Rockin River Ranch State Park

Similar documents
L o g a n Simp so n M e et i n g Not e s Pub l ic Meet in g #3 A u g u st 16, P ag e 2

Rockin River Ranch State Park. TAC Meeting No. 2

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Bradley M. Hill, R.G.

Welcome to the future of Terwillegar Park a Unique Natural Park

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by:

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

MORGAN CREEK GREENWAY Final Report APPENDICES

Daisy Dean Trail 628/619 ATV Trail Construction

Phoenix Habitat Restoration Projects

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

BACKGROUND DECISION. Decision Memo Page 1 of 6

RESOLUTION R WHEREAS, the required publications and public hearing have been conducted by the Planning Commission and the Town Council; and

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Chapter 2: Summary of Existing Open Space System

PLANNING CONSIDERATIONS

2.0 Physical Characteristics

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

MASTER PLAN EXECUTIVE SUMMARY

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Preliminary Site Evaluation

Welcome to Tappan Lake Park Master Plan Update

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

Final Recreation Report. Sunflower Allotment Grazing Analysis. July 2015

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Dungeness Recreation Area County Park Master Plan

ECOTOURISM AND BIODIVERSITY CONSERVATION

Electric System Serving Pierce County Current system and future investments

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Non-motorized Trail Plan & Proposal. August 8, 2014

White Mountain National Forest Saco Ranger District

SECTION 106 ACTIVITIES ANNUAL REPORT

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES

MORGAN CREEK GREENWAY CONCEPTUAL MASTER PLAN Including Carrboro High School Spur Trail TOWN OF CARRBORO

ROUTE ANALYSIS PROCESS

PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

F RIENDS OF THE SONORAN DESERT Open Space Bond Newsletter

Groundwater Recharge/Discharge Y 1, 2, 3, 4, 5, 16 X Wetland appears to be a contiguous hydraulic system, draining towards Goff Mill Brook.

October 23, 2017 Council Workshop

TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017

Northeast Quadrant Distinctive Features

Yard Creek Provincial Park. Management Plan

A Presentation for the Disaster Recovery Alliance Presented by Alexandra Coombs, Shelter Readiness Specialist American Red Cross of Orange County

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

Carson City Open Space APNs and , west of Deer Run Road bridge

Environmental Development of River Road Ranch

LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE. (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014)

Improving Directional Signage for TTC Services at Pearson Airport

2016 Regional Transportation Alternatives Program (TAP) Grant Application

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

SECTION 106 ACTIVITIES ANNUAL REPORT

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

RESPECT INTEGRITY TEAMWORK EMPOWERMENT

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Welcome to Atwood Lake Park Master Plan Update

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Merritt Island Airport

Lake Tahoe Airport Master Plan

Flood History. Floodplain Descriptions

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

Park to Playa Trail. June 17, 2014

Wilds. Headwaters. Lakes. Oxbows. Falls

Union Station Rail Corridor East Enhancements Project

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

French Fire Recovery and Restoration Project Wilderness Resource Impact Analysis

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

2015 PURDUE ROAD SCHOOL March 11, 2015

tt1ll rati;a Ocala International Airport General Aviation Charrette TECHNICAL MEMORANDUM February 28, 2017 Submitted to: Ocala International Airport

1 PLANNING BOARD COUNTY OF ALBANY

HLUET TRANSMITTAL RECOMMENDED ACTION

ARLINGTON COUNTY, VIRGINIA

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

Fischer s Park Master Plan

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

TONGASS NATIONAL FOREST

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Alternative Highest & Best Use Analysis Boutique Hotel

Clackamas County Development Agency

FORECASTING FUTURE ACTIVITY

Town of Oakfield Agricultural and Farmland Protection Plan

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

MANAGEMENT DIRECTION STATEMENT June, 1999

Transcription:

Rockin River Ranch State Park Public Meeting No. 3 August 16 th, 2017 Arizona State Parks and Trails (ASPT) Welcome Executive Director Sue Black Park budget = $4 million Balance of recreation uses, environment, and revenue 1

Meeting Outline 1. Planning Process/Schedule Overview 2. Cooperation and Partnerships 3. Summary of Previous Meetings 4. Inventory and Analysis 5. Review of selected comments and how they were addressed 6. Presentation of the Preliminary Master Plan 7. Break 8. Questions and Answers 9. Next Steps Rockin River Ranch State Park 2

Planning Objectives Balance between recreation experience and environmental preservation Preservation of the historic Verde Ranch ambiance Design a state park that the citizens love, enjoy, and are proud of Provide a sustainable revenue stream for ASPT to maintain the Park Build the project on me and on budget Cooperation & Partnerships Town of Camp Verde U.S. Forest Service, Prescott National Forest Yavapai County Board of Supervisors Emergency Services Public Works Sheriff s Office Eastern Area Command Flood Control District Copper Canyon Fire and Medical Authority Arizona Department of Transportation (ADOT) Arizona Department of Environmental Quality (ADEQ) Arizona Department of Water Quality (ADWR) Arizona Game and Fish Department Friends of the Verde River Greenway The Nature Conservancy 3

Summary of Previous Meetings May 16 th, 2017 Technical Advisory Committee (TAC) #1 June 1 st, 2017 Open House: 103 people signed in 41 comments were submitted July 13 th, 2017 Technical Advisory Committee (TAC) #2 July 17th, 2017 Public Meeting: 57 people signed in 51 question cards and 8 comment forms were submitted Three site plan alternatives were presented. Comments collected from the open house and submitted through email, mail, and phone calls were discussed. August 16 th, 2017 Technical Advisory Committee (TAC) #3 Inventory and Analysis Archaeological Resources Biological Resources Building Assessments Demographic Characteristics Federal Emergency Management Agency (FEMA) Floodway and Floodplain Land Use and Land Ownership Regional Recreation Systems Site Survey Slopes Utilities Water delivery system Visitor Use Data Visual Resources 4

Access Roads and Parking We heard concerns about access and parking. Two lane roads will be constructed to meet roadway standards. Parking was added at the Contact Station. Parking was added at the Day Use area to accommodate River access. Additional parking near Group Camping area. Additional parking near south River access point. Cabins We heard cabins were too close to private property. Cabins were relocated away from property lines to a more centrally located area. We heard there were too many cabins. We reduced the number of cabins to seven. 5

Camping We heard requests to move camping out of the Mesquite Bosque to preserve natural habitat and increase distance from private property. Group Camping was relocated north, away from the Mesquite Bosque, to a more centrally located area to reduce impacts. Buffer zone associated with Group Camping was increased. We heard requests for camping near the River. Camping near the River was not provided for the safety of Park visitors. This also preserves the integrity of the Verde River corridor habitat. Fencing and Trespassing We heard concerns that cabins should have a fence to separate visitors from horses. A double fence was added between the cabins and pastures. The buffer zone between the cabins and pastures has been expanded. We heard concerns over trespassing on adjacent private property. Camping and cabins were relocated to areas further from private property. We added fencing and vegetative screening along private property borders. 6

Restrooms We heard requests for additional restrooms, including near the south River access point. Contact Station Restrooms were added. North River Access Point Restrooms were added. South River Access Point Temporary Restrooms. Cabin area will have a dedicated restroom/shower building. Existing centrally located restroom (Office Building) will serve Park visitors/campers. Trails and Natural Areas We heard requests for additional trails and to preserve natural areas. A trail network has been added to provide park wide access for visitors. We have reduced development in or near the Mesquite Bosque. Improvements will be limited to an access road, small parking area, and a temporary restroom structure. Camping has been eliminated from the Mesquite Bosque. 7

Revised Site Plan for Rockin River Ranch Break Rockin River Ranch State Park Website www.azstateparks.com/rockin river Meeting Notes and Other Materials https://azstateparks.com/rockin river ranch tac 8

Questions and Answers Next Steps Rockin River Ranch State Park Website: www.azstateparks.com/rockin river Meeting Notes and Other Materials https://azstateparks.com/rockin river ranch tac 9