Stage 10 Map. Tasik Kenyir - Kuala Terengganu 103.1km Saturday 8 March Kuala Terengganu. Loop. Tasik Kenyir. Padang Air 47.

Similar documents
Kuala Lumpur. Top 5. KL Tower. Petronas Twin Tower and KLCC. Petaling Street (Chinatown) Batu Caves. Lake Gardens (taman Tasik...

PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

Outlet Region Address Tel. No. Fax. No. WiFi Business Hours

1 Need to Know 2. First Time in Malaysia. When to Go. Dos and Don ts. Quick Facts. Sample chapter. Need to Know

Page 1 of 6. Land Area (sq. ft.) Built Up (sq. ft.) No PROPERTY TYPE PROPERTY ADDRESS FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

1. CONTINUATION OF RIGHT LANE CLOSURE TOWARDS SLIP ROAD OF JALAN KUCHAI LAMA & NEW PANTAI EXPRESSWAY (NPE) (NORTH-BOUND)

GIORDANO PARTICIPATING OUTLETS - MAYBANK PROMOTION 2018

MAP 1: MEDIUM TERM NIGHT CONTRA-FLOW FROM PJU 3/31 TO PJU 5/1 (KOTA

PL ACES OF INTEREST IN IPOH & PERAK

LOW YAT PLAZA PUBLIKA NU SENTRAL

THE BODY SHOP (W. Malaysia ) OUTLETS

Click to edit Master text styles Second level Third level Fourth level Fifth level

Outlet Region Address Tel. No. Fax. No. WiFi Business Hours

FLOOR AREA AUCTION PRICE (RM) SQFT 139 SQ METER

1. CONTINUATION OF LANE CLOSURE ALONG PERSIARAN INDUSTRI (KEPONG-BOUND)

Address: 102, Bakar Arang Industrial Estate, Kawasan Perusahaan Ringan Bakar Arang, Sungai Petani, Kedah

TOURISM INVESTORS PARADISE

CONTENTS. Welcome to the East Coast Region. Pahang Map of Pahang Places of Interest Shopping & Dining Events Essential Information

LOKASI PUSAT KITAR SEMULA E-WASTE SEMPENA PC FAIR 2009 BIL. PUSAT KITAR SEMULA TETAP HARI OPERASI MASA OPERASI

20th - 28th November Schedule of Events The Regatta Organising Authority reserves the right to amend this schedule.

Paradigm Mall GF 01, Ground Floor, Paradigm Mall, 1, Jalan SS7/26A, Kelana Jaya, Petaling Jaya, Selangor

20% off for all CIMB Bank Premier Cards.

country charm & city convenience Apartment Denai Sutera English Brochure Open Size: 56cm(w)x33cm(h) Close Size: 28cm(w)x33cm(h)

40 Hidden gems in Malaysia

TROPICANA CORPORATION BERHAD (formerly known as Dijaya Corporation Berhad) ( Tropicana OR COMPANY )

GF 01, Ground Floor, Paradigm Mall, 1, Jalan SS7/26A, Kelana Jaya, Petaling Jaya, Selangor

OPPORTUNITY FOR INTERESTED BUYER IN SRI CHENANG RESORT & SPA

List of Guardian Stores. NO. State Store Name Address. 1 Holiday Plaza LOWER GROUND 10 HOLIDAY PLAZA JALAN DATO SULAIMAN,82050,JB,JOHOR

Penang Hills Watch Report 2016

Profile Budaya Restu Sdn. Bhd. LIST OF PROJECTS

CONTENTS. Welcome to the East Coast Region. Pahang Map of Pahang Places of Interest Shopping & Dining Events Essential Information

S/N REGION AREA CLINIC NAME ADDRESS TEL. FAX MON-FRI SAT SUN PUBLIC HOLIDAY REMARKS

CANCELLATION CHARGE OR NO SHOW (BASE ON PER PERSON)

STAGE MAP. Lingayen - Baguio City km Wednesday 23 May 2018 BAGUIO CITY. LINGAYEN Tayug. Tublay. Bokod. Itogon. Agoo.

3D2N Nature Discovery Trip, Cherating/Kemaman Date: July 2019

Sony Centre Dealer List NO. STATE SHOP NAME ADDRESS TEL. NO.

Tour Package for by 1

Focus Point Outlet list

PROJECT REFERENCES: ESTA SWITCHGEAR. Last updated: 17-Apr-18

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG GARDEN DAN JALAN ST. THOMAS 20 DISEMBER 2018


STAGE MAP. Quezon City - Palayan City km Sunday 20 May 2018 PALAYAN CITY QUEZON CITY. Maria Aurora. San Jose City. Science City of Muñoz

STAGE MAP. Bambang - Lingayen km Tuesday 22 May 2018 BAMBANG LINGAYEN. Buguias. Kibungan. Bundok Pulag. Atok. Solano. Tublay La Trinidad.

Seacare Medical Scheme (SMS) FOREIGN

PROJECTS LIST 2006 Updated 16 May 06

REDISCOVER URBAN LIVING SENTUL, KL

Advertising Revenue By Publisher: Y2016

TECHNICAL TOUR MALACCA

AN EVALUATION OF URBAN PUBLIC TRANSPORT ROUTE. CASE STUDY: HOP-ON HOP-OFF, KUALA LUMPUR, MALAYSIA. UNIVERSITI TEKNOLOGI MARA (UiTM)

List of schools which offers Form 6 classes in Sabah

INFORMATION BULLETIN NO. 1

NATIONAL ACHIEVERS CONGRESS 2017

CONNECTIVITY TO LIFESTYLE LIVING

Fast Speed Price List (Delivery & Pick up Service)

INDONESIA-MALAYSIA-THAILAND GROWTH TRIANGLE SUB-REGIONAL COOPERATION

No. Brand Outlet Locations Start Date End Date

Tourism Malaysia, Ministry of Tourism and Culture, Malaysia Feb 2016 (0216)

Description FACILITIES : Toilet Air conditioning Hot & Cold shower Thermos Drinking water Coffee & tea facilities.

BLK 623 CCK ST 12 (Next to Yew Tee MRT) BLK 623 Choa Chu Kang Street 62 # Tampines North Drive 2 (WRS)

PAR SYNERGY S CURRENT & RECENT PROJECT REFERENCES

============================================================================

50% SAVINGS UP TO. Luxurious Dining. Delicious Savings.

CHARLES & KEITH LOT CC16/17 NU SENTRAL NO 201 JALAN TUN SAMBATHAN 50470

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG)

The Role of Home Stay for Ecotourism Development in East Coast Economic Region

NAMES & ADDRESSESS OF LICENSED SURVEYORS FOR THE YEAR 2011

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA BESRAYA & SERI KEMBANGAN 20 OGOS 2018

PERSONAL CARE 101 HAIR CARE CENTRE NO 23 PLAZA MAHKOTA MELAKA JLN PM2 ADONIS FIRST ACADEMY OF COSMETOL

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG 28 NOVEMBER 2018

Index. 000 Map pages 000 Photograph pages. Lonely Planet 620 INDEX. 8 Hereen Street 243 8Q SAM Cintra Street 186

Cast Iron Pipes & Fittings

ANNEX A RESTRICTED ZONES

Hougang Ctrl Int Jurong East Temp Int

Spectator Information

OWN A BEACHFRONT RESIDENCE IN HISTORICAL MELAKA CITY

Genting Dream Shore Excursions

1 : ARRIVAL / KUALA LUMPUR

NTT Singapore - NTT i-net BB Scheduled Maintenance Date Start Time:HRS End Time:HRS Affected Area 07/10/ CAIRNHILL RISE CAIRNHILL CIRCLE

38 TH Annual General Meeting 13 December 2017 CORPORATE PRESENTATION

UNIVERSITI SAINS MALAYSIA. Second Semester Examination 2010/2011 Academic Session. April/May 2011

FEMCA June 9-15, STONEPARK.GLENMARIE.SHAH ALAM.MALAYSIA

Sunday Farquhar's Bar, E&O Hotel Penang. Roam Like Home! I'm Applefish

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG BANDAR SRI DAMANSARA & LEBUHRAYA SUNGAI BESI 23 NOVEMBER 2018

MINISTRY OF TRANSPORT MALAYSIA MALAYSIA IN CROSS BORDER RAIL INITIATIVE

Make your stop spectacular with American Express Selects SM

Exclusively for The Platinum Card and the American Express Platinum Credit Cardmembers

Dear Valued Club Members,

CONTEMPORARY ISSUES ON TOURISM DEVELOPMENT IN LANGKAWI

Genting Dream Shore Excursions

Intercity Bus Transportation System and its competition in Malaysia

CURRICULUM VITAE. Tel : Fax : H/P :

HOTEL Agoda 6% savings Bayview Hotel Melaka Complimentary 10% savings 10% savings Bintang Fairlane Serviced Suites 50% savings Complimentary

Information & Joining Instructions

Gamuda Berhad. Stellar Q1 Setting the Pace for FY12. Q INVESTORS BRIEFING 16 December 2011

1 PE 20 Ir. S PRABHAKARAN PILLAI 25 LORONG KEMARIS 2 BUKIT BANDAR RAYA KUALA LUMPUR W. PERSEKUTUAN (K.L)

Inspired by the CITY Driven by the STARS

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF NEW VILLAGE: BAGAN BAHARU 新芭 PERAK

10DAYS 8NITES JERUSALEM+ALAQSA MUSLIM TOUR

WATSONS CLICK & COLLECT EXPRESS UPDATED STORE LIST (AS OF 05 NOV 2018) WILAYAH PERSEKUTUAN KUALA LUMPUR

3 outlets :Lot C-13-01, 3 Two Square. Jalan 19/ Petaling Jaya, De Palma Hotel,Shah Alam & Sunway Giza Mall

Transcription:

Stage 10 Map Padang Air 47.4km Kuala Terengganu Loop Tasik Kenyir Passage 2 Finish Line 77.9km Passage 4 Finish Line 90.5km www.ltdl.com.my Race Manual 2014 125

Stage 10 Profile Padang Air 47.4km Dataran Shahbandar Passage 2 77.9km Dataran Shahbandar Passage 4 90.5km 103.1km 0km Tasik Kenyir Kuala Terengganu 16.8m 13.3m 5km 0km 5km to Finish Profile 126 www.ltdl.com.my Race Manual 2014

Stage 10 Schedule Start Location : Dataran Tasik Kenyir,Terengganu Finish Location: Dataran Shahbandar, Kuala Terengganu Neutral Zone : 4.2km KM KM to Go Feature Instruction Description From Start Gantry Straight On,T Junction Right,Junction Left,T Junction Right,End Of Neutral Zone Milestone Kuala Berang 32 Km @30 mins Cavalcade 90% Backwind Expected eadwind Estimated Time of Arrival H100% 110% 12:30 13:00 13:00 13:00 0.0 103.1 Sign Race Start Proper Milestone Kuala Berang 32 Km 12:35 13:05 13:05 13:06 1.1 102.0 Sign Straight On Kg.Basung 12:37 13:06 13:07 13:07 2.8 100.3 Junction Straight On 12:39 13:08 13:09 13:10 3.8 99.3 Sign Straight On Kg.Pasir Dula 12:40 13:10 13:10 13:12 8.9 94.2 T Junction Left Dir Sungai Tong 12:47 13:16 13:17 13:19 11.6 91.5 Sign Straight On Kg.Teris 12:51 13:19 13:21 13:23 13.2 89.9 Junction Straight On 12:53 13:21 13:23 13:26 14.9 88.2 Sign Straight On Kg.Tayor 12:55 13:23 13:25 13:28 20.9 82.2 Sign Straight On Kg.Bukit 13:04 13:31 13:34 13:37 21.8 81.3 Sign Straight On Kg.Bukit Nenas 13:05 13:32 13:35 13:39 25.2 77.9 T Junction Left Dir Kuala Terengganu 13:09 13:36 13:39 13:44 25.6 77.5 Sign Straight On Kg.Belara 13:10 13:37 13:40 13:44 27.7 75.4 Sign Straight On Kg.Pakoh Jaya 13:13 13:39 13:43 13:47 30.0 73.1 Sign Drink Starts Kurangkan Laju 13:16 13:42 13:46 13:51 36.1 67.0 Sign Straight On Kg.Sungai Ikan 13:24 13:50 13:54 14:00 38.8 64.3 Sign Straight On Kg.Gemuruh 13:28 13:53 13:58 14:04 40.7 62.4 Splitters Keep Left 13:31 13:56 14:01 14:07 43.9 59.2 Sign Straight On Kg.Bukit Guntung 13:35 14:00 14:05 14:12 45.0 58.1 Sign Straight On Kg.Tepoh 13:36 14:01 14:06 14:13 45.5 57.6 Traffic Light Junction Straight On 13:37 14:02 14:07 14:14 45.9 57.2 Sign Straight On Kg.Bukit Berangan 13:38 14:02 14:08 14:15 46.7 56.4 Sign Straight On Kg.Padang Air 13:39 14:03 14:09 14:16 47.4 55.7 Sign Sprint 1 Padang Air Kedai Sakan 13:40 14:04 14:10 14:17 47.9 55.2 Sign Straight On Kg.Tok Jiring 13:40 14:05 14:10 14:18 48.2 54.9 Traffic Light Junction Straight On 13:41 14:05 14:11 14:18 48.7 54.2 Sign Straight On Kg.Batu Enam 13:41 14:06 14:11 14:19 49.3 53.8 Roundabout 2nd Exit 13:42 14:06 14:12 14:20 49.6 53.5 Sign Straight On Kg.Pak Katak 13:43 14:07 14:13 14:20 50.8 52.3 Traffic Light Junction Straight On 13:44 14:08 14:14 14:22 51.2 51.9 Traffic Light Junction Straight On 13:45 14:09 14:15 14:23 52.1 51.0 Traffic Light Junction Straight On 13:46 14:10 14:16 14:24 53.1 50.0 Fork Right 13:47 14:11 14:17 14:25 55.3 47.8 Traffic Light Junction Straight On Jln Tengku Mizan 13:50 14:14 14:20 14:29 55.5 47.6 T Junction Traffic Lights Left Jln Sultan Mohamad 13:51 14:14 14:21 14:29 56.2 46.9 Traffic Light Junction Left Jln Bukit Kechil 13:52 14:15 14:22 14:30 56.9 46.2 Traffic Light Junction Straight On Jln Bukit Kechil 13:53 14:16 14:23 14:31 57.5 45.6 T Junction Traffic LightsRight Jln Hiliran 13:53 14:17 14:23 14:32 57.8 45.3 Traffic Light Junction Straight On Jln Hiliran 13:54 14:17 14:24 14:33 www.ltdl.com.my Race Manual 2014 127

Stage 10 Schedule @30 mins Cavalcade 90% Backwind Expected H100% eadwind 110% KM KM to Go Feature Instruction Description Estimated Time of Arrival 58.4 44.7 Traffic Light Junction Straight On Jln Hiliran 13:55 14:18 14:25 14:33 59.0 44.1 T Junction Traffic Lights Left Jln Kg.Cina 13:55 14:19 14:25 14:34 59.8 43.2 Junction Straight On Jln Banggol 13:57 14:20 14:27 14:36 60.0 43.1 Splitters Left Jln Banggol 13:57 14:20 14:27 14:36 60.3 42.8 T Junction Left Jln Sultan Ismail 13:57 14:20 14:27 14:36 60.4 42.7 Traffic Light Junction Straight On Jln Sultan Ismail 13:57 14:20 14:27 14:36 60.6 42.5 Fork Right Jln Batas Baru 13:58 14:21 14:28 14:37 61.0 42.1 Traffic Light Junction Right Jln Kemajuan 13:58 14:21 14:28 14:37 61.3 41.8 Traffic Light Junction Left Jln Cerong Lanjut 13:59 14:21 14:29 14:38 62.2 40.9 Roundabout 1st Exit Jln Sultan Omar 14:00 14:23 14:30 14:39 63.1 40.0 Traffic Light Junction Right Jln Sultan Ismail 14:01 14:24 14:31 14:40 63.6 39.5 Roundabout 2nd Exit Jln Sultan Zainal Abidin 14:02 14:24 14:32 14:41 65.3 37.8 Sign Finish Line Dataran Shahbandar 14:04 14:26 14:34 14:44 66.0 37.2 T Junction Right 14:05 14:27 14:35 14:45 66.1 37.0 Cross Junction Left Jln Banggol 14:05 14:27 14:35 14:45 66.3 36.8 Splitters Keep Left Jln Banggol 14:05 14:28 14:35 14:45 66.5 36.6 T Junction Left Jln Sultan Ismail 14:06 14:28 14:36 14:46 66.7 36.4 Traffic Light Junction Straight On Jln Sultan Ismail 14:06 14:28 14:36 14:46 66.9 36.2 Fork Right Jln Batas Baru 14:06 14:28 14:36 14:46 67.3 35.8 Traffic Light Junction Right Jln Kemajuan 14:07 14:29 14:37 14:47 67.6 35.5 Traffic Light Junction Left Jln Cerong Lanjut 14:07 14:29 14:37 14:47 68.5 34.6 Roundabout 1st Exit Jln Sultan Omar 14:08 14:30 14:38 14:49 69.3 33.8 Traffic Light Junction Right Jln Sultan Ismail 14:09 14:31 14:39 14:50 69.9 33.2 Roundabout 2nd Exit Jln Sultan Zainal Abidin 14:10 14:32 14:40 14:51 71.6 31.5 Sign 1st Passage Dataran Shahbandar 14:13 14:34 14:43 14:53 77.9 25.2 Sign 2nd Passage Sprint 2 Dataran Shahbandar 14:21 14:42 14:51 15:03 84.2 18.9 Sign 3rd Passage Dataran Shahbandar 14:30 14:50 15:00 15:12 90.5 12.6 Sign 4th Passage Sprint 3 Dataran Shahbandar 14:38 14:58 15:08 15:22 96.8 6.3 Sign 5th Passage Dataran Shahbandar 14:47 15:06 15:17 15:31 103.1 0.0 Sign Race Finish Dataran Shahbandar 14:55 15:14 15:25 15:40 128 www.ltdl.com.my Race Manual 2014

Transfer to Start Saturday 8 March 2014 3 3685 65 Kuala Terengganu Tok Nandong Sungai Nerus 14 Sungai Terengganu 3 Tasik Kenyir 14 Kuala Berang 14 Estimated Distance : 68km Estimated Time Travel : 60min Ajil www.ltdl.com.my Race Manual 2014 129

Stage 10 Start Location Tasik Kenyir Tasik Kenyir - Kuala Terengganu 103.1km Saturday 8 March 2014 o km Sungai Telemung T156 Start Tasik Kenyir 130 www.ltdl.com.my Race Manual 2014

Stage 10 Start Layout REAR Dataran Tasik Kenyir OFFICIAL OFFICIAL DIREC. DIREC. Parking Area TECH. POLICE MEDIA Toilet Ketengah VPP Souvenir Shop Teams exit SIGN Start TEAM TEAM TEAM TEAM NTIC Parking Area TOILET CAVAL. Lake www.ltdl.com.my Race Manual 2014 131

Stage 10 Start Time Table TIME 0800hrs 1000hrs 1130hrs 1150hrs 1200hrs 1230hrs 1245hrs 1250hrs 1255hrs 1300hrs 1330hrs 1345hrs 1545hrs ACTIVITIES VPP in operation Race facilities crew on site Race security on site Road closure at start area PA system on Race officials on site Side Events starts Invitees arrival Cavalcade assembles VIPs arrive Teams arrive Signing on opens Cavalcade departs Signing on closes Side Event ends Advance vehicles depart Riders assemble at start line Le Tour de Langkawi departs VIPs depart De-rig commences Road reopens 132 www.ltdl.com.my Race Manual 2014

Stage 10 Finish Location ulau yung esar Jalan Tengku Mizan g ampung Tok Ku Kuala Hiliran Hiliran Surau Dusun Melintang Tiang Hangus Pulau Wan Embong Pulau Duyung Kecil Jalan Hiliran 3 Che Long Sungai Terengganu Jalan Balik Bukit Bandar Baru Tiong Jalan Cina Pulau Kambing Jalan Bandar Baru Panglima Jalan Sultan Ismail Jalan Tok Lam Jalan Masjid Abidin Jalan Air JernihJalan Cerong Lanjut 4 km Jalan Kemajuan Jalan Bukit Kechil 5 km Batas Baru Rumah Pangsa Batas Baru Bukit Kecil Jalan Pasir Panjang Loop Bukit Besar Finish Surau Pasir Tanjung Tanjung Kapur Nesan Empat Tanjung Paya Jalan Sultan Omar Jalan Pejabat Taman Tertai Taman Budaya Ladang Padang Cicar Ladang Sekolah 2 km Ladang Siha Taman Intan 3 km Titian Lembah Taman Dalya Jalan Sultan Omar Jalan Sutan Mohamad Jalan Ibrahim Ladang Tok Pelam Hospital Besar Kuala Terengganu Ladang Hospital Mengadang Akarl Gernia Kubur Kecil Gong Gemia Taman Pusara Batu Buruk Jalan Persinggahan Jalan Pantai Batu Bu Jalan Sultan Mahmud Jalan Kamaruddin Mengabang Tengah Lorong Kuala Terengganu Nibung Jalan Panji Alam 1 km Jalan Pusara Jalan Kenanga www.ltdl.com.my Race Manual 2014 133

Stage 10 Finish Layout Garden TOILET Parking Area MEDIA TECH. Garden Istana Maziah Jalan Masjid Abidin POLICE Arch MARA Building CAVAL. Finish MB P.POD Shop Lot WHT Jalan Tok Lam Dataran Shahbandar O.B O.B SUPPORT SUPPORT OFFICIAL OFFICIAL MEDIA DIREC. DIREC. Jalan Sultan Zainal Abidin Shop Lot GUEST TEAM Dataran Shahbandar TEAM D 134 www.ltdl.com.my Race Manual 2014

Stage 10 Finish Time Table TIME 0700hrs 0800hrs 0900hrs 1000hrs 1305hrs 1325hrs 1405hrs 1425hrs 1435hrs 1525hrs 1545hrs 1630hrs 1700hrs 1900hrs ACTIVITIES Race facilities crew on site Road closure at finish area Race security on site Race officials on site PA system on Side Events starts Invitees arrival VIPs arrival Cavalcade arrives Advance vehicles arrive Le Tour de Langkawi arrives Le Tour de Langkawi finishes Presentation of leader s jersey VIPs depart De-rig commences Roads reopens www.ltdl.com.my Race Manual 2014 135

Note 136 www.ltdl.com.my Race Manual 2014