Finn Creek Park. Management Direction Statement Amendment

Similar documents
REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

MANAGEMENT DIRECTION STATEMENT June, 1999

Yard Creek Provincial Park. Management Plan

Victor Lake Park. Management Plan

Pillar Park. Management Plan

Bridge River Delta Park. Management Plan. Final Public Review Draft

BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

MANAGEMENT DIRECTION STATEMENT June, 1999

M.J. Milne & Associates Ltd.

Bear Creek Habitat Improvement Project

Daisy Dean Trail 628/619 ATV Trail Construction

MANAGEMENT DIRECTION STATEMENT

MANAGEMENT DIRECTION STATEMENT October, 1999

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Numaykoos Lake Provincial Park. Management Plan

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

USDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities

ANAGEMENT. LAN November, 1996

Fred Antoine Park. Management Plan. Final Public Review Draft

2.0 PARK VISION AND ROLES

MANAGEMENT DIRECTION STATEMENT October, 1999

MANAGEMENT DIRECTION STATEMENT

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

KOOTENAY LAKE PROVINCIAL PARK (MIDGE CREEK SITE)

Establishing a National Urban Park in the Rouge Valley

MANAGEMENT DIRECTION STATEMENT October, 1999

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

GOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC)

Marchand Provincial Park. Management Plan

October 31, OAK RIDGES MORAINE FOUNDATION 120 BAYVIEW PARKWAY, NEWMARKET, ON L3Y 3W

MAIN LAKE PROVINCIAL PARK

Coastal Gas Link Project of Trans Canada Pipelines. Community Profile of Stellat en First Nation


SUGARBOWL-GRIZZLY DEN PROVINCIAL PARK AND SUGARBOWL-GRIZZLY DEN PROTECTED AREA Purpose Statement and Zoning Plan

Policy. Huts, Cabins and Lodges in BC Provincial Parks

White Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

MARBLE RIVER PROVINCIAL PARK

KANANASKIS COUNTRY PROVINCIAL RECREATION AREAS MANAGEMENT PLAN DRAFT TERMS OF REFERENCE - November 20, 2007

Mt. Hood National Forest

ROAD AND TRAIL PROJECT APPROVAL

MANAGEMENT DIRECTION STATEMENT October, 1999

Aboriginal Traditional Knowledge

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

SPECTACLE LAKE PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Sasagiu Rapids Provincial Park. Draft Management Plan

RIVER ACCESS STRATEGY

White Mountain National Forest Saco Ranger District

Thank you for this second opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

White Mountain National Forest Saco Ranger District

MANAGEMENT DIRECTION STATEMENT March 2003

APPENDIX F List of Commitments

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Sand Lakes Provincial Park. Draft Management Plan

Policy PL Date Issued February 10, 2014

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

SLIM CREEK PROVINCIAL PARK

Watchorn Provincial Park. Management Plan

APPENDIX. Alberta Land Stewardship Act AMENDMENTS TO THE SOUTH SASKATCHEWAN REGIONAL PLAN

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

OMINEACA PROVINCIAL PARK

FINGER-TATUK PROVINCIAL PARK

Mackinnon Esker Ecological Reserve Draft - Management Plan

Disclosure Document for Castle Mountain Resort Future Development

Roberts Bank Terminal 2 Project

Michipicoten Island Regional Plan

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Teton Basin Ranger District

Outdoor Recreation Opportunities Management

National Forests and Grasslands in Texas

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

Thaidene Nëné Proposed National Park Reserve. Public Consultation in Yellowknife, NWT June 2016 Protected Areas Establishment Branch Parks Canada 1

Chapter 4.0 Alternatives Analysis

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

Clam Harbour Provincial Park

Crook County Oregon. Natural Resources Planning Committee Draft Report

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

Coronado National Forest Santa Catalina Ranger District

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

Transcription:

Finn Creek Park Management Direction Statement Amendment November 2013

Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date Brian Bawtinheimer Executive Director Parks Planning and Management Branch BC Parks November 14, 2013 Date

Table of Contents 1.0 Context...1 1.1 Scope... 1 1.2 Planning Area... 1 1.3 Public Process... 1 2.0 Analysis and Recommended Amendment...3 2.1 Rationale for Amendment... 3 2.2 Amendment... 5 List of Figures Figure 1: Finn Creek Park Snowmobile Access Trail... 2

1.0 Context This document outlines amendments to the Management Direction Statement approved in 1999. This amendment was initiated due to BC Parks becoming aware of an ongoing and increasing issue regarding snowmobiling and public safety adjacent to Finn Creek Park. A suggested solution was to consider utilizing the existing pipeline right-of-way in Finn Creek Park as part of a snowmobile trail. BC Parks reviewed the existing Management Direction Statement and determined that a public review and a possible amendment to the Management Direction Statement would be considered. The amendment process was initiated in November of 2012. 1.1 Scope The review of the Management Direction Statement was to consider whether to allow snowmobiles to transit Finn Creek Park along the existing pipeline right-of-way in the northeastern corner of the park. 1.2 Planning Area This amendment applies only to the use of the pipeline right-of-way in the northeast part of the park as shown in Figure 1. 1.3 Public Process The proposed amendment was placed on the BC Parks website for public comment in November 2012 for 30 days. Notification of the amendment was sent to potentially interested groups and agencies (Town of Blue River, Thompson Headwater Services Committee, Thompson Nicola Regional District, Ministry of Transportation and Infrastructure, Ministry of Forests, Lands and Natural Resource Operations, Yellowhead Ecological Association). Consultation with the Simpcw First Nation was undertaken between November 2012 and October 2013. 1

Figure 1: Finn Creek Park Snowmobile Access Trail 2

2.0 Analysis and Recommended Amendment 2.1 Rationale for Amendment Snowmobile access is not presently allowed within the park. A popular parking and snowmobile staging area is located immediately adjacent to the park boundary on Finn Creek Road (Figure 1) from which snowmobiles travel along Finn Creek Road to higher elevation. Snowmobiles also travel up the Foam Creek Forest Service Road, which is found immediately north of the park off of Highway 5, either making their way along the highway from the staging area or parking along the highway, creating a safety hazard for snowmobilers and highway traffic. Use of the pipeline right-of-way in the park by snowmobiles would connect the parking and staging area to areas used by snowmobilers and backcountry skiers to the north. All snowmobilers would then use the one staging area to the south of the park. It would allow a safe route for snowmobilers, eliminating any safety hazard for recreational users, the travelling public or road maintenance crews caused by the use of the highway right-of-way for parking or pullouts on Highway 5 at or near the entrance to the Foam Creek Forest Service Road. Mountain Caribou are found in higher elevation areas that are used by snowmobiles originating from the staging area. Providing transit of snowmobiles through the park would contribute to the broader provincial Mountain Caribou conservation effort by allowing dissemination of information on Mountain Caribou locations at the central snowmobile staging area so that areas used by caribou can be avoided as snowmobilers go to higher elevations. Presently, snowmobilers parking on the highway or at Foam Creek Forest Service Road to the north are not provided with this information. The proposed snowmobile use was evaluated with respect to park values and existing uses, and in relation to safety and conservation goals in the broader area. It was determined that use of the pipeline right-of-way would not negatively impact natural values or public enjoyment within the park due to the already close proximity of the highway and existing staging area, and since the activity would occur during the off season. Snowmobile activity within the park would occur over high snowpack, on an already disturbed site (pipeline right-of-way), minimizing potential impacts on vegetation in the park. Allowing snowmobiles would dissipate snowmobiles and their associated noise more quickly from the staging area and greatly increase safety. The greatest concern was the potential impact to salmon and trout and their habitat within Finn Creek by the crossing of the creek by snowmobiles. Protection of fish spawning and rearing habitats are the primary role and significance of the park. To assess this potential impact, BC Parks considered input from other agencies (Fish and Wildlife Section in the Ministry of Forests, 3

Lands and Resource Operations; federal Department of Fisheries and Oceans) and professional expertise of a consultant that provided recommendations to the local snowmobile club. The input received indicated that the crossing would not be detrimental to fish and fish habitat if all conditions stated by these agencies were met. These conditions were: Use six 36 culverts for the crossing. Tether the culverts only to the south creek bank to allow them to swing out of the main flow in the event of a rare winter flow increase. Avoid destruction of recently re-vegetated areas adjacent to the Kinder Morgan pipeline. Ensure adequate sized equipment is available to promptly remove the structure in the situation of a flow increase event that threatens the culverts. Minimize the environmental risk and worker safety by completing the work in a timely manner. Do not adversely impact the stream channel (including stream banks), fish habitat or fish passage. The natural rate of water flow must be maintained upstream and downstream of the worksite during all phases of in-stream activity. Removal of stable, naturally occurring material from the stream or stream channel is not permitted. All equipment must be located and operated in the dry season. Equipment used in close proximity to the wetted perimeter must be free of deleterious material (e.g., hydrocarbons) and in good mechanical condition (e.g., no fuel or hydraulic leaks). All refueling and servicing must be completed outside of the riparian management area. All machinery operating near a stream must have a spill kit. Measures must be taken to ensure that no harmful material (e.g., fuel and other hydrocarbons, soil, road fill, or sediment), which could adversely impact water quality, fish and other aquatic life, and/or fish habitat, can enter the wetted perimeter as a result of the project activities. Avoid disturbance to natural materials and vegetation that contribute to habitat or stream channel stability. Complete restoration activities (including erosion control), as required, that will lead to natural pre-disturbance conditions. These conditions, along with the requirement to have a crossing designed by a Professional Engineer, should mitigate any concerns respecting impacts to salmon and trout in Finn Creek. Snowmobiling will only occur in this one location within Finn Creek Park. This amendment will make a contribution to local recreation by allowing transit of snowmobiles through a small portion of the park. 4

2.2 Amendment TO BE ADDED: Page 3 in Section III. Other Land Uses and Interests, part E. Private and Public Stakeholder Interests, add a bullet stating: local snowmobile club is interested in utilizing the pipeline right-of-way to safely access snowmobiling areas to the north. TO BE DELETED: On page 7, within the Activity/Use Matrix, Delete the N that applies to Off-road Access (snowmobiling) Delete footnote 3 On designated trails only. REPLACE DELETED TEXT WITH: On page 7, within the Activity/Use Matrix, Insert Y 3 in the table applying to Off-road Access (snowmobiling). Insert footnote 3 On pipeline right-of-way only. 5