* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Similar documents
November 21, 2012 Barbara Kelleher, (954)

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Guide to. Road Construction Projects

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

DRAFT Transportation Improvement Program Update

State Route 8 Corridor. Northern Summit County s Path to Success

Progress Report for Projects of Regional Significance

Ohio Department of Transportation Construction Update

PennDOT Interstate Work next week March 30-April 3:

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

2 Construction Program

Palm Beach County Traffic Report July 13 through July 20, 2012

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Progress Report for Projects of Regional Significance

Weekly East Tennessee Construction Report for May 31-June 6, 2018

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

SilverSneakers locations

SilverSneakers locations

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Regional Trails Initiative EXECUTIVE SUMMARY

Road Construction Ahead January-April 2015 NORTHWEST REGION

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

FDOT Treasure Coast Traffic Impact Report

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

October 31, 2014 Chuck McGinness, (954)

Projected Advertisement Date

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Florida Department of Transportation MIKE DEW SECRETARY

State Project Reconstruction I-84

Long water shutdown scheduled for Tuesday, September 18

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Weekly construction update

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Palm Beach County Traffic Report August 24 through August 31, 2012

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Route 29 Solutions Projects

Viaduct Demolition at Girard Interchange

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Public Information Center August 12, 2010

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Wichita Falls MPO - MTP Project List 1 of 6

El Dorado County / Tahoe Roadwork Schedule

Whittier Bridge Project

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20

Most people notice when ODOT builds something

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

PRIORITIES COMMITTEE MEETING

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Springettsbury Township. Road Improvement Projects

Work in 2015 and Annual Mobility- Management Plan

Lake Erie Commerce Center Traffic Analysis

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

All closures this week happen at night, including full closures of Mesa and I-10

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

AGENDA ITEM I-6 Public Works

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Transit Routes (2004)

TRAFFIC ALERT FOR APRIL 23-27, 2018 Highway Work Zones in the Staunton District

2009 Regional Solicitation Selected Projects*

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Roads to Prosperity Program. Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018

Transcription:

New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties Scheduled Completion Date: July 2008 Project Limits/Description: Sign replacement along state highways in Genesee/Orleans counties. For More Info: NYSDOT Engineer in Charge Brian Bellan, (585) 589-5325 Traffic Impacts: Occasional shoulder closures in work areas. 4033.13 Project: Replacement of Route 33 Bridge over Black Creek in Batavia, Genesee County Start Date: August 2008 Scheduled Completion Date: June 2009 Project Limits/Description: Repairs to concrete structure and replacement of bridge rail. For More Info: NYSDOT Engineer in Charge Ron Frei, (585) 272-3340 Traffic Impacts: Daily or short-term lane closures with alternating traffic

Livingston 4805.51 Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) 272-3340 Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night 4005.04 Project: Reconstruction of Routes 5 & 20, Village of Avon, Livingston County Start Date: June 2008 Scheduled Completion Date: December 2009 Project Limits/Description: Rehabilitate Rts. 5 & 20 from Pole Bridge Road to River Street. In addition to improving the condition of the pavement, enhancements will be made to the landscaping, decorative street lights, signs, railroad gates and signals. For More Info: NYSDOT Engineer in Charge Laurel Barber, (585) 272-3340 Traffic Impacts: Lane closures.

Monroe 4104.09 Project: Reconstruct Route 104 (W. Ridge Road) in Greece- Phase II, Monroe County Start Date: October 2004 Scheduled Completion: Fall 2008 Project Limits/Description: This project will reconstruct Route 104 (Ridge Road) between the intersection at Elmgrove/N. Greece Road and NY 390. The existing pavement will be reconstructed and widened to accommodate three lanes of travel in both directions, with dedicated right turn lanes and a raised median. The drainage system will be replaced. In addition, the bridges that carry Route 104 over 390 will be replaced, as well as the entire sidewalk system within the project limits. New timed traffic signals, street lighting, pavement markings and signs will also be upgraded and replaced. Space for bicycles will be provided throughout the project area. For More Info: NYSDOT Engineer in Charge Scott Sullivan (585) 225-6690 Traffic Impacts: All access to homes and businesses along W. Ridge Road will be maintained. Temporary widening will maintain two lanes in either direction throughout the primary construction phase. 4490.09 Project: Rehabilitation of Interstate 490 in Rochester (Western Gateway), Monroe County Project Start Date: July 2007 Scheduled Completion: December 2009 Project Limits/Description: The project extends from the Erie Canal (Exit 9A) to the Genesee River (Exit 15). This contract includes much bridge work including the replacement of the bridge that carries I-490 over Mt. Read Blvd. Noise barriers will be constructed between Ames Street and Mt. Read Blvd. ITS Components to manage traffic, including two dynamic message boards and a vehicle detection system will be expanded. For More Info: NYSDOT Engineer in Charge, Ken McClenathan, (585) 235-3018 or see the Web site at www.490gateway.com Traffic Impacts: Traffic will be controlled by reducing travel lanes and crossing over the median. Ramps between Mt. Read Blvd and Brown/Broad St. will be closed.

4153.03 Project: Reconstruction and Resurfacing on Route 153 in East Rochester, Monroe County Start Date: July 2007 Scheduled Completion Date: December 2008 Project Limits/Description: The project limits are from Route 96 to West Commercial Street. The section between Route 96 and Route 31F will be resurfaced and essentially complete. The section between Route 31F and West Commercial Street will be reconstructed. Improvements will be made to the Route 96 intersection by removing the slip lane. For More Info: NYSDOT Engineer in Charge Len Davison, (585) 235-6770 Traffic Impacts: Northbound traffic on Route 153 (Washington Street) will be directed to detour at Route 31F west to the I490 West slip ramp exiting at West Commercial Street and back to Route 153. This will leave one lane of southbound travel through the village while the highway is under construction. All driveways will be accessible. 4ITV.07 Project: Installation of Traffic Management Equipment Along Interstate 390 in Gates and Chili, Monroe County Start Date: July 2007 Scheduled Completion Date: July 2008 Project Limits/Description: I390 from Scottsville Road to I390/490 interchange. The installation of fiber optic cable, closed circuit television cameras, variable message boards, and vehicle detection units will be installed for traffic management purposes. For More Info: NYSDOT Engineer in Charge Ellen Penepent, (585) 436-2060 Traffic Impacts: Some temporary lane or shoulder closures will be necessary. 4T37.06 Roadside and Overhead Sign Replacements- Rt. 390 and Mt. Read Blvd., Monroe County Start Date: June 2007 Scheduled Completion: June 2008 Project Limits/Description: Replacement of roadside and overhead signs along NY 390 from I490 to Lake Ontario State Parkway and on Mt. Read Blvd. from Buffalo Road to Rt. 104.

For More Info: NYSDOT Engineer in Charge, Gail House, (585) 415-2947 Traffic Impacts: Daily lane/shoulder closures as necessary. Occasional weekend closures on Mt. Read Blvd. 4065.06 Project: Route 65 (Clover St.)/Route 252 (Jefferson Road Intersection in Pittsford, Monroe County Start Date: July 2008 Scheduled Completion: November 2009 Project Limits/Description: Intersection reconstruction and widening; milling and resurfacing on Rt. 65; Canal trail improvements. For More Info: NYSDOT Engineer in Charge, Kathy Mialki, (585) 272-3340 Traffic Impacts: Lane closures 4T31.0X Project: Mowing and Trimming Along Expressways, Monroe County Start Date: May 2008 Scheduled Completion Date: December 2008 Project Limits/Description: Mowing along 390/490/590 For More Info: NYSDOT Engineer in Charge, Ellen Penepent, (585) 436-2060 Traffic Impacts: None 4390.46 Project: Rehabilitation of Route 390 Bridges over Lexington, Weiland, and Latona in Gates and Greece, Monroe County Start Date: June 2008 Scheduled Completion Date: December 2008 Project Limits/Description: Repair of bridge deck and replacement of bridge bearings. For More Info: NYSDOT Engineer in Charge Scott Sullivan, (585) 663-7918 Traffic Impacts: Daily night-time lane closures on NY 390. Some lane restrictions on roads underneath the structures will be necessary.

4286.03 Project: Route 286 Intersection at Creek/Blossom in Penfield, Monroe County Start Date: July 2008 Scheduled Completion Date: November 2008 Project Limits/Description: The intersection will be widened and resurfaced. For More Info: NYSDOT Engineer in Charge Karen Brown, (585) 272-3340 Traffic Impacts: Daytime detours for Creek and Blossom; lane closures on Rt. 286 4015.02 Project: Reconstruction of Rt. 15A (East Henrietta Road) in Brighton and Henrietta, Monroe County Start Date: September 2007 Scheduled Completion Date: August 2009 Project Limits/Description: Route 15A, East Henrietta Road, will be reconstructed from Jarley Road to just north of Crittenden Road and build a new access ramp extending Clay Road from Brighton Henrietta Town Line Road to Route 15A. For More Info: NYSDOT Engineer in Charge Doug Koenig, (585) 427-7165 Traffic Impacts: Traffic on Route 15A (East Henrietta Road), from just north of Jefferson Road to just south of Metro Park (opposite the south entrance to Monroe Community College) will be reduced to a single lane in each direction until mid May. In May, the lane closures will be extended north to Crittenden Road to rebuild East Henrietta Road in front of the college. Lane restrictions in front of the college are expected to be in effect until September 1. 4031.72 Project: Resurfacing on Route 31 in Perinton and Macedon, Monroe and Wayne Counties Scheduled Completion Date: November 2008, but travel impacts may end as early as July Project Limits/Description: Route 31 will be resurfaced from Aldrich Road to the Macedon/Palmyra village line.

For More Info: NYSDOT Engineer in Charge Tom Mialki, (315) 986-4910 Traffic Impacts: One-way traffic will alternate in each direction. 4947.18 Project: Replacement of Lake Ontario State Parkway Bridge over Dewey Avenue in Greece, Monroe County Scheduled Completion Date: December 2008 Project Limits/Description: Structure is located between NY 390 and Greenleaf Road For More Info: NYSDOT Engineer in Charge Russ Chapell, (585) 865-9181 Traffic Impacts: The Lake Ontario State Parkway will be closed at Dewey Ave. A detour will be posted directing traffic onto Latta Road and Greenleaf Road. 4490.15 Project: Long-Term Paving on Interstate 490 in Brighton and Pittsford, Monroe County Start Date: May 2008 Scheduled Completion Date: August 2008 Project Limits/Description: The road will be milled and resurfaced from North Landing Road to Route 31F. For More Info: NYSDOT Engineer in Charge Kathy Mialki, (585) 272-3340 Traffic Impacts: Multiple travel lanes will be closed during the overnight hours. 4805.51 Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) 272-3340 Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night

4490.13 Project: Long-Term Paving on I490 in Gates and Chili, Monroe County Scheduled Completion Date: October 2008 Project Limits/Description: A section of Interstate 490 from Route 204 to Route 386 and a section of Route 204 from Interstate 490 to the bridge over Pixley Road will be resurfaced. For More Info: NYSDOT Engineer in Charge Chris Gardner, (585) 272-3340 Traffic Impacts: Travel lanes will be closed; ramps will temporarily closed on Rt. 204 on nights and weekends. 4390.29 Project: Paving on Interstate 390 Ramps in Henrietta, Monroe County Scheduled Completion Date: October 2008 at Exits 12, 13, 14 Project Limits/Description: Milling and resurfacing on ramps For More Info: NYSDOT Engineer in Charge Scott Robinson, (585) 272-3449 Traffic Impacts: This work will be performed during the overnight hours. Multiple lanes will be closed.

Ontario 4096.37 Project: Replacement of Route 96 Bridge over Ontario Central Railroad in Victor, Ontario County Start Date: September 2007 Scheduled Completion Date: December 2008 (Bridge will be closed from March to September) Project Limits/Description: Structure is located just east of the Victor village limit. For More Info: NYSDOT Engineer in Charge Tom Mialki, (585) 924-8160 Traffic Impacts: The road is closed A passenger vehicle detour will be posted using Plastermill Road and McMahon Road. A truck detour will be posted using Maple Street to Boughton Hill Road to Route 332. 4064.01 Project: Replacement of Rt. 64 Bridges and Culverts over Mud and Center Gully Creeks in Bristol and S. Bristol, Ontario County Start Date: March 2008 Scheduled Completion Date: September 2008 Project Limits/Description: Four bridges and one box culvert that carry Route 64 in the Towns of Bristol and S. Bristol, Ontario County, between Bristol Center and Bristol Mountain Ski Resort will be replaced. For More Info: NYSDOT Engineer in Charge Joe Hendee, (585) 374-5545 Traffic Impacts: The roadway will remain open at all locations. Traffic will be reduced to a single lane with alternating one-way traffic patterns controlled with temporary traffic signals. Three of the five locations will be under construction from late March to late June. The other two locations will be under construction from early July through late September.

Orleans 4098.03 Project: Replacement of Route 98 Bridge over Beardsley Creek in Carlton, Orleans County Start Date: Spring 2008 Scheduled Completion Date: December 2008. (Bridge will be re-opened by June 30) Project Limits/Description: The bridge is located one half mile south of the intersection of Route 18. The existing structure will be replaced and the approaches will be reconstructed. For More Info: NYSDOT Engineer in Charge, Brian Bellan, (585) 589-5325 Traffic Impacts: The road will be closed at the bridge. Traffic will be detoured to Baker Road to Sawyer Road to Route 18 beginning from March 2008 through June 2008. All businesses will be accessible. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties Scheduled Completion Date: July 2008 Project Limits/Description: Sign replacement along State Highways in Genesee/Orleans Counties. For More Info: NYSDOT Engineer in Charge Brian Bellan, (585) 589-5325 Traffic Impacts: Occasional shoulder closures in work areas. 4805.05 Project: Rehabilitation of Keitel Road Bridge over Erie Canal in Albion, Orleans County Start Date: May 2008 Scheduled Completion Date: August 2009 Project Limits/Description: The bridge is located east of Route 31. For More Info: NYSDOT Engineer in Charge Carl Jarvis, (585) 272-3340 Traffic Impacts: Bridge will be closed during construction. No detour will be posted.

Wayne 4031.72 Project: Resurfacing on Route 31 in Perinton and Macedon, Monroe and Wayne Counties Scheduled Completion Date: November 2008, but travel impacts may end as early as July Project Limits/Description: Route 31 will be resurfaced from Aldrich Road to the Macedon/Palmyra village line. For More Info: NYSDOT Engineer in Charge Tom Mialki, (315) 986-4910 Traffic Impacts: One-way traffic will alternate in each direction. 4805.51 Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) 272-3340 Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night

Wyoming 4063.31 Project: Realignment of Route 63 (Peoria Curve) in Covington, Wyoming County Start Date: November 2007 Scheduled Completion Date: December 2008 Project Limits/Description: The road will be realigned to eliminate the sharp curve between Court St. and Livingston County Line. For More Info: NYSDOT Highway Designer, Mike Janes, (585) 584-8102 Traffic Impacts: In 2008, Peoria Road will be closed for four weeks while the new intersection is constructed. Upon completion of the intersection work, Route 63 will be closed for four weeks. Traffic will be detoured to Route 20 to Route 36. 4039.46 Project: Long-Term Paving on Route 39 from Route 16 to East Arcade Village Line, Wyoming County Start Date: June 2008 Scheduled Completion Date: October 2008 Project Limits/Description: Pavement resurfacing. The number of travel lanes between Tops Plaza and Liberty Street will change to two lanes with center left turn lane and wide shoulders. For More Info: NYSDOT Engineer in Charge Todd Clark, (585) 272-3340 Traffic Impacts: Lane closures