Optimization of Airspace and Procedures in the Metroplex

Similar documents
SoCal Metroplex Study Area

SoCal Metroplex Study Area

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown

Optimization of Airspace and Procedures in the Metroplex

Click to edit Master title style

Aviation Committee Meeting

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Air Navigation Bureau ICAO Headquarters, Montreal

Honeywell.com PBN Concepts Krakow, Poland

Los Angeles Basin Terminal Airspace Redesign

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

MODULE 4: SIDs and STARs. Slide <#> of

Noise-Based Use Restrictions

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Southern California Metroplex

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Continuous Descent? And RNAV Arrivals

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

NextGen. Accomplishments. Federal Aviation Administration

TWELFTH AIR NAVIGATION CONFERENCE

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

AERONAUTICAL INFORMATION CIRCULAR 18/18

Final Environmental Assessment for Northern California Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Navigation at the. Federal Aviation Administration Crossroads

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017

FLIGHT OPERATIONS PANEL (FLTOPSP)

Contextual note SESAR Solution description form for deployment planning

Martin Pastucha, Director of Public Works/Airport Director

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Federal Aviation Administration. Finding of No Significant Impact (FONSI) and Record of Decision (ROD)

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs

TWELFTH AIR NAVIGATION CONFERENCE

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

Los Angeles International Airport Community Noise Roundtable LAX Departure Overflights of Palos Verdes and San Pedro

FLIGHT OPERATIONS PANEL

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ENRI International Workshop on ATM/CNS

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

South Dakota Airports Conference

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Boeing Air Traffic Management Overview and Status

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

Colombian PBN implementation: El Dorado case study

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

COMMUNITY NOISE MITIGATION SUGGESTIONS

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Northern California Metroplex

NEW CALEDONIA PBN PLAN

THE NATIONAL ACADEMIES PRESS

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem

RNP AR and Air Traffic Management

Draft Environmental Assessment for the Cleveland-Detroit Metroplex Project

Required Navigation Performance (RNP) in the United States

SJC North and South Flow

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

RNP AR APCH Approvals: An Operator s Perspective

Trajectory Based Operations

Naples Noise and FAA Updates

Russian Federation ATM modernization program

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

Continuous Climb Operations (CCO) Manual

LA Basin Hot Spots. Southern California Airspace Users Working Group Education Subcommittee

Updates to Procedures at St. John s International Airport

Minnesota Airports Conference

#1 Semi Valley VFR and Air Carrier Transitions : The area over Semi Valley that is another hotspot is where the Fernando 5 Arrival to Burbank brings j

New York Aviation Management Association Conference

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

NextGen and ASPIRE Environmental Initiatives

Interim Response to Oakland Airport-Community Noise Management Forum s Recommendations

PBN/TF/7 DRAFT Appendix D to the Report D-1

Part 150 Update Status and Recommendation

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Required Navigation Performance at Alaska Airlines

34 th Airline/ATS Safety Forum

Título ponencia: Introduction to the PBN concept

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Implementation of PBN in Armenian airspace

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

System Oriented Runway Management: A Research Update

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Atlanta NextGen PBN Activities

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

Framework Brief. Edinburgh SIDs

Transcription:

Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal Metroplex Date: May 27, 2015 Administration 1

Agenda SoCal Metroplex Project Background Scope of Work Environmental Assessment Benefits Challenges Implementation Administration 2

Thursday, August 12, 2013 11,404 tracks Blue Jets Yellow Turboprops Red all others

Metroplex and NextGen The purpose of the project is to improve airspace efficiency and reduce complexity RTCA s Task Force 5 recommendations for NextGen implementation included: Focus on major metropolitan areas Optimize flight paths and climb/descent profiles Institute collaborative teams to broadly proliferate existing PBN experience and expertise Promote RNAV everywhere and RNP (Required Navigational Performance) where beneficial Integrate airspace and procedure design Decouple operations arriving and departing adjacent airports Use 3 NM and terminal separation rules wherever possible Administration 4

Southern California Metroplex Scope Scope of work Metroplex is an optimized approach to integrated airspace and procedures projects o Proposed solutions center on PBN procedures and airspace redesign Airspace and procedures solutions are limited to those that can be achieved without producing significant noise increases o Noise impacts assessed and reported in an Environmental Assessment (EA) o Draft EA will include a noise analysis and track/altitude information o Years modeled: 2015 and 2020 forecast conditions o Preliminary analysis shows no significant noise increases in the 65 DNL Administration 5

Design The SoCal Design Team worked in cooperation with Industry Procedure design was focused on establishing Optimized Profile Descents (OPD) where feasible Terrain and closely spaced airports contributed to design challenges Where OPDs were not feasible the Design Team developed solutions with Industry to improve procedures over current conditions RNP approaches attached to the end of a STAR were also developed with Industry partners Administration 6

SoCal Metroplex Airports The Southern California Metroplex consists of airspace delegated to the SCT and ZLA Interactive operations at eight SCT airports were examined closely Los Angeles International Airport (LAX) San Diego International Airport (SAN) Bob Hope Airport (BUR) Ontario International Airport (ONT) John Wayne Airport Orange County (SNA) Long Beach/Daugherty Field (LGB) Santa Monica Municipal Airport (SMO) Van Nuys Airport (VNY) Administration 7

SoCal Metroplex Delegated Airspace Administration 8

SoCal Metroplex Area of Interest This figure shows the six primary airports including BUR, LAX, LGB, ONT, SAN and SNA along with CRQ, PSP, SMO and VNY Administration 9

SoCal Metroplex Environmental Process OAPM Study Team Completes Recommendations Issue Notice of Intent to Prepare Draft EA (Jan 2014) Notional Designs Completed by D&I Team (June 2014) Prepare Draft EA (2014-2015) Perform Agency Technical Briefing Analyses Meetings (Fall 2014) Complete Draft EA (Spring 2015) Circulate Draft EA for Public Review (30 Days) Conduct Public Workshops (Summer 2015) Review Comments and Prepare Responses (Summer 2015) Circulate Final EA (Summer 2015) FONSI (Proposed November 2015) Implement Metroplex Procedures (Proposed March 2016) Administration 10

Purpose & Need of Metroplex EA Main Purpose of Metroplex To enhance efficiency in the SoCal Metroplex Reduce Complexity Provide Predictability Provide Flexibility Administration 11

EA Draft Study Area Administration 12

Public Workshops 15-Jun-15 16-Jun-15 17-Jun-15 18-Jun-15 19-Jun-15 Public Workshop SNA Public Workshop SMO Public Workshop LAX 22-Jun-15 23-Jun-15 24-Jun-15 25-Jun-15 26-Jun-15 Public Workshop SAN Public Workshop PSP Public Workshop LGB Torrance Public Workshop Redondo Beach LGB 29-Jun-15 30-Jun-15 1-Jul-15 2-Jul-15 3-Jul-15 Public Workshop VTU Public Workshop SBA Public Workshop BUR Administration 13

Summary of Potential Benefits Qualitative Benefits Quantitative Benefits Reduced ATC task complexity Reduced communications (flight deck and controller) Reduced phraseology Reduced frequency congestion Reduced pilot workload Repeatable, predictable flight paths Accurate fuel planning Laterally or vertically segregated flows where practical Administration 14

Optimized Profile Descent Example (Arrival) Cruise FL350 Level Flight Segments TOD FL290 An OPD prescribes speed and altitude restrictions at waypoints on the procedure that provide predictable lateral and vertical paths and assure separation from airspace and/or aircraft Vertical windows at waypoints allow for variable wind conditions permitting flight crews to be at the top or bottom altitude providing power-off descents and mitigate level-offs in most conditions Optimized Segment In the existing environment ATC will issue descent clearances to mitigate an aircraft departing protected airspace causing level offs and manipulation of power settings resulting in inefficient descents 060 Administration 15

Optimized Guidance Administration 16

Optimized Climb Profile Example (Departure) Cruise Level Flight Segments An RNAV/PBN SID prescribes speed and altitude restrictions at waypoints on the procedure that provide predictable lateral and vertical paths and assure separation from airspace and/or aircraft Vertical windows allow for variable wind conditions permitting flight crews and ATC repeatable and predictable paths for flight and fuel planning Radio communication and potential communication errors are reduced In the existing environment ATC will issue multiple climb clearances to mitigate an aircraft departing protected airspace causing level offs and manipulation of power settings resulting in inefficient departure/climb profiles Administration 17

RNAV STARs SoCal Metroplex Proposed Procedures RNAV SIDs Conventional STARs Conventional SIDs RNAV/RNP Approaches 37 50 25 44 22 RNAV STARs RNAV SIDs LAX Specific Conventional STARs Conventional SIDs RNAV/RNP Approaches 12/6 12 0 1 8 Note: 38 existing approach procedures will require amendment Administration 18

Challenges (1 of 2) LAX runway projects as of 04/28/2015 Runway 06L/24R unavailable from 06/29/2015 through 10/15/2015 Runway 24L approach threshold relocation 11/15/2015 through 05/15/2016 Runway 6R approach threshold displaced 05/15/2016 through 09/30/2016 Runway 25R approach threshold relocation 10/01/2016 through 01/15/2017 Runway 07L/25R closed 01/16/2016 through 05/30/2017 Runway 07R/25L resurfacing TBD (forecast closure 01/01/2018 through 05/31/2018) Flight Checks dependent on runway projects Administration 19

LAX MagVar SoCal MagVar SCT STARS Transition International Coordination Challenges (2 of 2) Mazatlán ACC and Tijuana Approach Control Achievement of OPD Benefits Department of Defense Airspace Expansions Administration 20

SoCal Metroplex Abbreviated Work Plan Activity Date Complete Design Phase Start 10/15/2012 Restart SoCal Metroplex 08/26/2013 Restart SoCal Metroplex 10/21/2013 Notional Design Complete 6/9/2014 Facilitation of SRM Panel Complete 7/11/2014 EA Affected Enviro Section 8/8/2014 Final Safety Document Complete 12/12/2014 EA Enviro Consequences Sect 2/23/2015 Safety Doc Signatures Complete 2/13/2015 SMS Process Complete 4/27/2015 Draft EA 6/10/2015 Final EA FONSI 11/11/2015 A/S and Procedures SMS Process Complete 11/11/2015 Implementation Phase Start 8/28/2015 Procedure Implementation Complete 9/15/2016 Updated 4/27/2015 Administration 21

Proposed Implementation Group Chart Date SoCal Due Date Group 1A 02/04/2016 (hold until 3/31 /2016) WSA FPT Due Date 5/17/2015 7/17/2015 Group 1B 3/31/2016 7/10/2015 9/11/2015 Group 2 5/26/2016 9/4/2015 11/6/2015 Group 3 7/21/2016 10/30/2015 1/1/2016 Group 4 TBD Group 5 TBD 9/15/2016 12/24/2015 2/26/2016 11/10/16 2/22/2016 4/22/2016 Administration 22

SoCal Metroplex SIDs and STARs Administration 23

Points of Contact Rob Henry, Manager SoCal Metroplex Robert.Henry@faa.gov Jose Gonzalez, SoCal NATCA Article 48 Jose.J.Gonzalez@faa.gov Shawn Kozica, SoCal District Management POC Shawn.M.Kozica@faa.gov Mike Taylor, SCT NATCA POC Michael.J.Taylor@faa.gov Ken Brissenden, ZLA Management POC Ken.Brissenden@faa.gov Walter Alexis, ZLA NATCA POC Walter.F.Alexis@faa.gov Administration 24

QUESTIONS? Administration 25

Acronym Definitions ATC: Air Traffic Control EA: Environmental Assessment NextGen: Next Generation Air Transportation System OAPM: Optimization of Airspace and Procedures in the Metroplex OPD: Optimized profile descent PBN: Performance based navigation RTCA: Radio Technical Commission for Aeronautics RNAV: Area Navigation RNP :Required Navigation Performance SCT: Southern California Terminal Radar Approach Control SID: Standard Instrument Departure SoCal: Southern California STAR: Standard Terminal Arrival Route ZLA: Los Angeles Air Traffic Control Center Administration 26