Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

Similar documents
Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

DRAFT. Dorabelle Campground Rehabilitation

CULTUS LAKE PARK BOARD AMENDED AGENDA

Town of Cary Capital Listing

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures

Developmental Cost Charge (DCC) Program Summary

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Thank you for joining us to learn about and provide input on the Highbury Interceptor Air Management Facility in Musqueam Park.

DESIGN, BUILD, FINANCE AND OPERATE OF THE WASTEWATER TREATMENT & SEWER SYSTEM FOR THE CITY OF BUDVA, MONTENEGRO

CITY OF HOBART SANITARY DISTRICT/STORM WATER BOARD MEETING MEETING OF

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

CITY COUNCIL AGENDA MEMORANDUM

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

Note: This form applies to campgrounds and trailer courts only, not to work camps or youth camps as defined in , MCA.

Mayor s State of the Town Message Presented 01/17/2013

Section 7 - Capital Improvement Program

Long water shutdown scheduled for Tuesday, September 18

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

DIVISION THIRTEEN - CAMPGROUND REGULATIONS - SCHEDULE D

Summary. River and way from. River and through the. goods from. Chicago. Ship Canal. Grade Level: 7 th. 8 th. historic time. of the.

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT

Water & Wastewater Project Activity Report

SUTTER COUNTY. General Plan Update Technical Background Report

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

October 17, Sandy Related Project Update From June 2013

Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15

Capital Improvement Program Fiscal Year

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

James Parker Alex Day JP Powers.

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Project Purpose: Project History and Status:

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

PUBLIC WORKS DEPARTMENT

The date, site name, report author, report recipient, and report number are presented above.

CAPITAL IMPROVEMENT PLAN

PUBLIC WORKS DEPARTMENT

TOWN OF FLOWER MOUND SUMMARY OF FIVE YEAR CIP PLAN FY Amendment 3 02/19/2018

Restoration and Redevelopment of the Former Durango Paper Mill Site

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR

2 Construction Program

Splash of Colour - Community Art Program North West Region. Expression of Interest 2018

Fiscal Year 2015 Council Budget Tour

Fiscal Year

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR

DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

March 2, The Straban Township Board of Supervisors met this day, March 2, 2009, 7:00 p.m. at 1745 Granite Station Road, Gettysburg.

COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR

Cedars RV Resort Owners Handbook. Phases 1,2,3

CONTRACTS AWARDED FIRE STATION SITE GRADING & CLASS I TRAIL PROJECT, ROSEVILLE #15-15

COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR

WORKS BOARD MEMBERS AGENDA 5:00PM. 23 N 2 nd Street A. CALL TO ORDER

FDOT Treasure Coast Traffic Report through

2013 Regional Water System Improvements Program Public Hearing March 14, 2013

KP Lasnaya 1 River

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Minutes of the Town of Lake George Regular Meeting held on November 10, 2014 at the Town Center, 20 Old Post Road, Lake George, New York

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR

Brevard County Utility Services Department

Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province

Some Historical Aspects of Urban Water Systems

Agency on Bay Management Gulfstream Phase IV Expansion

Paul Sturm Roberto Viqueira Ríos

COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR

TOILET and RELIEF TUBE SERVICING

COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR

Group similar facilities together separate dissimilar facilities.

HELCOM Ministerial Declaration on the implementation of the HELCOM Baltic Sea Action Plan

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Coastal Management: Treasure Island - Long Key Nourishment

COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR

Planned Procurement Opportunities Report. June 2017

Completion: August 2011 LS #321 Design LS #8

WASTEWATER ENGINEERING PROJECTS - FY19

Drinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0

N. Central St. & W. Jackson Ave. Streetscape Projects

FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018

Township of Wilmot Municipal Budget. Total Expenditures (excluding user-pay) Total Revenues (excluding user-pay) Expenditures $ 8,795,905

Case Study: 1. The Clarence River Catchment

ARLINGTON COUNTY, VIRGINIA

Bill Authorization Reference: BRCOTW ; Minute Item 5.1 THE REGIONAL MUNICIPALITY OF NIAGARA BY-LAW NO

APPENDIX F List of Commitments

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

Capilano Substation Upgrade

RAMSEY COUNTY MANUFACTURED HOME PARKS & RECREATIONAL CAMPING AREAS ORDINANCE

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Sharon. Property Address: 38 Norumbega Road Stockton springs Maine. Alliance Home Inspections

ENVIRONMENTAL PROTECTION ACT WATER WELL REGULATIONS

*Please note special meeting location this month.

State Project Reconstruction I-84

Transcription:

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016

Agenda Mayo Water Reclamation Facility (WRF) Force Main (FM) Project Background Construction Methods Current Status Mayo-Glebe Heights FM and Pumping Station (PS) Project Background Current Status Contact Information

Mayo WRF FM Project Background Project needed to: Increase treatment capacity in Mayo sewer service area Upgrade treatment to meet new State standards (Enhanced Nutrient Removal) Selected Alternative Decommission the Mayo WRF and convert it to a regional pumping station Install a force main that will pump all septic tank effluent flow collected from Mayo to the Annapolis WRF for ENR treatment and disposal The treated effluent will be discharged through the Annapolis WRF outfall to the mouth of the Severn River

Mayo WRF FM Background Information Six Construction Contracts: Loch Haven FM - six months duration South River FM - six months duration Quiet Waters Park FM - six months duration Hillsmere FM - six months duration Edgewood FM - six months duration Mayo WRF PS and Annapolis WRF Improvements - 10 months duration All work must be complete by December 31, 2016 to meet MDE deadline for ENR treatment of Mayo flow

Construction Contracts

Horizontal Directional Drilling Method

Pipe Storage

Staging Area

Visual and Sound Barrier

Entry Pit

Exit Pit

Pipe Fusion

Pipe Laydown

Valve Vault and Odor Control

Progress to Date Under Construction: South River FM Notice to Proceed (NTP): October 9, 2015 Quiet Waters Park FM NTP: January 4, 2016 Loch Haven FM NTP: February 12, 2016 Mayo and Annapolis WRF Improvements NTP: March 11, 2016 Starting in August: Edgewood FM Hillsmere FM

South River Contract Contractor is Carson Corporation Consists of three segments Loch Haven Drive Drill 1,750 feet (Magnolia Dr. to Bay View Point Dr.) South River Drill - 4,100 feet long Quiet Waters Park Open Cut - 450 feet of trenched construction South River Drill completed December 15, 2015 Loch Haven Drill completed May 10, 2016 Vault installation and site restoration to be complete early June 2016.

Loch Haven Contract Contractor is Schummer Loch Haven contract consists of two drills: Mayo WRF to Plainview Plainview to Magnolia Pipe assembled on shoulder of Plainview Ave. and Loch Haven Drive, and in South River Farms Park Mayo WRF to Plainview HDD completed May 12, 2016 Plainview to Magnolia HDD will begin March 23 and will take 3 weeks Sound barriers placed around drill on Plainview Vault installation and site restoration complete by end of June.

Glebe Heights PS & FM Project Background Glebe Heights Communal Facility Septic tank effluent is injected into drainage fields Soil treats wastewater New groundwater standards Project is needed to: Increase treatment capacity in Glebe Heights sewer service area to lift moratorium Meet new groundwater standards Project Elements: Upgrade the Glebe Heights I Pumping Station for future flows, install new Force Main, and pump flow to the Mayo Regional PS for transfer to Annapolis Decommission the Glebe Heights Communal Facility and transfer property to County Recreation and Parks

On Loch Haven Road across from intersection with Pure Water Way Glebe Heights Communal Facility

Glebe Heights I Pumping Station Existing pumping station will be replaced.

Entrance Pit on Glebe Heights Drive Corner of Laurel Avenue and Glebe Heights Drive.. Entrance or Exit Pit Open Cut Construction Pipe Laydown Area Open cut in Laurel Ave. Entrance pit on corner. Drill between corner and Loch Haven Park.

Exit Pit near Loch Haven Park Near tennis courts parking lot Entrance or Exit Pit Open Cut Construction Pipe Laydown Area

Glebe Heights Dr. looking toward Loch Haven Rd. Entrance or Exit Pit Open Cut Construction Pipe Laydown Area

Loch Haven Road Open Cut and Exit Pit At intersection with Glebe Heights Drive Exit pit at top of hill. Entrance pit at intersection of Loch Haven Rd and Pure Water Way Entrance or Exit Pit Open Cut Construction Pipe Laydown Area

Corner of Pure Water Way Entrance pit behind community sign Entrance or Exit Pit Open Cut Construction Pipe Laydown Area

Pure Water Way Open cut construction on Pure Water Way to entrance of treatment plant Entrance or Exit Pit Open Cut Construction Pipe Laydown Area

Schedule Glebe Heights PS & FM bid open was May 10 Notice To Proceed in August Construction will likely start in September Eleven month contract time Projected completion July 2017

Project Information Web Site Updates http://www.aacounty.org/departments/publicworks/engineering/capital_projects/mayo-servicearea-capacity-expansion Project Manager: Sharon Cole (410) 222-7976 or pwcole01@aacounty.org On-site inspector: Black & Veatch Mayo WRF ENR Upgrade and Expansion Loch Haven Community Outreach Meeting Mayo Water Reclamation Facility February 23, 2016

Questions?