Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Similar documents
Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Pedestrian Safety Review Spadina Avenue

Construction Staging Adelaide Street West

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Construction Staging Area 197 Redpath Avenue

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Construction Staging Area Blue Jays Way (357 King Street West)

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required.

TORONTO TRANSIT COMMISSION REPORT NO.

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Construction Staging Area 19 Western Battery Road

5.1 Traffic and Transportation

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Lake Erie Commerce Center Traffic Analysis

Hospital Link Project Project Update Winter 2018

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

A. CONCLUSIONS OF THE FGEIS

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

Appendix B Connecting Track Options Evaluation Criteria

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Site Location and Setting

PROGRESS PARK CONNECTOR

Request to Improve Transit along the Dufferin Street Corridor

TORONTO AND EAST YORK COMMUNITY COUNCIL AGENDA MEETING 5

4. Safety Concerns Potential Short and Medium-Term Improvements

This report recommends two new TTC transit services in southwest Toronto.

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Spadina Avenue Built Form Study Preliminary Report

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Union Station Queens Quay Transit Link Study

# 7. Date of Meeting: September 2, 2015 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT:

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

November 21, 2012 Barbara Kelleher, (954)

FINCH HYDRO CORRIDOR TRAIL PROJECT

Finchley and Golders Green Area Committee 27 April 2017

5.7 Local road upgrades


SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Monthly Traffic Update

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

TORONTO TRANSIT COMMISSION REPORT NO.

Appendix 4.1 L. No-Build Project Descriptions

YORK UNIVERSITY BUSWAY SERVICE CHANGES

TORONTO TRANSIT COMMISSION REPORT NO.

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Glasgow Street Traffic Review

MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET TRANSIT PILOT

Update Report - Etobicoke Creek and South Mimico Creek Trails

Work in 2015 and Annual Mobility- Management Plan

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Director, Community Planning, Toronto and East York District

Dufferin Jog Elimination Project

KING STREET TRANSIT PILOT

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

TORONTO TRANSIT COMMISSION REPORT NO.

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

AGENDA ITEM I-6 Public Works

EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

Design Meeting Presentation

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official

SR 934 Project Development And Environment (PD&E) Study

CITY COUNCIL AGENDA MEMORANDUM

1.2 Corridor History and Current Characteristics

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Caliber Charter School VALLEJO, CA

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

DTAH for the City of Toronto Dufferin Street Avenue Study Transportation Master Plan

Grove Field Airport Environmental Assessment

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

STAFF REPORT ACTION REQUIRED

SAN RAFAEL City Council January 20, 2015

Transcription:

STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure Management Wards: Toronto Centre-Rosedale, Ward 28 Reference Number: P:\2007\Cluster B\tra\tim\te07003tim SUMMARY The purpose of this report is to obtain authority to install bicycle lanes on Yonge Street from Queens Quay to Front Street and to undertake the necessary road alterations to accommodate the bicycle lanes. The installation of bicycle lanes on Yonge Street will require modifications to the existing curbs on the east side of Yonge Street. Generally, the existing traffic lane configuration will be maintained, with the exception of the section just north of Queens Quay where there will be a reduction in the northbound traffic lanes from two lanes to one lane with the removal of the existing taxi stand lay-by and its relocation adjacent to the new curb. The provision of bicycle lanes will also require the removal of the existing five to six on-street parking spaces on the west side of Yonge Street, south of Front Street. RECOMMENDATIONS Transportation Services Division recommends that City Council: 1. approve the installation of bicycle lanes on the west side of Yonge Street, from Queens Quay to Front Street, and on the east side from Queens Quay to The Esplanade, as detailed in Appendix A of this report; 2. approve the amendments to the traffic and parking regulations detailed in Appendix B of this report; Staff report for action on Bicycle Lanes on Yonge Street 1

3. approve the narrowing of the travelled portion of Yonge Street from Queens Quay to a point 110 metres north of Queens Quay, by realigning the curb on the east side of the roadway to reduce the pavement width from 19.6 metres to 15.5 metres, generally as shown on the attached Drawing No. 421F-8638, dated December 2006; 4. approve adjusting the width of Yonge Street, from Harbour Street to Lake Shore Boulevard East, by realigning the curb on the east side of the roadway to provide a consistent pavement width of 20.7 metres, generally as shown on the attached Drawing No. 421F-8639, dated December 2006; 5. approve the realignment of the westbound F.G. Gardiner Expressway off-ramp, from Yonge Street to a point approximately 38.0 metres east, to provide a right-angle intersection with Yonge Street, and approve adjusting the width of Yonge Street, from Lake Shore Boulevard East to the westbound F. G. Gardiner Expressway offramp, by realigning the curb on the east side of the roadway to provide a consistent pavement width of 19.4 metres, generally as shown on the attached Drawing No. 421F-8640, dated December 2006; 6 approve adjusting the width of Lake Shore Boulevard East, from Yonge Street to a point approximately 57 metres east, by realigning the curb on the north side of the roadway to provide a consistent pavement width of 8.2 metres, generally as shown on the attached Drawing No. 421F-8641, dated December 2006; and 7. authorize and direct the appropriate City officials to take the necessary action to give effect thereto, including the introduction of all necessary bills. Financial Impact Funds to implement the road alterations and pavement markings to install bicycle lanes on Yonge Street, in the estimated amount of $432,000.00, are provided for within the Transportation Services Division 2007 Capital Budget in the Cycling Infrastructure Account CTP 806-05. DECISION HISTORY City Council, at its meeting on September 25, 2006, adopted Clause No. 106 of Report No. 7 of Toronto and East York Community Council, and in so doing, directed City staff to report to Toronto and East York Community Council in 2007 on the implementation of bicycle lanes on Yonge Street from Queens Quay to Front Street. ISSUE BACKGROUND Recent development activity in the vicinity of Yonge Street and Lake Shore Boulevard resulted in significant streetscape improvements along the west side of this section of Yonge Street. These streetscape improvements have provided an opportunity to adjust the curb on the west side of Yonge Street to accommodate a southbound bicycle lane. Staff report for action on Bicycle Lanes on Yonge Street 2

Further adjustments to the curb on the east side are required to accommodate a northbound bicycle lane and improved streetscape between Queens Quay East and The Esplanade. COMMENTS Existing Conditions: Yonge Street, between Queens Quay and Front Street is a four lane arterial roadway which operates two-way, with a speed limit of 50 km/h. Traffic volumes for this section of Yonge Street are approximately 28,000 vehicles daily. There are four signalized intersections on this section of Yonge Street at Queens Quay, Harbour Street/Lake Shore Boulevard East, Lake Shore Boulevard West and Front Street. Parking is currently permitted on the west side of Yonge Street between Front Street and The Esplanade during the off-peak periods. During the morning and afternoon peak periods, stopping is prohibited in both directions on Yonge Street. The Toronto Transit Commission (TTC) operates the 320-Yonge night bus route and the 97B-Yonge and 6A-Bay rush hour bus routes on this section of Yonge Street. Road Alterations to Accommodate Bicycle Lanes: In order to accommodate the northbound bicycle lane on the east side of Yonge Street some adjustments to the roadway width and the east curb will be required. Yonge Street will be narrowed from Queens Quay to a point 110 metres north of Queens Quay, as illustrated by Drawing No. 421F-8638, dated December 2006, and entitled Yonge Street Queens Quay to Harbour Street Proposed Realignment. The existing taxi stand lay-by on the east-side of Yonge Street just north of Queens Quay will be removed in order to provide wider sidewalks. The taxi standing zone will be relocated adjacent to the new curb. This will require a change in the lane configuration from the existing two northbound traffic lanes to one northbound traffic lane plus the bicycle lane and taxi stand. Drawing No. 421P0013, dated December 2006, and entitled Yonge Street Queens Quay to a Point 110m North, illustrates the removal of the taxi stand lay-by and the bicycle lane design. A bicycle lane design has been prepared for Yonge Street which maintains the existing number of traffic lanes between a point 110 metres north of Queens Quay and Front Street. Generally, 1.6 metre wide bicycle lanes on both sides of the roadway and four 3.3 metre wide travel lanes will be provided. Drawing No. 421P0014, dated December 2006, and entitled Yonge Street - Harbour Street to Lake Shore Blvd. illustrates a typical cross-section along this section of Yonge Street. In order to accommodate the bicycle lanes in this section of Yonge Street the east curb will be adjusted at selected locations between Harbour Street and the westbound F.G. Gardiner Expressway off-ramp to Yonge Street to provide a consistent roadway width. Staff report for action on Bicycle Lanes on Yonge Street 3

In conjunction with the curb re-alignment on Yonge Street, the westbound F.G. Gardiner Expressway off-ramp will be re-aligned to provide a right-angle intersection with Yonge Street. These road alterations are depicted on the following drawings, dated December 2006: Drawing No. 421F-8639 Yonge Street Harbour Street to Lake Shore Boulevard East Proposed Curb Realignment. Drawing No. 421F-8640 Yonge Street Lake Shore Boulevard East to The Esplanade Proposed Curb Realignment. Matching the new lane alignment for Yonge Street, south of Front Street, with the existing alignment to the north is problematic because the pavement width is narrower north of Front Street and the west curb line is off-set north and south of the intersection. Consequently, the northbound bicycle lane will end at The Esplanade where it will connect with an eastbound bicycle route. The Toronto Bike Plan identifies The Esplanade as a recommended east-west bicycle route. For cyclists continuing north of The Esplanade to Front Street, shared lane markings will be provided in a wide curb lane. In addition, changes will be made to improve the pedestrian environment at the Yonge Street Lake Shore Boulevard East intersection. Lake Shore Boulevard East will be narrowed to 8.2 metres, from Yonge Street to a point 57.0 metres east of the intersection, by realigning the curb on the north-side. Drawing No. 421F-8641, dated December 2006, and entitled Lake Shore Boulevard East Yonge Street to a Point 57 metres East Proposed Curb Realignment, illustrates the road alteration. This change will improve the pedestrian environment on the north-east corner of the Yonge Street Lake Shore Boulevard East intersection. Staff report for action on Bicycle Lanes on Yonge Street 4

Parking and Traffic Impacts: For the section of Yonge Street between Queens Quay and a point 110 metres north, the new design results in the loss of one northbound travel lane. Analysis of the traffic operations in this section indicates that this change will not result in a significant impact on traffic. For the rest of Yonge Street, north to Front Street, there will be no change to the number of travel lanes and, therefore, no impact on traffic or transit operations. In order to accommodate the bicycle lane in the southbound direction between Front Street and The Esplanade, the existing on street pay and display parking will be removed. This will result in the loss of 5 to 6 spaces. The removal of these parking spaces will result in lost revenue for the Toronto Parking Authority in the order of $25,000.00 annually. The traffic and parking regulations which need to be amended to implement the bicycle lanes are attached as Appendices A and B of this report. CONTACT Daniel Egan, Manager, Pedestrian and Cycling Infrastructure Telephone: 416-392-9065 Email: degan@toronto.ca John Mende, P. Eng., Director, Transportation Infrastructure Management Transportation Services DD/db ATTACHMENTS Appendix A - Bicycle Lanes to Designated Appendix B - Traffic and Parking By-law Amendments Drawing No. 421P0012 Drawing No. 421P0013 Drawing No. 421P0014 Drawing No. 421F-8638 Drawing No. 421F-8639 Drawing No. 421F-8640 Drawing No. 421F-8641 Staff report for action on Bicycle Lanes on Yonge Street 5