Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Similar documents
Major Projects Overview

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

November 21, 2012 Barbara Kelleher, (954)

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

2 Construction Program

Carlisle Connectivity Projects Communication Plan and Project Status

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

1.2 Corridor History and Current Characteristics

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Fairfax County Parkway Widening Fairfax County

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

A VISION FOR I-95. January 12, Delaware Department of Transportation

5.1 Traffic and Transportation

AGENDA ITEM I-6 Public Works

10.0 Recommendations Methodology Assumptions

G Street Undercrossing. City Council Meeting Date: November 3, 2008

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

First rail. August 2011

I-35 Reconstruction Project

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

PRIORITIES COMMITTEE MEETING

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Guide to. Road Construction Projects

US 19 Sunset Point Rd to Countryside Blvd.

RW Bruhn Bridge and Approaches Project

Public Information Center August 12, 2010

PennDOT Interstate Work next week March 30-April 3:

I-270 Bridge Renovation at New Florissant Road

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

State Route 8 Corridor. Northern Summit County s Path to Success

Route 29 Solutions Projects

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

October 31, 2014 Chuck McGinness, (954)

Important Lane Closures, April 3 9, 2011

Community Advisory Panel Meeting #

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

State Project Reconstruction I-84

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Figure 1: Little Dry Creek Trail Crossing

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Construction Staging Adelaide Street West

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Palm Beach County Traffic Report July 13 through July 20, 2012

Head to University Avenue and save!

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford.

Score. Category. Access Aesthetics Community Resources

Transportation TRANSPORTATION PROJECTS

4. Safety Concerns Potential Short and Medium-Term Improvements

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

Public Open House. Chief Peguis Trail Project

Northeast Corridor Transportation Update

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

HYANNIS ACCESS IMPLEMENTATION TASK FORCE NOTES April 12, PM CAPE COD COMMISSION CONFERENCE ROOM ATTENDEES. Hyannis Area Chamber of Commerce

Road School. Project Overview. March 8, 2011

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

CONSTRUCTION ACTIVITY

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Pre-Construction Public Meeting July 2017

Pardon Our Dust Public Information Meeting

City of Palm Coast, Florida Palm Coast Safety Site Evaluation Report

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Long water shutdown scheduled for Tuesday, September 18

KING STREET TRANSIT PILOT

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FDOT Treasure Coast Traffic Impact Report

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

JACK EDWARDS NATIONAL AIRPORT (JKA) GULF SHORES, AL

SR 934 Project Development And Environment (PD&E) Study

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Transcription:

Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016

Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty through the project 4. Stakeholders share info with their organizations

Project Description Maximize mobility and roadway improvements on Route 141 corridor Mitigate congestion and reduce delay at Vance Rd intersection Upgrade Route 141 and I-44 interchange Provide a design that reduces crashes Improve drainage

Project Location

Project Area Vance Rd. Intersection Meramec River Buder Park Overhead Ameren Transmission Line

Project Area Vance Rd Intersection Route 141 carries six lanes Locally-owned side streets have limited R/W Intersection limits include a church, schools, and businesses Union Pacific Railroad bridge over Route 141 restricts traffic Marshall Rd. Meramec River

Project Area Route 141 at Vance Looking North PM Peak Forest Ave at Route 141 Looking West PM Peak

Project Area I-44 Interchange Route 141 carries six lanes over BNSF Railroad Commuter Lot is serviced by two MetroBus routes Overhead Ameren Transmission Line crosses Route 141 100,000 vehicles use I-44 per day while 60,000 vehicles use Route 141 Commuter Lot N. Outer Rd. Buder Park N. Hwy. Dr.

Project Area Route 141 Looking South AM Peak Eastbound I-44 Offramp Looking Northwest AM Peak

Project Description Crash History in Project Limits Roadway 2010 to 2014 Total Crashes Rear End Crashes* Route 141 923 645 I-44 296 123 * Included in total crash number

Project Area Flooding During Heavy Rain Events (occurs approx. 5-6 times per year)

Project Area Meramec Flooding at Interchange in 2015 Looking North (occurs approximately every 8 10 years)

Project Goals 1. Deliver the project within the program budget of $25 million. 2. Maximize mobility on Route 141 and improve efficiency at the I- 44 interchange and Vance Road intersection. 3. Deliver the project in a manner which demonstrates the importance of safety. 4. Provide a quality project resulting in a long-lasting transportation facility that minimizes future maintenance. 5. Deliver the project using a diverse workforce. 6. Complete the project by July 15, 2018.

Schedule Request for Qualifications released July 7, 2015 Shortlisted teams announced August 10, 2015 Request for Proposals released September 2, 2015 Five one-on-one bi-weekly discussions with teams September 7 through November 6, 2016 Final Proposals due November 25, 2015 Apparent Best Value selection January 6, 2016 Contract signed February 10, 2016 Design Ongoing Begin construction Summer 2016 Complete construction July 15, 2018

Thru Turns Vance Road and Marshall Road Intersections Thru Turn Intersection covering the Vance Road and Marshall Road intersections

Vance & Marshall Intersections Increase storage capacity Marshall Rd. Marshall ADA Vance Compliance Intersection Improvements All EB Utilize All Thru WB movements Thru traffic & LT Turn at Vance for are Thru movements movement still Intersection & allowed LT movements removed are still allowed Vance Rd.

Vance & Marshall Intersection Existing crosswalk and sidewalk conditions NE Corner (Sacred Heart Church & School) NW Corner Looking East SW Corner Looking North Toward VP Schools

Interchange WB I 44 Off Ramp Meramec Station Intersection Increased the WB I 44 off ramp to two lanes EB Meramec Station to NB 141 increased to dual lefts

Interchange SB 141 to EB I 44 flyover provides free flow Storage for NB lefts at Elam increased N. Outer Rd. NB 141 to WB I 44 loop provides free flow Roundabouts improve connections to N. Outer Rd WB I 44 to SB 141 loop provides free Increased flow signal spacing N. Hwy. Dr. EB I 44 to NB 141 increased to triple left

Traffic Impacts Off-line construction Most work off of 141 and I-44 Commitments to off-peak temporary lane closures for impacts North Outer Rd connections with 141 closed Detours required to access North Outer Rd Vance Rd Intersection Summer of 2017 completion July 15, 2018 completion

North Outer Road Detour Detour Duration : 115 & 260 Days Approximately 1.4 Miles

Safety Improvements Thru Turns 19 fewer conflict points Interchange 25% crash reduction at North and South Hwy Drive Intersections 141 Corridor 57 fewer crashes per year Overall 20% crash reduction Improved traffic flow results in fewer crashes

Project Overview Forest Ave lane additions Updated design and simplified signal timing means traffic moves more quickly and safely Use of Thru- Turn Use of Thru- Turn Longer turn lanes prevents turning traffic from blocking through lanes Provides good balance of 141 corridor mobility and local connectivity

Project Overview WB I-44 Off Ramp Free flow flyover ramp Updated design moves traffic faster and more efficiently Dual-lane exit from WB I-44 2 free flow loop ramps N. Outer Rd. Easier access to/ from N. Outer Rd. N. Hwy Dr. Triple left reduces backups and improves safety for EB ramp Ramps separated from interstate

Next Steps Public Meeting Date TBD Tentatively planned for 1 month prior to construction Future CIG meetings How often? Rte 141 & I-44 Design Build - Contact Info I44.Route141@modot.mo.gov

Questions?