Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Similar documents
EVANSVILLE METROPOLITAN PLANNING ORGANIZATION TECHNICAL COMMITTEE MINUTES

EVANSVILLE METROPOLITAN PLANNING ORGANIZATION POLICY COMMITTEE MINUTES

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Wichita Falls MPO - MTP Project List 1 of 6

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

ANNUAL PERFORMANCE AND EXPENDITURES COMPLETION REPORT

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

City of Grand Island Tuesday, December 12, 2017 Council Session

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

2 Construction Program

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Changes in TIP projects Draft vs. Final Draft

State Route 8 Corridor. Northern Summit County s Path to Success

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

Projected Advertisement Date

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Highways: Interstate. Highways: State Highways

Major Projects Overview

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

ANNUAL PERFORMANCE AND EXPENDITURES COMPLETION REPORT FISCAL YEAR 2017

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

COMMISSIONER'S REPORT

2009 Regional Solicitation Selected Projects*

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Bridge - Off State System

Bridge - Off State System

METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting

Progress Report for Projects of Regional Significance

OWENSBORO-DAVIESS COUNTY TRANSPORTATION IMPROVEMENT PROGRAM FY Owensboro Daviess County Metropolitan Planning Organization

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

NEW JERSEY DEPARTMENT OF TRANSPORTATION

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

Culpeper District. Albemarle County Monthly Report December 2011

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

Additional Economic Development Strategy submissions- Klickitat County

FY Transportation Improvement Program Basic Project List (in Thousands)

Delaware County Engineer

AWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost.

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

TRANSPORTATION IMPROVEMENT PROGRAM

Ohio Department of Transportation Construction Update

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

Michigan s Engineering Safety Program for Local Roadways

FDOT Treasure Coast Traffic Report through

Progress Report for Projects of Regional Significance

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County

CVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

District One Contacts

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

FY TIP Projects TDOT

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

FDOT Treasure Coast Traffic Impact Report

Santa Fe Metropolitan Planning Organization

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

FY TIP Projects TDOT

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Special Committee on U. S. Route Numbering

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

2007 FFY OBLIGATED AND GRANTED PROJECTS LIST FEDERAL REGION PROJECT PHASE

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

State Project Reconstruction I-84

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

FDOT Treasure Coast Traffic Impact Report

Transportation TRANSPORTATION PROJECTS

TRANSPORTATION INITIATIVE. Review of Road Funding and Revenue Alternatives February 8, 2017

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

I-94 East Corridor Performance

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

KDOT announces approved November bids

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Transcription:

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations

The Evansville Metropolitan Planning Organization Transportation Improvement Program (TIP) contains a listing of transportation projects proposed to be undertaken over a four year period. Many, though not all, of the projects in the TIP will utilize funds from the Federal Highway Administration (FHWA) and/or Federal Transit Administration (FTA). Projects schedules and costs often change based on a number of variables. As a consequence, the TIP does not always present the latest project expenditure information. In an effort to further inform the public about how federal funds are actually spent, the Moving Ahead for Progress in the 21 st Century Act (MAP 21) requires that Metropolitan Planning Organizations publish an annual listing of projects for which federal funds have been obligated in the preceding year. By definition, an obligated project has received authorization by a federal agency. This authorization is the federal government s legal commitment to pay the federal share of a project s cost. Project obligation does not necessarily mean that work is underway. The project process may require additional steps, such as design consultant selection, or the completion of a letting process, before work can commence. This report documents transportation projects in the Evansville MPO region that were obligated for spending using federal funds during the program year 2015. The TIP that was in effect during fiscal year 2015 was the 2013 2016 TIP, therefore, the TIP or programmed information provided in the following tables is from the 2013 2016 TIP. Please note that Indiana FHWA projects and FTA projects in both states reflect a state fiscal year reporting period (July 1, 2014 to June 30, 2015). Kentucky FHWA projects are reported for federal fiscal year 2015 (October 1, 2014 to September 30, 2015).

Evansville MPO Annual Listing of Obligated Projects State FY 2015 (July 1, 2014 June 30, 2015) INDOT Projects Contract Des# County Route Location/Description Work Phase * Previous Obligations 2015 Obligated R 34810 1006505, 1006506 Posey SR 62 7.82 and 8.32 miles East of East Jct SR69 Small Structure Pipe Lining CN NHS $ 680,800 $ $ 358,400 $ 322,400 B 33539 9620260 Vanderburgh US 41 US 41 NBL bridge over Cheatam Slough, 1.06 miles S of I 164 B 35743 1382251 Vanderburgh SR 62 Bridge Over Harper Ditch, 01.78 Miles East of US 41 IR 30624 PLC 37218 0015020, 0100785, 1000070, 0401383, 0401384 1297455, 1297456 Vanderburgh US 41 Inspection SBL and NBL Vietnam Gold Star Bridge, Evansville FY 20122017 Payment KY R 30360 0501206 Vanderburgh I 64 3.05 mi E of SR 65 to 0.5 mi E of US 41 R 30361 0501178 Vanderburgh I 164 0.70 miles W. of US 41 to I64 (Exclude RP 0.00 to 2.30) Bridge Deck Replacement PE NHS $ 800,000 $ $ 633,832 $ 166,168 Bridge And Repair Vanderburgh US 41 US 41 interchange with SR 62/SR 66 (Lloyd Expressway) Interchange Modification Single Location Bridge Inspection PCCP Cleaning and Sealing Joints CN STP $ 44,800 $ $ 51,713 $ PE NHS $ 336,000 $ 415,930 $ 729,840 $ RW NHS $ 2,476,400 $ 910,051 $ 145,387 $ 1,420,962 CN NHS $ 24,381,600 $ $ 15,307,223 $ 9,074,377 PE STP $ 160,000 $ $ 140,000 $ 20,000 CN IM $ 2,421,900 $ $ 2,818,454 $ PE IM $ 40,500 $ $ 40,500 $ R 36649 1298522 Vanderburgh I 164 US 41 intersection to 2.3 miles E of US 41 intersection HMA Overlay, Structural PE IM $ 90,000 $ $ 90,000 $ RS 30636 0200849 Vanderburgh US 41 0.32 m N of Lloyd Expwy (Virginia Avenue) to 3.25 mi N SR57(Boonville/New Harmony Rd) T 36984 1383240 Vanderburgh I 164 From US 41 to I 64 * reflects the amount programmed in the 20132016 TIP. Sign Modernization (Series Of Units) PE NHS $ 20,000 $ $ 20,000 $ CN IM $ 2,048,000 $ $ 1,986,146 $ 61,854

Evansville MPO Annual Listing of Obligated Projects State FY 2015 (July 1, 2014 June 30, 2015) INDOT Projects Contract Des# County Route Location/Description Work Phase * Previous Obligations 2015 Obligated B 29070 1296686 I 64 Over Big Creek, 3.50 mi W of SR61 Bridge Deck Overlay PE IM $ 108,000 $ 8,550 $ 9,810 $ 89,640 B 34566 0800735 SR 68 0.12 mi W of W jct with SR 161 over Little Red Creek B 34632 B 34633 1173802, 1173803 1173822, 1296212 Br Repl, Precast 3 Sided Culvert PE STP $ 112,248 $ 30,256 $ 3,514 $ 78,478 I 64 Over IN Southern RR, 1.48 mi E of I164/SR 57, EB & WB Bridge Deck Overlay CN IM $ 2,818,980 $ $ 873,301 $ 1,945,679 I 64 Over Little Red Creek, 2.65 mi W of SR 161, EB, and Over CR 600W; 3.38 mi W of SR61 Bridge Deck Overlay PE IM $ 171,635 $ 122,630 $ 49,005 B 34846 1296228 SR 68 Over New Pigeon; 1.82 mi E of SR57 Bridge Thin Deck Overlay CN STP $ 381,600 $ $ 196,441 $ 185,159 B 35599 1173355 SR 61 Over Koehler Ditch, 1.49 mile S SR62 Bridge Deck Overlay PE STP $ 56,460 $ 32,640 $ 23,820 IR 30187 IR 33285 0500194 IR 37466 1400648 1005579 PR 61 0101059, IR 30794 0101080, SR 261 9802480 SR 66 SR 61 From SR 62 to Millersburg Road From SR 66 to Jenner Rd (CR 150S) 2.88 miles N of SR 66 From French Island Trail (former SR 662) to Yankeetown Rd (Phase III) From SR 62 to 4 mi N of SR 62 R 31067 0710129 I 64 From 0.41 mi E of I164 to 0.13 mi E of SR 61 New Road Construction Added Travel Lanes Environmental Mitigation New Road Construction PE STP $ 60,000 $ 30,198 $ 75,550 $ RW STP $ 1,600,000 $ 160,000 $ 819,969 $ 620,031 CN STP $ 2,400,000 $ $ 2,304,693 $ 95,307 RW $ $ $ 686 $ CN $ $ $ 165,064 $ RW STP $ 80,000 $ $ 97,128 $ CN STP $ 120,000 $ $ 176,489 $ RW STP $ 40,000 $ $ 2,580 $ 37,420 UTPE STP $ 40,000 $ $ 18,391 $ 21,609 CN IM $ 4,888,800 $ $ 3,484,217 $ 1,404,583 R 34945 1296632 SR 61 5.70 mile N of Jct of SR66 Small Structure Pipe Lining RW STP $ 60,160 $ $ 800 $ 59,360 R 34960 0800811 SR 62 0.77 mile E of SR 61 Small Structure Replacement PE STP $ 76,000 $ 71,120 $ 74,916 $ RS 30688 0800092, 0800796, 797, 798 RS 34942 1296863 I 64 SR 61 Jct with SR 66 to W jct with SR 62 From 4.91 Miles W of SR 161 Interchange to 0.79 Miles E of US 231 * reflects the amount programmed in the 20132016 TIP. Patch and Rehab PCC Pavement; Small Stucture Replacement and Pipe Lining CN STP $ 1,973,600 $ $ 2,053,407 $ PE IM $ 475,237 $ $ 376,180 $ 99,057

Local Projects Indiana Evansville MPO Annual Listing of Obligated Projects State FY 2015 (July 1, 2014 June 30, 2015) Des# Sponsor County Road Name Description/Location Phase Federal * Obligated 0100574 Evansville Vanderburgh Over SR 66 Ped Overpass on (SR66) in Evansville, 2.2 miles E of US 41 S jct E. of Vann Ave CN CMAQ $ 2,143,600 $ 2,214,364 $ 0710494 Evansville Vanderburgh Oak Hill Rd 0.32 mi N to 1.7 mi N of SR 62(Morgan Ave) Phase II (Pigeon Crk to Lynch Rd) CN STPU $ 129,600 $ 1006024 Evansville Vanderburgh Washington Ave Intersection improvement at at Weinbach Avenue CN HSIP $ 1,119,656 $ 1,356,575 $ PE HSIP $ 14,670 $ 14,670 $ 1173696 Evansville Vanderburgh Tekoppel Ave SRTS infrustructure work on Tekoppel Ave., Franklin St., Wills Ave., Igleheart Ave. CN SRTS $ 190,022 $ 299,737 $ 1383066 Evansville Vanderburgh 2nd St Washington Ave at 2nd Street and 2nd Street at Parrott St/Jefferson St PE STPU $ 240,000 $ 237,939 $ 2,061 1383065 Evansville Vanderburgh Weinbach Ave Road Diet project from Pollack Ave. to Walnut St. PE STPU $ 403,032 $ 175,413 $ 227,619 1383064 Evansville Vanderburgh Covert Ave Road Diet project, From US 41 to I164 PE STPU $ 448,000 $ 208,000 $ 240,000 1006031 Evansville Vanderburgh Various Various locations throughtout the City of Evansville Sign Upgrades PE HSIP $ 11,000 $ 11,000 $ 1297334 Evansville Vanderburgh Fulton Ave Signal Modernization at the Ohio St Intersection CN CMAQ $ 144,900 $ 130,197 $ 14,703 1297336 Evansville Vanderburgh Various Signal Modernization Signals at Various Intersections CN HSIP $ 426,586 $ 329,177 $ 97,409 1383215 Vanderburgh Vanderburgh Various Inspection and reinspection of county bridges 20 feet and longer PE STPR $ 118,080 $ 118,080 $ 0400731 Vanderburgh Vanderburgh Burkhardt Rd Intersection improvement at Virginina St CN CMAQ $ 1,260,000 $ 1,255,024 $ 4,976 0500636 Lincoln Ave Road Reconstruction from Bell Road to Lenn Rd RW STPU $ 1,331,200 $ 704,000 $ 627,200 0800019 Newburgh Various Pedestrian and bike safety improvements CN SRTS $ 234,200 $ 311,539 $ 0710850 Newburgh Rivertown Trail B. Gene Aurand Trailhead to Pollack Ave/SR662 intersection (Phase 3A) PE TE $ 45,424 $ 45,424 $ 0901281 Newburgh Rivertown Trail From Old Lock and Dam to Belle Rive Drive (Rivertown Trail Phase IIA) CE TE $ 3,849 $ * reflects the amount awarded to the LPA for the project. May be reflected in prior year TIP. Planning Projects Indiana and Kentucky ID# Sponsor County Road Name Description/Location Phase 1401104 EMPO 1401105 EMPO 1401106 EMPO Vanderburgh / Vanderburgh / Vanderburgh / Obligated N/A Unified Plannning Work Program MPO Planning Activities PL PL $ 414,393 $ 414,393 $ N/A Unified Plannning Work Program MPO Planning Activities PL HSIP $ 108,000 $ 108,000 $ N/A Unified Plannning Work Program MPO Planning Activities PL STP U $ 39,354 $ 39,354 $ N/A EMPO Henderson N/A Unified Plannning Work Program MPO Planning Activities PL PL $ 57,600 $ 57,600 $ 1400920 EMPO Gibson/Posey N/A Indiana Rural Planning PL SPR $ 32,186 $ 32,186 $ 1400919 EMPO Vanderburgh/War rick Gibson/Posey Evansville MPO Annual Listing of Obligated Projects State FY 2015 (July 1, 2014 June 30, 2015) N/A Traffic Count Program PL SPR $ 10,000 $ 10,000 $

Evansville MPO Annual Listing of Obligated Projects Federal FY 2015 (October 1, 2014 September 30, 2015) Local Projects Kentucky Item# Sponsor County Road Name Description/Location Phase 2713 Henderson Henderson CS 1453 23502 Henderson Henderson CS 1315 2152.02 KYTC Henderson 2152.04 KYTC Henderson * Wathen Lane Bridge replacement: Replace exisitng bridge, pavement and guardrail. D STPM $25,000 $25,000 $0 Construct new pedestrian and bicycle path along Sand Lane in the City of Henderson C SRTS $212,972 $212,972 $0 Henderson Riverfront Project Federal TCSP funding. D HPP $153,200 $25,000 $128,200 Henderson Riverfront Project Federal TCSP funding. N HPP $1,739,204 $1,739,204 $0 KYTC Projects Item# Sponsor County Road Name Description/Location Phase 279.3 KYTC 22070 KYTC Henderson KY 351 22087 KYTC Henderson AU 9005 28304 KYTC Henderson EB 9004 KYTC Henderson US 41 21080 KYTC Henderson US 60 2968 KYTC Henderson KY 351 2232 KYTC Henderson US 60 Hopkins/ Webster EB 9004 * Wavely to Henderson Bypass. (PE & ENV combined with 2122.00 & 2123.00) R STP $1,000,000 $500,000 $500,000 U STP $1,000,000 $1,000,000 $0 Repair and Diamond Grind concrete pvmnt on KY 351 in Henderson from S of Carlisle St (MP 0.519) to N of Deepwood Dr (MP 2.791). C STP $3,008,968 $1,502,098 $1,506,870 Pavement Preventative on Audubon Pkwy(AU9005) From Pennyrile Pkwy(MP 0.00) to 0.285 mi E of Eutopia Rd (MP 11.647). C NH $12,400,000 $12,389,300 $10,700 Reconstruct/complete the half interchange at exit 68 (KY 416) on the Breathit Parkway. C STP $4,680,000 $5,455,866 $775,866 Conduct a study and analysis of existing traffic conditions on US 41 in Henderson from the US 60 interchange to Wolf Hills Road. N STPM $100,000 $100,000 $0 Replace bridge on US 60 over Green River at intersection with KY 1078. (Sufficiency rating of 38.9) D STP BRO $1,500,000 $900,000 $600,000 KY351 near Zion, horizontal and vertical realignment, shoulder widening, and install guardrail. U HSIP $285,000 $280,000 $5,000 Reconstruct elements of existing Breathitt Pkwy (Pennyrile Pkwy) btwn MP 37.0 and MP 73.4 to upgrade geometrics to interstate standards (I69 corridor improvement) C NHPP $3,200,000 $3,200,000 $0 2907 KYTC Various Various Safety improvements Sign installation on various route ramps in District 2 C HSIP Grouped Project $725,000 $0 * reflects the amount programmed in the current 20132016 TIP.

Evansville MPO Transit Grants Grant Evansville MPO Annual Listing of Obligated Projects State FY 2015 (July 1, 2014 June 30, 2015) Project (ALI) Obligation Date IN16X01300 61000118000 Administration $ 21,768 1/29/15 $ 21,768 $ Evansville MPO Pass Through Transit Grants to Subrecipients Grant Project (ALI) Obligation Date IN16X00900 11100 111215 Buy 3 Replacement Vehicles (Section 5310) $ 110,617 1/7/15 $ 110,617 $ IN95X05100 11100 111204 Buy 2 Replacement Vehicles (CMAQ*) $ 73,168 1/22/15 $ 73,168 $ IN95X05100 11900 119206 Buy 4 Bicycle Rack for Vehicles (CMAQ*) $ 5,600 1/22/15 $ 5,600 $ * CMAQ Transfer to FTA in SFY 2014 EMPO Kentucky Section 5303 Transit Grants Grant Project (ALI) Obligation Date KY800004 44.27.00 Other Activities UPWP Special Effort Planing $ 6,000 $ 6,000 $