The missing link in the Trans-European network in the southern Alps The strategy : what needs to be done

Similar documents
EDITORIAL A SHORT HISTORY

EDITORIAL Striving towards European economic integration and the need for sustainable development are frequently recurring themes of discussion.

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY telt-sas.com 2

HANNIBAL Project High Altitude Network for the Needs of Integrated Border-Crossing Applications and Links

Mobility and transport

Fabienne MARGAIL HEAD OF HINTERLAND DEPARTMENT MARSEILLE FOS PORT AUTHORITY. HINTERPORT 18 may 201& - Marseille

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

HEAVY GOODS VEHICLES Schedule of special traffic bans

Air transport and high-speed train user choices. Expected impacts within the European transport scenario

Ministry of Communications and Transport

MODAIR. Measure and development of intermodality at AIRport

Fast Track to Sustainable Mobility. TGV RHIN RHÔNE Pierre Messulam, Director SNCF-VFE

L 342/20 Official Journal of the European Union

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

The Baltic-Adriatic Axis. Better Infrastructure for Europe

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

IAT Annual Conference 'Driving Forward

Maurice Brun President of SETUMONT.

FAST Future Airport STrategies

53rd Permanent Committee of the Alpine Convention and the Workshop on Sustainable Tourism in the Alpine Green Economy

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

~~~ ALPARC The Alpine Network of Protected Areas

GREENPORTS February 2009, Naples

FREQUENTLY ASKED QUESTIONS

DaHar Danube Inland Harbour Development

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

Official Journal of the European Union L 337/43

Abruzzo Airport. Commercial Policy Development Routes

Elpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.

From policy to regional and local practice : the use of structural funds. The case of Île-de-France

Greece. Tourism in the economy. Tourism governance and funding

Final declaration of the Danube Summit on 6 th May 2009 in Ulm. Preamble

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Barents Euro Arctic Council 11 th Session Rovaniemi, Finland November 2007

For the international protection

TRANSPORT & MOBILITY CONFLICT MAP

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008

Austria. Tourism in the economy. Tourism governance and funding

Towards an alpine macroregion. Francesco Dellagiacoma

Brexit Preparedness seminar on transport. Council Working Party (Article 50 Format) 29/11/2018

AlpInfoNet Sustainable Mobility Information Network for the Alpine Space. Bolzano, 27th September 2013

Response to the London Heathrow Airport Expansion Public Consultation

Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )

Technical considerations on rapid transit mode selection BRT / LRT potentialities in France

Press Release Athens, 2 June 2014

Eurotunnel Group: Activity in the Third Quarter of 2013 Strong Revenue Growth (+16%)

Auckland Port and the Unitary Plan Dr Douglas Fairgray

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

ANNEX V. List of Abbreviations

Project Data Sheet BASIC PROJECT DATA

I. The Danube Area: an important potential for a strong Europe

Q3 Results. September 21, 2005» 1

Les Chemins de Fer du Sud de la France, Ligne de Central Var. History of the Line to 1925

Measure 67: Intermodality for people First page:

Taking Saturation into account in investment projects: Case study on Paris Lyon line

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Eurailspeed Parallel Session A.1. Alessandro Guiducci Associate Partner KPMG Advisory, Roma

HSR v LCC: competing or complementary modes? Can HSR expand if LCCs are taking over short routes?

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Governing Board of Enlarged Partial Agreement on Cultural Routes Luxembourg Strengthening the EPA on Cultural Routes: Possible future synergies

Tertiary Economic Activity. Providing services for people.

Passenger rights in context of European Parliament

LIMITE EN COUNCIL OF THE EUROPEAN UNION. Brussels, 10 February /11 LIMITE GENVAL 8 CATS 10 AVIATION 21 DATAPROTECT 9

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

East West Rail Consortium

OUR NETWORK. 1:22 24 departures per day. 2:01 10 departures per day. 5:34 3 departures per day. 2:15 18 departures per day. 3:17 11 departures per day

IMPACT conference 2018 «Affordability of Public Transport» Enforcing attractiveness & relevance Of Public Transport Services

McLean Citizens Association Transportation Committee Project Briefing

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

PRESS RELEASE. 30 August Press Contact - Bénédicte ALZATI - T+33 (0)

Chalet La Remuaz. Property Directions. Address: 112 Route du Tour, 74400, Montroc, Mont-Blanc. Coordinates: / 6.

The Atlantic Initiative for Tourism 2015 Conference Rabat, March 2015

General Information. Government

ARTWEI ARTWEI ARTWEI

International Seminar Audit of public procurement at regional and local level

Actions to Narrow the Gap Between Transport Efficiency of the Danube Region Countries

The ITGI Project Gas Corridor through Turkey, Greece and Italy

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy

Tourist residence. SOLEIL de Valfréjus SAVOIE. Traditional and contemporary

Transport Performance and the Data Clubs Approach. Richard Anderson ESRC International Public Service Rankings 13 th December 2005

APPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

in France! + 40 Tel : +33 (0) Contact us! Tel: / ,

Ground Transportation Strategy. Victoria Airport Authority

From: OECD Tourism Trends and Policies Access the complete publication at:

MARRAKESH DECLARATION

The Government s Aviation Strategy Transport for the North (TfN) response

PRIMA Open Online Public Consultation

Our awards. Here is the list of the latest awards, received between 2016 and 2007:

Transcription:

The missing link in the Trans-European network in the southern Alps The strategy : what needs to be done Europe needs a core network of traffic corridors with high efficiency and low emissions. The core network must ensure efficient multimodal links between the EU capitals and other main cities, ports, airports and key land border crossings, as well as other main economic centres. It should focus on the completion of missing links mainly cross-border sections and bottlenecks/bypasses. Extracts from the White Paper on European transport policy, March 2011 Maurice BRUN President of Setumont

The Evolution of European trans-alpine traffic flow : constant shift of north-south flows towards the East and west-east flows towards the South. The origins/destinations of traffic flows in the Southern Alps are very different to those in the northern Alps. Flows in the northern French Alps consist of exchange and local traffic between neighbouring regions, whereas, in the southern Alps, long distance international transit traffic is a majority, for which rail transportation is particularly relevant. What you need to know : different origins/destinations of south and north flows Although the amount of traffic in the French Northern Alps has decreased while traffic in the Southern Alps has simultaneously increased, there is no sustainable economic possibility of transfer from one corridor to another. In consequence, the large capacity margin of the northern alpine paths cannot be used to shift traffic which is congesting the southern alpine routes. For travelers from the Durance valley and massed flows coming from or transiting via the southern Alps, the future rail tunnel beneath Montgenèvre is the only direct access to the Pô plain European network, a TEN-T hub. This structure meets European directives in favour of modal shift and would protect the reliability of economic flows notably during the winter period. Evolution of all traffic flows in the northern Alps (Data from Alpifret and Alpinfo reports) Freight traffic throughout the Alps in millions of net tonnes France Switzerland Austria LYON-TURIN AXIS Notice : MONT BLANC + FREJUS CAPACITY MONT CENIS TUNNEL MONT CENIS Rail 2,4 Mt Rail Rail Excess capacity in the current Mont Cenis tunnel is over 7 times the amount of 2009 traffic. This capacity has been reinforced by recent work carried out to bring it up to B+ gauge. Alpine sector : Mont Cenis/Frejus to Brenner Source: Federal Transport Office Goods traffic through the Alps transiting via France, Switzerland and Austria by road or rail The Evolution of European Transit Flows (not including local exchanges) (sources : Alpifret and Alpinfo reports) Goods traffic crossing the Alps and transiting through France, Switzerland and Austria. +Rail Rail Rail Rail Rail +Rail +Rail +Rail 2 - SETUMONT REVIEW - n 5 - July 2011

Consequences of current choices for cross-border crossings in the southern Alps : traffic bans at Montgenèvre, congested roads at Ventimiglia. Tonnage transported by road and rail in 2009 (in millions of tonnes) Graphs from Alpifret reports 2008 and 2009 tonnes Ventimiglia has become the 2 nd most frequented Alpine crossing point after the Austrian Brenner crossing. BRENNER Accompanied combined transport Non-accompanied combined transport Conventional rail VENTIGMILIA Congestion in the Mont Blanc and Frejus tunnels in 2003 and 2008 (in hours x km per year) Level 800 h x km per year Comment from the Alpifret 2008 report In France, congestion remains very low in the Mont Blanc and Frejus tunnels apart from during peak holiday periods in general. Therefore, congestion is not caused by, or subjected to, heavy goods traffic. On the contrary, very high levels of congestion are observed at Ventimiglia on the Nice-Ventimiglia corridor on the A8 motorway Congestion at Ventigmilia (Nice-Ventigmilia axis on the A8 motorway) in 2003 and 2008 ( in hours x km per year) Therefore, it is essential to create an alternative high volume axis to the road in the Southern Alps. Level 800 h x km/ year NB Please note the different scales of the two graphs. A special scale is needed to illustrate the level of congestion at Ventigmilia. SETUMONT REVIEW - n 5 - July 2011-3

Official Evaluations : consensus on the real nature of trans-alpine flows What you need to know : complementarity between southern and northern trans- Alpine crossing points Official evaluations quoted below confirm and explain data gathered by Alpifret and Alpinfo. Because of their distinct origins/departures, southern Alpine flows cannot be transferred to French northern Alpine crossings on slots made available by severe competition from the Swiss Simplon- Lötschberg and Saint Gothard crossings. On the other hand, the future Montgenèvre Tunnel will provide significant assistance to the Lyon- Turin axis as this rail axis forms the natural northern access of the Montgenèvre project. The estimated cost of the Montgenèvre project is 10% of the total cost of doubling the Lyon-Turin rail axis. February 2003 Audit Report of the Inspection Générale des Finances ( Financial Inspection) and the Conseil Général des Ponts et Chaussées (Highways and Civil Engineering Department) on major transport infrastructure projects. Rail projects Annexe F1 Appreciation of quantitative elements Extracts concerning the distinct characteristics of flows in the northern and southern Alps B freight traffic Current traffic ( north Alpine axes) The main challenge lies in determining which area to choose in order to evaluate the evolution of alpine traffic as all areas do not have similar origins/destinations and are not therefore in direct competition. Delimitation of the area concerned in the North does not pose a problem, but consideration of traffic transiting via the Mediterranean coast at Ventigmilia and Montgenèvre is a different matter. At the end of its investigations, the mission considers however that these traffic flows are not really competing with traffic in the Maurienne and Mont Blanc areas and should not therefore be retained within the considered perimeter. Therefore, traffic passing south of Frejus, Montgenèvre and Ventigmilia are of different origins and destinations. The transport of goods across the Alps, major changes over the last ten years Ministry of Transport Analysis- SESP NO 163- December 2006 Extracts concerning the distinct characteristics of north alpine/south alpine flows and the consequence on the mutually coherent Montgenèvre-Ventigmilia link. Decrease in the level of attractiveness for the Mont-Blanc and Frejus tunnels(..) the decrease in the amount of traffic on French crossings linked to changes of route over 10 years is 10 Mt for 2004, namely 675 000 heavy goods trucks in total. These changes only affect Franco- Italian north Alpine crossings as the Ventigmilia route is not in direct competition with the Swiss and Austrian crossing points. Traffic between Germany and Italy has practically disappeared from French crossings since 1999. Increase of road traffic at Ventigmilia. The number of heavy goods crossing the Franco-Italian border at Ventigmilia has almost doubled in ten years. The economic dynamism of Spain has made it a major transit area (..)the increase in traffic at Ventigmilia over the last years is not just linked to structural growth. In fact, when the Montgenèvre Pass was closed to heavy goods vehicles over 26 tonnes as from 11 August 2003, traffic from the Provence-Alpes-Côte d Azur and Languedoc-Roussillon regions and also the Iberian peninsula increased. How can we apply the Grenelle de l Environnement to trans-alpine rail crossings? TDIE (Transport, Development, Intermodality, Environnment) Debate Trans-Alpine Infrastructures and Mobility- 2 December 2009 Extracts from the minutes published on the website www.transalpine.com Claude GRESSIER, the inter-ministerial delegate for the Lyon-Turin project As the journey from Germany or the Benelux countries to Milan or Turin is much shorter via Austria or Switzerland, a large part of transit traffic which used the French trans-alpine hass tunnels therefore changed routes. On the other hand, traffic keeps increasing at Ventigmilia, in particular because of Franco-Spanish transit. Claude GRESSIER points out that although in a partnership contract, the private partner will provide funding and has to be reimbursed, the ultimate funders are evidently the two States concerned and the European Commission. Tunnel tolls should not cover more than 10% of the total cost of the works. 4 - SETUMONT REVIEW - n 5 - July 2011

The Durance Valley Piedmont Rail link The Durance Valley Piedmont rail link via the Montgenèvre Tunnel meets specific and complementary services : improving access to the southern Alps for both passengers and freight, railroad transportation, international transit, increasing the hinterland of the Mediterranean ports etc. The map designed by the FNAUT-PACA (National Federation of Transport Users Associations) lets you visualize and understand the stakes of this project which is strategically urgent for the southern Alps. SETUMONT REVIEW - n 5 - July 2011-5

The decisions : 10 years of studies and headway for the southern Alps 23 rd March 2000 : the PACA Regional Council adopts the 4th State- Region contract plan CPER 2000-2006. The State and the Region decide, as a matter of priority, to commit to studies for the modernization and electrification of the current Durance Valley line, in view of a future rail tunnel beneath Montgenèvre. 9 th July 2002: the Interministerial Committee for Territorial Planning and Development (CIADT) at Limoges validates the France 2020 Collective Services schemes with the Montgenèvre tunnel. 27 th November 2001: during the Périgueux summit, French and Italian governments ask the intergovernmental Commission( CIG) for the improvement of Franco-Italian links in the southern Alps to put forward practical proposals for opening up the southern Alps, and in particular to study a rail project for Montgenèvre. 3 rd December 2003: the Province of Turin and the Hautes Alpes Conseil Général (local area council) sign a political agreement defining four priority objectives for the Montgenèvre project. This agreement specifies that with gradual improvements this solution will make the following possible: With the construction of just one tunnel, improved TGV high speed rail access to the tourist destination of Briançon and Clavières- Cesana, from Milan, Turin, Paris and Lyon and the installation of a TER(Regional Express Train) Marseille-Turin link; With the improvement and electrification of the railway line between Briançon and Gap, TGV high speed access to the whole of the Hautes Alpes; With the creation of a road-rail transportation centre at the intersection of the railway line and the A51 motorway in the Bâtie Neuve sector, heavy goods transit by road-rail transportation to Orbassano and the Pianura Padana; With the improvement and electrification of the railway line towards the Mediterranean, transport of freight convoys from Marseille and Spain to Turin and Eastern Europe. 25 th February 2004: the Commission for Regional Transport and Tourism Policy at the European Parliament, in the Bradbourn report, calls for the completion of project 6 of the TEN-T with the Marseille-Turin rail axis with the Montgenèvre tunnel as the cross-border section (2015). 16 th June 2006 : the Interregional Development and Improvement Plan for the Alps (SIADMA) emphasized the necessity to construct the Montgenèvre tunnel. The Committee of the Massif calls for the Montgenèvre tunnel to be included in Corridor 5 of the European transport network. 16 th December 2006: the SRADT Regional Development plan is validated by the PACA regional council the tunnel beneath Montgenèvre combined with an improved railway line from the PACA area to the Turin region is a major step in terms of infrastructure. Construction of this line creates the opportunity of transferring part of road flows between the Provence- Alpes-Côte d Azur, Languedoc- Roussillon regions, Piedmont in Italy and Catalonia. The link via Montgenèvre could be used for both conventional goods trains as well as a rolling rail-road motorway. 20 th March 2007: the PACA Regional Council adopts the State- Region project contract (CPER) 2007-2013. The State and the Region undertake economic and technical feasibility studies for the boring of the tunnel beneath Montgenèvre. Furthermore they commit to the modernization of the Alpine railway line from Aix to Briançon. 11 th May 2007: the Official Journal publishes decree No. 2007-779 approving the Bouches du Rhone Territorial Planning Directive that in its prescriptive guidelines put the Durance Valley-Italy link via the Montgenèvre railway tunnel as priority 1 of objective 1. 17 th September 2009: the Development Council of the Marseille -Fos Grand Port Maritime Major Seaport unanimously adopts the following two proposals for railway services :- The Development Council calls upon policymakers, economic and social leaders and non-governmental organizations, both locally and national, to act for the inclusion of the Montgenèvre railway tunnel on the TEN-T Trans-European Transport networks The Development Council suggests that a preliminary study should rapidly be undertaken by the PACA region on the entire route between Marseille and Turin via Montgenèvre. 6 - SETUMONT REVIEW - n 5 - July 2011

The Future Montgenèvre Tunnel Project The SETEC-TPI study of November 2003, carried out jointly by the Hautes Alpes General Council and the Province of Turin, puts forward several different solutions. The deep solution between Villar Saint Pancrace and Oulx (red dotted line) is the preferred option. 5 or 6 years required to complete the construction Estimated completion time for the construction of the tunnel is between 5 and 6 years depending on the solution chosen and the method of construction, not including time taken for studies, procedures and organization. Solutions Actual Tunnel Improvements to the Briançon-Gap line Total Shallow solutions in M Eur Deep solutions in M Eur Montgenèvre rail tunnel project synthesis report SETEC PI Minéa November 2003 SETUMONT REVIEW - n 5 - July 2011-7

Integration in the trans-european Transport Networks (TEN-T) On the 25 th February 2004, the European Parliament Commission for Regional Policy, Transport and Tourism, in the Bradbourn report, called for the Montgenèvre Railway tunnel to be included in the TEN-T to complete European priority project No. 6 (Pô plain). Setumont's Partners Provence-Alpes-Cote d'azur Regional Council Hautes-Alpes General Council Hautes-Alpes Territorial Chamber of Commerce and Industry Provence-Alpes-Cote d'azur-corsica Regional Chamber of Commerce and Industry Marseille-Provence Chamber of Commerce and Industry Alpes de Haute-Provence Chamber of Commerce and Industry Hautes Alpes Chamber of Trades and Crafts Major Seaport of Marseille The communities of Argentière La Bessée, Briançon, Gap, Marseille, Montgenèvre, Nevache, Val des Près. European Parliament 25 February 2004 REPORT Commission of Regional Policy,Transport and Tourism Rapporteur : Philip Charles Bradbourn Amendment : 19 (extracts) Extension of project No 6 along the railway axis Railway axis Marseille-Turin, Lyon-Trieste/Koper-Ljubljana- with the Montgenèvre Tunnel Budapest-Ukrainian border as a cross-border section (2015). Justification It is in the European interest that the project should make the missing connections.), The Alps represent a major natural obstacle to the development of several regions, including Provence-Alpes-Côte d'azur. A Marseille-Turin rail link (via the Durance Valley and the future Montgenèvre Tunnel) would make it possible, at reasonable cost, to create a cross-border section capable of completing the Lyons-Turin axis and ensure a genuine opening up of border regions and of the Rhône Valley. Finally, the construction of the Montgenèvre Tunnel will make it possible to develop a new intermodal transport centre in Marseille. Members of the Advisory Committee Monsieur Alessandro BARBERIS, President of the Turin Chamber of Commerce, Industry, Trade and Agriculture President of Eurochambers Monsieur Luc CORSO, Honorary vice-president of the Marseille- Provence Chamber of Commerce and Industry Monsieur Franco CAPRA Mayor of the commune of Clavière, Italy Monsieur Alain SEGUIN, Consultant Monsieur Jean-Pierre HUCHON, Consultant in economic intelligence and member of the NosterPaca Association Eligibility for TEN-T The Durance Valley and Montgenèvre Tunnel railway axis = a complementary line of the PP6 (east-west Pô valley) ensuring the direct connection of the PP3 (Iberian Peninsula) with the PP6 and PPP24 (Swiss north-south tunnels). Complementary line of the PP6 via the Durance Valley and Future Montgenèvre Tunnel / - Agence de Gap - Tél. 04 92 53 31 32 - Imprimeur labellisé IMPRIM'VERT