Production Work Instruction

Similar documents
BowDown. MiniMuM Crossbar spread 24 (61CM) Steel Hook (2X) Buckle Strap (2X) Plastic Tube (2X) Plain Strap (2X) SHORT BLACK T-BOLT (2x) BOWDOWN (2x)

BigStack. Minimum Crossbar spread 24 For factory racks: Check fitlist notes, or Yakima.com for your vehicle s crossbar spread.

TAKE EVERY PRECAUTION TO PREVENT CONTACT WITH SKIN OR HAIR!!!

User s Manual Trampoline 8

NNIN Nanotechnology Education

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

LBH18BPK. Instruction Sheet

One Piece Low Torque Kelly Valve. Preventive Maintenance Service Video Disassembly and Assembly Procedures

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

RUPHIS Blade Clamp. Instruction Manual

VACATION'R A ROOM FOR VERTICAL ARM AWNINGS 2015 & ON

Made of durable, lightweight polyester & vinyl material - the same material used for tents. No drilling required No rafters to install.

OW LEE CASUAL FIRESIDE Q&A

OW LEE CASUAL FIRESIDE Q&A

INSTINCT ALASKAN TENTS

Two Piece Low Torque Kelly Valve

TWISTLOCK VEHICLE STABILIZER (TVS) SYSTEM INSTRUCTIONS

Solera Family and Screen Room. Installation and Owner s Manual (For Aftermarket Applications) Table of Contents

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

It's easiest to divide the problem in two: rescuing the mother hawk and rescuing the young chicks.

INSTALLATION INSTRUCTIONS

PL500A Platform Extension

USER MANUAL BMU WORKCAGE. CONFORM TO THE MACHINE DIRECTIVE 2006/42/EC and to EN1808 (1999)

HARD DOOR UPGRADE KIT

VACATION'R A ROOM FOR VERTICAL ARM AWNINGS 2015 & ON

GEAR GUIDE CABELA S SET NUMBER:

F a l l P r o t e c t i o n E x p e r t s. Subject: Buckle Specifications and Operations

Technology working for you. From the Small Hand Feed Operation to Complete Engineered Plastic Granulator Systems

OWNER'S MANUAL CAMPOUT TABLE OF CONTENTS

COPPER RIVER CABIN TENT

MAINTENANCE KIT CONTENTS. Dry Cargo Operating and maintenance instructions C8A-HC. C8A-HC OPS-C8A-HC of

INSTRUCTION SHEET TWISTLOCK VEHICLE STABILIZER (TVS) SYSTEM PN S: , ,

WARNING: Read these materials prior to assembling and using this trampoline and enclosure

ASSEMBLY & CARE INSTRUCTIONS

WARDROBE FITTINGS Wardrobe Accessories P Clothes Hanger Accessories P Hangers & Shoe Racks P.

INSTALLATION INSTRUCTIONS

VEPR Round Drum Disassembly and Assembly

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

ASSEMBLY & CARE INSTRUCTIONS. 7 x4 TRAILER TENT SERIES 4 9. OPTIONAL SUNROOM Wall and floor kit. OPTIONAL SPARE ROOM Roof, wall and floor kit

Emergency Parachute Manual

ROOFTOP CARGO BAG (FRONT OF VEHICLE) HOOK (x4) ATTACHMENT STRAP (x4)

INSTALLATION INSTRUCTIONS

Rhino-Rack Sunseeker II Base Tent (32119)

General Purpose Shelter

ASSEMBLY INSTRUCTIONS

FS-14R Parachute Packing Instructions

Kontrol Kube Advanced Owners Manual

FS-14 Parachute. Packing Instructions. United States Department of Agriculture. Forest Service. Technology & Development Program

250 SERIES 1" STRUCTURAL TUBE MULLION ASSEMBLY INSTRUCTIONS

Carbon Lite Volleyball system ( Either in packages or components ordered separately )

Items that are not wrapped or packaged correctly can allow contamination and therefore present a risk of infection to the patient.

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

Assembly Instructions

Operation Manual SUPER BEAST Multi-tool SC-11M-10

Home Improvement Fittings Wardrobe Fittings

Solar Power Shade INSTRUCTION MANUAL

ROOFBAG CAR TOP CARRIER INSTALLATION BOOKLET

CAPRI PLUS. Instruction Manual. 28' x 38' Including sidewall and connector instructions.

4.2 Assembly Instructions

ROOFTOP CARGO BAG (FRONT OF VEHICLE) HOOK (x4) ATTACHMENT STRAP (x4)

INSTALLATION INSTRUCTIONS

A properly mounted pair of Rocky Mountain Saddle Bags. Bag Orientation

ELE-3COP-375 Title - Braid termination using a Band Strap Adaptor.

INSTALLATION AND USE OF THE AIR ASSISTED SYSTEM FOR JETSLIDE - AIRASSIST from CANDOCK

When moving the frame don t force anything! Move the leg to allow the brace to go over the rod.

Otter XT 650 Cabin Installation and Set-Up Instructions

Installation Instructions Part # 2784 Awning

ASSEMBLY INSTRUCTIONS

4A1-114/114KR & 4A1-2 MANUAL TENSIONERS

OWNER'S MANUAL CAMPOUT TABLE OF CONTENTS

SAFETY AND OPERATING MANUAL

Butler Personnel Parachute Systems, LLC

Manual Awning. Assembly Instructions. Product No Toll-free:

User Guide. Tripod. flowtech 75 Tripod. Part No. V

Cabinet Mount Assist Lift n Lock Instructions

KNIFE SHARPENING TECHNIQUE

Volta Belting Technology Ltd. Version no 8. Special. Tools Catalogue. The Next Step in Belting

Core Systems Installation Instructions

Otter Pro XT 1200 Cottage Installation and Set-Up Instructions

Rigging a portable loop antenna

MODEL 412-3PC, RISING DOUGH PIZZA OVEN

BR B Bike Rack Instructions

OWNER S MANUAL. ezup.com. 13 x 13 (4.0m x 4.0m) 10 x 10 (3.0m x 3.0m) 16 x 16 (5.0m x 5.0m)

Operating Instructions

- Limitation of Liability -

Otter Pro X-Over Lodge Installation and Set-Up Instructions

China Aeromodelling Design Challenge. Contest Rules China Aeromodelling Design Challenge Page 1 of 14

* * KR54-F, KR9854 & KR9954 Installation Instructions. Read All Warnings Before Starting Installation! Index:

BRJK11F2, BTJK11F2, BRJK07F2, BTJK07F2, kit

Safety Tips. Welcome. Contents. Care & Maintenance

BUILT-IN OVEN SAFETY

In-Home Gravity Harness System

User Guide. Tripod. flowtech 75 Tripod. Part No. V

HANDLING. Doc. No.: TKO AS3 Addendum 1 Revision: 0 Page: 2/10 SHORT INSTRUCTIONS FOR THE USE OF SWAGED ROTARY DRILLING AND VIBRATOR HOSES

ORION TENT GEAR GUIDE CABELA S SET NUMBER: ,

* * 4023 KR. Step 1 Prepare the Keyed Removable Unit. Not for use on electric or fire rated removable mullions

MANUAL BENDER P/N MB1000M

VACATION'R A ROOM FOR VERTICAL ARM AWNINGS

10' x 20' MAX AP CANOPY EXTENSION KIT Assembly Instructions

Transcription:

Production Work Instruction Document: Trapped Air Ball Work Instructions Document No.: TABWI-1 Revision: 1 Revision Date: March 13, 2013 Approved By: Ossie Fowler, HR Manager; Marilyn Moore, Quality Supervisor; Mike Ingram, President 1. Remove frame from take-out devise 2. Place frame on cutting table / trim table 3. De-flash / trim excess plastic from frame 4. Inspect balls for deformities and cut an X in all rejects 5. Place excess flash on conveyor belt granulator 6. Hang frame on cooling rack 7. Remove frame from cooling rack after cooling for 12 minutes or 12 flats NOTE: Do not drill-out balls from a frame prior to the 12 min. cooling period 8. Place frame on drilling table 9. Center drill over ball then drill-out ball from frame 10. Place frame flat on conveyor belt to granulator 11. When counter reads 2,000 and red light flashes, stop the process 12. Tie top of bag before removing the bag from the bag rack 13. Remove full bag of products from the bag rack 14. Install an empty bag on the bag rack 15. Write your employee number on the upper right-hand corner on each side 16. Transport full bag to the finished product staging area / storage 17. Repeat this cycle until the production plan is fulfilled

1. Remove frame from take-out devise A) Pull down on frame B) The plastic material will separate from the take-out device C) Safety: Employees must wear safety glasses and gloves when completing this action Take-Out Device Flat

2. Place frame on cutting table / trim table A) The frame is to be laying flat on the table, not hanging off the table or un-level B) The plastic material will separate from the take-out device C) Safety: Employees must wear safety glasses and gloves when completing this action Cutting Table Frame

3. De-flash / trim excess plastic from frame A) Use a sharp trimming tool / knife B) Cut-off the excess plastic as shown below C) Safety: Employees must wear safety glasses and gloves when completing this action Trim alongedge of frame Excess Plastic Cutting Tool

4. Inspect balls for deformities and cut an X in all rejects A) Use a sharp trimming tool / knife B) the 'X' will notify the driller of the defect and the ball will not be cutout of the frame C) Safety: Employees must wear safety glasses and gloves when completing this action Cut an 'X' in all bad balls Bad Shot / Bad Ball

5. Place excess plastic on conveyor belt granulator A) Safety: Employees must wear safety glasses when completing this action Conveyor Belt Excess Plastic

6. Hang frame on cooling rack A) Place frames in order on the cooling rack to allow the frame to cool for 12 minutes or 12 frames before drilling B) Safety: Employees must wear safety glasses when completing this action Insert frame between arms Cooling rack rotates Place frame in order on the cooling rack

7. Remove frame from cooling rack after cooling for 12 minutes or 12 flats A) Do not remove a frame from the cooling rack prior to the 12 min. cooling period or 12-frame cycle B) Safety: Employees must wear safety glasses when completing this action Cooling rack rotates Remove frame in rotational order for cooling purposes

8. Place frame on drilling table A) Frame must be laying flat on table and in-between the frame locators B) Safety: Employees must wear safety glasses when completing this action Frame Locators Balls will line-up with holes on drilling table

9. Center drill over ball then drill-out ball from frame A) Do not cut into ball B) If a ball is damaged, stop the process and capture the ball C) Safety: Employees must wear safety glasses when completing this action Drill

10. Place frame flat on conveyor belt to granulator A) Safety: Employees must wear safety glasses when completing this action Frame Conveyor

11. When counter reads 2,000 and red light flashes, stop the process A) The red light will flash when the counter reaches 2,000 B) Safety: Employees must wear safety glasses when completing this action Red Light Counter

12. Tie top of bag before removing the bag from the bag rack A) Safety: Employees must wear safety glasses when completing this action Tietop of bag

13. Remove full bag of products from the bag rack A) Position the forklift forks under the bag B) Lift-up on the bag to remove the tension the bag loops C) Drive in reverse to remove the bag from the bag rack 4 Bag Loops Forklift Forks positioned under bag

14. Install an empty bag on the bag rack A) Place each bag loop over the rack as shown B) Drive in reverse to remove the bag from the bag rack 4 Bag Loops

15. Write your employee number on the upper right-hand corner on each side of the bag

16. Transport full bag to the finished product staging area / storage A) Drive forklift in reverse to storage location Driving in Reverse Forks under bag

Quality Contorl Specifications Specifications: Trapped Air Ball is to be 4" diameter and black in color No punctures or holes that would prevent the ball from floa ng Weight must be between: 36-44 grams each Inspection Instructions 1. Quality Control is responsible complete a visual inspection of one frame on an hourly basis 2. Quality Control is responsible to weigh each ball in one frame on an hourly basis 3. The inspection is to be documented on the Trapped Air Ball Inspection Form TABWI-1.3.1 Revision 1 Nonconforming Material: 1. All product that do not meet the above specification are to be identified and controlled in conformance with the Nonconforming Material Procedure. 2. If an employee identifies bad material, the employee is responsible to place the bad material in a rejected material bin. 3. If bad material continues to be produced, stop production and notify Quality Control without delay.