Ministry of Transportation Republic of Indonesia

Similar documents
IMPROVEMENT OF URBAN TRANSPORT SYSTEM IN GREATER JAKARTA (LRT and MRT Progress)

January 2018 Air Traffic Activity Summary

JAKARTA TRANSPORTATION

Sustainable Urban Transport Development in Indonesia

Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA

An insider s look at the world s best infrastructure project: An interview with Mr. Dono Boestami, President Director of PT MRT Jakarta

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

Sound Transit Operations June 2016 Service Performance Report. Ridership

Sound Transit Operations August 2015 Service Performance Report. Ridership

Sound Transit Operations February 2018 Service Performance Report. Ridership

2017/ Q1 Performance Measures Report

Sound Transit Operations March 2018 Service Performance Report. Ridership

Jakarta Investment Project Digest

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode

Sound Transit Operations December 2014 Service Performance Report. Ridership

Sound Transit Operations January 2018 Service Performance Report. Ridership

Civil and Enviromental Engineering, Gadjah Mada University. PUBLIC TRANSPORT PLANNING (Frequency, Headway, and Number of Bus)

KARAWANG NEW INDUSTRY CITY

Urban Transport in Metropolitan Areas (P095485)

Auckland Transport Quarterly Indicators Report 2018/19

Welcome. Green Line in Your Community

Manual vs. Automatic Operation and Operational Restrictions

Sound Transit Operations January 2014 Service Performance Report. Ridership

From personal to mass transit

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

Khon Kaen Light Rail Transit

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective

Board Box. October Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia Financial Report Aug 2018 H.

Hampton Roads Express Lane Network

Jeneberang River. Serial No. : Indonesia-10 Location: South Sulawesi Area: 727 km 2 Origin: Mt. Bawakaraeng (2,833 MSL) Outlet: Makassar Strait

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Monthly SunPass Transponder Sales Inception to June 2012

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Analysts Briefing. 27 November Cathay Pacific Airways Limited

Statistics Report. April Page 1

Network integration modelling of feeder and BRT(bus rapid transit) to reduce the usage of private vehicles in Palembang s suburban area

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

SYSTEM BRIEF DAILY SUMMARY

HOTEL INDUSTRY OVERVIEW. Texas

December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Air China Limited Annual Results. March Under IFRS

Colindale Gardens Site Visit

Union Station Queens Quay Transit Link Study

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

INDONESIA TOURISM INVESTMENT INVITATION

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

RIDERSHIP TRENDS. October 2017

Cathay Pacific Airways Analyst Briefing. 21 November 2014

Analysts Briefing. 24 June Cathay Pacific Airways Limited

Tourism Snapshot A focus on the markets in which the CTC and its partners are active

RIDERSHIP TRENDS. January 2018

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

#1. Why is the City doing this project?

Air China Limited 2014 Annual Results Under IFRS

PERFORMANCE REPORT NOVEMBER 2017

Domestic Visitation to the Northern Territory

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

PERFORMANCE REPORT DECEMBER Performance Management Office

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

Statistics Report. May Page 1

SIA GROUP FINANCIAL RESULTS

The number of passengers using city transport increases 2.2% in December as compared with the same month of the previous year

METRO OPERATIONS COMMITTEE

December 2011 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Keflavik International Airport Passenger forecast 2018

Bus Reliability and Punctuality Performance

PERFORMANCE REPORT DECEMBER 2017

VCTC Transit Ridership and Performance Measures Quarterly Report

UN ESCAP. Regional Meeting on Cooperation of International Railway Transport. Bangkok, October Laos Country Paper

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

PLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Date: 11/6/15. Total Passengers

March 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Urban Transport in Metropolitan Areas (P095485)

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Passenger and Cargo Statistics Report

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Public transport strategy

January 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

FY2015 2nd Quarter Business Results

InterContinental Brand Simon Scoot -Vice President InterContinental Brand Management. June 2010

Statistics Report. June Page 1

Third Quarter Marketing Report B R A N SON/LAKES A R EA C VB N OVEMBER, 2013

Corporate Presentation

Rotorua. newzealand.com. argentina. Market information about our Visitors and our Active Considerers

Tourism Snapshot A focus on the markets in which the CTC and its partners are active

Planning for RAV: Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER

Indonesia Priority Sector: Tourism

August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

PRELIMINARY ACCOUNTS FOR 2012

December 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Existing Services, Ridership, and Standards Report. June 2018

Att. A, AI 46, 11/9/17

Tourism Snapshot. June 2015 Volume 11, Issue 6. A focus on the markets in which Destination Canada (DC) and its partners are active.

Resume Of Mr. Hendrikus Eko Yulianto

Hotel Sector JAKARTA HOTEL. Hotel Supply. Colliers Quarterly Q October Forecast at a glance. Star-rated Hotel

Transcription:

Ministry of Transportation Republic of Indonesia IMPROVEMENT OF URBAN TRANSPORT SYSTEM IN GREATER JAKARTA INDONESIA (Planning and Development LRT and MRT) By Muiz Thohir Deputy Director for Program Evaluation, Greater Jakarta Transport Authority Presented at: Capacity Building Workshop on Sustainable Urban Transport Index Colombo, Srilanka 30-31 October 2017

1 EXISTING CONDITION Greater Jakarta Transport Authority 2

GREATER JAKARTA (JABODETABEK) CHALLENGE : SPRAWL! Greater Jakarta includes 3 provinces and 8 municipalities Population: 31 million Greater Jakarta Transport Authority

Proportion of Commuting Trip Number of Vehicle : 24.9 million 31,1% 423.000 38,3% 571.000 Motorcycle: 18.5 million units ( 74 % ) Private car: 5.9 million units ( 24 % ) Buses : 512 thousand units ( 2 % ) Trip = 47.5 million / day 30,6% 425.000 Badan Greater Pengelola Jakarta Transportasi Authority Jabodetabek 4

O/D MATRIX 2015 ZONA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Total 2015 1 4,514,137 36,678 151,060 259,766 409,221 189,447 352,430 269,431 124,242 152,088 225,107 116,415 30,450 36,254 29,099 34,076 23,176 6,953,078 2 33,525 780,004 10,158 52,377 4,540 3,842 143,153 4,408 3,078 5,821 18,862 2,087 2,040 8,320 2,089 2,269 2,118 1,078,692 3 148,636 10,917 367,522 29,263 4,713 3,481 15,666 54,366 4,871 5,091 7,397 2,437 3,496 1,990 1,284 1,158 722.8868 663,010 4 232,566 54,131 28,166 719,203 14,029 12,045 136,540 9,536 5,763 12,553 35,088 4,952 2,350 9,988 1,634 3,011 3,344 1,284,899 5 397,448 5,012 4,587 14,544 1,888,969 47,238 35,208 57,123 113,082 145,605 35,660 101,936 5,811 8,880 9,639 15,830 10,490 2,897,062 6 187,253 4,263 4,251 13,192 40,561 1,459,584 42,972 10,361 9,992 68,088 64,726 6,450 3,099 11,244 3,983 9,939 10,847 1,950,804 7 346,843 148,368 14,536 122,564 35,477 39,512 2,785,760 17,175 15,250 28,323 240,476 12,576 5,659 43,695 4,372 5,120 8,861 3,874,568 8 261,313 4,690 56,872 9,955 55,349 10,826 19,290 2,251,927 115,466 16,230 16,781 16,480 27,411 5,382 2,234 2,999 2,406 2,875,609 9 122,807 3,133 4,922 6,316 111,318 10,057 15,946 124,888 3,183,221 16,201 21,149 68,483 178,878 5,611 2,576 3,214 1,849 3,880,570 10 152,300 5,871 4,626 13,922 140,442 67,918 29,047 16,235 18,546 2,505,458 26,420 25,413 2,920 6,071 16,730 46,736 56,393 3,135,049 11 226,972 18,342 7,289 36,006 31,279 64,656 227,466 17,517 21,277 25,225 3,967,599 7,456 3,262 179,845 3,254 4,807 17,756 4,860,008 12 113,042 2,523 2,731 4,874 103,883 9,360 12,196 17,429 65,698 25,749 9,379 1,299,005 20,557 1,731 2,912 10,954 1,759 1,703,782 13 31,125 2,420 3,383 2,240 6,124 3,034 5,755 29,096 182,445 2,939 3,410 20,382 2,471,282 2,346 1,574 27,886 1,846 2,797,286 14 36,490 7,810 2,205 10,184 9,352 10,862 44,863 5,455 6,060 6,391 179,786 1,789 579.1357 2,804,351 914.2318 790.0932 14,101 3,141,982 15 26,902 1,941 1,345 1,745 9,608 3,825 4,426 2,476 2,406 16,643 2,605 3,213 646.1143 1,332 980,764 162,117 115,981 1,337,976 16 34,901 2,488 1,408 2,818 15,453 10,512 4,784 3,368 3,776 47,482 4,985 11,058 28,083 1,640 169,946 1,885,981 73,508 2,302,193 17 21,827 2,501 623.5696 2,852 10,160 10,709 8,054 2,183 2,062 54,642 17,844 1,666 757.6981 16,959 114,991 72,808 2,476,402 2,817,042 Total 2015 6,888,088 1,091,092 665,687 1,301,821 2,890,477 1,956,906 3,883,556 2,892,973 3,877,237 3,134,529 4,877,276 1,701,799 2,787,281 3,145,639 1,347,993 2,289,695 2,821,559 47,553,609 Total Trip in Jabodetabek 2015 : 47.5 million / day Greater Jakarta Transport Authority 5

Current Major Problems of Transport in Greater Jakarta (Jabodetabek) Worsening Traffic Jam Significantly decreased vehicle speed since 10 years ago In Jakarta, average speed at peak hour 10km/hour Volume Capacity Ratio (VCR) in metropolitan area exceeded 1 Economic losses due to traffic congestion up to USD 1.3 billion (2010), and predicted to be USD 6.5 billion in 2020; 6

2 KEY PERFORMANCE INDICATORS Greater Jakarta Transport Authority 7

KEY PERFORMANCE INDICATORS 1. Public transport share is 60 % 2. Maximum travel time from origin to destination is 1.5 hours at peak hours. 3. Minimum average speed is 30 km / h at peak hours. 4. Coverage of public transport services in urban areas is 80 % of the length of the road. 5. Maximum walking distance to public transport is 500 m. 6. Each region must have feeder line connected to the trunk line in transit point. 7. The transit must have facilities for pedestrians and car park and ride, with the maximum tranfer distance between mode is 500 m. Greater Jakarta Transport Authority 8

MAIN TARGET : INCREASE PUBLIC TRANSPORT SHARE + 16% + 10% + 10% Existing 2016 2019 2024 2029 24% 40% 50% 60% 3 years 5 years 5 years Greater Jakarta Transport Authority 9

3 THE WAY FORWARD Greater Jakarta Transport Authority 10

MASTER PLAN OF GREATER JAKARTA TRANSPORTATION (RENCANA INDUK TRANSPORTASI JABODETABEK) R I T J 9 PILARS Greater Jakarta Transport Authority 11 SAFETY & SECURITY TRANSPORTATION GREEN NETWORK INFRASTRUCTURE TRANSPORTATION ROAD TRANSPORTATION SYSTEM RAIL TRANSPORTATION SYSTEM INTEGRATED TRANSPORTATION SYSTEM ENHANCING TRAFFIC PERFORMANCE FINANCING THE INTEGRATION OF TRANSPORTATION & LAND USE GREEN TRANSPORTATION PILAR 1 PILAR 2 PILAR 3 PILAR 4 PILAR 5 PILAR 6 PILAR 7 PILAR 8 PILAR 9

23/11/2017

23/11/2017 Existing Public Transport in GJTA Transport Mode Service Area Route Network Price Headway KRL (Commuter Line) Jabodetabek Six loop lines Subsidized-distance based fare 5-15 min Transjakarta (Bus Rapid Transit) Inner Jakarta 14 trunk corridors Subsidized-íntegrated price and network 5-20 min APTB (Feeder Transjakarta) Jabodetabek 24 main route Highly regulated market price 15 min- 1 hour Intermediate bus Inner Jakarta More than 20 Low regulated market price Random Angkot (mini bus) Jabodetabek More than 20 Low regulated market price Random Taxi Jabodetabek - Distance based fare - Jabodebatek Ressidence Connexion Jabodetabek Airport Connexion Jabodetabek More than 10 Market Price 15 min Jabodetabek More than 10 Markat Price 15 min

DEVELOPMENT OF PUBLIC TRANSPORT IN JABODETABEK 1. Commuter Line (CL), PT. KCJ (operated) 2. Bus Rapid Transit (BRT), PT. Transjakarta (operated) 3. Automatic People Mover system (APMS), Soekarno-Hatta Airport (operated) 4. LRT JABODEBEK, Ministry of Transportation /Adhi Karya 5. LRT JAKPRO, Jakarta Government / JAKPRO 6. Mass Rapid Transit (MRT), PT. MRT 7. Airport Railway (CL dan Ekspress), PT. KAI 8. Jakarta Bandung High-Speed Train (KCIC) 9. Light Rail Transit (LRT), Jababeka Greater Jakarta Transport Authority

4 LIGHT RAPID TRANSIT (LRT) MOT/ PT. ADHI KARYA Greater Jakarta Transport Authority 16

23/11/2017 PROJECT PROFILE BASED ON PRESIDENTIAL DECREE NO. 98/2015 PT. ADHI KARYA & PT. KERETA API INDONESIA ASSIGNED TO BUILD TOTAL COST 27 TRILYUN IDR 24 TRILIUN FOR INFRASTRUKTUR IDR 3 TRILIUN FOR TRAIN PT ADHI KARYA & PT. KAI BEAR BUDGET REQUIREMENT OF 9 TRILYUN AND THE REMAINING 18 TRILYUN BY THE BANKING SYNDICATION

23/11/2017

23/11/2017

23/11/2017

LENGTH OF TRACK 14,3 KM PROGRES ON AUSGUST 2017 37% 23/11/2017

23/11/2017 LENGTH OF TRACK 18,3 KM PROGRES ON AUSGUST 2017 17%

23/11/2017 LENGTH OF TRACK 10,5 KM PROGRES ON AUSGUST 2017 3 % Stasiun Cawang Pulau Intan PROSES PENGERJAAN AREA PEKERJAAN DEWI SARTIKA - KASN

Video Progres LRT MOT/ADHI KARYA 23/11/2017

5 LIGHT RAPID TRANSIT (LRT) JAKPRO Greater Jakarta Transport Authority 25

23/11/2017 PROJECT PROFILE BASED ON PRESIDENTIAL DECREE NO. 99/2015, JAKARTA GOVERNMENT TO ASSIGNED REGIONAL OWNED ENTERPRISES TO BUILD AND OPEARATE RAILWAY GOVERNOR DECREE NO. 213/2015 AND 211/2016 ASSIGN PT. JAKPRO TO DEVELOP LRT TOTAL COST 6,8 TRILYUN FROM LOCAL BUDGET (GOVERNMENT JAKARTA)

27 LEGAL BASIS LRT JAKARTA PerGub DKI Jakarta No. 213 Tahun 2015 sudah direvisi menjadi PerGub DKI Jakarta No. 211 Tahun 2016

7 CORRIDOR LRT NETWORK IN JAKARTA Total length of track for Asian Games 2018: ± 5,8 km (including Depo) Number of station LRT: 6 Elevated Station Koridor 1 (Fase 1)

CORIDOR 1 (FASE 1) Kelapa Gading Mall Station Depot LRT Gading Nias Kelapa Gading Boulevard Station Pulomas Station Equestrian Station Velodrome Station

Penugasan PT JakPro 11 Sep '15 Launching Konstruksi 22 Jun '16 Konstruksi Skala Besar 15 Jan '17 Purchase Order (PO) Sarana 1 Feb '17 Today Asian Games 2018 18 Aug '18 2015 2015 2016 2017 2018 2018 Pengadaan Konsultan 14 Sep - 2 Dec Pengawas 2.6 months Feasibility 3 Dec - 29 Feb Study 2.9 months Preliminary Design 5 months Pengadaan Kontraktor P101 Pelaksanaan P101 (Persiapan Konstruksi) Pengadaan Kontraktor P102 Pelaksanaan P102 (Konstruksi Prasarana) Pengadaan Kontraktor P103 Pelaksanaan P103 (Pabrikasi Sarana) Pre-Operational Plan dan Pembentukan Badan Usaha Sarana Prasarana Operational Plan 1 Mar - 31 Jul 5 Apr - 20 Jun 2.5 months 5.8 months Plan : 23,25% Actual : 23,67% Deviasi : +0,42% 4.2 months 20 Jun - 11 Dec 16 Aug - 20 Dec 23% 20.1 months 15 Dec - 1 Feb 1.5 months 16% 21 months 1 May '18 13 Aug '18 Soft Operation Delivery Sarana Pertama dan Testing & Commissioning 1 Nov '17 Pendirian PT LRT Jakarta dan Rekrutmen SDM Operasional 5 months 1 Jun - 31 Oct 9.5 months 20 Dec - 21 Aug 1 Nov - 13 Aug 1 Feb - 30 Oct

PROGRESS IMPLENTATION LRT JAKARTA Progress Summary : Plan Progress : 23.25% Actual Progress : 23.67% Deviation : +0.42% Update per tanggal 26 Mei 2017

FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Progress Pembangunan Depo LRT Pekerjaan Konstruksi Pondasi Viaduct di Section 5B Pekerjaan Konstruksi Pondasi Viaduct di Section 5A Pekerjaan Konstruksi Pondasi Rencana Stasiun Mall Kelapa Gading 32

FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Viaduct Section 4 Viaduct Section 3 Stasiun Kelapa Gading Boulevard Stasiun Pulomas

FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Viaduct Section 2 Stasiun Pacuan Kuda Viaduct Section 1 Stasiun Velodrome

FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Pembesian Pier Head di pier 140 di section 5A Proses pembesian pilecap di P153L Pembuatan Lantai kerja di Ramp P12 area Depo Pembesian Box Pilecap di RPSS Di Depo

FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Seremoni Erection Box Girder at P68 Box Girder Erection di P68 Section 3 Girder Launcher di P68 Section 3 Loading Test Segment Box Girder at P68 Section 3

5 MASS RAPID TRANSIT (MRT) Greater Jakarta Transport Authority 37

MRT NETWORK 23/11/2017

Travel Time Lenght of track Distance between station ± 30 menit ± 16 km 0,8 2,2 km Headway 5 minutes (2019) Target Passenger Train Width track Electricity 173,400 pass/day 16 train set (96 cars) 1 set = 6 cars 1.067 mm 60 MVA INFORMASI FITUR MRT JAKARTA FASE I SOUTH-NORTH CORRIODR (LEBAK BULUS BUNDARAN HI) Operation System Signailing System Total Cost Project (Fase I) Operational 2019 Automatic Train Operation (ATO) Communication- Based Train Control (CBTC) 123,368 juta = ± Rp 14,187 triliun Elevated Lane L : ± 10 KM Underground Lane L : ± 6 KM Jakarta Outer Ring Road (JORR) 13 Stasiun 7 Eleveted Station 6 Underground Station 39

FITUR MRT JAKARTA PHASE II SOUTH-NORTH (FASE II) & EAST - WEST Banten Kembangan Ancol Timur Ujung Menteng West Java South-North (Fase II) Corridor: Bundaran HI Ancol Timur Length of track: ± 13.5 Km Construction Method: Underground Number of Stations: 12 (including 1 Depo) (Start in 2018) Bundaran HI East West CoRridor: Cikarang Balaraja Length of track : ± 87 Km Number of Stations : 41 Lebak Bulus Fase I: Ujung Menteng Kembangan Length of track : ± 27 Km Construction Method : Underground and Eleveted Number of Stations : 22 (including 2 Depo) (Target konstruksi pada 2020) 40

PROGRES CONSTRUCTION

VIDEO PROGRES MRT 23/11/2017

Thank You Terima kasih Greater Jakarta Transport Authority 43