Alternatives Study of Alignment

Similar documents
DETAIL NOTE ON PROJECT

Sardar Patel National Highways Modern Dharmshala

Nakina Moraine Provincial Park. Interim Management Statement. Ontario. Ministry of Natural Resources

Development of Road Infrastructure in India

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Technical Explanation Introduction

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

RL (+) 82m to RL (+) 105m. Single Crop & Barren Land. Breakup of ownership: Private Land: 737 Acre Government Land: 123 Acre Forest Land: Nil

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

Understanding user expectations And planning for long term sustainability 1

London Borough of Barnet Traffic & Development Design Team

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Provincial Railway Technical Standards

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Biosphere Reserves of India : Complete Study Notes

Remote Sensing into the Study of Ancient Beiting City in North-Western China

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Article 13, clause no of the Concession Agreement states that:

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

4. Safety Concerns Potential Short and Medium-Term Improvements

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

--DRAFT INTRODUCTION. Transportation Land Development Environmental S e r v i c e s

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Presentation to Working Group II-B, UTTIPEC

Texas Transportation Institute The Texas A&M University System College Station, Texas

Bayview Escarpment. Interim Management Statement

White Mountain National Forest

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

Census Rationale. Census Objectives

Appendix 4 St. Charles Basin

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Airport Master Plan Update

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Boyne Valley Provincial Park. Interim Management Statement

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

LOCATION ANALYSIS PURVA ATTRIA. March 2013

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

US 380 FEASIBILITY STUDY

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

"ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Dallas Executive Airport

S Central Coast Heritage Protection Act APRIL 21, 2016

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

PRE FEASIBILITY REPORT TABLE OF CONTENTS

Wilderness Activities : (Page 162)

2. Introduction to Kurunegala Area : 2.1 Location and History : 2.2 Regional Aspects :

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Segment 2: La Crescent to Miller s Corner

EXPLANATORY STATEMENT

SOUTH INTERCHANGE AREA

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

Major Scheme Business Case Summary Report for Programme Entry

Airport Design-3 Geometric Design

Sawtooth National Forest Fairfield Ranger District

Welcome Land Use Element... LU-1

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

THE ALBERTA GAZETTE, SEPTEMBER

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

Installation Instructions

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

INTERPRETING TOPOGRAPHIC MAPS (MODIFIED FOR ADEED)

Runway and Taxiway Marking

Rural Rustic Road Program

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Score. Category. Access Aesthetics Community Resources

Turistička zajednica grada Zagreba

What is Rail Futures?

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

California State University Long Beach Policy on Unmanned Aircraft Systems

Stage 2 - November 2017 Survey and Map Comments (verbatim)

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

PROJECTED UTILIZATION OF THE PROPOSED HOTEL

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Aeronautical Satcom Markets

Chapter 4.0 Alternatives Analysis

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

San Martin Boulevard over Riviera Bay Project Development & Environment (PD&E) Study Update PID A

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

Transcription:

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments: i) Should avoid flood prone areas and agricultural lands. ii) iii) iv) The length should be as short as possible. It should have minimum impact on the existing public utilities and settlements. It should not disturb the existing drainage system. v) The alignment should be avoid of sharp curves. vi) vii) 2 Approach Methodology The alignment should be located away from the existing built up area and should not conflict with future planned development. Traffic capacity and safety should be optimized. Topographical maps of Survey of India and satellite images from Google Earth were studied to understand the terrain, water bodies, forest areas and any major channel etc. at macro level on both sides of stretches to be bypassed. Besides, thematic maps relative to soils, land capability, drainage, relief etc. were also scanned to have better appreciation of these factors. Remote Sensing maps were also acquired for precise study. Reinforced with the generalized information from maps, site visits were made to study the details at micro level. Site visits included thorough inspections of areas on both sides of urban stretches covering the study of terrain, land uses, environmental sensitive features and developmental activities. The coordinates of these features are taken as control points by GPS instrument. This exercise enabled us to identify the potential alignments for bypass alternatives. These were marked on remote sensing maps. This was followed by another site visit by multidisciplinary team consisting of highway engineer and social and natural environmentalists to verify the feasibility of these alternative alignments and to record impacts on natural environment (water bodies/wet lands, rivers/water crossings, forests etc.), social environment (agricultural land, intensity of development, resettlement problems etc.), cultural environment (archeological properties, temples/shrines etc). This process was repeated and refinements made in alternative alignments. 3 Alignment selection Alignment selection was carried out on the basis of evaluation of various alternatives for each bypass. The improvement of the existing alignment was included as an alternative. Both qualitatively and quantitatively evaluation has been done for various factors influencing the selection process. These factors can be broadly grouped under main heads such as geometrics, cost, economic benefits and social and environmental impacts. The qualitative evaluation rates the

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 2 of 6 alternative as less desirable, desirable, more desirable and most desirable against each factor. The factors that were considered for qualitative comparison are: (i) (ii) (iii) (iv) (v) (vi) (vii) Land availability. Effect on residential/commercial buildings. Ponds affected. Religious structures affected. Flora and fauna affected. Long term utility. Environmental Quality. Similarly quantitative evaluation was done for the following factors: i) Route length. ii) iii) iv) Number of sharp horizontal curves. Length of agricultural land affected. Length of barren land affected. v) Length of residential land affected. vi) vii) viii) ix) Length of commercial land affected. Number of road crossings. Number of river/canal crossings. Pucca / Kutcha - commercial / residential structures affected. x) Telephone/Electric poles to be shifted. The alignment alternative with the best rating has been selected. 4 Koderma Bypass The boundary of Koderma Town start from Km 26.500 and ends at the start of Forest area at Km 32.600. In this stretch of the project road available ROW is varying between 8 m to 30 m, also the stretch from Km 30.000 to Km 31.850 is very congested, this portion of the project road has major government and Private structures of the district like D.C. Office, Post Office, Tahsil Office, Govt. Hospital, Police Station, District Jail etc. The Project road in this stretch has 7 m wide carriageway and 1.5m wide earthen shoulder on both sides, Due to above mentioned facts, the scope of land acquisition for 4 lane facility in this area is very critical. Keeping in mind these facts and after discussion with NHAI officials it is proposed to Bypass this section of the Project road.

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 3 of 6 After various site visits and discussion we have proposed two alternative alignments for Koderma Town. These are: Alternative 1: Proposal of bypass on LHS of the Project road (Km 28.102 to Km 33.860) Alternative 2: Proposal of bypass on RHS of the Project road (km 27.300 to Km 33.450) Alternative 3: Elevated Corridor through existing alignment For making traffic free from interferences from local traffic, Project road carriageway needs to be raised so that through traffic can pass Koderma town without conflicting with local traffic. Elevated corridor will require connectivity for Koderma Girdih road through ramps/ loop. To provide Elevated corridor for Project road and Service road for local traffic it will require 28 m to 32 m RoW apart from land requirement for giving access to Koderma Girdih Road. Alternative I: The 1st alternative alignment starts from km 28.102 before Koderma Town and runs in the left direction of the existing alignment it meets the existing alignment at Km 33.860 thus having a total length of approx. 5.790 Km. Alternative II: The IInd alignment starts from Km 27.300, runs in right direction of existing alignment and meets the project road at Km 33.450, thus having a total length of 8.850 Km. This alignment crosses Railway line at two locations and also cross Koderma Domchanch road, thus requiring two additional ROBs and flyover. Alternative III: The alternative III follows existing alignment on which from Km 28.950 to km 31.625, thus having a total length of 1.900 km, elevated corridor with 775 m approach is proposed due to the heavy congestion/ Built up area and non-availability of ROW in this stretch. The proposal of this 1.900 Km elevated corridor will increase the project cost abruptly. The above three alternatives are shown in Fig-1.1 shown below & Comparative statement with merits and Demerits of three alternatives are given in below Table-1.1.

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 4 of 6 Km 33.450 Alternative I (LHS) Koderma Domchanch Road Alternative III Existing Alignment Km Alternative II (RHS) Km Railway Line Map depicting various Bypass alternatives

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 5 of 6 Sl. No. Table 1.1: Comparative Statement with Merits and Demerits of Three Alternatives Description Alternative 1 (Left side) Alternative 2 ( Right Side) Alternative 3 (Existing Alignment) 1 Length 5.790 Km 8.850 Km 5.400 Km 2 Length Bypassed 5.760 Km 6.150 Km N/A 3 Rail-Road Crossing Nil 2 Nil 4 Nala/Canal Crossing 3 3 Nil 5 No. of Major Cross Road Nil 1 1 6 Length of Flyover/Vehicular Underpass/Bridge - 2 ROBs of length 100m each and 1 flyover of 50 m excluding approach. 1.900 Km 7 Approach Length - (200 +200) x 3 = 1200 m 400+375=775 m 8 Service Road/Ramp - - 5.4x2 = 10.8 Km 9 Land Acquisition 32.10 Ha 53.10 Ha 21.60 Ha 10 Type of Land to be Acquired Agricultural & Wildlife Agricultural, residential & Wild life Commercial & Residential 11 Civil Cost Rs. 39.07 Crore Rs. 84.08 Crore Rs. 253.04 Crore 11 Advantage 1. The Alignment bypasses the congested area of Koderma Town. 2. This Alignment doesn t require any Rail Over Bridge. 3. No flyover is required. 4. Land to be acquired is mostly Agricultural. 5. Length of this alternative is less than Alternative II, hence requirement of land to be acquired is less. 1. The length of alternative passes through wildlife Sanctuary area is less as compared to Alternative I. No Bypass required.

Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 6 of 6 Sl. No. Description 12 Disadvantage Alternative 1 (Left side) 1. The only demerit is that some part of the alignment passes through Wild life Sanctuary area. Alternative 2 ( Right Side) 1. The alignment passes railway line at two places, hence two ROBs required. 2. The alignment crosses Koderma - Domchanch road, hence flyover is also required. 3. The Length of this alignment is more than other alternatives, hence land acquisition is also more. 4. R & R Cost will be high. 5. The overall impact will be increased cost. Alternative 3 (Existing Alignment) 1. The R & R would be significantly difficult due to the presence of heavily congested Built-Up section. 2. No future improvement is possible. 13 Recommendation PRIORITY I Not Recommended PRIORITY II