Whangarei Airport. Prepared by Carine Andries 10/20173

Similar documents
2009 Muskoka Airport Economic Impact Study

CHAPTER 1 EXECUTIVE SUMMARY

Sunshine Coast Airport Master Plan September 2007

Whangarei District Airport Strategic Review

8 OAMARU AIRPORT ZONE

Preferred Alternative Summary

Birmingham Airport 2033

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Current and Forecast Demand

TERMINAL DEVELOPMENT PLAN

Aviation Development

Westover Metropolitan Airport Master Plan Update

Airport forecasting is used in master planning to guide future development of the Airport.

Alternatives. Introduction. Range of Alternatives

COMMERCIAL AND GENERAL AVIATION

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

SouthwestFloridaInternational Airport

2 Aviation Demand Forecast

AERODROME SAFETY COORDINATION

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Introduction DRAFT March 9, 2017

Updates to Procedures at St. John s International Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Consideration will be given to other methods of compliance which may be presented to the Authority.

Existing Facilities. Current and Forecast Demand

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

AVIATION. MichiganReportCard.com 5

Auckland Airport: the next 20 years and beyond

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

FORECASTING FUTURE ACTIVITY

Hartford-Brainard Airport Potential Runway Closure White Paper

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Agenda: SASP SAC Meeting 3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

MASTER PLAN 2010 ADDENDUM REPORT

Response to the London Heathrow Airport Expansion Public Consultation

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

TfL Planning. 1. Question 1

MASTER PLAN CONCEPT 1 DRAFT

2018 Nelson and Marlborough Airspace Review Initial consultation

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Penzance Heliport Ltd.

Chapter 2 FINDINGS & CONCLUSIONS

BELFAST MUNICIPAL AIRPORT OVERVIEW

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Commission on the Promotion of Business Jets. Interim Report

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Burke Lakefront Airport (BKL) Master Plan Update

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Chapter 4.0 Alternatives Analysis

Lake Tahoe Airport Master Plan

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

The Future of Aviation for Central New Mexico

Schiphol Group. Annual Report

Rodrigues Regional Assembly Chief Commissioner s Office

Punta Gorda Airport Master Plan Update

BNA Master Plan Update Public Meeting No. 2

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

HELSINKI-MALMI INTERNATIONAL AIRPORT BUSINESS PLAN

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

5 Rail demand in Western Sydney

1. Background and Proposed Action

3.1 CRITICAL AIRCRAFT

Airport Master Planning Process & Update

Almaguin Strategic Plan - South River/Sundridge Airport

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES


Huronia/Midland Airport, CYEE

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Summary of Public Submissions Received on

Master Plan Update Community Advisory Committee Kick-off Meeting

Appendix C AIRPORT LAYOUT PLANS

3. Coach Supporting Statement

Sydney Airport Master Plan

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

AERODROME LICENCE APPLICATION PROCESS

Part 172 Air Traffic Service Organisations Certification, Amendment 2. Contents

Transcription:

Whangarei Airport Prepared by Carine Andries 10/20173 March 2010

TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2 3.5.3 Terminal and facilities... 3 Existing ground access system... 3 Taxiway/runway system... 4 Airport location and surroundings... 5 Other features... 5 Navigational aids... 5 Traffic control tower... 5 Fire rescue facilities... 6 4 5 6 7 POTENTIAL SITES FOR AIRPORT RELOCATION... 6 DRAFT 30 YEAR TRANSPORT STRATEGY FOR NORTHLAND... 6 EVALUATION / FUTURE DIRECTION... 8 REFERENCES... 9 1

LIST OF FIGURES Figure 1 - Transport Strategy - 2040... 7 LIST OF TABLES Table 1 - Air Transport Annual Aircraft Activity Forecasts... 4 Table 2 - General Aviation Activity Forecasts... 4 Table 3 - Total Aircraft Activity Forecasts... 5 2

1 Introduction Planning for the future and considering an expanding population base requires the contemplation of future transport and infrastructure needs, including airport operations. Given the objective of the Sustainable Futures Growth Strategy to ensure a planning platform for the Whangarei District to deal with a growing population over the next 30 to 50 years, it is essential to consider the capacity of the Whangarei Airport and its ability to serve the public for the years to come. The fact that the airport is 50% owned by the Whangarei District Council (WDC) and 50% owned by the Government has, in the past, presented some problems in relation to planning issues for the Council; given its role as airport owner and developer, and enforcement agency for resource management matters. This has led to the instigation of independent studies in order to reconcile the different roles. The following assessment is partially based on these earlier reports and forecasts for the airport, such as the Whangarei Airport Master Plan (1998), the Master Plan Review (1999), and the Whangarei Airport Operations Review (2003). Where changes have occurred to the airport since these reports were drafted, these have been taken into account. 2 Airport role and function The Whangarei District has, for many years, been served by one (regional) airport, located on the Onerahi Peninsula. The Whangarei Airport is a commuter airport, used for both private and domestic commercial flights (NRC, 2010). It is an important physical resource, serving a local population of around 78,000 people. The airport provides for recreational and economic opportunities, including daily scheduled flights, training facilities, heliport and private use facilities (Beca Planning, 2003, s32). The main operator at the airport is Air New Zealand Link, with regular flights also undertaken by Salt Air who might operate twice daily on week days. 3 Airport features and capacity The following assessment examines the existing terminal with associated facilities, the existing ground access system, the taxiway/runway system and the airport location and surroundings. 3.1 Terminal and facilities The existing terminal provides many facilities, including airline check-in baggage handling and office space, departure lounge, cafeteria, car rental, restrooms and baggage claim area. In general, the Airport Master Plan Review assessed the overall size of the terminal to be satisfactory for the levels of operation at the time, even though individual facilities within the terminal varied from being in excess of (i.e. departure lounge, cafeteria and toilets) to being less than (i.e. airline processing and baggage make-up) that which is theoretically required (Beca, 1999). To date, it appears no major difficulties are being experienced with the terminal facilities, even though the terminal could benefit from reorganization, as identified during the review, in order to improve the layout and space requirements. However, it may be more advantageous to construct a new, larger terminal once demand for its facilities outgrows its capacity (Beca, 1999). It is considered that the current airport premises has ample land available to accommodate such a facility. 3.2 Existing ground access system Apart from a few minor issues such as night time lighting and the provision of a covered walkway and transfer facilities to and from the secure lock-up carpark, the existing ground access system, consisting of 3

the terminal kerbside, rental carparks, public carparks, staff carparks and airport access road, was judged to be more than adequate for the operations at the time (Beca, 1999). To date, there appear to be no major issues with these facilities, and some further expansion within the existing site is considered possible should demand increase. 3.3 Taxiway/runway system Whangarei Airport has a single sealed runway with an operational length of 1061m or 1091m depending on whether the runway is used for landing or take-off, respectively. The runway has an associated sealed taxiway which connects the runway with the aircraft apron. The airport furthermore contains a grass runway and two grass taxiways which are mainly used for pilot training, microlight aircraft and helicopter operations. A recent upgrade of the airport (NRC, 2010) has ensured the airport remains certified to accommodate scheduled airline services for 50 seat capacity aircraft, rather than just cater for the occasional 50 seat charter plane, even though the majority of scheduled flights currently only carry a maximum of 19 passengers. The capacity of the sealed runway was assessed in the 1998 Master Plan and was estimated to be 70-85 operations per hour in VFR (visual flight rules) and 20-24 operations per hour in IFR (instrument flight rules). The Annual Service Volume (ASV) was estimated to be 140,000 to 160,000 operations per year. Latest figures obtained from the Airport Manager, indicate a total of 18,770 movements for year- end June 2009. The latest forecast modeling carried out in 2002 and represented in tables 1, 2 and 3 below, foresees a high growth scenario of 45,500 operations (Total Aircraft Activity) per annum by the year 2027 (Beca, 2003). This figure constitutes around one third of the total capacity of the runway system, and would appear to indicate that the airport will be able to serve the District for at least the next 50 years. Table 1 - Air Transport Annual Aircraft Activity Forecasts 1 Year Low Forecast 0% Medium Forecast 3% High Forecast 6% 2002 Current 6,400 6,400 6,400 2007 5 year horizon 6,400 7,400 8,400 2012 10 year horizon 6,400 8,400 10,300 2027 25 year horizon 6,400 11,300 16,100 Table 2 - General Aviation Activity Forecasts 2 Year Low Forecast 6% Medium Forecast 10% High Forecast 17% 2002 Current 5,600 5,600 5,600 2007 5 year horizon 7,300 8,400 10,400 2012 10 year horizon 9,000 11,200 15,100 2027 25 year horizon 14,000 19,600 29,400 1 Air transport activities denote commercial activities. 2 General aviation activities comprise private and club flights, microlight activities and helicopter flights. 4

Table 3 - Total Aircraft Activity Forecasts Year Low Forecast Medium Forecast High Forecast 2002 Current 12,000 12,000 12,000 2007 5 year horizon 13,700 15,800 18,800 2012 10 year horizon 15,400 19,600 25,400 2027 25 year horizon 20,400 30,900 45,500 Source: Whangarei Airport Operations Review (Beca, 2003) 3.4 Airport location and surroundings The Whangarei Airport is located on an elevated site overlooking the Whangarei Harbour, at the end of the Onerahi Peninsula. The site covers a total of approximately 60 hectares. A ten minute drive takes one into the Whangarei City centre (Beca Planning, 2003, s32). The surrounding area is characterised mainly by residential development which imposes limits as to noise generation and the physical expansion of airport operations. Due to these expansion limitations, it is unlikely that the airport will ever accommodate jet-planes. Indeed, the Draft 30 year Transport Strategy for Northland recently released by NRC for public comment, does not identify a role for the Whangarei Airport as an international airport. Instead, this role is associated with the Bay of Islands Airport. The airport s present location, close to the urban area and in close proximity to residential land uses that have grown up with, and around the airport, has both positive and adverse effects. An important positive effect is the short travelling time from the airport to the main urban Central Business District area. A further positive effect is the provision of passenger and freight transport to serve local business, industry and tourism. The main potential adverse effect of airport activities is noise and its potential effects on nearby residential land uses, although air emissions, safety and traffic effects may also arise. However, these adverse effects can be managed with careful planning, and are not seen as threatening the long-term viability of the airport. Adverse effects from an increase in frequency of flights will be partially offset by the trend towards quieter aircraft in the future. 3.5 Other features 3.5.1 Navigational aids The existing navigational aids appear to be adequate to support the projected aircraft operations, provided they are maintained on a regular basis. The Airport Manager has reported that the Visual Approach Slope Indicators (VASI) are earmarked to be replaced with a more modern PAPI system next year. 3.5.2 Traffic control tower The Whangarei Airport possesses a traffic control tower facility which was operated until 1988 when the volume of aircraft activity was considered too small to warrant the service. However, the facility remains and the service could be reinstated if and when demand occurs. Although, it seems more likely that a new traffic control tower would be constructed as part of new terminal facilities. 5

3.5.3 Fire rescue facilities The original Ministry of Transport fire station building remains located at the airport, adjacent to the tower and terminal. It has easy access to the taxiway and runway system, which is appropriate for the provision of fire rescue services. However, the Ministry sold the building to the Air Training Corps. This would have to be bought back if the fire rescue service was to return. The building would require some maintenance and would need to be fully equipped. 3.5.4 Aircraft fuel supplies Fuel supplies for the aircraft consist of a 40,000 litre public facility and two 20,000 litre private facilities. So far, these facilities have been satisfactory, but the refuelling of these holding tanks may need to become more frequent as air traffic movements increase. Consideration may need to be given to locating the Air BP Jet A1 tank underground. 4 Potential sites for airport relocation As part of the 1999 review of the Airport Master Plan, a desktop analysis was undertaken, investigating other sites for the potential relocation of the airport. One of the main requirements was that the new site should be able to accommodate a regional airport with a 1,500m runway length, able to accommodate jet aricraft. The location also had to be within an acceptable distance from the Whangarei CBD. A total of nine possible future locations were considered. However, a number of limitations including lack of utility provision, topographical intrusions, possibility of flooding and potential noise and safety implication for nearby primary schools and settlements, precluded the majority of sites for further consideration. The report concluded that only one of the sites satisfied all evaluation criteria. This was the Carter Road, Wilsonville site, located to the north-west of Hikurangi (Beca, 1999). Although this site may possess the necessary attributes for the development of a regional airport facility, the location is somewhat removed from the Whangarei CBD, an advantage held by the current airport. Furthermore, it was considered that the level of growth required to create the demand for a greenfield site was likely to be in the order of a doubling or trebling of the Whangarei District s population (Beca, 1999), a level far beyond any numbers forecast at the time, and still outside of the current growth model for the next 30 to 50 years. 5 Draft 30 year transport strategy for Northland In January 2010, the Northland Regional Council released the Draft 30 year Transport Strategy for Northland. Figure 1 is a visual representation of this strategy. In the document, the regional council identifies the Bay of Islands Airport as the international airport for Northland, given its current ability to clear passengers through customs for private international flights of up to 12 people, and given its ability to be developed as the gateway to the Bay of Islands. The Whangarei Airport, on the other hand, is earmarked to service domestic tourism, business and commercial travellers needs, providing direct flights to different destinations nationwide. NRC has identified that the Whangarei Airport, due to physical limitations, cannot expand any further than the recent runway extensions. Given this constraint, and noting advances in technology, enabling aircraft to carry more passengers and land on shorter runways, the report advocates that increasing the frequency of flights and destinations per day will be sufficient to service the district for the foreseeable future. 6

Figure 1 - Transport Strategy - 2040 Source: NRC Draft 30 year Transport Strategy, 2010 7

6 Evaluation / future direction Existing reports analysing and forecasting numbers in relation to the capacity and predicted growth of the Whangarei Airport, have presented a firm basis on which to assess the airport s ability to service the district for the next 30 to 50 years. The Regional Draft 30 year Transport Strategy clearly sees no role for the Whangarei Airport as an international airport. Its role and function are envisaged to remain focused on the needs of domestic tourists, business and commercial travelers to and from the Whangarei District. It seems likely that with increased demand over time, an increase in the frequency of flights will be necessary, possibly requiring the presence of another full-time operator in addition to Air New Zealand Link. Limitations of the current terminal have been highlighted, and the need to renovate this terminal or to construct new terminal facilities has been identified. There is sufficient scope on the existing airport site to accommodate these facilities. It is considered that advances in aircraft technology will, in the future, produce airplanes that are quieter, offsetting potential increases in noise; and reducing the impact on local residents. The recent extension of the runway system ensures the ability of the airport to accommodate larger aircraft, while its proximity to the Whangarei CBD has been recognised as its main advantages. These features, in addition to the airport s ability to cater for an increased frequency of flights and destinations, are considered to provide adequate capacity for the next 30 to 50 years. 8

7 References Beca Planning. (1999a). Whangarei Airport Master Plan 1999 review. Auckland, New Zealand Beca Planning. (1999b). Whangarei Airport Site Selection Study. Auckland, New Zealand Beca Planning. (2003). Airport Planning Review: Discussion Report. Auckland, New Zealand Northland Regional Council (2010). Draft 30 year Transport Strategy for Northland. Whangarei, New Zealand 9