONTO TRANSIT COMMISSION REPORT NO.

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

I-66 Inside the Beltway Feasibility Study

KING STREET TRANSIT PILOT

Transcription:

East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1

Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities Relocation Guideway Construction Mics. Lane Closures South Bellevue Park and Ride Mitigation plan Closure 2

TFP project 242 Bellevue Way HOV Partially funded (Design and Environmental work only) in the 2015-2021 Capital Investment Plan Environmental Work * Design* Right-of-Way Acquisition Project Permitting, Including SEPA Construction Bellevue Way HOV Preliminary Project Schedule 2015 2106 2017 2018 2019 2020 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Plan Modifications Per Negotiations and Permit Conditions * Funded 3

Bellevue Way Early Work Utilities Relocation Evaluated number of options 12 to 15 weekend full closures Potential keeping one lane northbound open during most of the weekend closures 4

5

Bellevue Way - Maintenance of Traffic During Construction Maintain 2 lanes of traffic in peak direction Minimize disruptions to City businesses and residents 6

Bellevue Way - Maintenance of Traffic During Construction Evaluating number of options including reversible lane operation 7

90% Design East Link Alignment -Winter s House to Wye 8

Bellevue Way SE Cross Sections 9

Bellevue Way SE Cross Sections 10

Bellevue Way - Maintenance of Traffic During Construction Value Engineering Construction Proposals (VECP). Inclusion of interim milestones for completion and opening of roadways Liquidated damages for delays Outreach Provide notices in advance of closures, detours and major construction activities 11

South Bellevue Park and Ride Closure Construction to Start: Spring/Fall 2016 Closure Duration: Approximately 48 to 60 months 12

South Bellevue Park and Ride Mitigation plan Identify and implement alternate parking and transit access Move existing Access Program to Eastgate Maximize use of existing bus service and underutilized Park and Ride capacity Lease lots with access to existing bus service serving South Bellevue riders destinations Modify existing bus routes where needed Work with City to monitor for Hide and Ride activity Outreach 13

South Bellevue Park and Ride Closure Contract milestones for completion of the garage Opportunities to make portion(s) of the Park-and- Ride available to commuters prior to completion of the South Bellevue Station Liquidated damages for delays 14

Next Steps Continue to work with project stakeholders Continue work with Sound Transit on design refinements Identify opportunities to minimize traffic impacts and lane closures Work with Sound Transit Contractor and evaluate new ideas City Right-of-Way Use permit conditions 15

Questions? 16

148 th Ave NE 164 th Ave NE Maintenance of Traffic SR 520 Bel-Red Overlake/Redmond 110 th Ave NE NE 8 th St NE 8 th St & 116 th Ave NE I-405 112 th Ave SE (SE 8 th to Main St) 112 th Ave SE (SE 15 th to SE 8 th ) Bellevue Way I-90 DRAFT 09/19/2014 17

Maintenance of Traffic Bellevue Way E320 Goal: Maintain 2 lanes of traffic in peak direction Park & Ride closed during construction (approximately 48 to 60 Months) 1 Lane each direction with a reversible lane (approximately 36 to 48 Months) 12 to 15 weekend full closures I-90 westbound night closures I-90 DRAFT 09/19/2014 18

Bellevue Way 112 th Ave SE Maintenance of Traffic Main St. 112 th Ave SE (SE 15 th to Se 8th) E320 Goal: Minimize traffic diversion to 108 th Ave SE and Bellevue Way Maintain 1 lane each direction during construction Temporary road 1 Lane each direction (18 months) 112 th Ave SE (SE 8 th to Main St) E320 Goal: Minimize construction truck traffic Off-peak lane closures DRAFT 09/19/2014 19

I-405 116 th Ave NE Maintenance of Traffic Main St NE 8 th St 110 Ave NE E 330/E335 Goal: Minimize impact to business access Two 1-month full closure of 110 th Ave NE south of the intersection Two 3-month lane closures (NE 4 th to NE 6 th (considering total closure between City Center 2 and NE 6 th ) SB lanes from NE 2 nd to NE 3 rd closed for duration of construction NE 2 nd Pl closed for duration of construction I-405 E335 Overnight HOV ramp closures Overnight lane closures NE 8 th St & 116 th Ave NE E335 Goal: Minimize impact to business access Overnight street closures Off-peak lane closures DRAFT 09/19/2014 20

130 th Ave NE 132 nd Ave NE Maintenance of Traffic NE 20 th St Bel-Red E340 NE Spring Blvd DRAFT 09/19/2014 Goal: Minimize impact to businesses Lane closures on NE 20 th, 130 th, 132 nd, 136 th, and NE 16 th (Spring Blvd.) Intersection closure @ NE 20 th /136 th PL NE, NE 16 th St (Spring Blvd.)/132 nd Ave. NE and NE 16 th St (Spring Blvd.)/136 th PL NE Overnight closures at various locations along NE 16 th St (Spring Blvd.) Full closure on NE 16 th St (Spring Blvd.) from 132 nd to 136 th PL NE (6 to 9 Months) Full closure on 136 th Pl NE from NE 16 th St (Spring Blvd.) to NE 20 th St (One Month) Advanced Utility Relocation (4 to 6 weeks) 21

148 th Ave NE 140 th Ave NE Maintenance of Traffic Overlake/Redmond E360 Overnight Street/Lane Closures NE 24 th St NE 20 th St DRAFT 09/19/2014 22

23

King County Access Program Provides paratransit service to customers with special needs South Bellevue is a transfer point between North-South and East-West Service Program will be moved to Eastgate during closure South Bellevue Station includes upgraded Access Program amenities 12

How South Bellevue is Utilized Riders come from a large area Bellevue Issaquah Kirkland Renton Majority of South Bellevue users ride the Route 550 Downtown Bellevue Mercer Island Seattle A majority are going to Seattle 25

License Plate Survey 26

Existing Park and Rides Use of existing underutilized Park and Rides with access to: buses serving Rt 550 destinations buses with connections to buses with Rt 550 destinations Sammamish Note: add where the P&R buses go Tibbets Creek in Issaquah Note: add where the P&R buses go Newport Hills Park and Ride Note: add where the P&R buses go South Kirkland Note: add where the P&R buses go 8

Leased Commuter Parking Stalls Selecting lots based on Bellevue Master Transit Plan Direct riders to existing underutilized lots buses serving Rt 550 destinations buses with connections to buses with Rt 550 designations Lease additional parking stalls close to riders point of origin buses serving Rt 550 destinations buses with connections to Rt 550 designations Others still being pursued 11

Existing bus service Sound Transit Routes 550 will continue to serve Bellevue Way and South Bellevue Park and Ride Other routes may use I-405 to reach downtown Bellevue Enatai service modified I-90 additional peak hour trips University Link/SR 520 route integration Transit Operations continually monitored and adjusted 13

12

Hide and Ride Monitoring Transit riders parking in neighborhood Working with City of Bellevue staff to develop measures Taking and inventory of existing parking Monitor during South Bellevue shut down Monitor during operations If needed implement measures in collaboration with Bellevue 31

Outreach Early Several months before closure Open leased lots before closure Provide additional options Pedestrian access to existing bus routes Several smaller existing commuter parking stalls in area Travel time comparisons Monitor results