Key Purpose & Need Issues

Similar documents
According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Planning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Chapter 3. Demand/Capacity & Facility Requirements

Chapter 5 Facility Requirements

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

Runway Length Analysis Prescott Municipal Airport

Chapter III - Demand/Capacity and Facility Requirements

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

APPENDIX X: RUNWAY LENGTH ANALYSIS

Table of Contents. Overview Objectives Key Issues Process...1-3

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Raleigh-Durham International Airport Airport Capacity Enhancement Plan. August 1991

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

CATCODE ] CATCODE

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18

SMALL TRANSPORT AIRCRAFT

APPENDIX D MSP Airfield Simulation Analysis

Master Plan Update Technical Advisory Committee Meeting

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport

AIRPORT WITH NO RUNWAYS IS A MALL

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia

Assignment 10: Final Project

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia

Chapter 3 FACILITY REQUIREMENTS

PORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS

NextGen Priorities: Multiple Runway Operations & RECAT

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

Airport Master Plan Update

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Study Committee Meeting. September 2015

Facility Requirements

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

3.1 Facility Requirements Overview Airfield Facility Requirements... 1

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

Indianapolis International Airport Capacity Enhancement Plan

FACILITY REQUIREMENTS

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

CEE Quick Overview of Aircraft Classifications. January 2018

4. Demand/Capacity Assessment and Facility Requirements

TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements

Final Approach Operations Symposium

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Section 5. Radar Separation

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

FACILITY REQUIREMENTS

Quiet Climb. 26 AERO First-Quarter 2003 January

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Portable Noise Monitor Report

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

Potential Procedures to Reduce Departure Noise at Madrid Barajas Airport

Hartford-Brainard Airport Potential Runway Closure White Paper

IFR SEPARATION USING RADAR

Public Information Meeting. September 2015

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

CHAPTER 1 INTRODUCTION AND BACKGROUND

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Airport Runway Location and Orientation. CEE 4674 Airport Planning and Design

Operational Authorization Process for ILS Precision Runway Monitor (PRM) and Simultaneous Offset Instrument Approach (SOIA)

Chapter 1 EXECUTIVE SUMMARY

PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES

FAA GBAS Program Update January 29, 2010

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Portland International Jetport Part 150 Noise Committee Meeting 2 April 4, :00PM Portland Jetport Conference Room. Agenda

MASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013

Surveillance and Broadcast Services

Navigation at the. Federal Aviation Administration Crossroads

Aircraft Classifications. Dr. Antonio Trani and Julio Roa Department of Civil and Environmental Engineering.

Airfield Capacity Prof. Amedeo Odoni

Chapter 4.0 Alternatives Analysis

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

Alternatives. Introduction. Range of Alternatives

Analysis of Air Transportation Systems. The Aircraft and the System

KSFO RNAV TO GLS DEMONSTRATION

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS

Facility Requirements

COMMUNITY NOISE MITIGATION SUGGESTIONS

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

CHAPTER 3 ALTERNATIVES CONSIDERED

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Time-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017

C > Capacity Analysis and Facility Requirements

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT

Wake Turbulence Standards

Portable Noise Monitor Report

Master Plan & Noise Compatibility Study Update

Transcription:

Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability Maintain reasonable level of delays (high level of customer service) Balance performance in all weather conditions Enable ATC & pilot efficiency/minimize runway crossings Consider the current state of the industry/assure financial feasibility Defer the need for major capital expenditures to the extent possible Consider opportunities for new ATC and avionic technology and procedures Maintain community compatibility/minimize environmental impacts Maintain the spirit of the current noise abatement program Strive to avoid major environmental impacts Comply with required operational, security and safety standards 1

1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 Annual Aircraft Operations 4 Runway Airfield Capacity Future Capacity Needs Current Construction Program Existing Airfield Capacity Forecast Annual Aircraft Operations Historic Annual Aircraft Operations 2 2025 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Annual Aircraft Operations

Hourly Rate of Arrivals and Departures Hourly Rate of Operations <------ Departures Arrivals -------> 120 100 80 60 40 20 0-20 -40-60 -80-100 -120 Hourly Rate of Arrivals and Departures Comparison of Master Plan 2004 and 2025 Demand Cases 92 Peak Hour Arrivals 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 92 Peak Hour Departures Time of Day MP 2004 Arrival Rate MP 2004 Departure Rate MP 2025 Arrival Rate MP 2025 Departure Rate 3

Runway Critical Areas 4

Runway Planning Parameters Low Capacity Intersecting Runways Dual Parallel Runways with 1,200 Foot Separation High Capacity Dual Parallel Runways with 2,500 Foot Separation 1,200 2,500 Dependent Departures Dependent Arrivals/Departures Dependent Arrivals Dual Parallel Runways with 4,300 Foot Separation Dependent Departures Dependent Arrivals/Departures Dependent Arrivals Minimum runway separation for airplane Design Group V and VI (B-747, B-777, A380) Triple Parallel Triple Parallel Runways Runways with 4,300 and with 4,300Foot Separation Independent Departures Independent Arrivals/Departures Dependent Arrivals 4,300 Independent Departures Independent Arrivals/Departures Independent Arrivals 4,300 4,300 Independent Departures Independent Arrivals/Departures Independent Arrivals Dependent = An arrival or departure on one runway must be coordinated with an arrival or departure on a second runway. Independent = An aircraft can land or depart on one runway, while another aircraft is landing or departing on a second runway. 5

Runway Planning Parameters Parallel Dependent ILS/MLS Runway Approach Requirements Runway Separation between 2,500 and 4,300 feet Aircraft 2 2,500-4,300 feet 1.5 nm 1.5 nm Runway Separation between 4,301 and 9,000 feet Aircraft 2 4,301-9,000 feet 2.0 nm 4.3 nm Aircraft 1 2.5 nm Aircraft 3 Aircraft 1 6.0 nm Aircraft 3 2,500 Near Far 500 Staggered Runway Thresholds When the thresholds are staggered and the approach is to the near threshold, the 2,500 foot separation can be reduced by 100 feet for each 500 feet of threshold stagger. Provides for simultaneous radar controlled arrivals and departures. When the thresholds are staggered and the approach is to the far threshold, the 2,500 foot separation requires an increase of 100 feet for each 500 feet of threshold stagger. 6

Runway Planning Parameters Same Runway Approach Separation Leading Trailing Leading Trailing Small 3 3 3 3 Small Large B757 Heavy B757 5 4 4 4 Small Large B757 Heavy Leading Trailing Leading Trailing Large 4 3 3 3 Small Large B757 Heavy Heavy 6 5 5 4 Small Large B757 Heavy Separation reduced to 2.5 nm within 10 nm of landing runway under certain conditions (e.g. runway occupancy time less than 50 seconds) Aircraft weight classifications on this chart are based on FAA Order 7110.65P, Air Traffic Control. This order prescribes procedures used by air traffic controllers for the control and separation of air traffic. This designation of aircraft is different than that applied by the KCAB for purposes of assessing aircraft noise impacts, in which a "small" aircraft is defined as less than 70,000 pounds and a "large aircraft is defined as over 70,000 pounds. Small aircraft with a maximum take off weight below 41,000 lbs (Beech 1900, Brasilia, Metro) Large aircraft with a maximum take off weight between 41,000 and 255,000 lbs (727, 737, A-320, CRJ, Dash 8, MD-80) B757 all Boeing 757 derivatives Heavy aircraft with a maximum take off weight above 255,000 lbs (747,767,A-330, DC-10, MD-11) 7

Runway Planning Parameters Simultaneous Independent Dual Approach Dual parallel runways with 3,000 foot separation Simultaneous Independent Triple Approach Triple parallel runways with 4,300 foot separations 3,000 NTZ One localizer offset 2.5 degrees Precision Runway Monitor System (PRM) with 1.0 second update 4,300 4,300 NTZ NTZ Dual parallel runways with 3,400 foot separation 3,400 NTZ Precision Runway Monitor System (PRM) with 2.4 second update Dual parallel runways with 4,300 foot separation Precision Runway Monitor System(PRM) Triple parallel runways with 5,000 foot separations 5,000 NTZ 4,300 NTZ 5,000 NTZ No Transgression Zone (NTZ) A 2,000 foot wide zone, located between parallel runway final approach course in which flight is not allowed Precision Runway Monitors (PRM) Provide Controller with high precision secondary surveillance data for aircraft on final approach to parallel runways. High resolution monitors display maps depicting approaches and NTZ. Localizer A navigational aid which provides course guidance to the runway. Simultaneous Independent Approach Procedures Permits simultaneous approaches to two/three parallel runways without separation requirements between adjacent arrival streams. 8

Runway Planning Parameters Source: FAA Instrument Procedures Handbook - 2004 9

Distribution of Wind Direction All Weather Conditions Percent of Wind Coverage N 6.43 NNE 3.45 NE 4.04 ENE 4.51 E 6.33 ESE 3.85 SE 3.56 SSE 3.85 S 11.12 SSW 11.90 SW 10.02 WSW 6.95 W 9.52 WNW 5.88 NW 4.81 NNW 3.78 Total 100.00 WNW W WSW NW SW NNW SSW N 12% 10% 8% 6% 4% 2% S NNE SSE NE SE ENE E ESE % Wind Coverage Note: Thirty years of hourly surface observations from 1973 through 2002 obtained from the National Oceanic and Atmospheric Administration (NOAA) were used to conduct this analysis. 10

Runway Takeoff Length Requirements- Air Carrier 762 ( 0.3%) 322 ( 0.3%) 772 ( 0.5%) M88 ( 7.5%) CVG Aircraft Fleet - 2025 735 ( 0.1%) DC9 ( 0.1%) D9S ( 0.1%) 752 ( 4.5%) 732 ( 3.7%) 763 ( 2.4%) 738 ( 3.7%) 72S ( 0.1%) 739 ( 0.1%) 343 ( 0.1%) 764 ( 0.1%) 60% 65% 70% 75% 80% 85% 90% 95% 100% Percentage of Maximum Aircraft Payload 10,000 ft Runway 8,000 ft Runway 11

Runway Takeoff Length Requirements- Commuter EMB 195LR CRJ-700 (25.4%) CRJ-200ER (35.1%) CVG Aircraft Fleet - 2025 EMB 190LR}(1.8%) EMB 170LR ERJ-145LR (0.6%) ERJ-140LR (0.3%) ERJ-135LR (0.5%) Avro RJ-85 (0.9%) Beechcraft 1900D (0.2%) Dash 8-311 (0.6%) BAE Jetstream 41 (0.4%) Dornier 328 (10.5%) Saab 340A (0.1%) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 Runway Length (Feet) 12

2005 Existing Airfield Operation 13

North/South Runway Alternatives 14

North-South Runway Alternatives Demand/Capacity Evaluation 15

East/West Runway Alternatives 16

East-West Runway Alternatives Demand/Capacity Evaluation 17

Evaluation Criteria for Next Round Environmental - Land Acquisition - Noise -Wetlands - Flood Plains - Threatened/Endangered Species - Other Environmental Considerations Operational Issues -Safety and Delay - Interaction with other Runways - Runway Crossings - Taxi Distances - Potential Obstructions - Other Operational Considerations 18

Evaluation Criteria for Next Round Constructability - Impacts to Airport Facilities -Impacts to Public Roads - Operational Impacts During Construction - Other Construction Considerations Finance Capital Costs Funding Eligibility Airline Costs Benefit-Cost Ratio Return on Investment Other Financial Considerations 19