ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

Similar documents
Minnesota Great River Road Transportation Alternatives Local Project Summaries December 19, 2016

Non-Motorized Transportation

Becker County Trail Routing Feasibility Study

Welcome to the Cross County Trail Public Input Session!

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

MEETING MINUTES District 1 Trail Planning Meeting 1

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

University Region Non-Motorized Plan 2015

Greater Minnesota Regional Parks and Trails Commission Designation Application

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

OR MISSION TRAIL ELEMENTARY

Greater Minnesota Regional Parks and Trails Commission Designation Application

Business Item No

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

US 19 Sunset Point Rd to Countryside Blvd.

A History of the Construction of the Radial Expressway System in Cook County

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Segment 2: La Crescent to Miller s Corner

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Site Location and Setting

Community Development Committee

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

I-94 East Corridor Performance

FINCH HYDRO CORRIDOR TRAIL PROJECT

City of Mahtomedi Park System Plan Public Hearing Draft: September 13, 2006

4.0 Context for the Crossing Project

Independence: overview

CITY COUNCIL AGENDA MEMORANDUM

Carlisle Connectivity Projects Communication Plan and Project Status

SAN RAFAEL City Council January 20, 2015

A BOAT RAMP TO NOWHERE

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Sacramento Placerville Transportation Corridor Alternatives Analysis

Southwest Quadrant Distinctive Features

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

1.2 Corridor History and Current Characteristics

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

4.19 Parks, Recreation, and Conservation Lands

Chapter 1. Master Plan Vision & Process

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Project Summary 2009

Perham to Pelican Rapids Regional Trail

FEASIBILITY CRITERIA

Blue River Trail Master Plan JSA to Town Hall June 2004

DRAFT Cuyuna Lakes State Trail Master Plan Amendment

SCOPING INFORMATION PACKET

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Environment and Natural Resources Trust Fund (ENRTF) M.L ENRTF Work Plan (Main Document)

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

Grade Crossings in High Speed Rail Corridors

Welcome! INTRODUCTION. Tell us what you think! Comment forms are provided for your feedback

SR 934 Project Development And Environment (PD&E) Study

The Baker/Carver Regional Trail is intended to

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Current Corridor Characteristics

Our Region. Mountains of Northeast Tennessee

3. Trail Alignments and Connections

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

ANNUAL REPORT FISCAL YEAR 2015

Lincoln County ORP Survey Response Summary

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Appendix E. Build Alternative Design Information

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

11. Recreational Trails and Pathways Needs

25 th Avenue Grade Separation. September 13, 2017

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

Major Projects Overview

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Community Advisory Panel Meeting #

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

I-70/I-71 Project Public Meeting Presented By

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

CHAPTER FOUR: TRANSPORTATION

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

City Council Workshop July 26, 2010

Transcription:

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE PROJECT INTRODUCTION Project partners: St. Cloud Area Planning Organiza on (APO) and the City of St. Cloud. The project area is approximately 2.5 miles long, extending from 44th Avenue N./Waite Avenue N. to the Mississippi River. Saintly Seven is the term given to the seven mile stretch of undeveloped trail between St. Joseph and the Mississippi River. The en re uncompleted trail segment from St. Joseph to the Mississippi River is included in local transporta on plans and the St. Cloud Area Planning Organiza on 2035 Bicycle and Pedestrian Plan. PROJECT GOAL LAKE WOBEGON TRAIL BACKGROUND Stearns County s manages the Lake Wobegon Trail segments from St. Joseph to Osakis and from Albany to Holdingford. The Lake Wobegon Trail is a 46-mile long, 10-foot wide, bituminous surfaced hike-and-bike pathway. The trail opened on September 30, 1998. The trail extends through Central MN from the city of St. Joseph to the city of Osakis. The trail also has an extension on the west side of Albany heading northeast to Holdingford and beyond. Snowmobiling is allowed on the exis ng segments of the Lake Wobegon Trail Stearns County s is planning to extend the Lake Wobegon Trail from St. Joseph to River s Edge in Waite The goal of the study is to iden fy a preferred alignment for a proposed extension of the Lake Wobegon Trail from 44th Avenue to the Beaver Island Trail in the City of St. Cloud, along the Mississippi River. Otter Tail County Todd County Douglas County Grant County Morrison County Stearns County 3rd Street 5th St/BNSF Corridor 10th Street PROJECT INTRODUCTION

PROJECT APPROACH

15th St N Madison Northway Mississippi River 12th St N Jaycee 33rd Ave N 29th Ave N 25th Ave N Wilson 10th St N ALTERNATIVE ROUTE 3 Hester Apollo High School State Highway 15 St. Peter Madison M.S. Pantown Elementary 9th St N Centennial Saint Cloud Spalt 8th Street N/Veterans Dr 7th St N Fountain ALTERNATIVE ROUTE 2 5th St N 4th St N 3rd St N Waite Avenue N. Central 4th St N ALTERNATIVE ROUTE 1 3rd St N 25th Ave N Beaver Island Trail Alternative Route 1 Alternative Route 2 Alternative Route 3 0 500 1,000 2,000 Existing Conditions ion ns Seberger Scenic River Trail Cooper Ave. ROUTE ALTERNATIVES

ISSUES & OPPORTUNITIES FOR ALTERNATIVE ROUTE 2 ISSUES OPPORTUNITIES Need to cross tracks west of CSAH 15 Right of way issues behind businesses west of CSAH 15 BNSF right of way needed west of 33rd Right of way issues at 25th Avenue Challenging crossing at 3rd Street with tracks 9th Avenue pedestrian bridge not compliant Tight right of way around Post Office property 6th Avenue N RR track crossing U lity conflicts Not scenic- adjacent to railroad and switchyard opera ons Direct approach to downtown from River s Edge City project proposed along 5th Avenue Connec on to Scenic River Trail Waite Avenue N Railroad Sightline & ROW Issues 33rd Ave N BNSF Railroad 5th Street N State Highway 15 Central Challenging Intersec on 3rd Street N Tight Right of Way Alternative Route 1 Alternative Route 2 0 200 400 800 ISSUES & OPPORTUNITIES FOR ALTERNATIVE ROUTE 1 ISSUES OPPORTUNITIES 37 intersec ons Direct approach to downtown from River s West of CSAH 15 street cross-sec on u lizes Edge most of right of way Connec on to Seberger CSAH 15 crossing Linkage through commercial area west of 46 driveway/alley crossings (north side) 33rd Avenue N and residen al east of 33rd 29 driveway/alley crossings (south side) Connec on to Scenic River Trail 9th Avenue pedestrian bridge not compliant Minimal right of way around Post Office property for 10 trail 6th Avenue N RR track crossing ALTERNATIVE ROUTES 1 2-A

25th Ave N BNSF Railroad 5th Street N Cooper Ave N Right of Way Issues Breckenridge Avenue Central 5th Street N 17th Avenue N 4th Street N 3rd Street N Challenging Intersec on 3rd Street N Alternative Route 1 Alternative Route 2 Seberger Cooper Ave N Scenic River Trail 0 200 400 800 ALTERNATIVE ROUTES 1 2-B

Mississippi River 4th Street N 6th Ave N 7th Ave N BNSF Railroad Non-Compliant Pedestrian Bridge At-Grade Railroad Crossing Breckenridge Ave 2nd Street N. 4th Street N Right of Way Issues 3rd Street N 9th Ave N 2nd Street N Beaver Island Trail Alternative Route 1 Alternative Route 2 0 200 400 800 ALTERNATIVE ROUTES 1 2-C

Older-Style Ramps 10th St N Apollo High School State Highway 15 38th Ave N 36th Ave N 33rd Ave N St. Peter Middle School 30th Ave N Pantown Madison Elementary 27th Ave N 9th St N Waite Avenue N 8th St N Fountain ISSUES & OPPORTUNITIES FOR ALTERNATIVE ROUTE 3 ISSUES OPPORTUNITIES Alternative Route 3 Furthest away from exis ng/planned trail CSAH 15 pedestrian bridge ramps are outdated 51 driveway/alley crossings (north side) 59 driveway/alley crossings (south side) Exis ng trail between Waite Avenue and CSAH 15 Exis ng bike route along 10th/11th Streets Connec ons to Pantown, Centennial and Hester s Connec ons to Madison Elementary and St Peter Middle School 0 200 400 800 ALTERNATIVE ROUTE 3-A

10th St N St. Peter Middle School 9th St N 30th Ave N Pantown Madison Elementary 10th St N 25th Ave N 20th Ave N Centennial 11th St N 10th Ave N Centennial Dr. Alternative Route 3 0 200 400 800 Corridor Segments Map ALTERNATIVE ROUTE 3-B

7th Ave N Hester Wilson 10th Ave N Centennial 10th St N 9th St N Mississippi River 11th St N Beaver Island Trail Alternative Route 3 8th St N 0 200 400 800 ALTERNATIVE ROUTE 3-C

Connec ons School Connec ons Trail Connec ons Scenic River Trail Ten-Foot Wide Paved Trail Rest Stop Trail Signage TRAIL AMENITIES/ASSETS

0 10 2 10 1 40 Trail Roadway 66 Right-of-Way 5 6 1 Boulevard 0 10 2 10 3 35 Trail Roadway 66 Right-of-Way 15 Boulevard 0 10 NORTH SOUTH 19 1.5 12 12 1.5 7 10 2 Boulevard Thru Lane Thru Lane Boulevard Trail 27 Roadway 66 Right-of-Way 3rd Street N. Poten al Cross-Sec on Existing Sidewalk 5th Street N. Poten al Cross-Sec on 10th Street N. Poten al Cross-Sec on 3rd Street N @ Waite Avenue N 5th Street N @ 28th Avenue N 10th Street N @ 32nd Avenue N 3rd Street N @ 30th Avenue N Cooper Avenue at 21st Avenue N Centennial Drive @ 19th Avenue N 3rd Street N @ 14th Avenue N Breckenridge Avenue at 14th Avenue N 11th Street N @ 9th Avenue N TYPICAL CROSS-SECTIONS

Typical Exis ng Residen al Street Half and Half, Two-way Road, ing and Buffered Bike Lane Half and Half Two-way Road (No ing) and Separated Trail Half and Half, Two-way Road, ing and Cycle Track ALTERNATIVE CROSS-SECTIONS