DRAFT Accelerated MDOT Projects Scenario December 18, 2013

Similar documents
DRAFT - Accelerated MDOT Projects Scenario - December 18, 2013

DRAFT - Accelerated MDOT Projects Scenario - December 18, 2013

The New House. 4 th District. Rose Mary Robinson D-Detroit. John Olumba D-Detroit. 10 th District. Phil Cavanagh D-Redford Twp.

, 8:30 to 4:30 Monday - Friday 2375 Gordon Road Alpena Service Agency. 706 Chippewa Square, Suite

The New House. 4 th District. Alberta Tinsley-Talabi D-Detroit. Maureen Stapleton D-Detroit. 10 th District. Harvey Santana D-Detroit

Human Resources Clients

Timesheets Clients. Fayette County GA. Carroll County AR. Gwinnett County GA. Pulaski County AR. Cook County IL. Brevard County FL.

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

A new approach to evaluating the fiscal health of Michigan local governments: Comparing fiscal performance relative to available resources

Field Inspection Clients

Purchase Order Clients

Timesheets Clients. Carroll County AR. Bartow County GA. Pulaski County AR. Fayette County GA. Gwinnett County GA. Brevard County FL.

Timesheets Clients. Carroll County AR. Bartow County GA. Pulaski County AR. Fayette County GA. Gwinnett County GA. Brevard County FL.

7. Thrifty Outlet, MI 4677 Alpine Ave NW, Comstock Park, MI Norton Shores, MI 700 W Norton Ave, Muskegon, MI 49441

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Incentive Type. Munising Farmers & Artisans' Market Token 355 Elm Avenue Munising

BS&A Online - Employee Self Service Clients

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

Special Assessment Clients

Special Assessment Clients

OFFICE OF THE GOVERNOR

MEA-RETIRED CHAPTER PRESIDENTS

Habitat for Humanity of Council Bluffs 1228 S Main, Council Bluffs, IA Habitat for Humanity of Council Bluffs

State of Michigan Local Government FY 2011 Financial Data (by Population Category)

More information: spartannash.com/habitat-for-humanity

Non-Motorized Transportation

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

University Region Non-Motorized Plan 2015

To: Mayor Pat Humphrey and the Clare City Commission From: Ken Hibl, City Manager Date: March 17, 2016 Regarding: City Manager's Report

Great Lakes Navigation System Buffalo District

2011 Great Lakes Waterways Conference

Agencies TrueNorth Heat & Energy Applications are Available Updated 2/2/15 County Agency Street Address City State Zip Code Alcona Alcona Library 312

Haller Appraisal Service, Inc.

Community Development/Building Department Clients

Teltow Contracting, Inc.

Great Lakes Navigation System Buffalo District

Guide to. Road Construction Projects

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

Changes in TIP projects Draft vs. Final Draft

State Route 8 Corridor. Northern Summit County s Path to Success

Ottawa County Road Commission Approved TABLE OF MAXIMUM GROSS AXLE LOADINGS

MDEQ Air Quality Division - Voided ROPs

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

MERIDIAN A \[0~~~~1' AGENDA CHARTER TOWNSHIP OF MERIDIAN MERIDIAN TRANSPORTATION COMMISSION January 18, :00 p.m.

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

WASHINGTON TOWNSHIP REGIONAL ANALYSIS

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

MHSFCA Academic All-State Nominations Greg Dolson Tecumseh High School

Wichita Falls MPO - MTP Project List 1 of 6

2002 and 2001 Iowa Land Values

More information: spartannash.com/special-olympics

Cash Receipting Clients

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Great Lakes Waterways Conference

L. BROOKS PATTERSON OAKLAND COUNTY EXECUTIVE

Date State County Project Description Joint Size NY Kings Shore (Belt) Parkway Bridge over Mill Basin D-160 & 320

Grand Trunk Railway of Canada (United States Trackage Only)

2017 M I C H I G A N

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

2 Construction Program

presentation to Director

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION NOTICE OF HEARING FOR THE GAS CUSTOMERS OF DTE Gas Company CASE NO.

Split Rock 100th anniversary. Superior Point Light. Eagle Harbor Lighthouse. Marquette Harbor Lightouse. Grand Island Lighthouse(before)

Population by County, Township, City, Village (Source: Population Division, U.S. Census Bureau; Release Date: 5/21/2015)

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Events/Shows in RED are set for Events supported by MCMM are noted

MINUTES MACATAWA AREA COORDINATING COUNCIL TRANSPORTATION TECHNICAL COMMITTEE

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Oakland County, Michigan. Ronald Goldstone, Senior Vice President

Townships Eligible to Apply for Township Sign Grant 2018

MoDOT Southwest District

Great Lakes Navigation System Dreding Update

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Great Lakes Navigation System

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County

ARMSTRONG COUNTY. Roadway realignment of PA 28 from State Route 1027 to State Route 1016 (Calhoun School Road) in Boggs Township 1 $ 7,850,

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

FDOT Treasure Coast Traffic Report through

Great Lakes Navigation System Dredging Update

Great Lakes Navigation System

2009 Seat Belt Usage Survey

KDOT announces approved December bids

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Harbor Maintenance Operations and Funding: Opportunities and Challenges for the Great Lakes Region

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN

Great Lakes Dredged Material Management

Transcription:

In the Current Estimated current 5- Reuestor (Include PE & CE) Location Description Current Work Description Job Number(s) Program? A S H Bay Genesee 32 Kahn 51 Graves Duffield Road $673,800 Bridge Over Misteuay Creek Toll Credits Cost % Reuired Match Bay Genesee 26 Robertson 50 Smiley Bristol Road $650,000 Bridge Rehabilitation From MDOT Region Engineer (RE) Not sure which structure this is. Bay Genesee 27 Ananich 51 Graves McClasin Lake Road $1,060,000 Argentine Township Reconstruction Bay Gratiot 33 Emmons 70 Outman Lumberjack Rd. $170,000 Williams to M 46 Resurface JN 119162, CS 29057 Y Bay Lapeer 31 Green 82 Daley I 69 $1,001,000 I 69 Bridge Repairs (Over Newark and Winslow Roads) Bridge Rehabilitation JN 113543, CS 44044 Y Bay Genesee 32 Kahn 85, 51 Glardon, Graves M 13 $702,000 M 13 North of I 69 to M 21 HMA Overlay From MDOT RE ADA at one intersection, RR tracks within limits, will have to look at a detour if we do RR work. Bay Saginaw 32 Kahn 94 Kelly M 83 $2,000,000 Genesee Street to M 15 (6.9 miles) Bay Saginaw 32 Kahn 94 Kelly M 47 $500,000 Church Street to Freeland Road Package Together w/ Project on Freeland Road Mill and Two Course HMA Overlay Two Course Mill & HMA Overlay w/c&g From MDOT RE Cheboygan Creek structure is scheduled for 2014; will have a coordination clause. From MDOT RE The Freeland Road project referenced is scheduled for 2015 (JN 108168 for $512,000). Is this funded? Bay Arenac 36 Moolenaar 97 Johnson US 23 $2,061,294 NCL Standish to SCL Omer One Course Mill & HMA Overlay Bay Midland 36 Moolenaar 98 Stamas US 10 BR (Eastman) $2,000,000 Saginaw Rd to Jerome St. Resurface $363,000 0.1125 $225,000 From Finance Midland Bay Bay 31 Green 98 Stamas US 10 Bridge Repairs $793,000 US 10 Bridge Repairs Over Huron and Eastern RR, and Over Patrick Road Bridge Rehabilitation 115898 Y Bay Isabella 33 Emmons 99 Cotter Coleman Road $647,000 West County Line to Woodruff Bay Genesee 26 Robertson Holcomb Road $500,000 Davisburg to Miller From MDOT RE This is in Oakland County (Clarkston) also. Bay Region Total $12,758,094 Grand Montcalm 31 Emmons 70 Outman Crystal Road $250,000 M 46 to North County Line Grand Kent 29 72 Yonker 52nd Street $700,000 Hildenbrand Grand Kent 29 Hildenbrand 72 Yonker Patterson $1,000,000 From 108th to 100th Grand Kent 28, 29 Jansen, I 96 $1,150,000 500' West of Cascade Rd E to M Coldmill, HMA Hildenbrand 11 Resurface 72, 73, 86 Yonker, MacGregor, Lyons Jansen Reuested N N $208,725 0.1125 $129,375 From MDOT RE New CPM project that can be added to the 2014 program. From Finance Kentwood

Grand Kent 28 Jansen 73, 74 MacGregor, VerHeulen Grand Kent 28 Jansen 74 VerHeulen M 37 $2,473,000 3 Mile Road North to Alpenhorn Drive DRAFT Accelerated MDOT Projects Scenario December 18, 2013 (Include PE & CE) Location Description Current Work Description Job Number(s) Program? A S H Cost % Match Bill Mar $75,000 Resurface Coldmill, HMA Resurface 117998 Y From MDOT RE Under design for FY 2015 letting. Can be accelerated. Grand Kent 28 Jansen 77, 75 Hooker, Godfrey Street $800,000 Market Avenue to Chicago Drive Dillon Grand Ionia 33 Emmons 86, 87 Lyons, Callton M 21 $1,900,000 Hillcrest Drive to Ionia East County Line Rehabilitation N N From MDOT RE Shelf job designed and ready. Grand Ottawa 30 Meekhof 88 Victory I 96, I 196 $2,200,000 I 96 8 Locations, I 196 1 Location Bridge Capital Preventative Maintenance Grand Ottawa 30 Meekhof 89 Price North Shore Road $674,000 North Beach Park Drive to 3,000 ft East Grand Ottawa 30 Meekhof 90 Haveman Washington Avenue $1,000,000 Fairview to Arbor Lane / 8th Street Transition Reconstruction / Resurface With Varying Lane Configurations Addition of Bike Lanes and Parking 118902 Y For the I 96 Bridges; N For the I 196 Bridge Grand Ottawa 30 Meekhof 90 Haveman 16th Street $750,000 Waverly Quarterline $750,000 federal funds From MDOT RE I 96 bridges are programmed; I 196 bridge would need to be added to the job or programmed separately. CPM projects are not line itemed in the 5 year plan. Grand Muskegon 34 Hansen 91 Lamonte Sternberg Road $1,145,000 Brooks Road to Maple Island Construction and Easement Acuisition Grand Muskegon 34 Hansen 91 Lamonte Ryerson Road $1,075,000 M 120 to Holton Duck Lake Road Rehabilitation Grand Region Total $15,192,000 Metro Wayne 1 Young 4 Robinson Cass Avenue Improvements $1,000,000 Non Motorized Corridor From Region RE route, but MDOT submitted this in support of known desired nonmotorized improvement with M 1 Streetcar. Metro Wayne 1 Young 6 Tlaib Belle Isle Roads (Grand Prix) $4,000,000 New JN Reuired N From Region RE New MDOT jurisdiction/responsibility under Belle Isle lease with City of Detroit. Metro Macomb 9 Beida 18 Roberts Kelly Road (SB) $1,655,000 9 Mile to Toepfer East Pointe Metro Wayne 6 Anderson 19 Walsh Industrial Road $900,000 Metro Wayne 7 Colbeck 21 Slavens Lotz Road $5,000,000 East of I 275 at Ford Road

(Include PE & CE) Location Description Current Work Description Job Number(s) Metro Macomb 10 Rocca 24 Forlini M 59 $2,000,000 M 53 to I 94 New JN Reuired Program? A S H Cost % Match Y $363,000 0.0275 $55,000 Reuested $10,000,000 / From MDOT RE Associated with JN 111361, CON in 2017. Will keep that and establish a new JN for repair work in 2014. From Finance Sterling Heights. Metro Macomb 10 Rocca 30 Farrington 19 1/2 Mile $864,000 Metro St. Clair 25 Pavlov 83 Muxlow I 94 BL $1,000,000 Military Street at Water Street New JN Reuired N $181,500 0.0875 $87,500 From MDOT RE Safety and economic development project to improve access and parking along the intersecting city street. From Finance Port Huron. Metro St. Clair 25 Pavlov 32 LaFontaine Wadhams Road $500,000 Wadhams Road at Lapeer Road Intersection Metro Macomb 11 Brandenburg 33 Goike M 19 $1,000,000 At Gratiot Avenue 116508 Y From MDOT RE Safety project, was recently delayed from 2016 to 2017. Will now be advanced to 2014. Metro Macomb 11 Brandenburg 36 Lund 25 Mile Road $800,000 Between Schoenerr and VanDyke Metro Oakland 15 Kowall 38 Crawford I 96 EB only $4,900,000 Novi Road to W. County Line Mill and Overlay 122516 Y $889,350 0.025 $122,500 From MDOT RE 2014 CPM. From Finance Novi. Metro Oakland 12 Marleau? 39, 40 Kesto, Walnut Lake Road $1,200,000 Halsted to Franklin McCready Metro Oakland 13 40 McCready Quarton Road $432,800 Intersection of Chesterfield Pappageorge Metro Oakland 13 41 Howrylak Livernois $750,000 Bridge Over Lane Ditch Pappageorge Metro Oakland 13 Pappageorge 41 Howrylak Crooks Road $1,000,000 Tower to Corporate Metro Oakland 12, 15 Marleau, Kowall 43, 29 Haines, Greimel M 59 $3,000,000 Elizabeth Lake Road to State Street Mill and Overlay and Concrete Patch Repairs 85540 N $544,500 0.0625 $187,500 From MDOT RE Was removed from previous 5 Plan due to funding constraints; will be restored with this funding. From Finance Pontiac. Metro Oakland 15 Kowall? 44 Kowall Pontiac Lake Bridge $500,000 Over Pontiac Lake Level Control Metro Oakland 12 Marleau 46 Jacobsen Orion Road $800,000 Oakland Township to Rochester Hills Metro St. Clair 25 Pavlov 81 Lauwers Shea Road $620,000 Palms Road to Marsh Road Metro St. Clair 25 Pavlov 81 Lauwers Lapeer Road $270,000 24th to 32nd Street From MDOT RE Could be coordinated with MDOT's I 94/I 69 interchange. Metro St. Clair 25 Pavlov 81, 32 Lauwers, LaFontaine Lapeer Road $2,800,000 Beech to Wadham

(Include PE & CE) Location Description Current Work Description Job Number(s) Metro Atlas Road $725,000 Atlas Road Bridge Metro Region Total $35,716,800 Program? A S H Cost % Match North Lake 35 Booher 100 Bumstead Brooks Road $350,000 10 and 1/2 Mile Road to 12 Mile Road North Leelanau 35 Booher 101 Franz Fredrickson Road $342,000 Empire Township North Manistee 35 Booher 101 Franz Nine Mile Road $800,000 4 Miles North Wexford 35 Booher 102 Potvin Old US 131 $2,000,000 Boon Rd. to M 42 (Cadillac to Manton) Reconstruction 113354 Y From MDOT RE Adjusted limits: N/Boon Road to S/US 131 North Wexford 35 Booher 102 Potvin Boon Road $240,000 US 131 to Seeley Road North Roscommon 35 Booher 103 Rendon BL I 75/ M 18 $655,000 Roscommon: BL I 75 Village Mill, HMA, ADA Ramp N N Limits Upgrading North Ogemaw 35 Booher 103 Rendon M 33 $400,000 Rose City: Village limits Mill & Fill, Jt. Repair, N N ADA Ramps North Ogemaw 35 Booher 103 Rendon M 55 $1,100,000 I 75 BL to M 33 N N North Grand 37 Walker 104 Schmidt US 31/M 37 $500,000 Division Street, 14th St to Grand View Pkwy in City PEL Study? N 2 of 3 North Grand 37 Walker 104 Schmidt West Front Street $1,000,000 West Front Street Bridge in City North Grand 37 Walker 104 Schmidt Cottage Street $49,000 Village of Kingsley Mill and Fill North Grand 37 Walker 104 Schmidt Fenton Street $300,000 Village of Kingsley Mill and Fill North Grand 37 Walker 104 Schmidt Village of Fife Lake $301,200 Pierce Street, Front Street, Janet Street and Main Street North Antrim 37 Walker 105 MacMaster Old State Road $900,000 From Central Lake Village to at Least Derenzy Road Design Phase in Process North Presue Isle 36 Moolenaar 106 Pettalia US 23 BR $750,000 In Rogers City, US 23BR Mill, HMA, ADA ramp N N upgrading North Emmet 37 Walker 107 Foster US 31 $445,000 In Bay View area, Petoskey Mill, HMA, ADA ramp upgrading N N North Emmet 37 Walker 107 Foster US 31 $400,000 US 31, Liberty Street to East Mitchell Street (Includes the Mitchell Street Bridge) Mill, Overlay, Joint Repair, Structure and Concrete Pavement Repair 115256 116431 Y From MDOT RE Let Project North Region Total $10,532,200 Southwest Branch 16 Caswell 58 Kurtz Athens Road Bridge $1,882,000 Over the St. Joseph River Southwest St Joseph 21 Proos 59 Lori M 86 $800,000 West of Centreville to RR tracks, Village of Centreville, St Joseph Co. 2.0" Coldmill and HMA Overlay Southwest 21 Proos 59 Lori North River Road $1,000,000 Bridge Over Mill Creek Southwest Kalamazoo 20 61 O'Brien Portage Road $540,000 E. Milham to Byrd Dr., city of HMA Resurface Portage Southwest Kalamazoo 20 61 O'Brien Oakland Drive $270,000 I 94 to Kilgore Road, City of Portage HMA Resurface Need to Obtain N From MDOT RE Can be simple log project.

(Include PE & CE) Location Description Current Work Description Job Number(s) Program? A S H Cost % Match Southwest Kalamazoo 20 61 O'Brien Ravine Road $250,000 Bridge Over US 131 Bridge Joint Need to N Replacement Obtain Southwest Calhoun 19 Nofs 62 Segal Roads $150,000 Southwest Calhoun 19 Nofs 63 Bolger M 227 $4,000,000 Marshall Resurface Need to Obtain N From MDOT RE Can be simple log project. Southwest Kalamazoo 20 66 Nesbitt Main Street $341,000 Creek Culver to Front Avenue, City of Mattawan HMA Resurface Southwest Allegan 24 Jones 72 Yonker 142nd Avenue $700,000 Division to Kalamazoo Street Southwest Berrien 21 Proos 78 Pagel Cleveland Avenue $750,000 Wagner Road to Warren Woods Road Southwest Berrien 21 Proos 79 Pscholka M 63 $130,000 Over Hickory Creek Joint Replacement, Need to N Healer Sealer Obtain Southwest Berrien 21 Proos 79 Pscholka Red Arrow Highway $1,035,000 South City Limits to the North City Limits, City of Bridgman HMA Resurface Southwest Van Buren 21 Proos 80 Genetski M 43 $1,100,000 64st Street to Blue Star Hwy, near South Haven, Van Buren Co 1.5" Coldmill and HMA Overlay 118992 Y From MDOT RE Can add to JN 118992, a log job to be let March 7, 2014, with later letting, which overlaps the entire proejct and moves the POE 2.5 miles to the east. Southwest Allegan 24 Jones 80 Genetski 112th Avenue $300,000 East of 20th Street Bridge Replacement Southwest Barry 24 Jones 87 Callton M 37/M 43 $400,000 Park Street to Heath Road, City of Hastings, Barry Co Concrete Pavement Repairs Need to Obtain N From MDOT RE Was to be added to JN 102692, an HMA project, which was already elt on October 4, 2013. Will have to be a new let log job if consideration for added work/limits for current project is not permitted. Southwest Region Total $13,648,000 Superior Schoolcraft 38 Casperson 109 Kivela US 2 $4,147,606 US 2 from East of the Delta/Schoolcraft County Line to M 149 Road R&R Mill & Resurface and Aggregate lift JN 113742; CS 75021 Superior 38 Casperson 109 Kivela County Road 498 $800,000 Design/Construction Superior Algor Connors Road $400,000 Superior Algor H 44 $300,000 Superior Dickinson CR 569 $775,000 Superior Menominee CR 577 $225,000 Superior Menominee CR 577 $300,000 Superior Region Total $6,947,606 University Monroe 17 Richardville 17 LaVoy Vivian Road $280,000 Vivian Road at Cole Road Signalization N University Monroe 17 Richardville 17, 56 LaVoy, Tuttle Hill Road $1,420,000 Ostrander Road to Oakville Road N Zorn University Livingston 22 Hune 42 Rogers Grand River $1,375,000 Hacker to I 96 N Y From MDOT RE An R&R Job in 2016.

(Include PE & CE) Location Description Current Work Description University 22 Hune 47 Denby D 19 $750,000 South of Wright Road to Howell City Limit Job Number(s) Program? N University Monroe 17 Richardville 56 Zorn I 75 $3,500,000 State Line to I 275 Concrete Patches N University Monroe 17 Richardville 56 Zorn Wabash Road $450,000 Wabash Road at North Macon N Creek University Monroe 17 Richardville 56 Zorn Wabash Road $330,000 Cone Road to North City Limits N Univeristy Monroe 17 Richardville 56 Zorn Samaria Road $5,000,000 N University Lenawee 16 Caswell 57 Jenkins M 52 $1,260,000 Valley Rd to M 50 Mill and Fill N University Jackson 17 Richardville 64, 65 Poleski, Jefferson Road $990,000 US 127 to Brooklyn Village Limit N Shirkey University Jackson 19 Nofs 65 Shirkey M 106 $1,750,000 Portage River to Bunkerhill Rd 2" Overlay N University Ingham 23 Whitmer 68 Schor Michigan Avenue $1,700,000 Waverly Road to Clare Street N University Clinton 33 Emmons 93 Leonard Old US 127 $1,400,000 Lansing DeWitt and Olive Townships N University Region Total $20,205,000 A S H Cost % Match Statewide Total $114,999,700 $2,368,575 $806,875