European Performance Scheme

Similar documents
SES Performance Scheme

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

Network Management, building on our experience of flow management and network planning.

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

European General Aviation Conference Schonhagen Airport. Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe Berlin 15 th May 2006

March 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28

October 2013 compared with September 2013 Industrial production down by 1.1% in euro area Down by 0.7% in EU28

CCBE LAWYERS STATISTICS 2016

Legal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL

European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016

The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013

An overview of Tallinn tourism trends

COMMUNICATION FROM THE COMMISSION TO THE COUNCIL

EUROCONTROL General Presentation

ANNEX ANNEX. to the. Commission Implementing Regulation (EU).../...

TRIPS OF BULGARIAN RESIDENTS IN ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2011

International Operations: NATA 2012 Air Charter Summit

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

The economic impact of ATC strikes in Europe Key findings from our updated report for A4E

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018

JAR-145: APPROVED MAINTENANCE ORGANISATIONS. Please find attached a copy of Amendment 6 to JAR-145, effective 1 November 2004.

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018

THIRTEENTH AIR NAVIGATION CONFERENCE

JAR-21: CERTIFICATION PROCEDURES FOR AIRCRAFT AND RELATED PRODUCTS AND PARTS. Please find attached a copy of JAR-21 Amendment 7 dated February 2007.

ATM in Europe It s all about Performance

Report on the Operation of the Route Charges System in Central Route Charges Office (CRCO)

Please find attached a copy of JAR-66 Amendment 2 dated February 2007.

Introduction. European Airspace Concept Workshops for PBN Implementation

JAR-147: APPROVED MAINTENANCE TRAINING/EXAMINATIONS. Please find attached a copy of JAR-147 Amendment 3 dated February 2007.

LifeWatch, costing and funding. The LifeWatch e-infrastructure financial issues

MAIS3+ assessment: Current practices around Europe

Public Hearing on Single European Sky II: «Make or Break Time» Views of the European Commission

Please find attached a copy of JAR-25 Amendment 20 dated December 2007.

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of some F&V products

JOINT AUTHORITIES FOR RULEMAKING OF UNMANNED SYSTEMS. Mike Lissone Secretary General JARUS

SLOVAKIA. Table 1. FDI flows in the host economy, by geographical origin. (Millions of US dollars)

JAR-23: NORMAL, UTILITY, AEROBATIC, AND COMMUTER CATEGORY AEROPLANES. Please find attached a copy of JAR-23 Amendment 3 dated February 2007.

CEFS SUGAR STATISTICS 2010

Context Scope Procurement approach Topics for discussions Timeline. EDA/ESA UAS Workshop May

FINLAND. Table 1. FDI flows in the host economy, by geographical origin. (Millions of US dollars)

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017

Rules for reimbursement of expenses for delegates attending meetings

CABOTAGE GUIDELINES. Hauliers from Croatia are covered by a ban on cabotage until the end of June 2017.

PROCESS FOR DEVELOPING RP2 IN RESPECT OF THE UK Workshop

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018

Single European Sky Benefits for the airline industry. Warsaw, 28 November 2011

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018

Slide 1. Slide 2. Slide 3 FLY AMERICA / OPEN SKIES OBJECTIVES. Beth Kuhn, Assistant Director, Procurement Services

Industrial Statistics of Lifts and Escalators. Ebru Gemici-Loukas, VDMA ASANSÖR, Istanbul 27. March 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

Cover Pool ( mn.) 4, , , , , ,494.6 of which derivatives ( mn.)

PERFORMANCE REPORT ENVIRONMENT

EUROCONTROL Short- and Medium-Term Forecast of Service Units: February 2011 Update

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018

CAP CONTEXT INDICATORS

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS

Fly America and Open Skies. For Travel on Federal Sponsored Awards

Cumulative Investments by Sector. Cumulative Investment by Country. Industry, Commerce & Agribusiness 18% Transport 30% Natural Resources 2%

PERFORMANCE REPORT ENVIRONMENT

NEFAB Annual Report 2016

PERFORMANCE REPORT ENVIRONMENT

TWELFTH AIR NAVIGATION CONFERENCE

Table I. General questions

Single European Sky II

Institute for Leisure Economics

irport atchment rea atabase

Travel Policy Fly America Act Compliance Presentation. Presented by: Travel Services

IMD World Talent Report Factor 1 : Investment and Development

GODINA XI SARAJEVO, BROJ 2 TOURISM STATISTICS. Tourism in BIH, February 2017

O 2 Call Options Explained

EUROCONTROL Low-Cost Carrier Market Update

KLAIPEDA GATEWAY TO THE EUROPEAN MARKET

Filoxenia Conference Centre Level 0

Network Manager Adding value to the Network 29 September 2011

The Nordic Countries in an International Comparison. Helga Kristjánsdóttir 20. apríl 2012

The explanations of other terms used throughout the tables are contained in the section on Definitions immediately following the tables.

ECAC/35-SD EUROPEAN CIVIL AVIATION CONFERENCE THIRTY-FIFTH SPECIAL PLENARY SESSION OF ECAC. (Paris, 18 May 2016) SUMMARY OF DISCUSSIONS

Reference: How to fly legally with a Hang Glider or Paraglider within Austrian airspace?

Single European Sky. Anforderungen und Entwicklungschancen für nationale Flugsicherungen. Sven Halle DG TREN Air Transport Unit (F2)

Performance Review Body 18

Elpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works

EUROCONTROL and the Airport Package

Report on Aeronautical MET Costs

Travel Policy Fly America Act Compliance Presentation. Presented by: Travel Services

EU-Russia summit Strong recovery of trade in goods between EU27 and Russia in 2011 An EU27 deficit of 91 bn euro with Russia in 2011

Europe What Could, Might and Will Happen to Your Operation Here

External Quality of Service Monitoring

Civil Aviation Agency of Latvia

Sole parents: participation and equality

% change vs. Dec ALL VISITS (000) 2,410 12% 7,550 5% 31,148 1% Spend ( million) 1,490 15% 4,370-1% 18,710 4%

EUROPEANS EXPERIENCE WITH USING SHIPS AND PERCEPTIONS OF MARITIME SAFETY

HELLENIC AIR NAVIGATION SUPERVISORY AUTHORITY NATIONAL PERFORMANCE PLAN GREECE RP

Call Type PAYU1 PAYU2 PAYU3 Out Of Bundle

TRAFFIC DEVELOPMENT POLICY 2018

Integration of RPAS in all flight phases and surface process

Transcription:

European Performance Scheme Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 12 February 2015 Rolf TUCHHARDT European Commission, DG MOVE

The SES policy initiative SES I approved in 2004 Focus on capacity and safety Supervisory authorities, certification, Functional Airspace Blocks SES II approved in 2009 Focus on performance and modernisation Binding performance targets, EASA extension, Network Manager SES 2+ proposed 2013 No change to SESI or SESII policy = refinement Pushing performance approach further

Implementation of Single European Sky Performance Safety Technology Performance scheme Performance Review Body Functional Airspace Blocks Network Manager National Supervisory Authorities EASA: ATM Competence Crisis coordination cell ATM Master plan SESAR Joint Undertaking Common projects Deployment governance Implementation projects External dimension Human factor Airports

Performance Scheme Legal basis: Article 11 of Regulation (EC) 549/2004 Implemented in 28 EU Member States plus Norway and Switzerland Fixed reference periods (RP1 2012-14, RP2 2015-19) Four key performance areas (safety, environment, capacity, cost-efficiency) Union-wide performance targets and binding national/fab targets consistent with Union-wide targets Commission assessment, assisted by independent Performance Review Body (PRB) Ongoing monitoring and reporting of performance

Setting of performance targets Commission adopts before the start of the reference period Union-wide performance targets Member States draw up performance plans including binding national or FAB targets Commission assesses consistency of national/fab targets with Union-wide performance targets If targets are inconsistent, Member States have to revise targets in light of Commission recommendation Commission assesses consistency of revised targets and may impose corrective measures N-1 + 6 months + 5 months + 4 months + 5 months Retroactive application as of start of RP

Finalisation of RP2

Four key performance areas Safety Cost-efficiency Environment Capacity

Setting of performance targets at different levels European Union-wide level Local level: Level of Functional Airspace Blocks Charging zone level Airport level Plus System of Key Performance Indicators (Target setting) and Performance Indicators (Monitoring)

Key performance area Effectiveness of safety management Level C/D in management objectives: safety policy and objectives, safety risk management, safety assurance, safety promotion, safety culture Safety Application of severity classification Between 80% and 100% of annually reported separation minima infringements, runway incursions, ATMspecific occurrences

Key performance area Average Union-wide determined unit costs for en route services Expressed in EUR2009 for each year of reference period Cost-efficiency Assumptions Reference determined cost reduce on average by 2.1% per year Average annual growth of traffic (service units) 1.2% per year Reduction of determined unit costs by on average 3.3% per year

Key performance area Horizontal en route flight efficiency of actual trajectory At least 2.6% in 2019 (baseline 2012: 3.17%) Environment Horizontal en route flight efficiency of last filed flight plan trajectory At least 4.1% in 2019 (baseline 2012: 5.15%) Remarks Distance flown outside 40NM of airport For extra-eu flights only part inside EU airspace measured

Key performance area Average en route ATFM delay per flight No more than 0.5 minutes delay per flight for each calendar year Capacity Remarks Difference between estimated take-off time requested by aircraft operator in last submitted flight plan and calculated take off time allocated by central unit of ATFM All IFR flights within EU airspace and all delay causes, excluding exceptional events

Assessment of consistency / Performance monitoring Safety Cost-efficiency Environment Capacity

Key performance area Effectiveness of safety management Comparison of the level at local level with the Union-wide target Application of severity classification Comparison of results of application of severity classification at local level with Union-wide target Reporting on level of 'just culture' Safety Application of automated safety data recording systems Level of occurrence reporting Number of SMI, RI, AI, ATM-occurrences

Key performance area Determined unit costs for en route services Trend RP1 Trend RP1RP2 Level vs. average of comparator group Additional Cost of capital (level/composition asset base; return on equity) Inflation assumptions Traffic forecast assumptions Description/assumptions pension costs; loans financing provision of ANS... Cost-efficiency Determined unit costs for terminal services Cost of Eurocontrol, with breakdown various service provision activities

Key performance area Horizontal en route flight efficiency Comparison with reference value from Network Manager Historical data in previous years Consistency with European Route Network Improvement Plan Additional time in taxi-out Additional time in terminal airspace (ASMA) Environment Effectiveness of booking flexible use of airspace (FUA) Rate of planning conditional routes (CDR) Effective use of conditional routes (CDR)

Key performance area Average en route ATFM delay per flight Comparison with reference value from Network Manager Capacity plans by ANSPs as reflected in Network Operations Plan Capacity Average arrival ATFM delay caused by landing restrictions (local target) Adherence to ATFM slots Average minutes of ATC pre-departure delay

Some selected monitoring results Cost-efficiency Environment Capacity

Cost-efficiency evolution of en route unit costs

Cost-efficiency en route unit costs and charges Det. unit costs 2015 % vs. 2015 unit rate in EUR2009 EU average in EUR Germany 80.99 43% 90.15 Switzerland 72.00 27% 98.53 Italy 69.39 23% 78.80 Austria 65.12 15% 73.34 United Kingdom 63.61 12% 92.45 France 63.56 12% 70.00 Spain Cont. 63.46 12% 71.69 Belgium 63.17 12% 70.68 Luxembourg 63.17 12% 70.68 Slovenia 59.56 5% 68.36 Netherlands 58.98 4% 66.57 Spain Canarias 58.21 3% 58.36 EU average 56.64 Denmark 56.12-1% 63.29 Sweden 53.36-6% 66.29 Finland 49.70-12% 56.23 Slovak Republic 49.34-13% 55.38 Croatia 47.42-16% 46.05 Norway 45.76-19% 52.19 Lithuania 42.10-26% 46.84 Czech Republic 40.28-29% 43.68 Hungary 34.32-39% 35.79 Cyprus 33.46-41% 36.91 Portugal 32.55-43% 37.13 Greece 32.36-43% 38.38 Romania 32.13-43% 37.35 Poland 30.14-47% 34.36 Bulgaria 29.49-48% 30.88 Ireland 28.45-50% 29.60 Malta 25.89-54% 22.33 Latvia 25.79-54% 27.58 Estonia 24.19-57% 31.10

Achievements performance monitoring (traffic) Average daily IFR flights ('000) 27 26 25 24 23 22 21 EU-wide average daily IFR traffic (Full year) -6.8% 0.2% 2.7% -3.0% -1.3% 1.9% 20 2008 2009 2010 2011 2012 2013 2014

Achievements performance monitoring (traffic) 24.1% 16.6% 11.6% 9.8% 9.7% 8.8% 6.8% 5.9% 5.6% 4.7% 4.5% 3.9% 2.8% 2.8% 2.7% 2.1% 2.1% 1.9% 1.7% 1.6% 1.5% -6.8% 1.5% 0.6% 30% 25% 20% 15% 10% 5% 0% -5% -10% Bulgaria Romania Hungary Slovakia Cyprus Greece Portugal Continental Lithuania Slovenia Austria Estonia Spain Czech Republic Ireland Latvia United Kingdom Italy SES AREA RP1 Finland Norway Poland % change vs. 2013 FAB - FABEC FAB - DK-SE Malta

Achievements performance results (environment)

Achievements performance results (capacity) 2.5 Other [all other codes] 2.0 1.5 1.0 0.5 0.0 2008 2009 2010 2011 2012 2013 2014 En route ATFM delay per flight (min.) Weather [codes W,D] ATC other [codes IRTV] Capacity/staffing [codes CSG] Reference value (2012,2013), Target (2014)

Achievements performance results (capacity, Jan-Dec 2014)

Opportunities for further improvements Airborne ANS Flight-efficiency En-route: 1.0 B TMA, taxi: 1.2 B ATFM Delays ER: 0.5, Apt: 0.3 2.2 B 0.8 B Total User cost (ground) 10.5 B User Charges 7.5 B ATCO Support costs Other staff Other operating CAPEX Depreciation Cost of capital Other costs ECTL, MET, NSA 2.0 B 3.5 B 1.2 B 0.8 B PRB Estimated TEC 2012 (SES)

Next steps Vision & Strategy for SES PRB