ARMSTRONG COUNTY. Roadway realignment of PA 28 from State Route 1027 to State Route 1016 (Calhoun School Road) in Boggs Township 1 $ 7,850,

Similar documents
APPLEWOLD BOROUGH: Applewold Borough Building, 8 Hickory Street, Kittanning, PA 16201

Please in order to register to attend any and all

2017 Armstrong County Outreach

WINNERS May 21 - Municipal Primary

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN

Pennsylvania Emergency Preparedness Guide:

2012 Additional Design Funding Primary Improvement

Bedford County 2015 Construction Projects

Springettsbury Township. Road Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

2009 MUNICIPAL ELECTION WINNERS

BEDFORD COUNTY START PERIOD

Guide to. Road Construction Projects

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

MEMORANDUM. DATE: February 1, 2007

PENNSYLVANIA SCENIC BYWAYS

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Additional Fee Free ATM Locations For Elliott Federal Credit Union Members (1 st Commonwealth Bank) Locations for Westmoreland County

2014 Project Update. PennDOT District 2-0 Karen Michael

LYCOMING COUNTY POLLING PLACES LYCOMING COUNTY OFFICE OF VOTER SERVICES POLLS OPEN 7:00AM - 8:00PM

2 Construction Program

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

WEEK 1 Saturday, December 2 nd Sunday, December 3 rd

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

MoDOT Southwest District

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

MoDOT Southwest District

2014 Official Guide. County. Picture yourself here. ArmstrongCounty.com

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

PHA Contact Information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Program Project Name Project Description

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

2015 Official Guide. County. there's more inside. ArmstrongCounty.com

TRAFFIC ALERT FOR APRIL 23-27, 2018 Highway Work Zones in the Staunton District

The Pioneer Corridor OBJECTIVES: CORRIDOR 16

PennDOT Interstate Work next week March 30-April 3:

FDOT Treasure Coast Traffic Impact Report

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

RD INSTRUCTION 1980-D, EXHIBIT C PAGE 240 GUARANTEED HOUSING PROGRAM INCOME LIMITS

HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR ENACTMENT Act of Dec. 14, 1992, P.L. 894, No. 143 A SUPPLEMENT To

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

Pennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS

2018 West Penn Power Smart Meter Installation Schedule

2010 Planned Construction STATEWIDE

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Projected Advertisement Date

November 21, 2012 Barbara Kelleher, (954)

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Townships Eligible to Apply for Township Sign Grant 2018

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Road Construction Ahead January-April 2015 NORTHWEST REGION

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Becky A. Bradley, AICP. Executive Director, LVPC Secretary, LVTS

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

Albert Gallatin Water Treatment Plant Point Marion, PA Customers Storage Tanks 2,200 5 Tanks 810,000 Gallons

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County

DIRECTIONS. to Howard County Public Schools and Facilities. Elementary Schools

Table of Contents. Aluminum Multi-Beam (1) Baltimore Thru Truss (2) Bowstring Arch Thru Truss (2) Camelback Pony Truss (1) Camelback Thru Truss (3)

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

State Senator JIM BREWSTER. Serving the 45th Senatorial District Summer 2018

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Project Delays in the FY09-14 Six-Year Improvement Program

A Listing of Cash Rates for All Classes of Vehicles Effective January 8, toll schedule 2017 PENNA TURN PIKE. Cash Rates. Safety starts with you.

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Governor Corbett Announces State Investment in 24 Rail Projects

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

AFTERNOON RUN IS REVERSE OF MORNING RUN

FY Transportation Improvement Program Basic Project List (in Thousands)

Culpeper District. Albemarle County Monthly Report December 2011

toll schedule 2017 Safety starts with you. SECTION 1: E-ZPass Rates SECTION 2: Cash Rates SECTION 3: PA Turnpike TOLL BY PLATE Locations / Rates

Weekly East Tennessee Construction Report for May 31-June 6, 2018

County Bridge Data: (Date bridge data last updated: August 2017)

Future Projects. District 3 Central Minnesota. mndot.gov/d3

TAMAQUA AREA SCHOOL DISTRICT BUS SCHEDULE TRANSPORTATION DEPARTMENT ext 1000

TRAFFIC ALERT FOR SEPTEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Weight-Based Vehicle Class Information. Gateway to Warrendale. Overview. Turnpike Extensions. Mainline. Delaware River Bridge to Neshaminy Falls

Central Region 2013 Welcome

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Part Four Greenways and Open Space Vision

Tell City-Troy Township School Corporation Bus Route Information

North Warren Elementary Transportation Information for

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

Road and Bridge Closure Report

State Route 8 Corridor. Northern Summit County s Path to Success

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Transcription:

BRIDGE SD MILES IMPROVED BASE Bridge Replacement Lower Pine Run Bridge Replacement Bridge Replacement on Township Road 748 over Pine Run in Redbank Township 1 $ 1,600,000 1 1 0 BASE Bridge Replacement Guffy Run Bridge Replacement Bridge replacement on PA 66 over Guffy Run in Parks Township 3 $ 2,650,000 1 1 0 BASE Bridge Replacement Brady's Bend Bridge #6 Replacement carrying PA 68 over Whiskey Run in Bradys Bend Township 1 $ 795,600 1 1 0 BASE Bridge Replacement Brady's Bend Bridge #5 Replacement carrying PA 68 over Sugar Creek in Bradys Bend Township 1 $ 2,017,000 1 1 0 BASE Relocation/Realignment Goheenville Dip Realignment Roadway realignment of PA 28 from State Route 1027 to State Route 1016 (Calhoun School Road) in Boggs Township 1 $ 7,850,000 1 0 3 BASE Bridge Replacement State Route 2011 Garretts Run Bridge Replacement Bridge replacement on State Route 2011 (Gault Hill Road) over Garretts Run in Manor Township 1 $ 1,900,000 1 1 0 BASE Bridge Replacement Hungry Hollow Bridge #1 Replacement Bridge replacement on State Route 2057 over Guffy Run in Parks Township 3 $ 2,025,000 1 1 0 BASE Bridge Replacement Brady's Bend Bridge #3 Replacement carrying PA 68 over Sugar Creek in Bradys Bend Township 1 $ 3,025,400 1 1 0 BASE Bridge Replacement Brady's Bend Bridge #4 Replacement carrying PA 68 over Sugar Creek in Bradys Bend Township 1 $ 1,713,400 1 1 0 BASE Bridge Replacement Brady's Bend Bridge #2 Replacement carrying PA 68 over Hart Run in Bradys Bend Township 1 $ 917,900 1 1 0 BASE Bridge Replacement Sunnyside Bridge #2 Replacement Design build project to replace the structure carrying PA 85 over a tributary to Cowanshannock Creek just west of Harris Road (Township Road 574) in Valley Township 1 $ 1,575,000 1 1 0 BASE Bridge Replacement Hoosicks Mill Bridge #1 Replacement Design build bridge replacement of the bridge carrying PA 85 over Cowanshannock Creek in Cowanshannock Township 1 $ 790,000 1 1 0 BASE Bridge Replacement Hoosicks Mill Bridge #3 Replacement Design build bridge replacement on PA 85 over a tributary to Cowanshannock Creek in Cowanshannock Township 1 $ 523,250 1 1 0 BASE Bridge Replacement Brick Church Bridge Replacement Bridge replacement on State Route 2005 (Cherry Run Road) over the North Branch of Cherry Run in Plumcreek Township 3 $ 2,725,000 1 1 0 BASE Bridge Replacement State Route 2026 over Fagley Run Bridge replacement on State Route 2026 over Fagley Run in South Bend Township 2 $ 2,221,820 1 1 0 BASE Relocation/Realignment Margaret Road Intersection Realignment of US 422 intersection with State Route 2005 and construction of turn lanes, and expansion of turn lanes at State Route 2005 Intersection with US 422 in Plumcreek Township 2 $ 17,600,000 0 0 2 BASE Bridge Rehabilitation Kittanning Truss Bridge Replacement Bridge preservation Activities; expansion dam repair, substructure repairs and painting on existing structure carrying State Route 1038 (Butler Road) over the Allegheny River in Kittanning Borough 1 $ 6,302,900 1 0 0 BASE Intersection Improvement Kittanning Elementary School Intersection Roadway realignment project on US 422 from the Theater Road Alignment Project east of Silvis Hollow Road (Kittanning Elementary School intersection) to east of Graham Road (1.5 miles) in Kittanning Township 2 $ 7,350,000 0 0 1.5 BASE Relocation/Realignment Wray Road Cut Realignment BASE Resurfacing Apollo to North Vandergrift Resurfacing BASE Reconstruction Hays Run 3R Roadway Realignment project on US 422 from Ping Wing Hollow Road to Lasher Road at the west end of the Theater Road Realignment Project in Manor Township 2 $ 10,050,000 0 0 0.5 Resurfacing of PA 56 from the bridge over the Kiskiminetas River in Apollo to the bridge over the Kiskiminetas River in North Vandergrift (Westmoreland County Line) in Apollo and North Apollo Boroughs and Kiskiminetas and Parks Townships 1 $ 3,000,000 0 0 2.7 Reconstruction, rehabilitation and resurfacing along PA 28 from (Anderson Creek Road) to (McAuley Falls Road) in Rayburn Township 2 $ 5,600,000 0 0 3.5 BASE Resurfacing PA 66 Resurfacing Resurfacing on PA 66 from 5th Avenue to US 422 in Manor Township 1 $ 3,230,000 0 0 2.73 Resurfacing on State Route 1422 from PA 66 to US 422 (Indiana Hill) in Manor BASE Resurfacing State Route 1422 - PA 66 to US 422 Township 1 $ 3,000,000 0 0 2.32 Page 1 of 5

IMPROVED Bridge preservation on PA 268 over US 422 eastbound and westbound in East BASE Bridge Preservation PA 268 Ramps Bridge Franklin Township 1 $ 2,400,000 1 0 0 Bridge replacement on State Route 1037 over South Fork Pine Creek in Wayne BASE Bridge Replacement Echo Bridge Replacement Township 2 $ 2,875,000 1 1 0 Bridge replacement on State Route 1039 over tributary to South Fork Pine Creek in BASE Bridge Replacement South Bryan Bridge #2 Replacement Cowanshannock Township 2 $ 1,825,000 1 1 0 Bridge replacement on State Route 2001 over tributary to Cowanshannock Creek in BASE Bridge Replacement Rural Valley Bridge #4 Replacement Rural Valley Borough 1 $ 1,825,000 1 1 0 Bridge replacement on State Route 2001 over Cowanshannock Creek in Rural Valley BASE Bridge Replacement Rural Valley Bridge #3 Replacement Borough 1 $ 1,825,000 1 1 0 BASE Bridge Replacement Logansport Bridge Replacement Bridge replacement on State Route 2029 over Taylor Run in Bethel Township 1 $ 2,675,000 1 1 0 BASE Bridge Replacement Apollo Bridge Replacement Bridge replacement on PA 56 over Sugar Hollow Run in Apollo Borough 1 $ 1,825,000 1 1 0 BASE Bridge Replacement Parker Bridge #1 Replacement Bridge replacement on PA 268 over tributary to Allegheny River in Parker City 3 $ 1,875,000 1 1 0 BASE Bridge Replacement Eddyville Bridge #2 Replacement Bridge replacement on State Route 2021 over Pine Run in Redbank Township 1 $ 2,825,000 1 1 0 BASE Bridge Replacement Nichola Bridge #1 Replacement Bridge replacement on State Route 3013 over Buffalo Creek in West Franklin Township 2 $ 2,875,000 1 1 0 BASE Bridge Replacement Glorietta Bridge #2 Replacement Bridge replacement on PA 56 over the southern tributary to Kiskiminetas River in Kiskiminetas Township 1 $ 1,875,000 1 1 0 BASE Bridge Rehabilitation Oakland Cemetery Bridge Replacement Bridge rehabilitation on PA 66 over Crooked Creek in Manor Township 2 $ 2,920,000 1 0 0 BASE Bridge Replacement Foxburg Bridge #2 Replacement Bridge replacement on PA 268 over Fowler Run in Hovey Township 2 $ 1,875,000 1 0 0 BASE Bridge Replacement Stitts Run Bridge Replacement Bridge replacement on State Route 2066 over Stitts Run in Parks Township 2 $ 1,875,000 1 1 0 BASE Bridge Rehabilitation Briar Hill Overpass Replacement Bridge rehabilitation on State Route 3017 over US 422 EB/WB and Ramps F and G in East Franklin Township 1 $ 5,350,000 1 1 0 BASE Bridge Replacement Bradys Bend Bridge #16 Replacement Bridge replacement on State Route 4003 over Sugar Creek in East Franklin Township 3 $ 2,650,000 1 1 0 BASE Bridge Replacement Brady's Run Bridge #3 Replacement Bridge replacement on State Route 2063 over Brady Run in Gilpin Township 3 $ 2,450,000 1 1 0 BASE Bridge Replacement Craigsville Bridge Replacement Bridge replacement on State Route 4035 over Buffalo Creek in West Franklin Township 3 $ 3,050,000 1 1 0 BASE Bridge Replacement Jackson Road Bridge Replacement Bridge replacement on State Route 2050 over Rattling Run in Kiskiminetas Township 3 $ 2,450,000 1 1 0 BASE Bridge Replacement Dock Hollow Run Bridge #1 Replacement Bridge replacement on State Route 3027 over Dock Hollow Run in South Buffalo Township 3 $ 2,650,000 1 1 0 BASE Bridge Replacement Walkchalk Bridge #3 Replacement Bridge replacement on State Route 4008 over Glade Run in East Franklin Township 3 $ 2,450,000 1 1 0 BASE Bridge Replacement South of Dayton Bridge Replacement Bridge replacement on PA 839 over Glade Run in Cowanshannock Township 3 $ 2,450,000 1 1 0 BASE Bridge Replacement Roaring Run Bridge Replacement Bridge replacement on State Route 2047 over Roaring Run in Kiskiminetas Township 3 $ 2,450,000 1 1 0 BASE Bridge Replacement Queenstown Road Bridge Replacement Bridge replacement on State Route 4002 over tributary to the Allegheny River in Perry Township 3 $ 2,020,000 1 1 0 BASE Bridge Replacement Mt Zion Church Bridge Replacement Bridge replacement on State Route 1029 over North Fork of Pine Creek in Boggs Township 3 $ 2,020,000 1 1 0 BASE Bridge Replacement East of Templeton Bridge Replacement Bridge replacement on State Route 1030 over Whisky Run in Pine Township 3 $ 2,020,000 1 1 0 BASE Bridge Replacement Transylvania Bridge #1 Replacement Bridge replacement on PA 128 over tributary to Pine Run in South Buffalo Township 3 $ 2,020,000 1 1 0 Page 2 of 5

BASE Bridge Replacement Poverty Hill Bridge Replacement BRIDGE SD MILES IMPROVED Bridge replacement on PA 28 over tributary to Cowanshannock Creek in Rayburn Township 3 $ 2,020,000 1 1 0 BASE Bridge Replacement Goheenville Bridge #1 Replacement Bridge replacement on PA 28 over Scrubgrass Creek in Boggs Township 2 $ 2,600,000 1 0 0 BASE Bridge Replacement East of Rural Valley Bridge Replacement Bridge replacement on PA 85 over Cowanshannock Creek in Cowanshannock Township 3 $ 2,650,000 1 0 0 BASE Intersection Improvement PA 56/State Route 2052 Intersection Intersection improvements at the existing PA 56 and State Route 2052 intersection in Kiskiminetas Township 1 $ 200,000 0 0 0.25 BASE Intersection Improvement PA 66/State Route 2065 Intersection The proposed Project is a roundabout at the intersection of PA 66 and State Route 2065 in Leechburg Borough 2 $ 4,050,000 0 0 0.25 BASE Bridge Replacement PA 839 over Mahoning Creek Bridge replacement on PA 839 over Mahoning Creek in Wayne Township 3 $ 4,420,000 1 0 0 Bridge replacement on PA 56 over the northern tributary to Kiskiminetas River in BASE Bridge Replacement Glorietta Bridge #1 Replacement Kiskiminetas Township 3 $ 2,120,000 1 1 0 BASE Bridge Replacement PA 66 over Carnahan Run Bridge replacement on PA 66 over Carnahan Run in Parks Township 3 $ 2,750,000 1 1 0 Bridge replacement on Township Road 738 over South Fork Pine Creek in Wayne BASE Bridge Replacement Township Road 738 over South Fork Pine Creek Township 3 $ 2,437,000 1 1 0 BASE Bridge Replacement Township Road 347 over Bear Creek Bridge replacement on Township Road 347 over Bear Creek in Perry Township 3 $ 2,555,000 1 1 0 BASE Bridge Replacement Township Road 591 over Cherry Run Bridge replacement on Township Road 591 over Cherry Run in Plumcreek Township 3 $ 2,280,000 1 1 0 BASE Bridge Replacement Township Road 840 over Valley Run Bridge replacement on Township Road 840 over Valley Run in Perry Township 3 $ 2,160,000 1 1 0 BASE Bridge Replacement Township Road 221 over Sugar Creek Bridge replacement on Township Road 427 over Sugar Creek in Bradys Bend Township 3 $ 2,160,000 1 1 0 BASE Bridge Replacement Township Road 720 over tributary to Cowanshannock Creek Bridge replacement on Township Road 720 over tributary to Cowanshannock Creek in Cowanshannock Township 3 $ 2,160,000 1 1 0 BASE Bridge Replacement Township Road 644 over North Branch of Cherry Run Bridge replacement on Township Road 644 over North Branch of Cherry Run in Kittanning Township 3 $ 2,110,000 1 1 0 BASE Bridge Replacement Laurel Point Bridge Replacement Bridge Replacement on State Route 2057 over Carnahan Run in Parks Township 3 $ 2,249,796 1 1 0 BASE Bridge Replacement Claypoole Road No. 3 Bridge Replacement Bridge Replacement on State Route 3009 over tributary to Buffalo Creek in West Franklin Township 3 $ 2,256,640 1 1 0 BASE Bridge Replacement Center Hill No. 6 Bridge Replacement Bridge Replacement on State Route 3017 over Glade Run in North Buffalo Township 3 $ 3,449,214 1 1 0 BASE Resurfacing Indiana Hill PM Resurfacing of State Route 1422 from State Route 1040 to State Route 422 in Manor Township 1 $ 292,500 0 0 1.28 BASE Resurfacing Baum Station South PM Resurfacing of PA 28 from State Route 1035 to Seg 404/418 in Boggs Township 1 $ 112,500 0 0 0.48 BASE Resurfacing Baum Station North PM Resurfacing of PA 28 from State Route 1018 to Seg 440/328 in Boggs Township 1 $ 607,500 0 0 0.8 Resurfacing of PA 128 from State Route 128 at Seg 260/0000 to Ninth Street at Seg BASE Resurfacing Fifth Avenue South PM 280/0553 in Manor Township and Ford City Borough 1 $ 360,000 0 0 0.85 BASE Resurfacing PA 85 PM Resurfacing of PA 85 from PA 28 to Seg 20/0633 in Rayburn Township 1 $ 45,000 0 0 0.17 BASE Resurfacing Margaret Road West PM Resurfacing of PA 85 from State Route 2005 to Seg 150/0000 in Cowanshannock Township 1 $ 90,000 0 0 0.2 BASE Resurfacing Water Street PM Resurfacing of State Route 1040 from State Route 1442 to State Route 1038 in Kittanning Borough 1 $ 263,250 0 0 0.67 BASE Resurfacing Pine Hill PM Resurfacing of PA 268 from State Route 1038 to Lemmon Hollow Road (Township Road 880) in East Franklin Township 1 $ 360,000 0 0 1.63 BASE Resurfacing Fifth Avenue PM Resurfacing of PA 128 from Ninth Street at Seg 280/0553 to State Route 66 at Seg 300/1364 in Ford City Borough 1 $ 337,500 0 0 1.61 Page 3 of 5

IMPROVED Resurfacing of PA 839 from Smith Road (Township Road 383) to Seg 130/0000 in BASE Resurfacing Dayton South PM Wayne Township 1 $ 472,500 0 0 2.1 BASE $ 201,430,670 59 51 28.54 Resurfacing on US 422 from State Route 8012 to State Route 8010 in East Franklin, DOI Resurfacing US 422 - State Route 8012 to State Route 8010 North Buffalo and Manor Townships 1 $ 3,000,000 0 0 3.76 Resurfacing on PA 28 from Butler County Line to State Route 3023 in South Buffalo DOI Resurfacing PA 28 - Butler County Line to State Route 3023 Township 1 $ 2,000,000 0 0 2.03 Resurfacing on PA 68 from Butler County Line to Clarion County Line in Bradys Bend DOI Resurfacing PA 68 - Butler County Line to Clarion County Line Township 1 $ 1,100,000 0 0 5.34 DOI Resurfacing PA 66 - State Route 2019 Resurfacing on PA 66 from State Route 2019 to PA 128 in Manor Township 1 $ 1,750,000 0 0 2.76 Replacement of the signal at State Route 1040 (Market Street) and Water Street in DOI Safety Improvement State Route 1040/Water Street Signal Improvements Kittanning Borough 1 $ 750,000 0 0 0.75 DOI ITS US 422 ITS - Armstrong Installation of six DMS and three CCTV cameras along US 422 in Armstrong County 1 $ 1,275,000 0 0 0.1 Bridge rehabilitation on State Route 8010 over US 422 EB and WB in Manor DOI Bridge Rehabilitation State Route 8010 over US 422 EB and WB Township 2 $ 3,550,000 1 0 0 DOI Bridge Replacement Township Road 858 over Long Run Bridge replacement on Township Road 858 over Long Run in Kiskiminetas Township 1 $ 2,210,000 1 1 0 DOI Bridge Replacement Township Road 518 over Cherry Run Bridge replacement on Township Road 518 over Cherry Run in Plumcreek Township 2 $ 2,210,000 1 1 0 DOI Bridge Replacement Township Road 487 over Cowanshannock Creek Bridge replacement on Township Road 487 over Cowanshannock Creek in Cowanshannock Township 2 $ 2,230,000 1 1 0 DOI Resurfacing State Route 3128 Cadogan South Resurfacing Resurfacing of State Route 3128 from Clinton Road (Township Road 881) to PA 128 in South Buffalo and Cadogan Townships 1 $ 382,500 0 0 2.55 DOI Resurfacing State Route 3011 Worthington South Resurfacing Resurfacing of State Route 3011 from State Route 3004 to US 422 in South Buffalo, North Buffalo, West Franklin Townships and Worthington Borough 1 $ 791,100 0 0 5.27 DOI Resurfacing State Route 2001 Water Street Resurfacing Resurfacing of State Route 2001 from State Route 2003 to PA 85 in Plumcreek, Cowanshannock and Rural Valley Townships 1 $ 943,500 0 0 6.29 DOI Resurfacing PA 128 Cadogan to PA 28 Resurfacing Resurfacing of PA 128 from Kountz Road to PA 66 in South Buffalo, North Buffalo, Cadogan, and Manor Townships and Ford City Borough 1 $ 1,000,000 0 0 6.66 DOI Resurfacing State Route 2047 Edmon Road Resurfacing Resurfacing of State Route 2047 from State Route 1060 to PA 56 in Kiskiminetas Township 1 $ 1,000,000 0 0 6.55 DOI Resurfacing State Route 3013 Nicholm Road Resurfacing Resurfacing of State Route 3013 from State Route 2008 to State Route 1021 in West Franklin Township 2 $ 736,500 0 0 4.91 DOI Resurfacing State Route 1004 Madison Rd. Ph-1 Resurfacing Resurfacing of State Route 1004 from State Route 1005 to PA 28 in Madison and Mahoning Townships 2 $ 406,500 0 0 2.71 DOI Resurfacing State Route 1004 Madison Rd. Ph-2 Resurfacing Resurfacing of State Route 1004 from Poseytown Road (Township Road 438) to State Route 1005 in Madison Township 2 $ 1,073,600 0 0 8.95 DOI Resurfacing State Route 4009 Kittanning Hollow Road Resurfacing Resurfacing of State Route 4009 from PA 268 to PA 68 in Sugarcreek and Bradys Bend Townships 2 $ 525,000 0 0 3.5 DOI Resurfacing State Route 3017 Center Hill South Resurfacing Resurfacing of State Route 3017 from Segment 0200 to State Route 2956 in North Buffalo and East Franklin Townships 2 $ 625,000 0 0 4.17 DOI Resurfacing State Route 3017 Slate Lick North Resurfacing Resurfacing of State Route 3017 from PA 128 to Segment 0200 in South Buffalo and North Buffalo Townships 3 $ 453,100 0 0 3.02 DOI Resurfacing State Route 3001 Bunker Hill Road Resurfacing Resurfacing of State Route 3001 from PA 128 to Hickory Street in North Buffalo Township 2 $ 609,000 0 0 4.06 DOI Resurfacing State Route 4010 Walkchalk Resurfacing Resurfacing of State Route 4010 from State Route 4035 to PA 268 in West Franklin, East Franklin Townships and Worthington Borough 3 $ 1,000,000 0 0 6.02 DOI Resurfacing PA 536 N. Freedom Resurfacing Resurfacing of PA 536 in Redbank Township 3 $ 371,000 0 0 2.47 Resurfacing of State Route 1042 from PA 85 to PA 839 in Cowanshannock Township DOI Resurfacing State Route 1042 Nu Mine Resurfacing and Rural Valley Borough 3 $ 395,000 0 0 2.63 Page 4 of 5

IMPROVED Resurfacing of State Route 4006 from Limestone Road (Township Road 647) to DOI Resurfacing Reesedale Resurfacing Holly Road (Township Road 540) in Washington Township 1 $ 1,747,474 0 0 4.65 Resurfacing of PA 85 from a point.23 miles north of the Clearfield Pike (State Route 1038) intersection to a point.56 miles south of the Harris Road (Township Road DOI Resurfacing Rural Valley West Resurfacing 574) intersection in Rayburn Township 1 $ 798,564 0 0 1.68 Resurfacing of PA 839 from Grant Avenue to the bridge over Little Pine Run in DOI Resurfacing Milton to McGregor Resurfacing Redbank, Wayne Townships and Dayton Borough 1 $ 2,513,215 0 0 7.7 Resurfacing of PA 28 from a point.20 miles west of the Madison Road (State Route 1004) intersection to a point.43 miles east of the bridge over Bostonia Run in DOI Resurfacing Distant East Resurfacing Mahoning Township 2 $ 1,812,403 0 0 2.46 Resurfacing of PA 28 from the Calhoun Road (Township Road 810) intersection to a point.20 miles west of the Madison Road (State Route 1004) intersection in DOI Resurfacing Distant West Resurfacing Mahoning Township 2 $ 2,950,751 0 0 3.19 Resurfacing of PA 268 from the Lemon Hollow Road Intersection to the a point.35 DOI Resurfacing Cowansville South Resurfacing miles south of Boltz Road in East Franklin Township 2 $ 1,105,562 0 0 3.21 Resurfacing of PA 268 from a point.61 miles north of Fosters Mills Road (State DOI Resurfacing Frogtown Resurfacing Route 4013) to the Perry Township line in Sugarcreek Township 2 $ 2,850,723 0 0 3.54 Resurfacing of PA 839 from Little Pine Run to the PA 28 intersection in Redbank and DOI Resurfacing South Bethlehem South Resurfacing Mahoning Townships and South Bethlehem Borough 2 $ 2,080,447 0 0 6.45 Resurfacing of PA 210 from the PA 56 intersection to the Ben Franklin Road (US DOI Resurfacing PA 56 to Elderton Resurfacing 422) intersection in South Bend and Plumcreek Townships 2 $ 2,729,861 0 0 3.78 Resurfacing of State Route 2066 from the PA 56 intersection to the PA 66 DOI Resurfacing State Route 2006 Resurfacing intersection in Parks and Bethel Townships 3 $ 3,228,377 0 0 7.81 Resurfacing of PA 28 from a point of.56 miles west of the State Route 1027 intersection to the Calhoun Road (Township Road 810) intersection in Boggs and DOI Resurfacing PA 28 Resurfacing Mahoning Townships 3 $ 3,069,958 0 0 2.96 DOI Resurfacing Forks Church Resurfacing DOI Resurfacing Rural Valley Resurfacing DOI Resurfacing Cowansville North Resurfacing DOI Resurfacing PA 156 Resurfacing DOI Resurfacing Parker City East Resurfacing DOI Resurfacing Apollo to Leechburg Resurfacing SENATE RECONSTRUCT Slabtown South SENATE Reconstruction Dunbar Dip Resurfacing of PA 66 from a point.067 miles west of the Evergreen Road (State Route 2063) intersection to a point.08 miles east of the Crooked Creek Dam Road (State Route 2019) intersection in Gilpin, Bethel, and Manor Townships 3 $ 3,402,811 0 0 8.52 Resurfacing of PA 85 from a point.12 miles south of the Rural Valley Borough and Cowanshannock Township line to the Indiana County Line in Cowanshannock Township 3 $ 3,201,922 0 0 9.2 Resurfacing of PA 268 from Watersonville Road (State Route 4017) to a point.61 miles north of Fosters Mills Road (State Route 4013) in Sugarcreek Township 3 $ 2,520,608 0 0 3.3 Resurfacing of PA 156 from the Westmoreland County Line to the PA 56 intersection in Kiskiminetas Township 3 $ 2,750,000 0 0 5.73 Resurfacing of PA 268 from Division Road to the Butler County Line in Hovey and Perry Townships and Parker City 3 $ 3,200,000 0 0 6.21 Resurfacing of PA 66 from the Westmoreland County Line to a point.067 miles west of the Evergreen Road (State Route 2063) intersection in Parks and Gilpin Townships and Leechburg Borough 3 $ 2,991,324 0 0 5.78 DOI $ 73,340,800 4 3 170.67 Reconstruction and realignment of PA 28 between State Route 1035 and Heffelfinger Road in Boggs Township, Armstrong county 3 $ 15,250,000 0 0 0.79 Reconstruction and realignment of US 422 to improve horizontal and vertical alignment between Silvis Holow Road (State Route 2012) and Simpson Church Road in Kittanning Township 3 $ 16,699,500 0 0 1.31 SENATE $ 31,949,500 0 0 2.1 Page 5 of 5