TRAILS INTERSECTION SIGNS

Similar documents
Exterior Wayfinding Signage Design Standards

Trans Canada Trail Signage Guidelines MADE BY CANADA

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Signs, Tools & Equipment Order Form

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Greenbelt Route Signage Guidelines

Staff Report Sign Design

4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services

Shuswap Trail Sign Style Guide 1

A PLACE FOR OUTDOOR FUN!

SELF RE-ERECTING MARKER POSTS

County of Elgin Tourism Signage Policy Addendum A

Play Systems. new Models for 2013!

V O X POP MARKETING SYSTEMS

Installation Instructions for the Rolltec Adalia X3M Extenda Awning

Gas Conversion Kits and Instructions

Guidelines for Snowmobile Trail Signing and Placement STOP SLOW

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Installation Instructions for the Rolltec Physique XL Awning

ASSEMBLY INSTRUCTIONS

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

U Y W I T H C O N F I D E N C E!

Installation Instructions for the Rolltec Bravo Awning

GUIDELINES FOR SNOWMOBILE TRAIL SIGNING & PLACEMENT

SECTION 5. Hardware and Optional Accessories for Steel Doors:

ALPINE SLIDEOUT COVER

Piestewa Peak/Dreamy Draw Trail Guide

Gas Cylinder Lift Easy, consistent lifting. Limited maintenance as compared to other mechanisms.

SECTION SPECIFICATIONS PART 1 GENERAL

Assembly TOOLS REQUIRED: 17mm and 14mm or equivalent wrenches.

TOURISM & PUBLIC SERVICES RURAL SIGNAGE POLICY

US Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3

INDEX LOUVERS TECHNICAL DATA FROM DOOR PRODUCTS

Y Camper Shell Tracks, 37 Cross Bars. Y Camper Shell Tracks, 44 Cross Bars.

Snowmobile GUIDELINES FOR TRAIL SIGNING

CHAPTER 5. Chapter 5 Recreation Element

» GEMINI 390 CARAVAN«

Greenbush Town Hall / Fire Station

CONVEX Awning Instructions

Hammer, Discus, Shot Put, Javelin

Safety instructions and warnings Package contents and parts Tool requirements Product features... 5

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

Seven-eighths-spacing Rackmount Kit/Chassis Rackmount Kit. Techmar enclosure designs include interchangeable modular components,

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

How to Build Your Own Flour Mill and Sifter

300 Model 870 Four Wheel Hose Cart Owner s Manual

Welcome to GERBER TABLES. Your campground and rv park essentials company. Meeting the needs of the leisure industry since 1969

Aluminum Benches & Picnic Tables Catalog

Draft proposed amendments. Chapter Terminology

ASSEMBLY INSTRUCTIONS

The Events Structure Product Guide

Closet and Specialty Hardware

Building Permit Application

Safety instructions and warnings Package contents and parts Tool requirements Product features... 4

LITE Spear Awning Instructions

Insulated Tools. F o r P. r o f e. s s i o. n a l s. .. S i. n c e 1

flatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux )

The safe & affordable install

Premium - Retractable Stand

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

BEST BUYS! Nets & Ground Equipment. Direct From Your Manufacturer & Supplier +44(0) See Our Full Range at

L&W ENGINEERING INC.

Enhanced Emergency Shelter Kit (EESK)

5.1 Introduction 5-1. Modified on 7/14/05

E13.11 SPRING CATCHES E13 BOTTOM HUNG OPEN IN WINDOWS

Signs, Tools & Equipment Order Form

Ice Age National Scenic Trail

DATUM POINTS (24) (12) (9) (22) (4) (3) (75) (2) (19)

Series 2050 Garden Window Frequently Asked Questions

Smoke House. What you will need. Personal protective equipment

35 Bee Tree Park Planning Zone 3

Model 3300 Handi-Crimp

VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT

*Trailhead at Marquette Commons Project Type Needs year

RETRACTABLE AWNING w/ OPTIONAL HOOD ASSEMBLY INSTRUCTIONS

HUNTCO SITE FURNISHINGS. Double Bike Locker Assembly Instructions HUNTCO SITE FURNISHINGS

MANUFACTURER OF QUALITY BLEACHERS, BENCHES, & PICNIC TABLES FOR OVER 25 YEARS

Sign Library. Florida Trail Association

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Otter Pro XT Cabin Installation and Set-Up Instructions

Take a cruise with some friends!

Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

BEAM CLAY Custom Ball Netting

International Scout 80/800

SIN GLE BOND HOSE CLAMPS

2008 Catalog FLAGS BANNERS PENNANTS ROOFTOP SIGNS POLE BANNERS CURB SIGNS APPROVED VENDOR

DON T SEE WHAT YOU ARE LOOKING FOR? WE OFFER ENDLESS CUSTOM DISPLAY SOLUTIONS! PLEASE CONTACT US FOR DETAILS.

Structural Mullion System

2008 Catalog FLAGS BANNERS PENNANTS ROOFTOP SIGNS POLE BANNERS CURB SIGNS APPROVED VENDOR

Flammability of Interior Materials

Standard Awning Installation Instructions

Reduce the potential of injury.

» AQUILA 320(HIGH TOP) «

80070 TOP MOUNT CAMPER SHELL and TRANSIT CONNECT RACK TMCS_3:1

AND LOAD CANOPY RACK SPECIFICATIONS

Transcription:

TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail. Signabond Lite 3mm Aluminum Composite Sign Panels with.75 radius corners shall be secured to an unstained 4 x 4 pressure treated sign post. Sign panels shall have a 2-sided, full color imprint, printed on permanent vinyl with luster lam. Back of sign shall be Dark Blue PMS 647C. You are Here symbols will be part of the graphic sign panel and will not be added after installation. Some trails will require seasonal replacement for cross-country skiing and mountain biking maps. The trail intersection number the user is at is indicated at the top of the post. Nearby intersections, restrooms and parking areas shall be listed below the map with directional arrows. Three sides of the post can be used for wayfinding. Complex trail systems require additional directional signage below the map. Simple trail systems may not need additional signage below the map. Trail difficulty levels shall be shown on the maps, not the sign posts. Seasonal x-country ski trail signs shall be installed on removable (ground sleeves required) posts or permanent posts. COMPLEX TRAIL SYSTEMS SIMPLE TRAIL SYSTEMS 32

EQUESTRIAN Signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail. Plastic sign symbols, 1/4 thick, shall be attached to an unstained 4 x 4 pressure treated sign post. The trail intersection number shall be placed at the top of the post. An equestrian trail symbol shall be added just below the number. Trail color symbols with arrows shall also be attached. Additional symbols shall be added when necessary. Maps will not be attached to the sign posts and will only be located at a trailhead. 4 x 4 treated sign posts shall be 10 length. This is taller than most other sign posts. 33

PLASTIC SIGN ATTACHMENTS 1/4 Plastic Sign Attachments 34

CONFIRMATION SIGNS Confirmation signs shall be placed on trail segments that exceed one-half mile in length and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the trail. The signs are intended to boost user confidence along lengthy trail segments. The upcoming intersection number and a directional arrow shall appear on both sides of the post. Trail maps are not required on confirmation signs. Pressure treated 4 x 4 posts for equestrian trail confirmation signs are 10 and shall remain unstained. Equestrian confirmation signs include horse symbol and colored arrows CONFIRMATION TRAIL SIGN 35

MILE MARKERS Hike-Bike Trails: Mileage signs shall be located at intervals no greater than 1/2 mile, 3 minimum from the edge of pavement. Post length shall be 8. Hike-Bike Trail Pavement Markings: Pavement markings shall appear at 1/4 mile intervals unless trail signage is installed at quarter mile intervals. Equestrian Trails: Mileage signs shall be located at intervals no greater than 1 mile. Post length shall be 10. Mileage For Other Trail Types: Mileage will be shown on trail maps only, not on intersection or confirmation posts. 36

MAJOR TRAILHEADS Purpose and Location Trailheads provide an opportunity to orient visitors to a trail system and highlight the starting point for a trail or network of trails. Major trailheads shall be located in locations visible from a parking lot or entrance to an interpretive facility. The design of the trailhead structure is modeled after recently constructed wooden structures at Stony Creek Metropark. Major Trailhead Design / Construction Structures shall be 10 wide x 8-8 tall, single sided. All structures shall be stained Cordovan Brown. There shall be a minimum head clearance of 6-10 below the roof of the structure. A 4 x 5-6 1/2 sign board constructed of 3/4 plywood shall be installed between the structure posts. It shall be framed by 4 x 4 pressure treated lumber that has been rabbeted 3/4 deep. Add 2 x 4 furring strips to secure a 4 x 6 sign panel. Post spacing shall be a minimum of 72 to accept the Signabond Lite 3mm Aluminum Composite Panel with square corners.. Drill holes in sign as needed. A trail intersection identifier number shall be attached to the left sign post and aligned with the top 4 x 4 sign frame timber. Access to major trailhead structures shall meet ADA requirements even if the trails do not. A You Are Here marker shall appear on the graphics that are attached to the sign board. 3/4 x 8 Cedar Siding shall be used to fill in the back side of the sign panel and secured with nails. Material costs for the trailhead structure is approximately $1,100 Optional Add-ons Bike repair station shall be manufactured by Dero Playcore Company, Model: Fixit Repair Station with Fixit Pump Air Kit 3 (with pressure gauge), Powder Coat Color: Sky Blue Custom Bike Rack shall be manufactured by Dero Playcore, Model: TBD, Color: TBD, Cost: TBD Donation plaques shall be centered above the sign panel on the 4 x 4 sign frame. Additional timbers shall be added to the top if necessary. Grant project identification plaques shall be centered similar to donation plaques. Boot scrapers shall be installed near the trailhead structures in locations that do not create a trip hazard. Trailhead Structure Materials Sign Board Materials (2) 4 x 4 x 12 P.T. (1) 4 x 8 x 3/4 P.T. PLYWOOD TIMBER SCREWS TO SECURE SIGN BOARD TO STRUCTURE 37

Trail Intersection Number Location (Typically Intersection #1) Donation Plaque or Grant Plaque Location 38

39

MINOR TRAILHEADS Minor Trailhead Construction / Design 24 x 36 Signabond Lite 3mm Aluminum Composite Sign Panels with 1.5 radius corners shall be secured to unstained 4 x 4 pressure treated sign posts with galvanized screws. 4 holes will need to be drilled in the sign panels for mounting. Sign panels shall have a 2-sided, full color imprint, printed on permanent vinyl with luster lam. Back of sign shall be Dark Blue PMS 647C. You are Here symbols will be part of the graphic sign panel and will not be added after installation. Minor trailhead structures require two 4 x 4 posts. A trail intersection identifier number shall be located at the top of the left sign post. X-Country Ski Minor Trailheads Seasonal trailheads shall be located at the start of ski trails. These signs can be removable (ground sleeves required) or permanent. If permanent posts are installed, a replacement sign to fill the space should be installed when not in use. 40