District One Contacts

Similar documents
ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

1989/90 Division I - Bowling Green State University

Riverdale High School State Route 37 Mount Blanchard, OH

2 Construction Program

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

State Route 8 Corridor. Northern Summit County s Path to Success

Palm Beach County Traffic Report July 13 through July 20, 2012

Most people notice when ODOT builds something

FDOT Treasure Coast Traffic Report through

Ohio Department of Transportation Construction Update

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

November 21, 2012 Barbara Kelleher, (954)

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Draft Committed List 2/19/2015

Midwest Athletic Conference All-Time Football Records

Delaware County Engineer

Midwest Athletic Conference All-Time Football Records

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Public Water Systems with Endorsed Drinking Water Source Protection Plans (as of October 23, 2014)

Guide to. Road Construction Projects

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Endorsed Drinking Water Source Protection Plans (as of November 6, 2017)

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

FDOT Treasure Coast Traffic Impact Report

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Palm Beach County Traffic Report August 24 through August 31, 2012

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

MEMORANDUM VILLAGE OF NORTHBROOK

FDOT Treasure Coast Traffic Impact Report

Location Test Date Start Time. Dec 9, Dec 12, Dec 16, Dec 18, Dec 10, Dec 17, 2014

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

City of Grand Island Tuesday, December 12, 2017 Council Session

Capital Project Item. Maintenance Item

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Projected Advertisement Date

Culpeper District. Albemarle County Monthly Report December 2011

Greene...6:30 P.M. Athens...5:00 P.M. Athens...12:00 P.M. Ross...12:00 P.M. Richland...5:00 P.M. Champaign...6:30 P.M.

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

FY Transportation Improvement Program Basic Project List (in Thousands)

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Florida Department of Transportation MIKE DEW SECRETARY

Gulf Coast MPO Obligated Projects

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Bulletin June 25, 2010 COUNTY VOTED 2009 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE

PID Number. Letting Date. Federal State BRIDGE REPAIR 7/9/2008. Federal State Letting Date. PID Number

Bulletin August 2013 COUNTY, MUNICIPAL & TOWNSHIP PERMISSIVE MOTOR VEHICLE LICENSE TAX REVENUE RECEIVED BY TYPE OF JURISDICTION IN 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Capital Improvement Program Fiscal Year

PennDOT Interstate Work next week March 30-April 3:

October 31, 2014 Chuck McGinness, (954)

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Culpeper District. Albemarle County Monthly Report. September 2012

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

El Dorado County / Tahoe Roadwork Schedule

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 10/20/2016

Bulletin October 15, COUNTY VOTED 2013 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE (For collection in 2014)

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Capital Improvement Plan

Montgomery Citizens Advisory Committee Meeting Minutes

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Public Water Systems with Endorsed Drinking Water Source Protection Plans (as of January 9, 2019)

Wildcats PREP FOOTBALL T33

Weekly construction update

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Aloha Township Local Road Ratings Report for 2018

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Transcription:

District 1

District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us Darren Schimmoeller District Construction Engineer 419-999-6901 darren.schimmoeller@dot.state.oh.us Rhonda Pees District Public Information Officer 419-999-6803 rhonda.pees@dot.state.oh.us Scott Mullins District Asst. Construction Engineer 419-999-6903 scott.mullins@dot.state.oh.us -IR-75 Construction Contact 1

DISTRICT ONE SUMMARY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 ODOT AND LOCAL GOVERNMENT PROJECTS ODOT PROJECTS LOCAL GOV T. PROJECTS GRAND TOTALS COUNTY NO. OF NO. OF NO. OF ESTIMATED COST ESTIMATED COST PROJECTS PROJECTS PROJECTS ESTIMATED COST DISTRICT WIDE 5 $2,971,107 0 $0 5 $2,971,107 ALLEN 2 $62,007,000 3 $3,391,090 5 $65,398,090 DEFIANCE 1 $1,825,660 3 $3,194,644 4 $5,020,304 HANCOCK 5 $11,576,838 3 $2,208,694 8 $13,785,531 HARDIN 3 $935,428 2 $1,615,574 5 $2,551,002 PAULDING 1 $1,729,933 1 $755,052 2 $2,484,985 PUTNAM 2 $848,970 1 $1,168,305 3 $2,017,275 VAN WERT 2 $1,276,494 2 $2,670,372 4 $3,946,866 WYANDOT 2 $5,492,758 0 $0 2 $5,492,758 TOTALS 23 $88,664,188 15 $15,003,731 38 $103,667,919 PROJECT TYPE BRIDGE MAINTENANCE & REPLACEMENT CULVERTS PAVEMENT MARKINGS RESURFACE RECONSTRUCTION/CORRIDOR OTHER DISTRICT ONE STATS (ODOT PROJECTS) NO. OF PROJECTS 3 COST $1,299,768 4 $1,007,431 2 $1,061,387 8 $20,359,344 2 $62,007,000 4 $2,929,258 MILES RESURFACED 74.61 5.64 2

DISTRICT WIDE PROJECTS (No Map) CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 96628 D01-Mowing- FY2014/2015 92420 D01-PM-FY15 87854 D01-BM-FY15 92423 D01-RPM-FY16 92424 D01-GR-FY15 Mowing on 4-lane routes throughout District One in years 2014 and 2015. Traffic will be maintained during construction. Upgrade existing painted pavement markings on various routes throughout District One. Traffic will be maintained during construction. Miscellaneous bridge maintenance activities at various locations throughout District One. Traffic will be maintained during construction. Replace raised pavement marker castings and or lenses as needed on various routes throughout District One. Traffic will be maintained during construction. Repair or replace guardrail sections and/or posts as needed on various routes throughout District One. Traffic will be maintained during construction. ODOT s 4-Lane Routes throughout District One. Various Routes throughout District One. Various Bridges throughout District One. Various Routes throughout District One. Various Routes throughout District One. Various Various Sold Sold Spring 2014-Fall 2015 Spring/Summer 2015 $1,295,376 $778,928 Various 3/20/2015 Summer 2015 $234,679 Various 6/18/2015 Summer/Fall 2015 $282,459 Various 6/18/2015 Summer/Fall 2015 $379,665 DISTRICT WIDE TOTAL $2,971,107 3

ALLEN COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 86634 ALL-81-18.10 89029 ALL-75-0.21 Install a new storm sewer system, curb and gutter, and resurface with asphalt concrete. Traffic will be maintained during construction. Total reconstruction of IR-75. Traffic will be maintained during construction. ODOT s On SR 81 from the Indiana & Ohio Railroad to the newly constructed section of SR 81. On IR 75 from the Auglaize County line to just south of the Fourth St. interchange. 0.32 Sold 5.32 Sold Spring/Summer 2015 Spring 2014-Fall 2016 ALLEN COUNTY-ODOT LET TOTAL $1,123,743 $60,883,257 $62,007,000 4

ALLEN COUNTY (Continued) PID No. County-Route- CITY OF LIMA 90217 ALL-Kibby St. VILLAGE OF ELIDA 90954 ALL-SRTS-Elida Sidewalks ALLEN COUNTY ENGINEER 97504 ALL-Collett OBPP Combination of street rehab and replacement. Profile to be adjusted in some areas. Includes curb and gutter, sidewalk and drainage work. Traffic will be maintained during construction. Construct sidewalks along Sunnydale St. and Pioneer Rd. Add school zone pavement markings on Pioneer Rd. and Sunnydale St. Add crosswalk pavement markings on Pioneer Rd. and Elida Rd. Upgrade the pedestrian signal at the Elida Rd. and Pioneer Rd. Traffic will be maintained during construction. Design Build. As part of the Ohio Bridge Partnership Program replace superstructure on the Collett St. bridge over the Ottawa River. Traffic will be detoured during construction. Local Governments On Kibby St. from SR 65 (Pine St.) to SR 309/117 (Bellefontaine Ave.) On Sunnydale St. from Baxter St. to Howard St.; on Pioneer Rd. from Sunnydale St. to Elida Rd. Collett St. over the Ottawa River between Kibby Street and North Shore Dr. 1.06 3/18/2015 Summer/Fall 2015 $2,268,434 Spot 6/4/2015 Summer 2015 $98,607 Spot 4/9/2015 TOTAL ESTIMATED COST FOR ALLEN COUNTY: Summer/Fall 2015 120 day closure ALLEN COUNTY-LOCAL GOVERNMENTS TOTAL $1,024,049 $65,398,090 $3,391,090 5

PID CRS 86634 ALL-81-18.10 89029 ALL-75-0.21 90217 ALL-Kibby St. 90954 ALL-SRTS-Elida Sidewalks 97504 ALL-Collett OBPP Allen County 2015 Construction s Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab 12 696 BLUFFTON 103 DELPHOS 65 BEAVERDAM 30 CAIRO 30 75 115 30 309 ELIDA 90954 LIMA 66 309 86634 81 LAFAYETTE 81 66 SPENCERVILLE 117 198 501 117 90217 97504 89029 117 309 HARROD 75 Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 6 65 196 3/10/2015

DEFIANCE COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 80501 DEF-2/18/49-2.34/2.82/4.01 Resurface with asphalt concrete. Traffic will be maintained during construction. ODOT s On SR 2 from the western junction with SR 49 to the ECL of Hicksville; SR 18 from Meuse Argonne St. to SR 2; and SR 49 from SR 2 to the Williams county line. 21.14 Sold Summer 2015 $1,825,660 DEFIANCE COUNTY-ODOT LET TOTAL $1,825,660 7

DEFIANCE COUNTY (Continued) PID No. County-Route- DEFIANCE COUNTY ENGINEER 96867 DEF-CR 188-3.90 Widen pavement and resurface with asphalt concrete. Local traffic will be maintained during construction. On CR 188 (Harris Rd.) from SR 18 south to approximately Bowman Rd. 2.76 Sold CITY OF DEFIANCE DEF-Bike/Ped Trail- 96711 Construct a bike/pedestrian path. Phase 1 City of Defiance reservoir Spot Sold 92830 DEF-SR 111 South Clinton St Widen to provide a center two-way left turn lane. Include curb, gutter and storm sewer improvements. Signals and signing will also be upgraded. Traffic will be maintained during construction. Local Governments On SR 111 (S. Clinton St.) from Sunday St. to just north of Cedar St. Spring/Summer 2015 Spring/Summer 2015 $1,042,436 $454,288 0.35 5/19/2015 Summer/Fall 2015 $1,697,920 DEFIANCE COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR DEFIANCE COUNTY: $5,020,304 $3,194,644 8

Defiance County 2015 Construction s 80501 2 15 249 249 NEY 66 49 127 15 24 2 18 80501 2 49 HICKSVILLE 18 SHERWOOD 127 18 24 92830 DEFIANCE 281 96711 96867 18 PID CRS 80501 DEF-2/18/49-2.34/2.82/4.01 96867 DEF-CR188-3.90 96711 DEF-Bike/Ped Trail-Phase 1 92830 DEF-SR 111 South Clinton St Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab 111 15 Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 9 3/11/2015

HANCOCK COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 ODOT s PID No. County-Route- 75520 HAN-68/15-12.73/17.38 Resurface with asphalt concrete. Traffic will be maintained during construction. On US 68/SR 15 from just south of the Lima Ave. interchange to the SR 37 interchange. 6.05 Sold Summer/Fall 2015 $2,481,263 88842 HAN-12/18/613- Resurface with asphalt concrete. Traffic 22.28/6.82/8.12/5. will be maintained during construction. 39 On SR 12 from the ECL of Arcadia to the WCL of Fostoria; SR 18 from WCL of Fostoria to Fremont St. in Fostoria and from Vine St. in Fostoria to the Seneca county line; and SR 613 from the ECL of McComb to IR 75. 12.75 Sold Spring/Summer 2015 $1,908,531 93683 HAN-224/568-12.76/0.23 Resurface with asphalt concrete. Traffic will be maintained during construction. On US 224 from Trenton Ave. in Findlay to the end of the five lane section at SLM 17.40; SR 568 from Beech Ave. to East St. 4.73 Sold Summer 2015 $2,051,182 92445 HAN-15-17.80 Repair, regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of guardrail and add curb for the entire length of the guardrail. Add catch basins along the curb as necessary with outlets at the bottom on the slope. Traffic will be maintained during construction. On SR 15 approximately 0.5 miles east of US 68. Spot Sold Spring/Summer 2015 $533,772 88831 HAN-75-8.66 Resurface with asphalt concrete, repair failed joints, and replace guardrail. Traffic will be maintained during construction. On IR 75 from 0.45 miles south of CR 60 to just north of CR 313. 5.44 6/18/2015 Summer/Fall 2015 $4,602,090 HANCOCK COUNTY-ODOT LET TOTAL $11,576,838 10

HANCOCK COUNTY (Continued) 94934 PID No. County-Route- HANCOCK COUNTY ENGINEER HAN- CR12/180/698-5.02/0.23/0.00 CITY OF FINDLAY 97384 HAN-Findlay FY15 Resurfacing VILLAGE OF VAN BUREN 88351 HAN-SRTS-Van Buren Resurface with asphalt concrete. Traffic will be maintained during construction. Resurface with asphalt concrete. Traffic will be maintained during construction. Add school zone flashing signage, pavement markings, crosswalks and signage, and sidewalks at the town square. Traffic will be maintained during construction. Local Governments On CR 12 from SR 103 to CR 37; CR 180 from SR 15 to SR 37; and CR 698 from CR 304 to SR 103. s of Bright Rd., Lima Ave., Blanchard St., Western Ave. and Broad Ave. in the City of Findlay. Various streets in the Village of Van Buren. 10.2 3/12/2015 Summer 2015 $965,604 3.27 Sold Summer 2015 $1,154,854 Spot Sold Summer 2015 $88,236 HANCOCK COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR HANCOCK COUNTY: $13,785,531 $2,208,694 11

Hancock County 2015 Construction s MCCOMB 235 88842 75 88351 VAN BUREN 18 613 18 613 FOSTORIA 88842 88842 613 ARCADIA 186 FINDLAY 12 BLUFFTON 12 MOUNT CORY BENTON RIDGE 235 235 RAWSON 94934 75 12 698 224 224 88831 JENERA 97384 97384 68 93683 97384 92445 93683 97384 94934 37 75520 37 MOUNT BLANCHARD 15 103 568 VANLUE 330 Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 235 30 103 94934 ARLINGTON 68 12 103 30 37 PID CRS 75520 HAN-68/15-12.73/17.38 88842 HAN-12/18/613-22.28/6.82/8.12/5.39 93683 HAN-224/568-12.76/0.23 92445 HAN-15-17.80 88831 HAN-75-8.66 94934 HAN-CR12/180/698-5.02/0.23/0.00 97384 HAN-Findlay FY15 Resurfacing 88351 HAN-SRTS-Van Buren 3/10/2015

PID No. County-Route- 84580 HAR-67-3.29 95479 HAR-81-15.13 97366 HAR-31-6.30 Replace bridge deck edges and overlay bridge deck on the SR 67 bridge over the Scioto River. Traffic will be detoured during construction. Culvert replacement. Traffic will be detoured during construction. Culvert replacement. Traffic will be detoured during construction. HARDIN COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 ODOT s On SR 67 over the Scioto River. Spot Sold On SR 81 just east of County Road 159 On SR 31 just north of Township Road 190. Summer 2015 75 day closure Spot 5/7/2015 Summer 2015 30 day closure Spot 7/2/2015 Summer/Fall 2015 30 day closure HARDIN COUNTY-ODOT LET TOTAL $509,040 $153,871 $272,517 $935,428 13

HARDIN COUNTY (Continued) PID No. County-Route- VILLAGE OF ADA 93783 HAR-Ada-Klingler Rd. 96263 HAR-SRTS-Ada Reconstruction and widening. Local traffic will be maintained during construction. Construct sidewalks and curb ramps on Grand Ave. from the school to Buckeye Ave. and on Highland Ave. from Grand Ave. to Johnson St. Traffic will be maintained during construction. Local Governments On Klingler Rd. from Lima Ave. to Lincoln Ave. On Grand Ave. from the school to Buckeye Ave. and on Highland Ave. from Grand Ave. to Johnson St. 0.45 Sold Spring/Summer 2015 $1,456,742 Spot 4/29/2015 Summer 2015 $158,832 HARDIN COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR HARDIN COUNTY: $2,551,002 $1,615,574 14

309 96263 93783 235 ALGER Hardin County 2015 Construction s ADA 195 81 309 701 DUNKIRK 68 68 95479 81 53 37 FOREST PATTERSON PID Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab CRS 84580 HAR-67-3.29 95479 HAR-81-15.13 97366 HAR-31-6.30 96263 HAR-SRTS-Ada 93783 HAR-Ada-Klingler Rd. MCGUFFEY 67 235 KENTON 309 117 84580 67 31 97366 385 117 68 292 Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 15 RIDGEWAY 273 MOUNT VICTORY 3/10/2015

PAULDING COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 93688 PAU-49/613-5.78/0.00/6.08 Resurface with asphalt concrete. Traffic will be maintained during construction. ODOT s On SR 49 from the SCL to the NCL of Payne; and SR 613 from the Indiana state line to SR 49 in Payne and from SR 500 to US 127. 11.62 4/9/2015 Summer 2015 $1,729,933 PAULDING COUNTY-ODOT LET TOTAL $1,729,933 16

PAULDING COUNTY (Continued) PID No. County-Route- VILLAGE OF PAULDING 90952 PAU-SRTS-Paulding Sidewalks Add new sidewalks along Water St. from Jackson St. to Baldwin St., along Emerald Rd. from Helen St. to the school and along N. Main St. from Baldwin St. to Miles St. Add new sidewalk at missing sections on Caroline St. between Grant St. and Emerald Rd. and on George St. between Walnut and Cherry St. Construct a raised concrete median in the main school drive. Traffic will be maintained during construction. Local Governments Various streets near the Paulding Elementary and Middle school. Spot Sold Spring/Summer 2015 PAULDING COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR PAULDING COUNTY: $2,484,985 $755,052 $755,052 17

Paulding County 2015 Construction s 49 CECIL 127 24 PID CRS 93688 PAU-49/613-5.78/0.00/6.08 90952 PAU-SRTS-Paulding Sidewalks ANTWERP 24 111 637 PAULDING 127 111 90952 637 66 49 500 613 93688 93688 PAYNE 613 93688 LATTY BROUGHTON 613 MELROSE OAKWOOD 613 500 66 127 637 114 114 HAVILAND GROVER HILL 114 Legend ODOT Sponsored s Local Sponsored s Spot Map Produced by Cody Lape 30 District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 SCOTT 18 Bridge Replacement Bridge Rehab 3/10/2015

PUTNAM COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- ODOT s Estimated Cost 87138 PUT-114-3.06 Resurface with asphalt concrete. Traffic will be maintained during construction. On SR 114 from SR 694 to the NCL of Kalida. 4.51 Sold Summer 2015 $647,773 95481 PUT-224-6.51 Culvert replacement. Traffic will be detoured during construction. On US 224 approximately 0.56 miles east of SR 634. Summer 2015 Spot 5/21/2015 30 day closure PUTNAM COUNTY-ODOT LET TOTAL $201,197 $848,970 PID No. County-Route- PUTNAM COUNTY ENGINEER 87353 PUT-OLD SR12-16.40 Bridge replacement. Traffic will be detoured during construction. Local Governments Old SR 12 bridge over the Ottawa River. Spot Sold Spring/Summer 2015 90 day closure PUTNAM COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR PUTNAM COUNTY: $2,017,275 $1,168,305 $1,168,305 19

Putnam County 2015 Construction s BELMORE 15 634 109 65 CONTINENTAL 108 MILLER CITY LEIPSIC 634 613 613 WEST LEIPSIC 613 15 65 634 DUPONT 115 GLANDORF 15 114 694 CLOVERDALE 87138 114 KALIDA 224 OTTAWA 224 GILBOA 634 66 224 65 95481 224 OTTOVILLE 189 190 FORT JENNINGS 115 COLUMBUS GROVE 12 PANDORA Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 190 189 87353 12 20 Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab PID CRS 87138 PUT-114-3.06 95481 PUT-224-6.51 87353 PUT-OLD SR12-16.40 3/10/2015

VAN WERT COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 84565 VAN-697-1.78 92451 VAN-224-11.64 Bridge Replacement. Traffic will be detoured during construction. Repair, regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of guardrail and add curb for the entire length of the guardrail. Add catch basins along the curb as necessary with outlets at the bottom on the slope. Traffic will be maintained during construction. ODOT s SR 697 bridge over the Little Auglaize River. On US 224 approximately 0.2 miles south of US 30. Spot Sold Spring/Summer 2015 45 day closure $556,049 Spot 5/7/2015 Summer/Fall 2015 $720,445 VAN WERT COUNTY-ODOT LET TOTAL $1,276,494 21

VAN WERT COUNTY (Continued) PID No. County-Route- VAN WERT COUNTY ENGINEER 84904 VAN-TR41-02 CITY OF VAN WERT 93782 VAN-Van Wert W. Main St.-Phase II Bridge Replacement. Traffic will be detoured during construction. Reconstruction and widening of W. Main St. Traffic will be detoured during construction. Access to driveways, residences, and businesses will be maintained. Local Governments Township Road 41 bridge over the St. Mary's River. On Main St. from Fisher St. to John Brown Rd. Spot Sold 0.64 Sold Spring/Summer 2015 90 day closure Spring/Summer/ Fall 2015 VAN WERT COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR VAN WERT COUNTY: $3,946,866 $929,498 $1,740,874 $2,670,372 `` 22

Van Wert County 2015 Construction s SCOTT 49 637 30 127 224 CONVOY 49 92451 66 224 VAN WERT 224 93782 116 30 MIDDLE POINT 84565 697 WREN 118 116 DELPHOS 49 WILLSHIRE OHIO CITY 127 709 VENEDOCIA 116 Map Produced by Cody Lape 33 District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 84904 PID 81 CRS 84565 VAN-697-1.78 92451 VAN-224-11.64 84904 VAN-TR41-02 93782 VAN-Van Wert W. Main St.-Phase II 118 23 81 ELGIN 117 Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement Bridge Rehab 3/10/2015

WYANDOT COUNTY CONTRACT PROJECTS TO BE UNDER CONSTRUCTION DURING CALENDAR YEAR 2015 PID No. County-Route- 77146 WYA-23/30-10.17/912 ODOT s Resurface on US 23 from the CSX RR overpass to 0.22 miles south of CR 47; and US 30 from 0.8 miles south/west of CR 330 to the US 23 interchange. Concrete overlay of deck and approach slabs and patch and seal all concrete surfaces on US 23 over CR 182, US 23 over CR 330, and US 23 over the Little Tymochtee Creek. Patch and seal deck, approach slabs, and all concrete surfaces on US 23 over the Sandusky River, US 23 over SR 199, SR 53 over US 23 and US 23 over the CSX RR. Traffic will be maintained during construction with some detours for ramp closures. 8.37 Sold Summer 2015 $5,112,912 95495 WYA-67-7.76 Replace culvert and construct a new On SR 67 approximately 0.3 ditch with clear zone grading. Traffic will miles south of TR 103 be detoured during construction. Spot 4/23/2015 Summer 2015 30 day closure $379,846 WYANDOT COUNTY-ODOT LET TOTAL $5,492,758 PID No. County-Route- Local Governments WYANDOT COUNTY-LOCAL GOVERNMENTS TOTAL TOTAL ESTIMATED COST FOR WYANDOT COUNTY: $5,492,758 $0 24

Wyandot County 2015 Construction s PID CRS 77146 WYA-23/30-10.17/912 95495 WYA-67-7.76 15 568 23 CAREY 103 53 103 231 67 SYCAMORE 103 67 23 231 199 53 WHARTON 293 30 77146 77146 77146 77146 77146 77146 UPPER SANDUSKY 77146 NEVADA 53 KIRBY 53 30 FOREST 231 Legend ODOT Sponsored s Local Sponsored s Spot Bridge Replacement 37 294 95495 67 23 294 Bridge Rehab HARPSTER Map Produced by Cody Lape District One Ohio Department of Transportation Office of Planning and Engineering 1885 N. McCullough Lima, Ohio 45801 67 MARSEILLES 25 231 3/11/2015