INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

Similar documents
REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

Changi Airport A-CDM Handbook

Intentionally left blank

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

Airport Collaborative Decision Making (A-CDM) Operations Guidelines Version Date: 2017/07/21

DELHI AIRPORT COLLABORATIVE DECISION MAKING (DA-CDM) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)

Target Off-Block Time (TOBT)

AERONAUTICAL INFORMATION CIRCULAR 1/19

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

Implementation, goals and operational experiences of A-CDM system

AIRPORT COLLABORATIVE DECISION MAKING

GENERAL 1. What is Airport CDM? 2. What is the aim of A-CDM? 3. Why has A-CDM been implemented at Amsterdam Airport Schiphol?

A-CDM from the Flight Crew Perspective. Francisco Hoyas

Can elements of the A-CDM milestone approach be automated? Bob Graham Head of Airport Research for Alan Marsden TAM Manager

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

Airport Collaborative Decision Making. Dublin A-CDM Operational Procedures

Ultra s Experience with A-CDM

International Civil Aviation Organization

Aviation ICT Forum OCT 2014

Seen through an IATA lens A-CDM Globally

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

The SESAR Airport Concept

A-CDM FOR REGIONAL AIRPORTS CONCEPT VALIDATION DOCUMENTO PÚBLICO

2nd forum. Airport FRA. procedure

CANSO view on A-CDM. Case study on A-CDM at HKIA. Change management & human factors

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

FAA Surface CDM. Collaborative Decision Making and Airport Operations. Date: September 25-27, 2017

AIRPORT COLLABORATIVE DECISION MAKING (A-CDM): IATA RECOMMENDATIONS

Key Performance Indicators 2017

Key Performance Indicators 2016

FACILITATION PANEL (FALP)

Making the World A better place to live SFO

Airspace Organization and Management

Integration of the Airport and the Network DPI/FUM Messages Management Overview

LFPG / Paris-Charles de Gaulle / CDG

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Key Performance Indicators 2015

South African ATFM & A-CDM - Progress and Integration Status. Mikateko Chabani

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

A-CDM Implementation: Burden or Blessing for ANSPs?

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Nikolaos Papagiannopoulos. Juan Francisco García Lopez

MULTI-NODAL ATFM COMMON OPERATING PROCEDURES (COP)

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

SESAR Solutions. Display Options

Guide for. A-CDM in CPH

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)

Air Traffic Management during VTBS RWY 01R/19L Maintenance

FRA CDM. Airport Collaborative Decision Making (A-CDM) BRIEF DESCRIPTION Frankfurt Airport Version 4.0. German Harmonisation

Acronyms. Definition. Explanation. All coloured Acronym rows are time parameters which have a standard length of four characters.

D02 - Phase 1 - System Requirements Specification

Air Traffic Flow & Capacity Management Frederic Cuq

ICAO Bay of Bengal ATS Coordination Group ATFM Task Force

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

[EFFECTIVE DATE: 23 AUG 2012]

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

ICAO Regional Seminar on CORSIA Session 1: Overview of CORSIA CORSIA Administrative Aspects and Timelines

Traffic Flow Management

Collaborative Decision Making at JCAB ATMC

and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009

LINKING EXISTING ON GROUND, ARRIVAL AND DEPARTURE OPERATIONS. Abstract Description of LEONARDO System, a CDM integrated System

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

ART Workshop Airport Capacity

Annual Report 2017 KPI

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

SAFETY ASSESSMENT OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)

Aircraft movements and parking stands

FLIGHT OPERATIONS PANEL (FLTOPSP)

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

CAAC China. CCAR Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Apr-2016

Airport Collaborative Decision Making

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE. Collaborative Decision Making at LISBON Airport

Airport Departure Flow Management System (ADFMS) Architecture. SYST 798 / OR 680 April 22, Project Sponsor: Dr. Lance Sherry, CATSR

AIR TRAFFIC FLOW MANAGEMENT

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

Appendix A COMMUNICATION BEST PRACTICES

Atlantic Interoperability Initiative to Reduce Emissions AIRE

DFLEX (DEPARTURE FLEXIBILITY) When Airport CDM becomes a reality!

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

Combining Control by CTA and Dynamic En Route Speed Adjustment to Improve Ground Delay Program Performance

Progressive Technology Facilitates Ground-To-Flight-Deck Connectivity

Contents. Subpart A General 91.1 Purpose... 7

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

PART D SECTION 2 STAND ALLOCATION

The NAT OPS Bulletin Checklist, available at (Documents, NAT Docs), contains an up to date list of all current NAT Ops Bulletins.

ICAO Annex 14 Standards and Aerodrome Certification

Transcription:

Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE 918141 AIC INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT 1. Introduction 1.1. The purpose of this AIC is to inform aircraft operators of CAAS and Changi Airport Group s plan to implement A-CDM at Singapore Changi Airport by second quarter of 2016 to optimise airport operations by having an efficient turnaround process and improving the predictability of operational events. 1.2. A-CDM involves the sharing of accurate and timely information between airport operator, aircraft operators (AO), ground handling agents (GHA) and air traffic control (ATC) through different supporting systems and implementing a set of operational procedures. 1.3. The sharing of real time information enables better predictability of events during the turnaround process and aids in pre-departure sequence planning. Changi A-CDM aims to improve gate management, flight punctuality, reduce taxiway and holding point congestion which will be beneficial to all stakeholders. 1.4. Definition of commonly used terms in A-CDM 1.4.1. Target Off Block Time (TOBT) The time an AO or GHA estimates that an aircraft will be ready, all doors closed, boarding bridge removes, pushback vehicle available and ready to start-up/pushback immediately upon reception of clearance from ATC. 1.4.2. Target Start Up Approval Time (TSAT) The time provided by ATC that an aircraft can expect start-up/push back approval. 1.4.3. Calculated Take Off Time (CTOT) A time calculated as a result of tactical slot allocation, at which a flight is expected to become airborne. 2. A-CDM Pre-Departure Procedures 2.1. The A-CDM procedures apply to all scheduled flights departing Changi Airport except for VVIP, CASEVAC, SAR and aircraft on special tasks.

2.2. Changi Airport s A-CDM portal will automatically calculate a system TOBT for each departure flight taking into account the estimated or actual in-block time (EIBT/AIBT), minimum turnaround time (MTT) and scheduled time of departure (STD). 2.3. If the calculated TOBT (EIBT/AIBT + MTT) is earlier than STD, the system will take the STD as TOBT. 2.4. If the calculated TOBT (EIBT/AIBT + MTT) is later than STD, the amount of turnaround delay that system predicts is equal to TOBT STD. 2.5. The Pre-Departure Sequencer (PDS) will calculate the TSAT automatically by taking into account factors such as TOBT, calculated take-off time (CTOT), variable taxi times (VTT), wake turbulence category, departure separation etc. A pre-departure sequence is a result from the calculated TSATs, thus the accuracy of TOBT is vital to an optimal TSAT. 2.6. AO are required to assess the system generated TOBT at 40 minutes prior to departure and update if necessary. Thereafter, TOBT needs to be updated constantly if it is expected to differ by 5 minutes or more until the flight commences pushback. AO can consider delegating the responsibility of TOBT submission to their GHA subject to prior internal arrangements between AO and GHA. 2.7. Failure to pushback by TSAT+5 minutes with no updates in TOBT will lead to an automated TOBT revision by the system which will be at least 15mins later. Delays can be expected as a result of re-sequencing base on the penalty revision. AO or GHA are strongly encouraged to update TOBT as soon as any expected delay to aircraft readiness for pushback is made available to avoid unnecessary hold-ups. 2.8. TOBT shall be updated through the following systems: a. Airport Operations Centre System (AOCS) A-CDM web based portal; or b. Gate Message Input Display (GMID) at boarding rooms 2.9. TOBT information is available through the following channels: a. AOCS A-CDM portal b. GMID c. Aircraft Docking Guidance System (ADGS) at contact stands d. Radio communication with GHA or AO 2.10. TSAT information is available through the following channels: a. AOCS A-CDM portal b. GMID c. ADGS at contact stands d. Radio communication with GHA or AO e. ATC - Upon issuance of ATC clearance (for flights parked at stands without ADGS) 3. A-CDM Start-up Procedures 3.1. Pilot shall ensure aircraft is ready for push back at TOBT.

3.2. Pilot need to maintain communication with the AO/GHA as they are responsible for updating the TOBT. Notify the AO/GHA to update the TOBT if it is expected to differ by 5 minutes or more. 3.3. Pilot to contact Clearance Delivery and request for ATC clearance within 5 minutes of TOBT. 3.4. ATC will update TSAT changes if any, during issuance of ATC clearances. Note that TSAT displayed on ADGS may not be final and can be revised due to en-route clearance restrictions, ground congestion or flow measures. 3.5. Pilot shall contact Ground Movement Control for pushback at TSAT after obtaining ATC clearance, or as directed by ATC. 3.6. A flight issued with gate hold (TSAT>TOBT) but chooses to commence pushback before the assigned time will be allowed to do so subject to traffic. However, the flight should not expect an earlier departure time as the planned pre-departure sequence will be maintained. 3.7. If a flight is unable to pushback by TSAT + 5 minutes due readiness of aircraft, ATC clearance and TSAT will be cancelled. Pilot must notify the AO/GHA to update the TOBT for a new TSAT before requesting for a new ATC clearance. 3.7.1 Non-compliance of initial TSAT may result in an aircraft losing its existing position in the pre-departure sequence. Delay can be expected as a result of re-sequencing based on new TOBT input. 3.7.2 Flight will not be allowed to depart until a valid TOBT is entered and revised TSAT is given and complied with. 3.8. If delay in push back is due to ground traffic movement or ATC clearance restrictions, the ATC clearance will remain valid even if it exceeds TSAT + 5 minutes. Pilots need not update TOBT for such situations. 4. A-CDM information via Aircraft Docking Guidance System (ADGS) 4.1. All contact stands in Changi Airport will have ADGS. The fundamental operation and usage of ADGS still remains the same for flight crew. Additional information which includes TOBT, TSAT and TOBT count-down timer will be displayed in local times as part of improvements to support A-CDM operations. (See Attachment A) 5. Summary of the A-CDM Pre-departure Process 5.1 The flowchart below provides a simple overview of the process that AO, GHA and Pilots shall follow in A-CDM operations at Singapore Changi Airport. It includes the responsibilities and coordination detailed in Section 2 and 3 above.

STD - 40mins TOBT - 25mins TOBT - 5mins TSAT TSAT + 5mins AO/GHA to assess TOBT at least 40mins in advance of departure TOBT published on ADGS TSAT published on ADGS TSAT displayed may not be final and will be revised subject to ATC clearance restrictions, flow measures etc. Ensure aircraft ready to push back at TOBT Call Clearance Delivery and request for ATC clearance ATC will update changes in TSAT if any Call Ground Movement Control for push back clearance Latest time to call for push back ATC clearance and TSAT will be cancelled if aircraft is not ready to push Inform AO/GHA to submit revised TOBT for new TSAT before requesing for ATC clearance Continuous update of TOBT when it is expected to differ by 5mins or more until off-blocks 6. A-CDM Operational Trials 6.1. Changi Airport will be ntroducing A-CDM operational trials over a few phases prior to full implementation of A-CDM. The trials are planned to commence in December 2015 and more details will be provided in the AIP Supplement to be published in October 2015. 6.2. A-CDM procedures captured in this AIC will be constantly reviewed during the operational trials and may be refined prior to implementation. 7. Contact and Information 7.1. Detailed information on A-CDM processes at Changi Airport can be found at http://www.changiairport-cdm.sg 7.2. Please email the Changi A-CDM Team at a-cdm@changiairport.comm for application of AOCS A-CDM and GMID account or if you have any queries. 7.3. Aircraft Operators may also contact their Ground Handling Agent directly on queries regarding TOBT submission.

Attachment A Aircraft Docking Guidance System (ADGS) Description Aircraft arrival to stand No change in existing functionality and display Display on ADGS B773 >>>>II<<<< ^ ^ ^ 40 minutes prior to TOBT ADGS will display TOBT submitted by AO/GHA and a count down timer (2 digits) to TOBT in minutes As ADGS can only display up to 7 characters per line, the displayed message will be scrolling. Timings displayed will be in Local Time (LT) TOBT timings will change instantly if there is an update done by AO/GHA Snapshot 1 TOBT101 30 Snapshot 3 T1015LT 30 Snapshot 2 OBT1015 30 25 minutes prior to TOBT ADGS will display TSAT derived by PDS As ADGS can only display up to 7 characters per line, the displayed message will be scrolling. TSAT timings may change as the PDS is continuosly optimising push back times based on real time traffic conditions Snapshot 1 TOBT101 TSAT 101 25 1015LT 1017LT 25 Snapshot 2 Snapshot 3 BT1015L AT1017L 25